LAPORAN BULANAN ENGINEERING APARTEMENT TAMAN KEMAYORAN CONDOMINIUM PROSES PERBAIKAN KEBOCORAN DENGAN PEMBERIAN AQUAPROOF PADA SUMBER KEBOCORAN YANG TERJADI PADA DINDING LUAR HUNIAN DILAKUKAN OLEH ENGINEERING DENGAN MENGGUNAKAN KERETA GONDOLA UNTUK PROSES PENGERJAAN TOWER EBONY LANTAI 2 THE LEAKING OF REPAIR PROCESS WITH A TAKING AQUAPROOF ON THE SOURCE OF LEAKING HAVE OCCUR AT WALL OF OUTSIDE TENANT THAT S BY ENGINEERING WITH USING THE GONDOLA OF TRAIN TO THE WORKING PROCESS EBONY TOWER ON THE FLOOR TWO PROSES PERBAIKAN KERAMIK DALAM KOLAM RENANG YANG DIKARENAKAN TERDAPAT KERAMIK YANG TELAH RUSAK KOLAM RENANG THE REPAIR OF PROCESS IN CERAMIC OF SWIMMING POOL CAUSE IT GET HAVE CERAMIC HAS BROKEN SWIMMING POOL D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 1
PROSES PENGGANTIAN MULTI-VALVE UNTUK POMPA KOLAM RENANG YANG BARU DILAKUKAN OLEH ENGINEERING DIKARENAKAN MULTI-VALVE YANG LAMA TELAH RUSAK (BOCOR) DAN DIAWASI OLEH BAPAK.CONTROLLER RUANG POMPA KOLAM RENANG THE CHANGING MULTI-VALVE NEW OF PROCESS TO POOL PUMP THAT S BY ENGINEERING CAUSE IT THE PAST OF MULTI-VALVE HAS BROKEN (LEAKING) AND THE SURVEILLANCE BY MR.CONTROLLER POOL PUMP ROOM PROSES PENGGALIAN YANG DILAKUKAN OLEH ENGINEERING UNTUK MENGATASI KEBOCORAN YANG TERJADI DI BASEMENT DENGAN MEMBERIKAN AQUAPROOF DAN SEMEN CAIR TOWER FLAMBOYAN LANTAI DASAR THE DIG UP OF PROCESS THAT S BY ENGINEERING TO HANDLING OF LEAKING IN OCCUR AT BASEMENT WITH A TAKING AQUAPROOF AND THE FLUID OF SEMENT FLAMBOYAN TOWER ON THE BASE FLOOR : PERBAIKAN SALURAN AIR MESIN CUCI YANG MAMPET : TOWER BOUGENVILLE LANTAI 19/06-07 : THE REPAIR OF LINE WATER DRAIN WASHING MACHINE ISN T GOING : BOUGENVILLE TOWER ON THE FLOOR NINETEEN ZERO SIX - SEVEN D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 2
PROSES PERBAIKAN LAMPU TL YANG PADAM TOWER ASTER LANTAI 8 THE REPAIR TL OF LAMP PROCESS HAS GO OUT ASTER TOWER ON THE FLOOR EIGHT PROSES PERBAIKAN CUBICLE OUTGOING TOWER CENDANA YANG DILAKUKAN OLEH VENDOR CUBICLE RUANG PHBUTR CENDANA THE REPAIR OF OUTGOING CUBICLE CENDANA TOWER PROCESS THAT S BY THE CUBICLE OF VENDOR CENDANA PHBUTR ROOM PROSES PERBAIKAN SALURAN WASTAFEL YANG MAMPET TOWER EBONY LANTAI 06/01 THE REPAIR OF WASTAFEL LINE PROCESS ISN T GOING EBONY TOWER ON THE FLOOR SIX ZERO ONE D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 3
PENGAWASAN TERHADAP PENGERJAAN CUBICLE OUTGOING YANG DIAWASI OLEH BUILDING MANAGER,CHIEF ENGINEERING,SUPERVISOR ENGINEERING,CREW ENGINEERING,SECUIRITY DAN CONTROLLER RUANG PHBUTR CENDANA THE MONITORING OF CUBICLE OUTGOING WORKING AND THE SURVEILLANCE BY MANAGER OF BUILDING,ENGINEERING CHIEF,ENGINEERING SUPERVISOR,ENGINEERING CREW,SECUIRITY AND CONTROLLER CENDANA PHBUTR ROOM PROSES PENYETTINGAN KARTU AKSES YANG DILAKUKAN OLEH ENGINEERING ATAS PERMINTAAN PENGHUNI LIFT CENDANA P2 THE SETTING OF ACSES CARD PROCESS THAT S BY ENGINEERING AS REQUEST OF TENANT CENDANA ELEVATOR P2 PROSES PENGECATAN SETELAH PERBAIKAN KEBOCORAN YANG TERJADI DI PLAFON TOWER ASTER LANTAI 7/07 THE PAINTING OF PROCESS AFTER TO LEAKING OF REPAIR IT S HAPPEN AT CEILING ASTER TOWER ON THE FLOOR SEVEN ZERO SEVEN D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 4
PROSES PERBAIKAN PLAFON YANG DIKARENAKAN RUSAK AKIBAT KEBOCORAN TOWER ASTER LANTAI 7/07 THE REPAIR OF CEILING PROCESS IS BROKEN CAUSE IT S LEAKING CENDANA TOWER ON THE FLOOR SEVEN ZERO SEVEN PROSES CHECKLIST SYSTEM M/E YANG DILAKUKAN OLEH ENGINEERING DAN DIAWASI OLEH SECUIRITY RUANG POMPA AKASIA DAN RUANG POMPA CENDANA THE CHECKLIST OF MECHANIC/ELECTRIC SYSTEM THAT S BY ENGINEERING AND THE SURVEILLANCE OF SECUIRITY AKASIA PUMP ROOM AND CENDANA PUMP ROOM PROSES PERBAIKAN PINTU LOBBY BASEMENT YANG DIKARENAKAN ENGSEL PADA PINTU TELAH RUSAK TOWER ASTER LOBBY BASEMENT THE REPAIR OF PROCESS ON THE LOBBY DOOR OF BASEMENT CAUSE IT S ENGSEL ON THE DOOR HAS BROKEN ASTER TOWER ON THE BASEMENT FLOOR D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 5
PROSES PERBAIKAN AC INDOOR DAN OUTDOOR YANG DILAKUKAN OLEH VENDOR AC DAN DIAWASI OLEH ENGINEERING TOWER ASTER LOBBY BASEMENT THE REPAIR OF PROCESS IS INDOOR AIR CONDITIONER AND OUTDOOR THAT S BY VENDOR AND THE SURVEILLANCE BY ENGINEERING ASTER TOWER ON THE BASEMENT OF LOBBY PROSES PERBAIKAN PIPA SALURAN CUCIAN PIRING YANG MAMPET DIKARENAKAN TERDAPAT GUMPALAN LEMAK TOWER EBONY LANTAI 21/05 THE REPAIR OF PIPELINE DISWATER PROCESS ISN T GOING CAUSE IT GET ON THE LUMP OF AXUNGE EBONY TOWER ON THE FLOOR TWENTY ONE ZERO FIVE PROSES PERBAIKAN PIPA SALURAN PEMBUANGAN WASTAFEL YANG BOCOR TOWER ASTER LANTAI 6/02 THE REPAIR OF PIPELINE THROW WASTAFEL PROCESS IS LEAKING ASTER TOWER ON THE FLOOR SIX ZERO TWO D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 6
PENGAWASAN FESTIVAL HOLY(PERAYAAN ORANG- ORANG INDIA) YANG DILAKUKAN OLEH ENGINEERING LAPANGAN FUTSAL THE SURVEILLANCE OF HOLY FESTIVAL (THE CELEBRATE OF INDIAN) THAT S BY ENGINEERING THE FUTSAL FIELD TERDAPAT MOBIL DAMKAR YANG DIGUNAKAN UNTUK PEMBUATAN HUJAN BUATAN PADA FESTIVAL HOLY (PERAYAAN ORANG INDIA) DAN DIAWASI OLEH ENGINEERING TOWER AKASIA LANTAI DASAR GET ON THE CAR OF FIRE ETINGUISHER HAVE USE TO MAKING OF RAINY ON HOLY FESTIVAL (THE CELEBRATE OF INDIAN) AND THE SURVEILLANCE BY ENGINEERING AKASIA TOWER ON THE BASE FLOOR PROSES PERBAIKAN HANDEL PINTU LOBBY YANG DIKARENAKAN HANDEL TERLEPAS DARI DUDUKANNYA TOWER EBONY LOBBY LANTAI DASAR THE REPAIR OF PROCESS THE DOOR HANDLE OF LOBBY CAUSE IT S RELEASED FROM PLACED EBONY TOWER LOBBY ON THE BASE FLOOR D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 7
PROSES REVISI PANEL-PANEL FASILITAS AREA BASEMENT YANG DILAKUKAN OLEH ENGINEERING THE REVISION PANEL PROCESS THAT S BY ENGINEERING IN BASEMENT AREA EBONY-CENDANA,ASTER-FLAMBOYAN,AKASIA-BOUGENVILLE D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 8
PROSES PENGECHEKAN POMPA DI MULAI DARI KONDISI PANEL POMPA,MOTOR POMPA,VALVE-VALVE YANG TERDAPAT PADA INSTALASI POMPA,BEARING-BEARING POMPA,PACKING-PACKING POMPA,AS POMPA,KOPEL POMPA DAN BAGIAN LAIN PADA POMPA DILAKUKAN OLEH ENGINEERING DIRUANG POMPA CENDANA,FLAMBOYAN DAN AKASIA THE CHECKING OF PUMP PROCESS AT BEGIN FROM PUMP OF PANEL,VALVES IS GET ON THE PUMP OF INSTALLATION,PUMP OF MOTOR,PUMP OF COPLE,PUMP OF AS,BEARINGS OF PUMP,PACKINGS OF PUMP AND THEN OTHER IN THE PART OF PUMP THAT S BY ENGINEERING IN PUMP CENDANA ROOM,PUMP FLAMBOYAN ROOM AND PUMP AKASIA ROOM D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 9
PROSES PENGECHEKAN DAN PEMBERSIHAN EXHAUST FAN YANG TELAH BERDEBU DAN KOTOR DILAKUKAN OLEH ENGINEERING DIRUANG SAMPIT-RAM EBONY-CENDANA,ASTER-FLAMBOYAN DAN AKASIA-BOUGENVILLE THE CLEANING AND CHECKING PROCESS OF EXHAUST FAN HAS TO RUSTY AND DIRTY THAT S BY ENGINEERING IN SAMPIT-RAM EBONY-CENDANA,ASTER-FLAMBOYAN AND AKASIA-BOUGENVILLE D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 10
PROSES PERAPIHAN KABEL-KABEL PADA PANEL-PANEL SAMPIT YANG TERLEPAS DARI JALURNYA DILAKUKAN OLEH ENGINEERING DIRUANG SAMPIT-RAM AKASIA-BOUGENVILLE,ASTER-FLAMBOYAN DAN EBONY-CENDANA THE CLEAN-UP OF CABLES PROCESS ON SAMPIT PANEL HAVE RELEASED FROM HIS LINE THAT S BY ENGINEERING IN SAMPIT-RAM AKASIA-BOUGENVILLE,ASTER-FLAMBOYAN AND EBONY-CENDANA D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 11
PROSES REVISI YANG DILAKUKAN OLEH ENGINEERING DAN PEMBERSIHAN TRACK BUSBAR PADA PANEL INCOMING PLN,PANEL BUSTIE DAN PANEL INCOMING GENZET DIRUANG PHBUTR DAN TRAFO EBONY-CENDANA THE REVISION PANEL PROCESS AND CLEAN TO BUSBAR TRACK THAT S BY ENGINEERING ON THE PLN INCOMING,BUSTIE AND GENZET INCOMING AT THE PHBUTR AND TRAFO EBONY-CENDANA ROOM D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 12
PROSES REVISI YANG DILAKUKAN OLEH ENGINEERING DAN PEMBERSIHAN TRACK BUSBAR PADA PANEL INCOMING PLN,PANEL BUSTIE DAN PANEL INCOMING GENZET DIRUANG PHBUTR AKASIA DAN BOUGENVILLE THE REVISION PANEL PROCESS AND CLEAN TO BUSBAR TRACK THAT S BY ENGINEERING ON THE PLN INCOMING,BUSTIE AND GENZET INCOMING AT THE PHBUTR AKASIA AND BOUGENVILLE ROOM D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 13
PROSES PERBAIKAN DAN PERAWATAN YANG DILAKUKAN OLEH ENGINEERING UNTUK INSTALASI PIPA INDUK AIR KOTOR YANG BERMASALAH PADA AREA BASEMENT THE REPAIR AND MAINTENANCE PROCESS THAT S BY ENGINEERING TO MAINPIPE WATER DIRTY INSTALLATION AT BASEMENT AREA IS TROUBLE D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 14
PROSES PEMBUATAN SALURAN AIR YANG DILAKUKAN ENGINEERING UNTUK MENGATASI GENANGAN AIR YANG TERJADI DI AREA BASEMENT AKIBAT KEBOCORAN THE MAKING OF LINE WATER PROCESS THAT S BY ENGINEERING TO HANDLING WATER OF PUDDLE IN HAPPENING AT BASEMENT AREA IS LEAKING OF EFFECT D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 15
PROSES PEMBERIAN AQUAPROOF YANG DILAKUKAN OLEH ENGINEERING UNTUK MENGATASI KEBOCORAN PADA KANOPI YANG TERDAPAT DIANTARA TOWER ASTER-FLAMBOYAN,AKASIA-BOUGENVILLE DAN EBONY-CENDANA THE TAKING OF AQUAPROOF PROCESS THAT S BY ENGINEERING TO HANDLING LEAKING HAVE GET ON CANOPY THE BETWEEN TOWER OF ASTER-FLAMBOYAN,AKASIA-BOUGENVILLE AND EBONY-CENDANA D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 16
PROSES PENGGANTIAN RANGKAIAN LAMPU TL MENJADI LAMPU LED YANG DILAKUKAN OLEH ENGINEERING DAN PEMASANGAN LAMPU LED DI LOBBY KORIDOR TOWER FLAMBOYAN THE CHANGING LAMP OF TL CRAFT TO BE A LED OF LAMP CRAFT PROCESS THAT S BY ENGINEERING ON THE CORRIDOR LOBBY AT FLAMBOYAN TOWER D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 17
PROSES REVISI YANG DILAKUKAN OLEH ENGINEERING DAN PEMBERSIHAN TRACK BUSBAR PADA PANEL INCOMING PLN,PANEL BUSTIE DAN PANEL INCOMING GENZET DIRUANG PHBUTR ASTER-FLAMBOYAN THE REVISION PANEL PROCESS AND CLEAN TO BUSBAR TRACK THAT S BY ENGINEERING ON THE PLN INCOMING,BUSTIE AND GENZET INCOMING AT THE PHBUTR ASTER AND FLAMBOYAN ROOM D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 18
PROSES PERBAIKAN STICK RADAR PADA ROOFTANK AKASIA,BOUGENVILLE,ASTER,FLAMBOYAN,EBONY DAN CENDANA DILAKUKAN OLEH ENGINEERING THE REPAIR OF RADAR STICK PROCESS THAT S BY ENGINEERING ON THE ROOFTANK AKASIA,BOUGENVILLE,CENDANA,EBONY,ASTER AND FLAMBOYAN D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 19
PROSES PENGERJAAN PERBAIKAN PANEL DAMKAR YANG DILAKUKAN OLEH CV.STARION DAN DIAWASI OLEH ENGINEERING DI RUANG POMPA CENDANA DAN AKASIA THE REPAIR OF WORKING PROCESS ON THE PANEL FIRE ETINGUISHER THAT S BY CV.STARION AND THE SURVEILLANCE BY ENGINEERING IN THE PUMP CENDANA AND AKASIA D O K U M E N T A S I E N G I N E E R I N G P E R I O D E A P R I L 2 0 1 6 HALAMAN 20