1 PERENCANAAN PENJADWALAN DAN PERSEDIAAN SPAREPART DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT.X Evi Siswanti Magister Teknik Industri, Fakultas Teknik Industri, Universitas Trisakti E_mail : vie_die_06@yahoo.co.id ABSTRACT PT.X is a supplier company that manufactures plastic bottles. Currently PT.X has a production capacity of 4.3 million bottles per day. The production capacity can be met if the production machine running well and in a reliable state. PT.X not currently have a machine maintenance activities are laid out well. This often caused many damage occurs unscheduled engine which causes the cost of lost opportunity (opportunity cost) for the manufacture of products and the high costs of component inventory. The method used in solving the problem in this study is the use of Reliability Centered Maintenance analysis in determining the policy of treatment and then seek maintenance intervals based on the minimum cost. The results obtained are contained 8 components that have critical categories with each scheduled maintenance policy is age replacement, with this calculation obtained a saving of approximately 44% on inventory costs and increased reliability component approximately 42% -64%. Keywords: RCM, Age Replacement, Reliability, 1. PENDAHULUAN PT.X merupakan sebuah perusahaan supplier yang memproduksi botol plastik. Mesin merupakan bagian vital dalam proses produksi karena hampir 90% proses produksi yang dilakukan di PT.X menggunakan mesin. Kelangsungan produksi sangat bergantung kepada mesin yang beroperasi, sehingga aktivitas pemeliharaan mesin yang baik sangat dibutuhkan. PT.X saat ini belum memiliki aktivitas pemeliharaan mesin yang tertata dengan baik. Tindakan pemeliharaan seperti perbaikan hanya dilakukan ketika mesin rusak. Hal ini seringkali menyebabkan tidak diketahuinya prioritas pekerjaan sehingga pekerja melakukan pekerjaannya tidak terjadwal dengan baik. Hal ini menyebabkan banyaknya terjadi kerusakan mesin yang tidak terjadwal selain menyebabkan tingginya biaya persediaan dan kehilangan produksi. Dalam mengatasi hal ini maka pengaturan aktivitas pemeliharaan yang terjadwal dengan baik sangat perlu dilakukan karena dapat mencegah kegagalan sistem atau mengembalikan fungsi sistem jika kegagalan terjadi, dapat mengurangi downtime mesin dan yang paling utama adalah dapat mengurangi pembelian sparepart dengan melakukan pembelian sesuai dengan kebutuhan. Pengaturan aktivitas pemeliharaan akan dilakukan dengan menggunakan metode Reliability Centered Machine. Hal ini disebabkan metode RCM dapat membentuk Preventive Maintenance dan tugas yang berhubungan yang dapat mengembalikan kehandalan dan keamanan pada levelnya semula pada saat terjadinya penurunan kondisi peralatan atau sistem dengan biaya minimal. Dengan didapatnya pengaturan aktivitas perawatan melalui interval perawatan diharapkan dapat meningkatkan keandalan mesin dan menyelesaikan masalah persediaan komponen di PT.X 2. TINJAUAN PUSTAKA 2.1 Pengertian Pemeliharaan Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

2 Perawatan merupakan kegiatan pendukung yang menjamin kelangsungan mesin dan peralatan sehingga pada saat dibutuhkan dapat dipakai sesuai dengan yang diharapkan, sehingga kegiatan perawatan merupakan seluruh rangkaian aktivitas`yang dilakukan untuk mempertahankan unit-unit pada kondisi operasional dan aman, dan apabila terjadi kerusakan maka dapat dikendalikan pada kondisi operasional yang handal dan aman.[1] 2.2 Reliability Centered Machine RCM adalah teknik untuk mengembangkan program PM. Hal tersebut didasarkan pada asumsi bahwa keandalan yang melekat pada peralatan adalah fungsi dari desain dan pembangunan kualitas. Beberapa tujuan penting dari RCM adalah: a. Membentuk desain yang berhubungan supaya dapat memfasilitasi Preventive Maintenance ( PM ). b. Mendapatkan informasi yang dapat berguna meningkatkan desain dari produk atau mesin yang ternyata tidak memuaskan yang berhubungan dengan kehandalan. c. Membentuk PM dan tugas yang berhubungan yang dapat mengembalikan kehandalan dan keamanan pada levelnya semula pada saat terjadinya penurunan kondisi peralatan atau sistem. d. Mendapatkan semua tujuan diatas dengan total biaya yang minimal Ada 7 pertanyaan dasar yang harus diajukan agar implementasi dari RCM dapat berlangsung secara efektif, yaitu: 1. Apa fungsi-fungsi dan standar-standar prestasi dan kaitannya dengan asset dalam konteks operasinya saat ini? 2. Dengan jalan apa saja asset ini dapat gagal untuk memenuhi fungsifungsinya? 3. Apa yang menyebabkan masing-masing kegagalan fungsi? 4. Apa yang terjadi apabila setiap kegagalan timbul? 5. Apa saja yang dipengaruhi oleh setiap kegagalan? 6. Apa yang harus dilakukan untuk mencegah setiap kegagalan? 7. Apa yang harus dilakukan apabila suatu cara pencegahan tidak dapat ditemukan? Marvin Rousand (1998) menjabarkan 12 langkah penerapan RCM: 1. Melakukan studi pendahuluan 2. Melakukan pemilihan dan pendefinisian sistem 3. Analisis Kegagalan Fungsional 4. Pemilihan Item/ komponen Kritis 5. Pengumpulan data dan analisis 6. FMCEA 7. Pemilihan tugas perawatan 8. Menentukan Interval perawatan 9. Analisis perbandingan Preventive Maintenance 10. Treatment Item-item non kritis 11. Implementasi 12. Pembaharuan dan pengumpulan data setelah perawatan 2.3 Keandalan ( Reliability ) Keandalan didefinisikan sebagai probabilitas komponen, peralatan, mesin, atau sistem tetap beroperasi dengan baik sesuai dengan fungsi yang diharapkan dalam interval waktu dan kondisi tertentu [1] Secara umum, realibility akan mempengaruhi availibility atau keberadaan alat untuk berfungsi dengan baik terutama untuk produk/barang yang repairable [3] Berikut merupakan beberapa distribusi umum yang digunakan untuk menghitung tingkat keandalan suatu peralatan: A. Distribusi Weibull R(t) = e (1) B.Distribusi Normal R(t) = 1- Φ (2) C. Distribusi Lognormal R(t)= 1 Φ (3) 2.4 Kebijakan Penggantian Komponen (Age Replacement) Model Age Replacement adalah suatu model penggantian dimana interval waktu penggantian komponen dilakukan dengan memperhatikan umur pemakaian komponen tersebut, sehingga dapat menghindari terjadinya penggantian peralatan yang masih baru dipasang akan diganti dalam waktu yang relatif singkat.[2] Dalam menentukan interval waktu yang Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

3 optimal untuk penggantian pencegahan dapat digunakan model age replacement dengan memperhitungkan biaya minimum, yaitu dengan memperhitungkan ekpetasi total ongkos penggantian per satuan waktu ( Ctp) dimana ekpetasi total ongkos penggantian per satuan waktu ( Ctp) adalah ekspetasi ongkos perawatan selama satu siklus penggantian pencegahan dibagi dengan ekspetasi panjang siklus penggantian pencegahan. C TP = () ( ) ( ) ( ) (4) Dimana : C(tp) = Ekspetasi total biaya penggantian komponen per satuan waktu Cp = Biaya perawatan Cf = Biaya kegagalan Tp = Waktu penggantian perawatan Tf R(tp) = Waktu penggantian kerusakan = Fungsi keandalan komponen pada waktu tp M(tp) = Rata-rata waktu terjadinya kerusakan bila penggantian pencegahan dilakukan pada waktu tp 2.5 Biaya Perawatan Biaya perawatan adalah biaya yang dikeluarkan untuk merawat komponenkomponen mesin agar tetap terjaga kondisinya. (Ansori dan Mustajib, 2013). Biaya biaya tersebut antara lain : 1. Biaya tenaga kerja merupaka biaya yang dikeluarkan untuk merawat komponenkomponen mesin agar mesin tetap terjaga kondisinya. 2. Biaya sparepart merupakan biaya penggantian kerusakan komponen atau pembeliaan komponen baru. 3. Biaya akibat perawatan merupakan pendapatan yang hilang selama mesin atau fasilitas produksi mengalami kegagalan. C TK perawatan :Biaya tenaga kerja perawatan Perhitungan untuk biaya perawatan menggunakan rumus yang sama. 2.6 Persediaan Komponen Salah satu masalah penting dalam suatu perusahaan menufaktur adalah mengenai pengendalian suku cadang, khusunya suku cadang yang sering mengalami kerusakan. Pada umumnya masalah yang dihadapi didalam pengendalian persediaan selalu berkaitan dengan usaha untuk menentukan pemesanan suku cadang yang ekonomis dalam arti pengeluaran ongkosnya minimal tetapi jumlah persediaannya optimal. Persediaan dapat dibedakan pula atas beberapa jenis atau tipe, yaitu: persediaan siklus (cycle stock), persediaan dalam perjalanan (in-transit), persediaan pengaman atau penyangga (safety atau buffer stock), persediaan spekulatif (speculative stock), persediaan musiman (seasonal stock), dan dead stock. 3. METODOLOGI PENELITIAN Metodologi pada penelitian ini adalah: C p = C R + MTTR ( Co + C TK) (5) Dimana : C p : Biaya perawatan C R : Biaya penggantian komponen untuk perawatan Co : Biaya kerugian perjam karena Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

4 4.2. Hirarki Fungsi Sistem Peralatan Penentuan hirarki fungsional pada mesin blowing dilakukan dengan mengelompokan tiap-tiap fungsi sistem dan sub sistem sampai pada level komponen sehingga secara logika terkait kedalam suatu sistem hirarki 4.3 Analisis Kegagalan Fungsi Analisis kegagalan fungsi dimulai dengan mendeskripsikan fungsi dari sistem hingga ke sub system 4.4 Komponen Kritis Penentuan komponen kritis ini dilakukan berdasarkan pada data downtime dengan frekuensi terbesar Pemilihan komponen kritis ini menggunakan diagram pareto agar lebih memudahkan dalam menentukan frekuensi yang terbesar diantara komponen yang satu dengan komponen yang lainnya. Tabel 1. Data Kerusakan Komponen 4. HASIL DAN PEMBAHASAN 4.1 Pemilihan dan Pendefinisian Sistem Pendefinisan Dalam menentukan sistem terpilih dalam penelitian ini, ada beberapa kriteria yang dipersyaratkan yaitu : 1. Sisem yang memiliki tindakan corrective maintenance dan/atau biaya corrective maintenance yang tinggi. 2. Sistem yang memiliki kontribusi yang besar atas terjadinya full atau partial outage (atau shutdown). 3. Sistem memiliki dampak yang tinggi terhadap keselamatan dan keamanan. Berdasarkan data yang didapat dari bulan Jan-Agt 2015, kriteria diatas dipenuhi oleh unit blowing, bahwa unit blowing memiliki downtime tertinggi dari semua unit yaitu sekitar 96.8%. No Nama Sparepart Total Kerusakan % Kerusakan % Akumulasi kerusakan 1 Piston Silinder Blow ,20% 24,20% 2 Roda Mold ,15% 41,35% 3 Besi Pemotong ,22% 53,57% 4 Pisau Pemotong 159 9,34% 62,91% 5 Jarum Blow 112 6,58% 69,49% 6 Adjusting Shaft Core 73 4,29% 73,77% 7 Per Mold 65 3,82% 77,59% 8 Mouth Mold 57 3,35% 80,94% 9 Silinder clamping 54 3,17% 84,11% 10 Selang 8 x 4 47,5 2,79% 86,90% 11 Snapring S ,41% 89,31% 12 Heater U Besar 40 2,35% 91,66% 13 Dudukan silinder cutting 33 1,94% 93,60% 14 Silinder Cutting 28 1,64% 95,24% 15 Selang 6 x ,64% 96,89% 16 Cutting 27 1,59% 98,47% 17 Per Roda 26 1,53% 100,00% Gambar 1. Diagram Pareto Dari data tersebut diketahui bahwa terdapat 8 komponen kritis yaitu diantaranya piston silinder, roda mold, adjusting shaft core, mouth mold, jarum, per mold, besi pemotong, dan pisau pemotong, komponen 4.5 Nilai MTTF dan MTTR Hasil uji distribusi nilai TTF dan pada masing-masing komponen kritis menngunakan software minitab 16 Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

5 Tabel 2. Nilai MTTF Distribution Komponen No MTTF ( hour ) Webull Lognormal Eksponential Normal 1 Piston Silinder Blow Roda Mold Besi pemotong Pisau Pemotong Jarum Adjusting Shaft Core Per mold Mouth Mold Perhitungan persediaan komponen dihitung berdasarkan per siklus perawatan. Table 6 memperlihatkan kebutuhan komponen per siklus perawatan Tabel 6. Persediaan komponen per siklus Tabel 3. Nilai MTTR Distribution No Komponen MTTR ( hour) Webull Lognormal Eksponential Normal 1 Piston Silinder Blow Roda Mold Besi pemotong Pisau Pemotong Jarum Adjusting Shaft Core Per mold Mouth Mold Failure Mode Effect Analysis ( FMEA) Tahap berikutnya adalah mendefinisikan FMEA,yang terdiri dari fungsi, kegagalan fungsi, modus kegagalan, dan efek kegagalan. Informasi dari analisis FMEA ini kemudian akan digunakan untuk menentukan kebijakan perawatan pada IDT dan LTA. 4.7 IDT dan LTA Pada penentuan menggunakan Intermediate Decision Tree ( IDT )IDT dan Logic Tree Analysis ( LTA ) didapat kebijakan perawatan yang dihasilkan kebijakan pada masing-masing komponen kritis adalah penggantian terjadwal 4.8 Interval Waktu Perawatan Denngan menggunakan model age Replacement dalam menentukan biaya minimum didapat inetrval waktu perwatan untuk masing-masing komponen kritis pada tabel 5. Tabel 5. Interval Waktu Perawatan 4.9 Persediaan Komponen 5. KESIMPULAN Berdasarkan pengolahan data dan analisis yang telah dilakukan maka dapat disimpulkan bahwa aktivitas perawatan yang akan dilakukan adalah dengan menerapkan perawatan penggantian pencegahan dengan interval perawatan 216 jam untuk komponen piston silinder blow, 264 jam untuk komponen roda mold, 264 jam untuk besi pemotong, 288 jam untuk komponen per mold, 456 jam untuk adjusting shaft core, 720 jam untuk mouth, 744 jam untuk komponen pisau pemotong, dan 1056 jam untuk komponen jarum. Akivitas perawatan penggantian dapat meningkatkan keandalan komponen 42%- 64% dan pengehematan biaya persediaan sekitar 44% DAFTAR PUSTAKA Ansori, Nachnul. Mustajib, M.Imron. Sistem Perawatan Terpadu, CV.Graha Ilmu,Yogyakarta 2013 Jardine, Andrew K.S. Tsang, Albert H.C. Maintenance, Replacement and Reliabilitty, CRC Press, 2013 Kurniawan, Fajar. Teknik dn Aplikasi Manajemen Perawatan Industri, CV. Graha Ilmu, Yogyakarta, 2013 Rausand, Marvin. Hoyland, Arnljot. System Realiability Theory, John Wiley & Sons Inc, Canada, 2004 Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

6 Rausand,Marvind. Realibility Centered Maintenance, Realibility Engineering and System Safety, 1998 Tahril Aziz, Mohammad. Suprawardhana, M.Salman, Penerapan RCM Berbasis WEB Pada Sistem pendingin Primer di Reaktor Serbaguna GA Siwabessy, JFN Vol 4 No. 1, Universitas Gajah Mada, Mei Perencanaan Penjadwalan (Evi Siswanti) Jurnal Teknik Industri ISSN:

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW Bahtiar S. Abbas 1 ; Edi Steven 2 ; Harry Christian 3 ; Tedy Sumanto 4 1,2,3,4 Jurusan Teknik Industri, Fakultas Teknik, Universitas Bina Nusantara,

Lebih terperinci

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II)

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II) SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II) (STUDI KASUS PADA PT. BRIDGESTONE TIRE INDONESIA) Disusun oleh : RIAN JANUARSYAH 2012.10.215.130

Lebih terperinci

BAB III METODOLOGI PENELITIAN

BAB III METODOLOGI PENELITIAN BAB III METODOLOGI PENELITIAN Metodologi penelitian merupakan tahapan-tahapan di dalam melakukan penelitian yang bertujuan untuk menghindari terjadinya kesalahan-kesalahan dalam penelitian. Tahapan-tahapan

Lebih terperinci

JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT. NOBEL INDUSTRIES*

JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT. NOBEL INDUSTRIES* Reka Integra ISSN: Jurusan Teknik Industri Itenas No.02 Vol.4 Jurnal Online Institut Teknologi Nasional April 2016 JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT.

Lebih terperinci

BAB III METODOLOGI PENELITIAN...

BAB III METODOLOGI PENELITIAN... DAFTAR ISI COVER... I HALAMAN JUDUL... II LEMBAR PENGESAHAN PEMBIMBING... III LEMBAR PENGESAHAN PENGUJI... IV SURAT PERNYATAAN... V HALAMAN PERSEMBAHAN... VI HALAMAN MOTTO... VII KATA PENGANTAR... VIII

Lebih terperinci

DAFTAR ISI. ABSTRAK... iii. ABSTRACT... iv. KATA PENGANTAR... v. DAFTAR ISI... viii. DAFTAR TABEL... xii. DAFTAR GAMBAR... xiii

DAFTAR ISI. ABSTRAK... iii. ABSTRACT... iv. KATA PENGANTAR... v. DAFTAR ISI... viii. DAFTAR TABEL... xii. DAFTAR GAMBAR... xiii DAFTAR ISI ABSTRAK... iii ABSTRACT... iv KATA PENGANTAR... v DAFTAR ISI... viii DAFTAR TABEL... xii DAFTAR GAMBAR... xiii DAFTAR LAMPIRAN... xiv BAB I PENDAHULUAN 1.1. Latar Belakang Penelitian... 1 1.2

Lebih terperinci

BAB I PENDAHULUAN 1.1 Latar Belakang

BAB I PENDAHULUAN 1.1 Latar Belakang BAB I PENDAHULUAN 1.1 Latar Belakang Perkembangan dunia industri di Indonesia yang sangat cepat menyebabkan banyak industri yang tumbuh dan bersaing dalam mendapatkan konsumennya. Melihat gejala tersebut

Lebih terperinci

BAB I PENDAHULUAN 1.1 Latar Belakang

BAB I PENDAHULUAN 1.1 Latar Belakang BAB I PENDAHULUAN 1.1 Latar Belakang Mesin dalam dunia industri memiliki definisi sebagai salah satu faktor produksi yang menentukan kelancaran suatu proses produksi. Kelancaran proses produksi menuntut

Lebih terperinci

ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING

ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING Sutandani Suriono, Bernardus Bandriyana, Tri Pudjadi Binus University, Jl. K. H. Syahdan No. 9, Kemanggisan / Palmerah

Lebih terperinci

Objek dalam penelitian ini adalah mesin pendukung sistem boiler yang berbahan bakar batu bara di PT Indo Pusaka Berau.

Objek dalam penelitian ini adalah mesin pendukung sistem boiler yang berbahan bakar batu bara di PT Indo Pusaka Berau. BAB III METODOLOGI PENELITIAN 3.1 Objek Penelitian Objek dalam penelitian ini adalah mesin pendukung sistem boiler yang berbahan bakar batu bara di PT Indo Pusaka Berau. 3.2 Jenis Penelitian Dalam penelitian

Lebih terperinci

T U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi

T U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi T U G A S A K H I R P e n e n t u a n I n t e r v a l P e r a w a t a n G u n a M e n u r u n k a n D o w n t i m e M e s i n P e n g e r i n g O v e n B o t o l D i PT. P h a r o s I n d o n e s i a Diajukan

Lebih terperinci

Penjadwalan Pemeliharaan Mesin Pengelasan Titik Bergerak Menggunakan Metode Realibility Centered Maintenance (RCM)

Penjadwalan Pemeliharaan Mesin Pengelasan Titik Bergerak Menggunakan Metode Realibility Centered Maintenance (RCM) Petunjuk Sitasi: Noor, A. M., Musafak, & Suhartini, N. (2017). Penjadwalan Pemeliharaan Mesin Pengelasan Titik Bergerak Menggunakan Metode Realibility Centered Maintenance (RCM). Prosiding SNTI dan SATELIT

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Pengertian Pemeliharaan (Maintenance) Pemeliharaan (maintenance) dapat didefinisikan sebagai (Ariani, 2008): suatu kombinasi dari berbagai tindakan untuk menjaga, memperbaiki dan

Lebih terperinci

PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI TEKNIK *

PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI TEKNIK * Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.04 Vol.03 Jurnal Online Institut Teknologi Nasional Oktober 2015 PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI

Lebih terperinci

Gambar 3.1 Diagram Alir Sistematika Pemecahan Masalah

Gambar 3.1 Diagram Alir Sistematika Pemecahan Masalah BAB III METODOLOGI PENELITIAN Metodologi penelitian merupakan metode berpikir untuk menghasilkan tahapan-tahapan yang harus ditetapkan oleh peneliti dalam proses penelitian. Berikut adalah tahapan-tahapan

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Rumusan Masalah dan Pengambilan Keputusan Pada metodologi pemecahan masalah mempunyai peranan penting untuk dapat membantu menyelesaikan masalah dengan mudah, sehingga

Lebih terperinci

Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang

Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang JATI UNIK, 07, Vol., No., Hal. 4-9 ISSN : 597-657 (Print) ISSN : 597-7946 (Online) Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang Hariyanto *, Sri Rahayuningsih,

Lebih terperinci

4.1.7 Data Biaya Data Harga Jual Produk Pengolahan Data Penentuan Komponen Kritis Penjadualan Perawatan

4.1.7 Data Biaya Data Harga Jual Produk Pengolahan Data Penentuan Komponen Kritis Penjadualan Perawatan DAFTAR ISI HALAMAN JUDUL... i HALAMAN PENGAKUAN... ii SURAT KETERANGAN DARI PERUSAHAAN... iii HALAMAN PENGESAHAN PEMBIMBING... iv HALAMAN PENGESAHAAN PENGUJI... v HALAMAN PERSEMBAHAN... vi HALAMAN MOTTO...

Lebih terperinci

PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER CD DI PT. DHARMA ANUGERAH INDAH (DAI)

PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER CD DI PT. DHARMA ANUGERAH INDAH (DAI) Mulyono: PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER D DI PT. DHARMA... 9 PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER D DI PT. DHARMA ANUGERAH INDAH (DAI) Julius Mulyono ), Dini Endah Setyo Rahaju

Lebih terperinci

BAB II LANDASAN TEORI Pengertian perawatan Jenis-Jenis Perawatan Metode Reliability Centered Maintenance (RCM)...

BAB II LANDASAN TEORI Pengertian perawatan Jenis-Jenis Perawatan Metode Reliability Centered Maintenance (RCM)... DAFTAR ISI HALAMAN JUDUL... i LEMBAR PENGESAHAN PEMBIMBING... ii LEMBAR PENGESAHAN PENGUJI... iii HALAMAN PENGAKUAN... iv HALAMAN PERSEMBAHAN... v HALAMAN MOTTO... vi KATA PENGANTAR... vii DAFTAR ISI...

Lebih terperinci

Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan)

Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan) 60 A Perhitungan Interval Waktu Kerusakan (TTF) dan Downtime (TTR) Perhitungan Index of Fit Data TTF dan TTR Pemilihan Distribusi Data TTF dan TTR Uji Kesesuaian Distribusi Data Kerusakan Tidak Distribusi

Lebih terperinci

KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING

KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING M. Imron Mustajib 1, Ulin Nuha 2, dan Nahnul Ansori 3 1,2,3 Program Studi Teknik Industri, University

Lebih terperinci

Jurnal PASTI Volume IX No 2,

Jurnal PASTI Volume IX No 2, PERENCANAAN PERAWATAN AIR COMPRESSOR UNIT UNTUK KOMPONEN AIR QUICK COUPLINGS DENGAN METODE RELIABILITY CENTERED MAINTENANCE DI PT ASTRA INTERNATIONAL TBK TSO CABANG SALEMBA Renty Anugerah Mahaji Puteri

Lebih terperinci

PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR

PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR Fathiruddin Ilwan, Fatkhul Hani Rumawan, Lina Dianati Fathimahhayati Program

Lebih terperinci

RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN

RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN Jurnal Riset dan Teknologi Kelautan (JRTK) Volume 14, Nomor 1, Januari - Juni 2016 RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN M. Rusydi Alwi Dosen

Lebih terperinci

USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME

USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME Much. Djunaidi dan Mila Faila Sufa Laboratorium Sistem Produksi, Jurusan Teknik Industri

Lebih terperinci

ROI ADENAN H / FTI / TI

ROI ADENAN H / FTI / TI PERENCANAAN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) DI P.T VARIA USAHA BETON WARU-SIDOARJO SKRIPSI Oleh: ROI ADENAN H 0632010175 / FTI / TI JURUSAN TEKNIK INDUSTRI FAKULTAS

Lebih terperinci

KETERANGAN SELESAI PENELITIAN...

KETERANGAN SELESAI PENELITIAN... DAFTAR ISI HALAMAN JUDUL... i PERNYATAAN KEASLIAN... ii LEMBAR KETERANGAN SELESAI PENELITIAN... iii LEMBAR PENGESAHAN PEMBIMBING... iv LEMBAR PENGESAHAN PENGUJI... v HALAMAN PERSEMBAHAN... vi HALAMAN MOTTO...

Lebih terperinci

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PEMECAHAN MASALAH BAB 3 METODOLOGI PEMECAHAN MASALAH 3.1 Flowchart Diagram 3.1 Flowchart Metodologi Pemecahan Masalah Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan) 62 63 3.2 Observasi Lapangan Observasi

Lebih terperinci

Jurnal Ilmiah Widya Teknik Vol No ISSN

Jurnal Ilmiah Widya Teknik Vol No ISSN Jurnal Ilmiah Widya Teknik Vol. 13 --- No. 1 --- 2014 ISSN 1412-7350 PERANCANGAN PREVENTIVE MAINTENANCE PADA MESIN CORRUGATING dan MESIN FLEXO di PT. SURINDO TEGUH GEMILANG Sandy Dwiseputra Pandi, Hadi

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN 68 BAB 3 METODOLOGI PENELITIAN 3.1 Model Flowchart Rumusan Masalah dan Pengambilan Keputusan Berikut ini flowchart diagaram alir metodologi penelitian untuk menganalisa terjadinya breakdown dan cara meminimasinya

Lebih terperinci

PERENCANAAN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN INSULATION MOULDING DI CV BINA TEKNIK SKRIPSI.

PERENCANAAN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN INSULATION MOULDING DI CV BINA TEKNIK SKRIPSI. PERENCANAAN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN INSULATION MOULDING DI CV BINA TEKNIK SKRIPSI Oleh : WAVIY AMIIN NPM. 0732010141 JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNOLOGI

Lebih terperinci

ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT.

ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT. ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT. RST TUGAS AKHIR Diajukan sebagai salah satu syarat untuk memperoleh gelar

Lebih terperinci

PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PT. ADILUHUNG

PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PT. ADILUHUNG PREVENTIVE MAINTENANCE MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PT. ADILUHUNG Ulin Nuha, Mohamad Imron Mustajib, Nachnul Ansori Program Studi Teknik Industri, Fakultas Teknik, Universitas

Lebih terperinci

Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya Minimum Menggunakan Metode Smith dan Dekker (Studi Kasus di PT.

Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya Minimum Menggunakan Metode Smith dan Dekker (Studi Kasus di PT. Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.02 Vol. 02 Jurnal Online Institut Teknologi Nasional Juli 2014 Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya

Lebih terperinci

PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR Yugowati Praharsi 1, Iphov Kumala Sriwana 2, Dewi Maya Sari 3 Abstract: PT. Artha Prima Sukses Makmur memiliki lima mesin

Lebih terperinci

BAB I PENDAHULUAN I-1

BAB I PENDAHULUAN I-1 BAB I PENDAHULUAN 1.1. Latar Belakang Produktifitas merupakan salah satu tolak ukur sebuah perusahaan manufaktur dan jasa dalam menilai apakah kinerja perusahaan dapat dikatakan baik. Bagaimana perusahaan

Lebih terperinci

Desy Ambar Yunanta ( )

Desy Ambar Yunanta ( ) Penilaian Risiko dan Perencanaan Kegiatan Perawatan Induction Furnace dengan Pendekatan RCM II (Reliability Centered Maintenance) Studi Kasus di PT Barata Indonesia (Persero) Gresik Desy Ambar Yunanta

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN 30 BAB 3 METODOLOGI PENELITIAN 3.1 Peneltian Pendahuluan Penelitian pendahuluan dilakukan untuk mengetahui kondisi pabrik sebenarnya dan melakukan pengamatan langsung untuk mengetahui permasalahan yang

Lebih terperinci

PERENCANAAN INTERVAL PERAWATAN PADA MESIN FORMING DENGAN PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM II) DI PT.IGLAS GRESIK SKRIPSI.

PERENCANAAN INTERVAL PERAWATAN PADA MESIN FORMING DENGAN PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM II) DI PT.IGLAS GRESIK SKRIPSI. PERENCANAAN INTERVAL PERAWATAN PADA MESIN FORMING DENGAN PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM II) DI PT.IGLAS GRESIK SKRIPSI Oleh : AMRI SIMAHARA NPM. 0732010046 JURUSAN TEKNIK INDUSTRI FAKULTAS

Lebih terperinci

PERENCANAAN PEMELIHARAAN MESIN PRODUKSI DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE

PERENCANAAN PEMELIHARAAN MESIN PRODUKSI DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE PERENCANAAN PEMELIHARAAN MESIN PRODUKSI DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA MESIN BLOWING OM (Studi Kasus: PT Industri Sandang Nusantara Unit Patal Lawang) PRODUCTION

Lebih terperinci

Nelson Manurung 1* 1 Jurusan Teknik Mesin, Politeknik Negeri Medan *

Nelson Manurung 1* 1 Jurusan Teknik Mesin, Politeknik Negeri Medan * OPTIMASI JADWAL PEMELIHARAAN SCREW PRESS PEMERAS DAGING BUAH KELAPA SAWIT DENGAN METODE TIME BASED MAINTENANCE (Studi Kasus di Pabrik Kelapa Sawit PTPN III Aek Nabara Selatan) Nelson Manurung 1* 1 Jurusan

Lebih terperinci

BAB 4 METODOLOGI PENELITIAN

BAB 4 METODOLOGI PENELITIAN BAB 4 METODOLOGI PENELITIAN 4.1 Peneltian Pendahuluan Penelitian pendahuluan dilakukan untuk mengetahui kondisi pabrik sebenarnya dan melakukan pengamatan langsung untuk mengetahui permasalahan yang dihadapi

Lebih terperinci

BAB I PENDAHULUAN 1.1 Latar Belakang

BAB I PENDAHULUAN 1.1 Latar Belakang BAB I PENDAHULUAN 1.1 Latar Belakang Dewasa ini persaingan dalam dunia perindustrian semakin ketat. Semua perusahaan bidang apapun berusaha memberikan yang terbaik bagi konsumennya. Banyak faktor yang

Lebih terperinci

RR. INTANTYA PRANANDINI SASMAYANTI

RR. INTANTYA PRANANDINI SASMAYANTI TUGAS AKHIR PERENCANAAN JADWAL KEGIATAN PEVENTIVE MAINTENANCE MENGGUNAKAN METODE RCM II DAN PENENTUAN PERSEDIAAN SPARE PART DENGAN PENDEKATAN RCS DAN INVENTORY POLICIES (STUDI KASUS : PT. BARATA INDONESIA

Lebih terperinci

Seminar Nasional Waluyo Jatmiko II FTI UPN Veteran Jawa Timur

Seminar Nasional Waluyo Jatmiko II FTI UPN Veteran Jawa Timur Perencanaan Perawatan pada Mesin Extruder dengan Menggunakan Metode Reliability Centered Maintenance (RCM) di PTPN XI Rosela Baru Surabaya Ir. Endang P W, MMT Teknik Industri FTI-UPN Veteran Jatim Abstract

Lebih terperinci

PENENTUAN INTERVAL PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE PADA MESIN BLOW MOULD DI CV. BAHANA KARYA SKRIPSI.

PENENTUAN INTERVAL PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE PADA MESIN BLOW MOULD DI CV. BAHANA KARYA SKRIPSI. PENENTUAN INTERVAL PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE PADA MESIN BLOW MOULD DI CV. BAHANA KARYA SKRIPSI Oleh : DEDE HERMAWAN GUSTIN NPM. 0832010022 JURUSAN TEKNIK INDUSTRI

Lebih terperinci

Perencanaan Sistem Pemeliharaan Mesin Roller Head Dengan Menggunakan Metode Reliability Centered Maintenance

Perencanaan Sistem Pemeliharaan Mesin Roller Head Dengan Menggunakan Metode Reliability Centered Maintenance Perencanaan Sistem Pemeliharaan Mesin Roller Head Dengan Menggunakan Metode Reliability Centered Maintenance II (RCM II) (Studi Kasus di departmen maintenance PT. Bando Indonesia) Muhammad Arif Widyoadi,

Lebih terperinci

ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS

ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS INFO TEKNIK Volume 17 No. 2 Desember 2016 (253-262) ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS Fina Andika Frida

Lebih terperinci

Oleh: Gita Eka Rahmadani

Oleh: Gita Eka Rahmadani ANALISA KEANDALAN PADA DAPUR INDUKSI 10 TON MENGGUNAKAN METODE FAILURE MODE EFFECT & CRITICALITY ANALYSIS (FMECA) ( STUDI KASUS PT BARATA INDONESIA (PERSERO) Oleh: Gita Eka Rahmadani 6506.040.040 Latar

Lebih terperinci

INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA API PARAHYANGAN * (STUDI KASUS DI PT. KERETA API INDONESIA)

INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA API PARAHYANGAN * (STUDI KASUS DI PT. KERETA API INDONESIA) Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.02 Vol.4 Jurnal Online Institut Teknologi Nasional April 2016 INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA

Lebih terperinci

Usulan Kebijakan Preventive Maintenance dan Pengelolaan Spare Part Mesin Weaving dengan Metode RCM dan RCS

Usulan Kebijakan Preventive Maintenance dan Pengelolaan Spare Part Mesin Weaving dengan Metode RCM dan RCS Petunjuk Sitasi: Martasari, N. S., Alhilman, J., & Athari, N. (2017). Usulan Kebijakan Preventive Maintenance dan Pengelolaan Spare Part Mesin Weaving dengan Metode RCM dan RCS. Prosiding SNTI dan SATELIT

Lebih terperinci

Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)

Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM) https://doi.org/10.22219/jtiumm.vol18.no1.86-93 Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM) Hamim Rachman *, Annisa Kesy Garside, Heri Mujayin Kholik Jurusan Teknik

Lebih terperinci

PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI.

PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI. PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI Oleh : NURAHADIN ZAKI ROMADHON NPM. 0632010165 JURUSAN TEKNIK INDUSTRI

Lebih terperinci

BAB III METODOLOGI PENELITIAN. Langkah perancangan yang akan dilakukan adalah sebagai berikut: produksi pada departemen plastik

BAB III METODOLOGI PENELITIAN. Langkah perancangan yang akan dilakukan adalah sebagai berikut: produksi pada departemen plastik BAB III METODOLOGI PENELITIAN 3.1 Langkah Perancangan Langkah perancangan yang akan dilakukan adalah sebagai berikut: a. Melakukan studi literatur sejumlah buku yang berkaitan dengan preventive maintenance.

Lebih terperinci

USULAN PERAWATAN MESIN BERDASARKAN KEANDALAN SPARE PART SEBAGAI SOLUSI PENURUNAN BIAYA PERAWATAN PADA PT. XYZ

USULAN PERAWATAN MESIN BERDASARKAN KEANDALAN SPARE PART SEBAGAI SOLUSI PENURUNAN BIAYA PERAWATAN PADA PT. XYZ USULAN PERAWATAN MESIN BERDASARKAN KEANDALAN SPARE PART SEBAGAI SOLUSI PENURUNAN BIAYA PERAWATAN PADA PT. XYZ Devi Costania Siagian, Humala Napitupulu, Ikhsan Siregar Departemen Teknik Industri, Fakultas

Lebih terperinci

Identifikasi Bahaya dan Penentuan Kegiatan Perawatan Pada Tower Crane 50T Menggunakan Metode RCM II (Studi Kasus Perusahaan Manufaktur Kapal)

Identifikasi Bahaya dan Penentuan Kegiatan Perawatan Pada Tower Crane 50T Menggunakan Metode RCM II (Studi Kasus Perusahaan Manufaktur Kapal) Identifikasi Bahaya dan Penentuan Kegiatan Perawatan Pada Tower Crane 50T Menggunakan Metode RCM II (Studi Kasus Perusahaan Manufaktur Kapal) Anggita Hardiastuty1 *, Galih Anindita 2, Mades D. Khairansyah

Lebih terperinci

PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT DI PT. MOUNT DREAM INDONESIA

PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT DI PT. MOUNT DREAM INDONESIA Penentuan Interval Waktu Optimal Penggantian Komponen Dengan Metode Age Replacement PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Diagram Alir Gambar 3.1 Diagram Alir Metodologi Penelitian 11 12 Gambar 3.1 Diagram Alir Metodologi Penelitian (Lanjutan) 3.2 Langkah-Langkah Pelaksanaan Penelitian Untuk

Lebih terperinci

Sistem Persediaan Komponen Multi Eselon Dengan Permintaan Berdasarkan Laju Kerusakan (Studi Kasus Di Perusahaan Tepung Ikan) *

Sistem Persediaan Komponen Multi Eselon Dengan Permintaan Berdasarkan Laju Kerusakan (Studi Kasus Di Perusahaan Tepung Ikan) * Reka Integra ISSN: 2338-5081 Teknik Industri Itenas No.1 Vol.1 Jurnal Online Institut Teknologi Nasional Juli 2013 Sistem Persediaan Komponen Multi Eselon Dengan Permintaan Berdasarkan Laju Kerusakan (Studi

Lebih terperinci

BAB 1 PENDAHULUAN. bergerak dalam dunia industri khususnya sebagai supplier bahan baku

BAB 1 PENDAHULUAN. bergerak dalam dunia industri khususnya sebagai supplier bahan baku BAB 1 PENDAHULUAN 1.1 Latar Belakang Penelitian PT. Cisangkan yang terletak di Bandung merupakan perusahaan manufaktur yang bergerak dalam dunia industri khususnya sebagai supplier bahan baku bangunan.

Lebih terperinci

PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM

PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM Khawarita Siregar, Ukurta Tarigan, dan Syahrul Fauzi Siregar Departemen Teknik Industri, Fakultas

Lebih terperinci

ANALISA PERENCANAAN KEBIJAKAN PERAWATAN UNTUK MENGURANGI DOWNTIME DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (Studi Kasus di PT X)

ANALISA PERENCANAAN KEBIJAKAN PERAWATAN UNTUK MENGURANGI DOWNTIME DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (Studi Kasus di PT X) NLIS PERENCNN KEBIJKN PERWTN UNTUK MENGURNGI DOWNTIME DENGN METODE RELIBILITY CENTERED MINTENNCE II (Studi Kasus di PT X) Fadli fdi Effendi 1) dan Suparno 2) Manajemen Industri, Magister Manajemen Teknologi

Lebih terperinci

Seminar Nasional IENACO 2016 ISSN: PREVENTIVE MAINTENANCE PADA KOMPONEN KRITIS MESIN DENGAN METODE RELIABILITY CENTERED MAINTENANCE

Seminar Nasional IENACO 2016 ISSN: PREVENTIVE MAINTENANCE PADA KOMPONEN KRITIS MESIN DENGAN METODE RELIABILITY CENTERED MAINTENANCE PREVENTIVE MAINTENANCE PADA KOMPONEN KRITIS MESIN DENGAN METODE RELIABILITY CENTERED MAINTENANCE Wresni Anggraini 1* Risvaldi 2 1, 2 Jurusan Teknik Industri, Fakultas Sains dan Teknologi, Universitas Islam

Lebih terperinci

OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN METODA AGE REPLACEMENT DI PT. KERETA API INDONESIA *

OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN METODA AGE REPLACEMENT DI PT. KERETA API INDONESIA * ]Reka Integra ISSN: 2338-5081 [ Teknik Industri Itenas No.04 Vol. 01] Jurnal Online Institut Teknologi Nasional [April 2014] OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN

Lebih terperinci

BAB I PENDAHULUAN. antara perusahaan manufaktur menjadi semakin ketat. Setiap perusahaan berusaha

BAB I PENDAHULUAN. antara perusahaan manufaktur menjadi semakin ketat. Setiap perusahaan berusaha BAB I PENDAHULUAN 1.1. Latar Belakang Permasalahan Industri manufaktur dewasa ini mengalami perkembangan yang sangat pesat, hal ini disebabkan adanya perubahan yang dinamis sehingga kompetisi antara perusahaan

Lebih terperinci

OPTIMASI PERAWATAN STONE CRUSHER MENGGUNAKAN RELIABILITY CENTERED MAINTENANCE (RCM)

OPTIMASI PERAWATAN STONE CRUSHER MENGGUNAKAN RELIABILITY CENTERED MAINTENANCE (RCM) 1 OPTIMASI PERAWATAN STONE CRUSHER MENGGUNAKAN RELIABILITY CENTERED MAINTENANCE (RCM) Ya umar, Totok R. Biyanto Jurusan Teknik Fisika - Fakultas Teknologi Industri Institut Teknologi Sepuluh Nopember Surabaya

Lebih terperinci

BAB III METODOLOGI PEMECAHAN MASALAH

BAB III METODOLOGI PEMECAHAN MASALAH BAB III METODOLOGI PEMECAHAN MASALAH Metodologi Pemecahan masalah adalah suatu proses berpikir yang mencakup tahapan-tahapan yang dimulai dari menentukan masalah, melakukan pengumpulan data melalui studi

Lebih terperinci

PERANCANGAN PREVENTIVE MAINTENANCE PADA MESIN PRODUKSI DI PT. KHARISMA ABADI SEJATI

PERANCANGAN PREVENTIVE MAINTENANCE PADA MESIN PRODUKSI DI PT. KHARISMA ABADI SEJATI PERANCANGAN PREVENTIVE MAINTENANCE PADA MESIN PRODUKSI DI PT. KHARISMA AADI SEJATI Wilson 1, Eddy 1 ) Mahasiswa Jurusan Teknik Industri Sekolah Tinggi Teknik harapan ) Staf pengajar Jurusan Teknik Industri

Lebih terperinci

Usulan Kebijakan Preventive Maintenance Subsistem Kritis Engine T700 dengan Metode Reliability Centered Maintenance (RCM)

Usulan Kebijakan Preventive Maintenance Subsistem Kritis Engine T700 dengan Metode Reliability Centered Maintenance (RCM) Petunjuk Sitasi: Noviyanti, A. A., Atmaji, F. T., & Juliani, W. (2017). Usulan Kebijakan Preventive Maintenance Subsistem Kritis Engine T700 dengan Metode Reliability-Centered Maintenance (RCM). Prosiding

Lebih terperinci

Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN:

Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN: Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN: 1858-2516 Penentuan Jadwal Pemeliharaan Pencegahan dan Perhitungan Kebutuhan Komponen Kritis pada Mesin Tuber 645M dan

Lebih terperinci

Perancangan Kebijakan Perawatan Mesin Printer 3D CLab A01

Perancangan Kebijakan Perawatan Mesin Printer 3D CLab A01 Petunjuk Sitasi: Herianto, & Irlanda, E. A. (2017). Perancangan Kebijakan Perawatan Mesin Printer 3D CLab A01. Prosiding SNTI dan SATELIT 2017 (pp. C56-61). Malang: Jurusan Teknik Industri Universitas

Lebih terperinci

PERENCANAAN PERAWATAN DENGAN METODE REABILITY MAINTENANCE(RCM II) PADA MESIN ANDI PTP 3013 DI PT. PANGGUNG ELECTRIC CITRABUANA SKRIPSI

PERENCANAAN PERAWATAN DENGAN METODE REABILITY MAINTENANCE(RCM II) PADA MESIN ANDI PTP 3013 DI PT. PANGGUNG ELECTRIC CITRABUANA SKRIPSI PERENCANAAN PERAWATAN DENGAN METODE REABILITY MAINTENANCE(RCM II) PADA MESIN ANDI PTP 3013 DI PT. PANGGUNG ELECTRIC CITRABUANA SKRIPSI Disusun Oleh : AGUS PRIHANTONO NPM : 0632010188 JURUSAN TEKNIK INDUSTRI

Lebih terperinci

Seminar Nasional IENACO 2015 ISSN PENJADWALAN PERAWATAN MESIN DIVISI PIPA (STUDY KASUS DI PT. X)

Seminar Nasional IENACO 2015 ISSN PENJADWALAN PERAWATAN MESIN DIVISI PIPA (STUDY KASUS DI PT. X) PENJADWALAN PERAWATAN MESIN DIVISI PIPA (STUDY KASUS DI PT. X) Robert Triatmaja 1*, LM.Hadi Santosa 2, Ig.Joko Mulyono 3 1,2,3 Program Studi Teknik Industri,Fakultas Teknik Universitas Katolik Widya Mandala

Lebih terperinci

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT (PT. Malang Indah) Skripsi DiajukanKepadaUniversitasMuhammadiyah Malang UntukMemenuhi Salah

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Diagram Alir Penelitian akan dilakukan dengan langkah-langkah berikut Gambar 3.1: Gambar 3.1 Diagram Alir 11 12 Gambar 3.2 Diagram Alir (Lanjutan) 3.2 Langkah-Langkah Penelitian

Lebih terperinci

Penjadwalan Maintenance Menggunakan Metode Reliability Centered Maintenance II (RCM II) pada Mesin Pendingin Sabroe Di PT. SMART Tbk.

Penjadwalan Maintenance Menggunakan Metode Reliability Centered Maintenance II (RCM II) pada Mesin Pendingin Sabroe Di PT. SMART Tbk. Penjadwalan Maintenance Menggunakan Metode Reliability Centered Maintenance II (RCM II) pada Mesin Pendingin Sabroe Di PT. SMART Tbk. Atrisita Diastari 1, Priyo Agus Setiawan 2, Aulia Nadia Rachmat 3 1

Lebih terperinci

BAB 1 PENDAHULUAN 1.1. Latar Belakang Masalah

BAB 1 PENDAHULUAN 1.1. Latar Belakang Masalah BAB 1 PENDAHULUAN 1.1. Latar Belakang Masalah Berkembangmya ilmu dan teknologi memberikan banyak kemudahan bagi kehidupan umat manusia. Kendaraan bermotor merupakan sarana transportasi yang sangat menunjang

Lebih terperinci

RANCANGAN PERAWATAN BUS TRANSJAKARTA MENGGUNAKAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE DI PERUM DAMRI SBU BUSWAY KORIDOR I & VIII

RANCANGAN PERAWATAN BUS TRANSJAKARTA MENGGUNAKAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE DI PERUM DAMRI SBU BUSWAY KORIDOR I & VIII RANCANGAN PERAWATAN BUS TRANSJAKARTA MENGGUNAKAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE DI PERUM DAMRI SBU BUSWAY KORIDOR I & VIII Muhammad Aditya Putra dan Iveline Anne Marie Laboratorium Sistem

Lebih terperinci

PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI

PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI TUGAS SARJANA Diajukan untuk Memenuhi Sebagian dari Syarat-syarat

Lebih terperinci

MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN DEKOMPOSER DI PETROGANIK PT. PETROKIMIA GRESIK SKRIPSI

MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN DEKOMPOSER DI PETROGANIK PT. PETROKIMIA GRESIK SKRIPSI MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN DEKOMPOSER DI PETROGANIK PT. PETROKIMIA GRESIK SKRIPSI Oleh : PRIMA PANGLIPUR J NPM. 0532010014 JURUSAN TEKNIK

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Rumusan Masalah dan Pengambilan Keputusan Metodologi pemecahan masalah mempunyai peranan penting untuk membantu menyelesaikan masalah dengan mudah. Oleh karena itu

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Perumusan masalah dan Pengambilan Keputusan Model perumusan masalah dan pengambilan keputusan yanag digunakan dalam skripsi ini dimulai dengan melakukan observasi

Lebih terperinci

ISSN : e-proceeding of Engineering : Vol.3, No.2 Agustus 2016 Page 2685

ISSN : e-proceeding of Engineering : Vol.3, No.2 Agustus 2016 Page 2685 ISSN : 2355-9365 e-proceeding of Engineering : Vol.3, No.2 Agustus 2016 Page 2685 PENGEMBANGAN KEBIJAKAN PERAWATAN PADA MESIN MANUGRAPH DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM

Lebih terperinci

Analisis Keandalan Mechanical Press Shearing Machine di Perusahaan Manufaktur Industri Otomotif

Analisis Keandalan Mechanical Press Shearing Machine di Perusahaan Manufaktur Industri Otomotif Analisis Keandalan Mechanical Press Shearing Machine di Perusahaan Manufaktur Industri Otomotif Abdurrahman Yusuf 1, Anda Iviana Juniani 2 dan Dhika Aditya P. 3 1,2,3 Program Studi Teknik Desain dan Manufaktur,

Lebih terperinci

BAB 3 METODE PEMECAHAN MASALAH

BAB 3 METODE PEMECAHAN MASALAH 94 BAB 3 METODE PEMECAHAN MASALAH 3.1 Diagram Alir Di bawah ini merupakan urutan dari pada tahapan penelitian yang akan dilakukan oleh penulis : Gambar 3.1 Diagram Alir Penelitian 95 96 Uji Kesesuaian

Lebih terperinci

BAB II LANDASAN TEORI

BAB II LANDASAN TEORI 4 BAB II LANDASAN TEORI 2.1. Pengertian Pemeliharaan (Maintenance) Pemeliharaan adalah semua aktivitas yang dilakukan untuk mempertahankan kondisi sebuah item atau peralatan, atau mengembalikannya ke dalam

Lebih terperinci

USULAN PROGRAM PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE

USULAN PROGRAM PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE USULAN PROGRAM PERAWATAN YANG OPTIMAL DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA SISTEM P1 FILLING POINT II FILLING SHED I (STUDI KASUS TBBM SEMARANG GROUP PT. PERTAMINA (PERSERO)

Lebih terperinci

ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM

ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX-36000 UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM Sachbudi Abbas Ras 1 ; Andy Setiawan 2 ABSTRACT Maintenance system, surely takes important role

Lebih terperinci

BAB 3 Metode Penelitian Persiapan Penelitian Berikut ini tahapan-tahapan yang dilakukan dalam persiapan penelitian ini: 1. Studi Lapangan.

BAB 3 Metode Penelitian Persiapan Penelitian Berikut ini tahapan-tahapan yang dilakukan dalam persiapan penelitian ini: 1. Studi Lapangan. BAB 3 Metode Penelitian 1. 3.1 Persiapan Penelitian Berikut ini tahapan-tahapan yang dilakukan dalam persiapan penelitian ini: 1. Studi Lapangan. Kegiatan melakukan pengamatan secara langsung di lapangan

Lebih terperinci

BAB 4 METODOLOGI PENELITIAN

BAB 4 METODOLOGI PENELITIAN BAB 4 METODOLOGI PENELITIAN 4.1 Model Rumusan Masalah dan Pengambilan Keputusan Metodologi pemecahan masalah mempunyai peranan penting untuk membantu menyelesaikan masalah dengan mudah. Oleh karena itu

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI 28 BAB 2 LANDASAN TEORI 2.1 Pemeliharaan (Maintenance) 2.1.1 Pengertian Pemeliharaan (Maintenance) Beberapa definisi pemeliharaan (maintenance) menurut para ahli: Menurut Patrick (2001, p407), maintenance

Lebih terperinci

PERANCANGAN RCM UNTUK MENGURANGI DOWNTIME MESIN PADA PERUSAHAAN MANUFAKTUR ALUMINIUM RCM TO REDUCE DOWNTIME MACHINE AT ALUMINIUM MANUFACTURING

PERANCANGAN RCM UNTUK MENGURANGI DOWNTIME MESIN PADA PERUSAHAAN MANUFAKTUR ALUMINIUM RCM TO REDUCE DOWNTIME MACHINE AT ALUMINIUM MANUFACTURING PERANCANGAN RCM UNTUK MENGURANGI DOWNTIME MESIN PADA PERUSAHAAN MANUFAKTUR ALUMINIUM RCM TO REDUCE DOWNTIME MACHINE AT ALUMINIUM MANUFACTURING Herry Christian Palit 1, *), Winny Sutanto 2) 1) Industrial

Lebih terperinci

Universitas Bina Nusantara

Universitas Bina Nusantara Universitas Bina Nusantara Jurusan Teknik Industri Skripsi Sarjana Semester Genap tahun 2006/2007 ANALISA PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN RELIABILITY DAN AVAILABILITY PADA MESIN PRESS DI PT INTIRUB

Lebih terperinci

TIN315 - Pemeliharaan dan Rekayasa Keandalan Materi #1 Genap 2015/2016. TIN315 - Pemeliharaan dan Rekayasa Keandalan

TIN315 - Pemeliharaan dan Rekayasa Keandalan Materi #1 Genap 2015/2016. TIN315 - Pemeliharaan dan Rekayasa Keandalan Materi #1 TIN315 Pemeliharaan dan Rekayasa Keandalan Pokok Bahasan 2 1. Pengenalan Disiplin Ilmu Keandalan dan Aplikasinya 2. Probabilitas 3. Pemodelan Jaringan dan Evaluasi Sistem 4. Pengantar Analisa

Lebih terperinci

KAJIAN PENERAPAN METODOLOGI RELIABILITY CENTERED MAINTENANCE (RCM) PADA KASUS TERJADINYA BREAKDOWN MESIN MOLDING DI PT.UVW

KAJIAN PENERAPAN METODOLOGI RELIABILITY CENTERED MAINTENANCE (RCM) PADA KASUS TERJADINYA BREAKDOWN MESIN MOLDING DI PT.UVW KAJIAN PENERAPAN METODOLOGI RELIABILITY CENTERED MAINTENANCE (RCM) PADA KASUS TERJADINYA BREAKDOWN MESIN MOLDING DI PT.UVW TUGAS AKHIR Yulianta 1128003020 PROGRAM STUDI TEKNIK INDUSTRI FAKULTAS TEKNIK

Lebih terperinci

BAB II TINJAUAN PUSTAKA. besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam

BAB II TINJAUAN PUSTAKA. besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam BAB II TINJAUAN PUSTAKA 2.1 Tinjauan Pustaka Manajemen operasi merupakan salah satu bidang yang berpengaruh sangat besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam menjalankan operasionalnya,

Lebih terperinci

Jl. Raya Telang Po Box 2 Kamal, Bangkalan Indonesia 1

Jl. Raya Telang Po Box 2 Kamal, Bangkalan Indonesia   1 Penentuan Kebijakan Perawatan Optimal Pada Mesin Steam Turbine 105-JT Dengan Pendekatan Reliability Centered Maintenance (RCM) (Studi Kasus : PT. Petrokimia Gresik) Handik Yulianto 1), Samsul Amar ST.,

Lebih terperinci

BAB 6 KESIMPULAN DAN SARAN

BAB 6 KESIMPULAN DAN SARAN BAB 6 KESIMPULAN DAN SARAN 6.1. Kesimpulan Berdasarkan analisis dan pembahasan data mengikuti metode Reliability Centered Maintenance (RCM) yang telah dilakukan maka, dapat disimpulkan : a. Penentuan komponen

Lebih terperinci

PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) DALAM MERENCANAKAN KEGIATAN PEMELIHARAAN MESIN PRODUKSI PADA PABRIK X

PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) DALAM MERENCANAKAN KEGIATAN PEMELIHARAAN MESIN PRODUKSI PADA PABRIK X PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) DALAM MERENCANAKAN KEGIATAN PEMELIHARAAN MESIN PRODUKSI PADA PABRIK X Ida Bagus Suardika Jurusan Teknik Industri, Fakultas Teknologi Industri, Institut

Lebih terperinci