ANALISIS MESIN DAN KOMPONEN KRITIS SEBAGAI DASAR PENGEMBANGAN STRATEGI PEMELIHARAAN DI PABRIK KELAPA SAWIT KEBUN RAMBUTAN PT. PERKEBUNAN NUSANTARA 3

dokumen-dokumen yang mirip
ANALISIS RELIABILITY DAN AVAILABILITY MESIN PABRIK KELAPA SAWIT PT. PERKEBUNAN NUSANTARA 3

BAB I PENDAHULUAN. berperan sebagai pengolah bahan mentah kelapa sawit untuk menghasilkan minyak

STUDY SISTEM PREVENTIVE MAINTENANCE PADA TURBIN UAP DENGAN KAPASITAS 700 KW PUTARAN TURBIN 1500 RPM DI PKS PT.PERKEBUNAN NUSANTARA I

Universitas Bina Nusantara

BAB I PENDAHULUAN. produk, kehandalan dan kelancaran suatu proses serta biaya. Hal ini memicu para

CORRECTIVE MAINTENANCE BANTALAN LUNCUR LORI PABRIK KELAPA SAWIT DENGAN KAPASITAS ANGKUT 2,5 TON TBS MENGGUNAKAN ANALISA KEGAGALAN

PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI

ANALISIS KERUSAKAN LINER PADA MUD PUMP IDECO T-800 TYPE TRIPLEX PUMP BERDASARKAN RELIABILITY, AVAILABILITY, DAN METODE FAULT TREE ANALYSIS DI PT.

Perancangan Penjadwalan Perawatan Mesin dengan Metode Map Value Stream Mapping (MVSM) di PT XXX

PROGRAM PENDIDIKAN SARJANA EKSTENSI UNIVERSITAS SUMATERA UTARA MEDAN

BAB III METODOLOGI PENELITIAN

BAB I PENDAHULUAN. Perkembangan teknologi yang semakin pesat, memacu industri-industri

4.1.7 Data Biaya Data Harga Jual Produk Pengolahan Data Penentuan Komponen Kritis Penjadualan Perawatan

ANALISA PERAWATAN PADA KOMPONEN KRITIS MESIN PEMBERSIH BOTOL 5 GALLON PT. X DENGAN MENGGUNAKAN METODE RCM ( RELIABILITY CENTERED MAINTENANCE )

T U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi

DAFTAR ISI HALAMAN JUDUL LEMBAR PENGESAHAN PEMBIMBING LEMBAR PENGESAHAN PENGUJI SURAT KETERANGAN PERUSAHAAN LEMBAR PENGAKUAN PERSEMBAHAN

BAB II LANDASAN TEORI Pengertian perawatan Jenis-Jenis Perawatan Metode Reliability Centered Maintenance (RCM)...

BAB III METODOLOGI PEMECAHAN MASALAH

ANALISA PERAWATAN DAN USULAN PREVENTIVE MAINTENANCE PADA MESIN CONSTANT SPEED MIXER DI PT KEBAYORAN WARNA PRIMA

D E P A R T E M E N T E K N I K I N D U S T R I F A K U L T A S T E K N I K UNIVERSITAS SUMATERA UTARA M E D A N

BAB I PENDAHULUAN. antara perusahaan manufaktur menjadi semakin ketat. Setiap perusahaan berusaha

TUGAS SARJANA. Oleh:

DAFTAR ISI HALAMAN JUDUL TA. SURAT PENGAKUAN...ii. SURAT KETERANGAN PERUSAHAAN...iii HALAMAN PENGESAHAN HALAMAN MOTTO HALAMAN PERSEMBAHAN

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II)

Universitas Sumatera Utara

TUGAS SARJANA. Diajukan Untuk Memenuhi Sebagian Dari Syarat-Syarat Memperoleh Gelar Sarjana Teknik. Oleh AGUS FERNANDO KS

BAB 3 METODOLOGI PENELITIAN. menggunakan data stagnasi mesin yang dicatat oleh perusahaan. Penelitian

PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM

UNIVERSITAS BINA NUSANTARA

RANCANGAN STRATEGI PENINGKATAN PRODUKTIVITAS TENAGA KERJA PADA LINI PRODUKSI 2 DEPARTEMEN PRODUKSI PT. XYZ DELI SERDANG TESIS OLEH

DEPARTEMEN TEKNIK INDUSTRI UNIVERSITAS SUMATERA UTARA M E D A N

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT. ADINA MULTI WAHANA

EKSPEKTASI BIAYA SUKU CADANG KENDARAAN DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS COST-BASED (STUDI KASUS: PT. JAWA INDAH)

BAB I PENDAHULUAN. I.1 Latar Belakang

Pembuatan dan Uji Karakteristik Material Beton Ringan (Concrete Foam) yang Diperkuat Serat Tandan Kosong Kelapa Sawit (TKKS) Akibat Beban Statik

BAB IV METODE PENELITIAN

ANALISIS PERBANDINGAN ATURAN PRIORITAS PENJADWALAN PRODUKSI DI PT. ATMINDO TESIS

RANCANGAN PERBAIKAN KUALITAS PELAYANAN KESEHATAN UNTUK MENINGKATKAN PRODUKTIVITAS RUMAH SAKIT PELABUHAN MEDAN TESIS. Oleh J U N I.

(Studi Kasus :PT.Suri Tani Pemuka Banyuwangi)

OPTIMALISASI INTERVAL WAKTU PENGGANTIAN KOMPONEN MESIN PACKER TEPUNG TERIGU KEMASAN 25 KG DI PT X

SKRIPSI PENENTUAN JADWAL PREVENTIVE MAINTENANCE DENGAN SIMULASI MONTE CARLO (STUDI KASUS PT. XYZ) Disusun oleh: Ardhi Kuntum Mashruro ( )

PENERAPAN PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN RELIABILITY PADA BOILER FEED PUMP PLTU TARAHAN UNIT 3 & 4 TUGAS SARJANA

BAB II LANDASAN TEORI

ANALISIS KEHILANGAN CRUDE PALM OIL PADA STASIUN PEMURNIAN DI PABRIK KELAPA SAWIT PT. PERKEBUNAN NUSANTARA III SEI MANGKEI

MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN DEKOMPOSER DI PETROGANIK PT. PETROKIMIA GRESIK SKRIPSI

ANALISIS KEPUASAN KERJA KARYAWAN SETELAH PERUBAHAN STRUKTUR ORGANISASI PADA PKS PT SUMBER SAWIT MAKMUR GELADIKARYA. Oleh : MUHAMMAD LUTHFI

BAB I PENDAHULUAN. perawatan terbagi atas dua yaitu preventive maintenance dan corrective

PENENTUAN INTERVAL PERAWATAN PADA UNIT PRODUKSI BUTIRAN DENGAN BASIC RELIABILITY CENTERED MAINTENANCE (RCM) DI PT PETROKIMIA KAYAKU GRESIK SKRIPSI

ANALISIS WAKTU ANTAR KERUSAKAN MESIN ELECTRIC MOTOR MENGGUNAKAN METODE FAILURE FINDING INTERVAL DI PT. RIAU ANDALAN PULP AND PAPER (PT.

PERENCANAAN PERAWATAN DENGAN METODE REABILITY MAINTENANCE(RCM II) PADA MESIN ANDI PTP 3013 DI PT. PANGGUNG ELECTRIC CITRABUANA SKRIPSI

ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING

UNIVERSITAS SUMATERA UTARA M E D A N 2010

BAB I PENDAHULUAN 1.1. Latar Belakang

SISTEM PERAWATAN MESIN BERBASIS PREVENTIVE MAINTENANCE DENGAN METODE MODULARITY DESIGN PADA PT. SUMATERA PIONEER BUILDING MATERIAL TUGAS SARJANA

ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT.

PERENCANAAN ULANG LAYOUT DALAM UPAYA PENINGKATAN UTILISASI KAPASITAS PENGOLAHAN DI PT. NUBIKA JAYA TESIS

STUDI PEMELIHARAAN PADA AIR COMPRESSOR DI PNEUMATIC UNLOADER SISTEM PT. INALUM DENGAN KAPASITAS BONGKAR 300 TON SERBUK / JAM

UNIVERSITAS SUMATERA UTARA M E D A N 2016

BAB I PENDAHULUAN Latar Belakang

TUGAS SARJANA. Diajukan untuk Memenuhi Sebagian dari Syarat-Syarat Memperoleh Gelar Sarjana Teknik. Oleh WILBERT NIM

P E R A N C A N G A N S I S T E M I N F O R M A S I PENGENDALIAN PERSEDIAAN SPARE PART UNTUK MENINGKATKAN PRODUKTIVITAS PADA PT. SARANA BAJA PERKASA

ROI ADENAN H / FTI / TI

KETERANGAN SELESAI PENELITIAN...

TUGAS AKHIR SKRIPSI. Kukuh Prabowo

Perancangan Sistem Pemeliharaan Menggunakan Metode Reliability Centered Maintenance (RCM) Pada Pulverizer (Studi Kasus: PLTU Paiton Unit 3)

STUDI IMPLEMENTASI PREVENTIVE MAINTENANCE PADA PT. INTAN SUAR KARTIKA DENGAN METODE RELIABILITY CENTERED MAINTENANCE CHRISTINA

UNIVERSITAS BINA NUSANTARA

PENENTUAN UMUR EKONOMIS BOILER DENGAN METODE BIAYA TAHUNAN RATA RATA DI PTPN III PKS KEBUN RAMBUTAN TEBING TINGGI

STUDI PREVENTIVE MAINTENANCE PADA POMPA SENTRIFUGAL MULTI STAGE PADA PENGISIAN AIR KETEL DI PTPN IV PKS GUNUNG BAYU

PERENCANAAN STRATEGI INDUSTRI JASA OTOMOTIF UNTUK MENERAPKAN MANAJEMEN GREEN PROCESS DI PT. X TESIS OLEH RINI HALILA NASUTION /TI

ANALISIS PRODUKTIVITAS DENGAN MENGGUNAKAN METODE OBJECTIVE MATRIX PADA BAGIAN PRODUKSI PABRIK KELAPA SAWIT GEDONG BIARA PT MOPOLI RAYA TUGAS SARJANA

JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT. NOBEL INDUSTRIES*

Universitas Sumatera Utara

PENENTUAN KEANDALAN SPARE PARTS YANG TERMASUK KELOMPOK KRITIS DENGAN METODE RELIABILITY PADA PT. CENTRAL WINDU SEJATI

PERENCANAAN PERSEDIAAN KNIFE TC 63 mm BERDASARKAN ANALISIS RELIABILITAS (Studi Kasus di PT. FILTRONA INDONESIA)

SISTEM MANAJEMEN PERAWATAN UNIT MMU PUMP DAN OIL SHIPPING PUMP

PERFORMA DAN BIAYA OPERASIONAL MESIN PENCACAH PELEPAH KELAPA SAWIT RANCANGAN UPT MEKANISASI PERTANIAN PROVINSI SUMATERA UTARA

BAB 4 HASIL DAN PEMBAHASAN. merupakan mesin paling kritis dalam industri pengolahan minyak sawit. Pabrik

ANALISA PREVENTIVE MAINTENANCE UNTUK MENINGKATAKAN REABILITAS MESIN DI PT.SUCACO

UNIVERSITAS BINA NUSANTARA

STUDI TENTANG PEMELIHARAAN BOILER FEEDWATER PUMP GSG /12 PADA PEMBANGKIT LISTRIK TENAGA UAP (PLTU) LABUHAN ANGIN KAPASITAS MW

INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA API PARAHYANGAN * (STUDI KASUS DI PT. KERETA API INDONESIA)

UNIVERSITAS BINA NUSANTARA IMPLEMENTASI METODE PREVENTIVE MAINTENANCE UNTUK MESIN MILLING PADA PT TIRTA INTIMIZU NUSANTARA. Wahyudi Susanto

BAB 3 METODOLOGI PENELITIAN

PENERAPAN METODE RCM UNTUK MENGURANGI LOSS TIME MESIN MOLDING BMD DI PT. X TUGAS AKHIR. Dita Angelita

Nelson Manurung 1* 1 Jurusan Teknik Mesin, Politeknik Negeri Medan *

STUDY PREVENTIVE MAINTENANCE PADA TURBIN UAP SHINKO DENGAN KAPASITAS 800 KW DAN PUTARAN TURBIN 1500 RPM DI PMKS PT. SISIRAU

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW

BAB 2 TINJAUAN PUSTAKA

PENERAPAN KONSEP RELIABILITY CENTERED MAINTENANCE (RCM) PADA SISTEM PERAWATAN MESIN DI PT. XYZ ALLAN BAGUS PRASETYO NIM

3 BAB III LANDASAN TEORI

KAJIAN RELIABILITAS DAN AVAILABILITAS PADA SISTEM KOMPONEN PARALEL

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PENELITIAN

Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN:

PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER CD DI PT. DHARMA ANUGERAH INDAH (DAI)

PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI TEKNIK *

BAB I PENDAHULUAN 1.1 Latar Belakang

ESTIMASI PARAMETER UNTUK DATA WAKTU HIDUP YANG BERDISTRIBUSI RAYLEIGH PADA DATA TERSENSOR TIPE II DENGAN METODE MAKSIMUM LIKELIHOOD SKRIPSI

Universitas Bina Nusantara

Transkripsi:

ANALISIS MESIN DAN KOMPONEN KRITIS SEBAGAI DASAR PENGEMBANGAN STRATEGI PEMELIHARAAN DI PABRIK KELAPA SAWIT KEBUN RAMBUTAN PT. PERKEBUNAN NUSANTARA 3 TESIS Oleh: YUHELSON 077015001/TM PROGRAM MAGISTER TEKNIK MESIN FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA MEDAN 2010

ANALISIS MESIN DAN KOMPONEN KRITIS SEBAGAI DASAR PENGEMBANGAN STRATEGI PEMELIHARAAN DI PABRIK KELAPA SAWIT KEBUN RAMBUTAN PT. PERKEBUNAN NUSANTARA 3 TESIS Diajukan Sebagai Salah Satu Syarat untuk Memperoleh Gelas Magister Teknik dalam Program Studi Magister Teknik Mesin, pada Fakultas Teknik Oleh: YUHELSON 077015001/TM PROGRAM MAGISTER TEKNIK MESIN FAKULTAS TEKNIK UNIVERSITAS SUMATERA UTARA MEDAN 2010 ii

Judul Penelitian : ANALISIS MESIN DAN KOMPONEN KRITIS SEBAGAI DASAR PENGEMBANGAN STRATEGI PEMELIHARAAN DI PABRIK KELAPA SAWIT KEBUN RAMBUTAN PT. PERKEBUNAN NUSANTARA 3 Nama Mahasiswa : Yuhelson Nomor Pokok : 077015001 Program Studi : Magister Teknik Mesin Menyetujui Komisi Pembimbing (Prof. Dr. Ir. Bustami Syam, MSME) Ketua (Prof. Dr. Ir. Sukaria Sinulingga, M.Eng) (Dr.-Ing. Ikhwansyah Isranuri) Anggota Anggota Ketua Program Studi, Dekan, (Prof. Dr. Ir. Bustami Syam, MSME) (Prof. Dr. Ir. Armansyah Ginting, M.Eng) Tanggal lulus: 18 Mei 2010 iii

Telah diuji pada Tanggal: 18 Mei 2010 NAMA PENGUJI TESIS Ketua : Prof. Dr. Ir. Bustami Syam, MSME Anggota : 1. Prof. Dr. Ir. Sukaria Sinulingga, M.Eng 2. Dr.-Ing. Ikhwansyah Isranuri 3. Ir. Tugiman, MT 4. Ir. Mulfi Hazwi, M.Sc iv

ABSTRAK Penelitian ini merupakan suatu studi kasus yang bertujuan untuk menghasilkan suatu rancangan strategi pemeliharaan di Pabrik Kelapa Sawit Rambutan PTP Nusantara 3. Metode yang digunakan adalah melakukan analisis data kerusakan mesin kritis dan komponennya dengan menggunakan aplikasi distribusi Weibull, sehingga dapat menentukan nilai-nilai karakteristik sistem pemeliharaan, yaitu; keandalan, laju kegagalan, MTBF, ketersediaan, kriteria kerusakan, biaya kegagalan, biaya preventif, dan waktu antar penggantian koponen. Dari hasil analisis menggunakan diagram Pareto ditemukan bahwa mesin-mesin yang kritis adalah Screw Press, beserta komponen kritisnya, yaitu: Left & Right Handed Worm, Bushing, Press Cylinder, Rebuild Worm, Bearing SKF 29326, Left Handed Shaft, and Right Handed Shaft. Berdasarkan analisis kerusakan tersebut selanjutnya dibuat rancangan Strategi Pemeliharaan, sehingga dapat menurunkan frekuensi kegagalan Screw Press, menurunkan kerugian produksi, dan meningkatkan keandalan, ketersediaan, dan MTBF. Strategi pemeliharaan didisain berdasarkan interval waktu penggantian komponen, kemudian dibuat modifikasi penjadwalan pemeliharaan optimum. Analisis dari strategi pemeliharaan yang baru memperlihatkan bahwa keandalan Screw Press (1) meningkat dari 0.4207 menjadi 0,8259, Screw Press(2) dari 0,4024 ke 0,8259, Screw Press(3) dari 0,4504 ke 0,8259, dan Screw Press(4) dari 0,4204 ke 0,8259. ketersediaan dari Screw Press(1) meningkat dari 0,8564 menjadi 0,9524, Screw Press(2) dari 0,9201, ke 0,9524, Screw Press(3) dari 0,8585 ke 0,9524, dan Screw Press(4) dari 0,875 ke 0,9524. Kemungkinan frekuensi kegagalan dari Screw Press(1) is menurun dari 37 menjadi 19, Screw Press(2) dari 23 ke 19, Screw Press(3) dari 25 ke 19, dan Screw Press(4) dari 23 ke 19. Penelitian ini memperlihatkan bahwa analisis kerusakan mesin sangat berguna untuk mengambil kebijakan dalam perencanaan strategi pemeliharaan pada suatu pabrik...kata kunci: mesin kritis, keandalan, ketersediaan, screw press, strategi pemeliharaan. i

ABSTRACT This study presents a case study to find out the maintenance strategy at the Rambutan Palm Oil Factory of PTP Nusantara 3. The methodology in this research was by analyzes the failures data of critical machines and it s components, by Weibull distribution applications, so it can founded the values of maintenance system characteristics, i.e: reliability, failure rate, mean time between failure, availability, failure types, failure cost, preventive cost, and replacement interval time. Based on analysis of Pareto s diagram founded that critical machines is Screw Press due components critical, i.e: Left & Right Handed Worm, Bushing, Press Cylinder, Rebuild Worm, Bearing SKF 29326, Left Handed Shaft, and Right Handed Shaft Based on analysis of the failures, the researcher tries to establish the Maintenance Strategy, so it can be reduce the Screw Press frequency failure, reduce the loss production, and improve the reliability, availability, and MTBF. Maintenance strategies are created based on replacement interval time of subsystems, and then create the optimal maintenance scheduling that has been modified. Analysis of the new maintenance strategy of different subsystems shows that the reliability of Screw Press(1) can be improve from 0.4207 to 0,8259, Screw Press(2) from 0,4024 to 0,8259, Screw Press(3) from 0,4504 to 0,8259, and Screw Press(4) from 0,4204 to 0,8259 respectively. The availability of Screw Press(1) improved from 0,8564 to 0,9524, Screw Press(2) from 0,9201, to 0,9524, Screw Press(3) from 0,8585 to 0,9524, and Screw Press(4) from 0,875 to 0,9524. The probability of failure frequency of Screw Press(1) is reduced from 37 to 19, Screw Press(2) from 23 to 19, Screw Press(3) from 25 to 19, and Screw Press(4) from 23 to 19. This study shows that analyzes of machine failure is very useful for deciding the policy in the planning of maintenance strategy at a factory.. Keywords: critical machines, reliability, availability, screw press, maintenance srategy. ii

KATA PENGANTAR Puji syukur kehadirat Allah SWT, atas berkat rahmat dan hidayah-nya sehingga penulis dapat menyelesaikan penulisan Tesis ini dengan judul Analisis Mesin dan Komponen Kritis Sebagai Dasar Pengembangan Strategi Pemeliharaan di Pabrik Kelapa Sawit Kebun Rambutan PT. Perkebunan Nusantara 3, yang merupakan salah satu syarat yang harus dipenuhi setiap mahasiswa dalam menyelesaikan studinya di Program Studi Magister Teknik Mesin, Fakultas Teknik Unversitas Sumatera Utara (USU). Penelitian ini merupakan salah satu model untuk meningkatkan sistem pemeliharaan mesin pabrik kelapa sawit, seiring dengan kemajuan teknologi yang diterapkan di dunia industri saat ini. Dalam kesempatan ini, penulis menghaturkan rasa terima kasih kepada Prof. Dr. Bustami Syam, MSME selaku Ketua Komisi Pembimbing, Ketua Program Doktor dan Magister Teknik Mesin USU, yang telah memberikan arahan dan bimbingan dalam penelitian dan penulisan tesis ini. Ucapan terima kasih juga ditujukan kepada Prof. Dr. Sukaria Sinulingga, M.Eng dan Dr. Ing. Ikhwansyah Isranuri, selaku anggota komisi pembimbing, yang telah banyak memberikan arahan dalam penulisan tesis ini. Ucapan terima kasih selanjutnya penulis sampaikan kepada Prof. Dr. Ir. Armansyah Ginting, M.Eng, selaku Dekan Fakultas Teknik USU yang telah memberi kesempatan kepada penulis untuk menyelesaikan penulisan tesis ini. iii

Akhirnya kepada seluruh dosen dan staf administrasi Program Studi Magister Teknik Mesin Fakultas Teknik USU yang telah memberikan pengetahuan dan fasilitas selama dalam pendidikan, serta seluruh rekan-rekan mahasiswa yang telah memberikan bantuan dan dorongan dalam penulisan tesis ini. Demikianlah kata pengantar ini dibuat, dengan harapan hasil penelitian ini dapat bermanfaat bagi kemajuan ilmu pengetahuan, dan penulis mengharapkan saran dan kritikan dari pembaca agar penulisan tesis ini menjadi lebih baik. Medan, Mei 2010 Penulis, Yuhelson 077015001 iv

RIWAYAT HIDUP Nama : Yuhelson Tempat/Tgl. Lahir : Padang Panjang/ 11 Maret 1958 Pekerjaan Alamat Kantor Email Pendidikan : Dosen Fakultas Teknik, Universitas Muhammadiyah Riau (UMRI) : Kampus Universitas Muhammadiyah Riau (UMRI) Jl. KH. Ahmad Dahlan No. 88 Sukajadi Pekanbaru Riau : yuhelson@yahoo.com Nama Sekolah Tahun Tamat Sekolah Dasar Negeri No. 3 Padang Panjang 1971 Sekolah Teknik Negeri No.1 Padang Panjang 1974 Sekolah Teknik Menengah (STM) Karya Padang Panjang 1977 Fakultas Pendidikan Teknologi dan Kejuruan, Jurusan Teknik Mesin Universitas Negeri Padang Riwayat Pekerjaan 1983 No. Pekerjaan Tahun 1. Dosen Pendidikan Teknik Mesin Universitas Negeri Padang 1985 2004 2. Sekretaris Jurusan Pendidikan Teknik Mesin Universitas Negeri Padang 1994-1996 3. Ketua Jurusan Pendidikan Teknik Mesin Universitas Negeri Padang 1997 1999 4. Asisten Direktur II Sub Projek Management Unit TPSDP Universitas Negeri Padang 2000-2001 5. Sekretaris Program SemiQue Jurusan Pendidikan Teknik Mesin Universitas Negeri Padang 2003-2004 6. Dosen Akademi Teknologi Muhammadiyah Pekanbaru 2004 2008 7. Ketua Program Studi Teknik Otomotif Akademi Teknologi Muhammadiyah Pekanbaru 2004-2007 8. Dosen Universitas Muhammadiyah Riau (UMRI) 2008 - sekarang v

DAFTAR ISI ABSTRAK. ABSTRAK KATA PENGANTAR RIWAYAT HIDUP... DAFTAR ISI DAFTAR TABEL DAFTAR GAMBAR DAFTAR LAMPIRAN.. i ii iii v vi ix xii xv BAB 1 PENDAHULUAN 1 1.1 Latar Belakang... 1 1.2 Perumusan Masalah... 4 1.3 Tujuan Penelitian. 1.3.1 Tujuan umum.. 1.3.2 Tujuan khusus... 1.4 Manfaat Penelitian... 6 1.5 Batasan Penelitian. 7 BAB 2 TINJAUAN PUSTAKA.. 8 2.1 2.2 2.3 2.4 2.5 2.6 Manajemen Pemeliharaan dan Kontrol... Strategi Pemeliharaan (Maintenance Strategies)... Penerapan Strategi Pemeliharaan... Keandalan (Reliability)... 2.4.1 Indeks keandalan.. Tingkat Kekritisan Mesin. Distribusi Keandalan Weibull... 2.6.1 Fungsi kepadatan.. 2.6.2 Fungsi keandalan. 2.6.3 Fungsi laju kegagalan.. 2.6.4 Fungsi kumulatif.. 2.6.5 Mean Time Between Failure (MTBF)... 5 5 6 8 9 17 19 23 23 24 25 27 28 28 29 vi

2.7 2.8 2.9 2.10 2.11 2.12 Ketersediaan (Availability).. Biaya Pemeliharaan dan Perbaikan... Penentuan Interval Waktu Pemeliharaan... Analisa Gaya Screw Press Pengelolaan dan Pengontrolan Suku Cadang... 2.11.1 Dasar-dasar kontrol suku cadang... 2.11.2 Jumlah pesanan ekonomis... Kerangka Konsep Pemikiran... 29 31 32 33 35 35 37 39 BAB 3 METODE PENELITIAN. 40 3.1 3.2 3.3 3.4 Tempat dan Waktu... Bahan dan Alat... Sumber dan Jenis Data... Pelaksanaan Penelitian... 3.4.1 Melakukan studi lapangan... 3.4.2 Pengumpulan data... 3.4.3 Pengolahan data... 3.4.4 Analisa data... BAB 4 HASIL DAN PEMBAHASAN... 46 4.1 Gambaran Umum Perusahaan.. 46 4.1.1 Proses produksi... 46 4.1.2 Hasil produksi.. 49 4.1.3 Jam kerja Screw Press. 50 4.1.4 Proses maintenance di PKS Rambutan 50 4.2 Pengolahan Data.. 51 4.2.1 Identifikasi mesin dan komponen kritis.. 51 4.2.2 Harga komponen dan biaya pemeliharaan preventif 56 4.2.3 Biaya tenaga kerja pemeliharaan. 57 4.2.4 Biaya kehilangan produksi. 58 4.2.5 Biaya penggantian komponen. 59 4.3 Kriteria Kegagalan Screw Press... 62 4.3.1 Kegagalan Left & Right Handed Worm. 63 4.3.2 Kegagalan Left Handed Shaft, Rigght Handed Shaft.. 67 4.3.3 Kegagalan Bearing... 70 4.3.4 Kegagalan Bushing 74 4.3.5 Kegagalan Press Cylinder... 75 4.4 Analisis Data... 76 4.4.1 Pengujian distribusi data... 77 4.4.2 Estimasi parameter.. 77 4.4.3 Analisis keandalan Screw Press.. 80 4.4.4 Analisis keandalan sub-sistem (komponen Screw Press)... 83 40 40 40 41 41 42 42 43 vii

4.5 4.4.5 Analisis laju kegagalan Screw Press.. 4.4.6 Analisis laju kegagalan komponen Screw Press.. 4.4.7 Analisis Mean Time Between Failure (MTBF) 4.4.8 Menentukan ketersediaan (Availability). 4.4.9 Analisis biaya pemeliharaan optimum... 4.4.10 Analisis jadwal pemeliharaan optimum Screw Press... 4.4.11 Perbandingan sistem pemeliharaan yang lama dengan sistem pemeliharaan yang dimodifikasi.. 4.4.12 Analisis penyediaan suku cadang. Pengembangan Strategi Pemeliharaan. 4.5.1 Prioritas utama mesin dan komponen yang akan dimaintain 4.5.2 Prosedur pelaksanaan pemeliharaan. 4.5.3 Jenis pemeliharaan... 4.5.4 Jadwal pemeliharaan preventive.. 4.5.5 Sistem penyediaan suku cadang... 4.5.6 Target strategi pemeliharaan 86 89 91 94 96 99 101 104 107 109 109 115 115 116 116 BAB 5 KESIMPULAN DAN SARAN 117 5.1 Kesimpulan.. 117 5.2 Saran. 121 DAFTAR PUSTAKA 122 viii

DAFTAR TABEL Nomor Judul Halaman 2.1 Faktor-Faktor Yang Mempengaruhi Keberhasilan Pemeliharaan... 11 2.2 Annualized Costs Data for Single System... 22 2.3 Annualized Costs Data for Parallel System... 22 2.4 Jumlah dan Tingkat Kekritisan Peralatan Mesin di PKS Tor Ganda Tahun 2005... 24 4.1 Indikator Mutu Produksi PKS Rambutan... 48 4.2 Produksi dan Bahan Baku PKS Rambutan... 49 4.3 Jumlah Hari Kerja Tiap Bulan... 49 4.4 Jumlah Jam Kerja Screw Press pertahun... 50 4.5 Frekuensi Kegagalan Screw Press Tahun 2007 sd Tahun 2009. 52 4.6 Komponen Screw Press yang Mengalami Kegagalan... 53 4.7 Frekuensi Kegagalan Komponen Screw Press Tahun 2007 sd Tahun 2009... 56 4.8 Harga Komponen Screw Press dan Biaya Pemeliharaan/hari... 56 4.9 Biaya Tenaga Kerja Nganggur Akibat Kegagalan/hari... 57 4.10 Biaya Tenaga Kerja Penggantian Komponen Preventif/hari... 58 4.11 Jumlah Bahan Baku, Produksi dan Harga... 58 4.12 Biaya Penggantian Komponen Akibat Kegagalan Tiap Komponen. 60 ix

4.13 Biaya Penggantian Komponen Preventif Tiap Komponen 61 4.14 Gejala dan Penyebab Kegagalan Bearing. 73 4.15 Nilai Siginifikansi Level Masing-masing Distribusi. 76 4.16 Parameter β dan η Untuk Screw Press dan Komponennya 78 4.17 Nilai Keandalan Screw Press. 82 4.18 Interval Waktu Pemeliharaan Berdasarkan Tingkatan Keandalan. 83 4.19 Nama Komponen Screw Press dan Kode.... 84 4.20 Nilai Keandalan Komponen Screw Press... 85 4.21 Interval Waktu Pemeliharaan Berdasarkan Tingkatan Keandalan Sub-sistem.. 86 4.22 Nilai Laju kegagalan Screw Press. 87 4.23 Nilai Laju Kegagalan Komponen Screw Press 90 4.24 Nilai MTBF Komponen Screw Press 93 4.25 Interval Waktu Penggantian Optimum Untuk Tiap-Tiap Komponen... 97 4.26 Matrik Jadwal Penggantian Komponen Screw Press... 100 4.27 Perbandingan Kondisi Screw Press Sistem Lama dengan Sistem Baru... 102 4.28 Perbandingan Total Biaya Sebelum, Sesudah Penjadwalan dan Sesudah Penjadwalan Modifikasi... 103 4.29 Perbandingan Keandalan R(t) Sebelum, Sesudah Penjadwalan dan Sesudah Penjadwalan Modifikasi... 103 4.30 Jumlah Kebutuhan Komponen Per Tahun dan Harga Komponen... 106 x

4.31 Stok Minimum Untuk Batas Pemesanan Kembali... 107 4.32 Prosedur Penerapan Pemeliharaan Terjadwal.. 111 4.33 Prosedur Penerapan Pemeliharaan Berbasis Kondisi... 112 4.34 Prosedur Penerapan Pemeliharaan Korektif..... 113 4.35 Jadwal Penggantian Komponen Screw Press... 115 4.36 Jumlah Kebutuhan dan Stok Komponen Screw Press... 116 xi

DAFTAR GAMBAR Nomor Judul Halaman 2.1 Kerangka Pikir Pengembangan Strategi Pemeliharaan... 12 2.2 Strategi Pemeliharaan... 13 2.3 Model Konseptual Diagram Keputusan Berdasarkan Karakteristik Reliability dan Availability... 14 2.4 Alogaritma Keputusan QRCM... 16 2.5 Bagan Prosedur Pemeliharaan Terencana... 18 2.6 Pengaruh Suatu Program Reliability Terhadap Biaya Masa Pakai... 19 2.7 Biaya Masa Pakai Optimum... 20 2.8 Single System Optimal Design-With RAM... 21 2.9 Parallel System Optimal Design-With RAM... 22 2.10 Pengaruh β pada Laju Kegagalan Weibull... 26 2.11 Pengaruh β pada Reliability. 26 2.12 Gambar kurva Bath-tub... 28 2.13 Ilustrasi Ketersediaan 30 2.14 Diagram Gaya Screw... 33 2.15 Grafik Penyediaan Suku Cadang... 36 2.16 Kerangka Konsep Pemikiran... 39 3.1 Diagram Alir Metode Penelitian... 45 xii

4.1 Skematik Diagram Pengolahan Pabrik Kelapa Sawit... 47 4.2 Alur Proses Kegiatan Maintenance. 51 4.3 Frekuensi Kegagalan Mesin Tahun 2007 sd 2009... 52 4.4 Frekuensi Kegagalan Komponen Screw Press 1... 54 4.5 Frekuensi Kegagalan Komponen Screw Press 2... 54 4.6 Frekuensi Kegagalan Komponen Screw Press 3... 55 4.7 Frekuensi Kegagalan Komponen Screw Press 4... 55 4.8 Screw Press. 62 4.9 Left & Right Handed Worm.. 63 4.10 Diagram Benda Bebas Worm Screw... 64 4.11 Penampang Normal Worm Screw. 65 4.12 Right Handed Shaft dan Left Handed Shaft 68 4.13 Dimensi Rght Handed Shaft... 68 4.14 Bearing Pecah.. 70 4.15 Bearing Aus. 70 4.16 Penggantian Bushing... 74 4.17 Press Cylinder.. 75 4.18 Grafik Confidence Bounds Dua Sisi Screw Press 1. 78 4.19 Grafik Confidence Bounds Dua Sisi Screw Press 2. 79 4.20 Grafik Confidence Bounds Dua Sisi Screw Press 3 79 4.21 Grafik Confidence Bounds Dua Sisi Screw Press 4 80 xiii

4.22 Reliability Screw Press 1, 2, 3, dan 4.. 81 4.23 Reliability Komponen Screw Press.. 84 4.24 Laju Kegagalan Screw Press 1, 2, 3, dan 4 88 4.25 Laju Kegagalan Komponen Screw Press. 89 4.26 MTBF Komponen Screw Press 92 4.27 Availability Screw Press 1, 2, 3, dan 4 95 4.28 Biaya Pemeliharaan Komponen Screw Press.. 96 4.29 Sumber-sumber Ketidakandalan (Unreliability).. 108 4.30 Diagram Keputusan Strategi Pemeliharaan.. 110 4.31 Diagram Keputusan Pemeliharaan Screw Press 114 xiv

DAFTAR LAMPIRAN Nomor Judul Halaman 1. Data Kerusakan Mesin... 124 2. Daftar Mesin dengan Frekuensi Kegagalan Terbesar.. 127 3. Data Kerusakan Screw Press... 128 4. Frekuensi Kegagalan Komponen Screw Press... 136 5. Data Interval Waktu Kerusakan Screw Press... 137 6. Data Interval Waktu Kerusakan Komponen Screw Press... 140 7. Perhitungan Parameter Weibull... 143 8. Perhitungan Reliability dan Availability Screw Press. 149 9. Perhitungan Biaya Pemeliharaan. 153 10. Analisis Penjadwalan Screw Press Hasil Pengembangan Strategi Pemeliharaan.. 160 11. Gambar Screw Press 162 12. Surat Izin Penelitian. 163 xv