20 TABEL BREAKDOWN COST MODEL NO SUB DIVISION TOTAL BIAYA (Rp) % BIAYA CUM % BIAYA CUM % ITEM 1 Structural Concrete Rp 2,644,237, CENTRAL COOLING EQUIPMENT Rp 323,696, Ceramik Tilling Rp 250,559, Metal Door and Frames Rp 207,252, Structural Stainless-Steel Framing Rp 199,801, Clay Unit Mansory Rp 187,461, Plaster and Gypsum Board Assemblies Rp 184,057, ELECTRICAL AND CATHODIC PROTECTION Rp 181,870, LIGHTING Rp 140,236, Structural Aluminium Framing Rp 124,721, M EDIUM -VOLTAGE ELECTRICAL DISTRIBUT Rp 119,150, Foundation Anchor Rp 112,698, Excavation and Fill Rp 92,661, Texture Ceilling Rp 91,296, Interior Painting Rp 84,584, Metal Windows Rp 84,431, Facility Sanitary Sewerage Rp 71,462, Roof Tiles Rp 53,046, VOICE COMUNICATION Rp 48,357, Bath Furnishing Rp 41,576, Metal Railling Rp 39,263, Exterior Painting Rp 29,657, Portland Cement Plastering Rp 26,723, Support For Plaster and Gypsum Board Rp 25,345, Facility Storm Drainage Rp 21,307, Audio-Video System Rp 20,558, Roof Panels Rp 19,971, Partitions Rp 16,345, Waterproofing-Membrane Tilling Rp 13,084, Facility Water Distribution Rp 12,882, Survey Rp 8,950, Architectural Concrete Rp 7,225, Mansory Flooring Rp 1,108, Jumlah Rp 5,485,587,231.88

21

22

23

24

25

26

27 Dari hasil analisa cost/worth pada masing masing item pekerjaan diatas, penulis mengambil 3 item pekerjaan dengan nilai c/w tertinggi yakni, Pekerjaan Dinding didapatkan bahwa nilai c/w > 2, artinya pekerjaan tersebut perlau di tinjau ulang, ditambah dengan pekerjaan pintu dan penutup lantai yang mempunyai nilai c/w 1.86 dan 1.81 dimana kemungkinan ada biaya yang tidak di perlukan. Sehingga ketiga item tersebut diatas layak untuk dilakukan penerapan rekayasa nilai.

28

29

30

31

32

33 Berdasarkan hasil dari sintesa maka diperoleh prioritas alternatif sebagai berikut : Prioritas 1 : Alternatif 2 (A2): Batako, Spesi (PC-PP), Plesteran Dinding (PC-PP), Cat Paragon. Prioritas 2 : Alternatif 3 (A3) : Bata Ringan, Spesi Semen Instan, Plesteran Dinding Semen Instan, Cat Altex Prioritas 3 : Desain Awal (A0): Bata, Spesi (PC-PP), Plesteran Dinding (PC-PP), Cat Decolith. Prioritas 4 : Alternatif 1 (A1): Bata, Spesi (Semen Instan), Plesteran Dinding (Semen Instan), Cat Avitex.

34 Berdasarkan hasil dari sintesa maka diperoleh prioritas alternatif sebagai berikut : Prioritas 1 : Alternatif 2 (B2) : Kusen Kayu Meranti 5/10, Slimar Kayu Meranti 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen). Prioritas 2 : Alternatif 3 (B3)Kusen Kayu Kamper 5/10, Slimar Kayu Kamper 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen). Prioritas 3 : Desain Awal (B0):Kusen Aluminium 5/10, Slimar Aluminium 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen). Prioritas 4 : Alternatif 1 (B1):Kusen Kayu Kamper 5/10, Slimar Aluminium 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen).

35 Berdasarkan hasil dari sintesa maka diperoleh prioritas alternatif sebagai berikut : Prioritas 1 : Alternatif 1 (C1) : Keramik 30x30 Polos Mulia, Mortar, Semen warna. Prioritas 2 : Alternatif 2 (C2):Granito 40x40 Polos Mulia, Mortar, Semen warna. Prioritas 3 : Alternatif 3 (C3): Tegel Wafel 20x20, Mortar, Semen warna. d.prioritas 4 :. Desain Awal (C0): Keramik 40x40 Polos Super Milan, Mortar, Semen warna.

36 Item Pekerjaan : Pekerjaan Dinding Fungsi : Membatasi Ruang TAHAP REKOMENDASI 1. Rencana Awal Bata, Spesi (PC-PP), Plesteran Dinding (PC-PP), Cat Decolith. Biaya Rp Usulan : Batako, Spesi (PC-PP), Plesteran Dinding (PC-PP), Cat Paragon. Biaya Rp Penghematan Biaya : Rp ,48 Sebesar 11% dari desain awal 4. Dasar Pertimbangan : - Berdasarkan analisa biaya siklus hidup proyek dan analisa pengambilan keputusan dengan menggunakan metode AHP.

37 TAHAP REKOMENDASI Item Pekerjaan : Pekerjaan Pintu Fungsi : Menghubungkan Ruang 1. Rencana Awal : Kusen Aluminium 5/10, Slimar Aluminium 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen). Biaya Rp Usulan : Kusen Kayu Meranti 5/10, Slimar Kayu Meranti 3/10, Kaca Bening 5mm, Multipleks 9mm, Aksesoris (engsel, handle dan plat stainless, kunci, stiker sand blast, Benangan kusen). Biaya Rp Penghematan Biaya : Rp ,00 Sebesar 36 % dari desain awal 4. Dasar Pertimbangan : - Berdasarkan analisa biaya siklus hidup proyek dan analisa pengambilan keputusan dengan menggunakan metode AHP

38 TAHAP REKOMENDASI Item Pekerjaan : Pekerjaan Keramik Lantai Fungsi : Menutup Lantai 1. Rencana Awal Keramik 40x40 Polos Super Milan, Mortar, Semen warna. Biaya Rp Usulan : Keramik 30x30 Polos Mulia, Mortar, Semen warna. Biaya Rp Penghematan Biaya : Rp Sebesar 16% dari desain awal 4. Dasar Pertimbangan : - Berdasarkan analisa biaya siklus hidup proyek dan analisa pengambilan keputusan dengan menggunakan metode AHP.

39

40

41

BAB II BAB I TINJAUAN PUSTAKA PENDAHULUAN

BAB II BAB I TINJAUAN PUSTAKA PENDAHULUAN BAB II BAB I TINJAUAN PUSTAKA PENDAHULUAN. Latar Belakang Sejalan dengan pertumbuhan perekonomian di Kab Blitar khususnya di daerah kecamatan Sutojayan, maka pemerintah setempat membangun sebuah sarana

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG JAYANATA BEAUTY PLAZA SURABAYA

PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG JAYANATA BEAUTY PLAZA SURABAYA PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG JAYANATA BEAUTY PLAZA SURABAYA Oleh KRISTINANTO SW 3107 100 546 Latar Belakang Proyek Pembangunan Gedung Jayanata Beauty Plaza Surabaya

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN KANTOR PUSAT PT.PELINDO III PERAK - SURABAYA

PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN KANTOR PUSAT PT.PELINDO III PERAK - SURABAYA TUGAS AKHIR RC 091380 PENERAPAN REKAYASA NILAI PADA PELAKSANAAN PROYEK PEMBANGUNAN KANTOR PUSAT PT.PELINDO III PERAK SURABAYA Oleh : NADIA DEVITA OKTARINI 3108 100 083 Dosen Pembimbing : CHRISTIONO UTOMO,

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN PROYEK PERUMAHAN SAPPHIRE PARK REGENCY

PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN PROYEK PERUMAHAN SAPPHIRE PARK REGENCY PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN PROYEK PERUMAHAN SAPPHIRE PARK REGENCY HERIMURTTI P.M. 3109100046 Dosen Pembimbing: Christiono Utomo, ST.MT.Ph.D Nama Proyek Lokasi Proyek DATA UMUM PROYEK : Sapphire

Lebih terperinci

PRESENTASI TUGAS AKHIR PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN POLITEKNIK ELLEKTRONIKA NEGERI SURABAYA

PRESENTASI TUGAS AKHIR PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN POLITEKNIK ELLEKTRONIKA NEGERI SURABAYA PRESENTASI TUGAS AKHIR PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN POLITEKNIK ELLEKTRONIKA NEGERI SURABAYA SEPTYARINI PUTRI AYUDYA 3109100031 Dosen Pembimbing : Cahyono Bintang Nurcahyo,

Lebih terperinci

BAB I PENDAHULUAN BAB II TINJAUAN PUSTAKA. tersebut?

BAB I PENDAHULUAN BAB II TINJAUAN PUSTAKA. tersebut? BAB I PENDAHULUAN PT.PELINDO III tersebut? Perak Surabaya 1.1. Latar Belakang Surabaya merupakan salah satu pusat berbagai kegiatan aktivitas bisnis dan perdagangan terbesar di Pulau Jawa. Sejalan dengan

Lebih terperinci

Tatia Ardilla / Dosen Pembimbing : Cahyono Bintang Nurcahyo, ST. MT.

Tatia Ardilla / Dosen Pembimbing : Cahyono Bintang Nurcahyo, ST. MT. PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN ASRAMA X PROVINSI BALI (The Application of Value Engineering in The Project of X Dormitory Bali Province) Tatia Ardilla / 3109100091 Dosen Pembimbing :

Lebih terperinci

ZONE 1 ZONE 2 ZONE 3 PEMBAGIAN ZONING

ZONE 1 ZONE 2 ZONE 3 PEMBAGIAN ZONING LOKASI PEKERJAAN LANTAI ATAP LANTAI 9 LANTAI 8 LANTAI 7 LANTAI 6 LANTAI 5 LANTAI 4 LANTAI 3 LANTAI 2 LANTAI 1 LANTAI DASAR SEMI BASEMENT ZONE 1 ZONE 2 ZONE 3 PEMBAGIAN ZONING I II A 1 2 III B 3 LANTAI

Lebih terperinci

Dosen Pembimbing: Ir.putu Artama Wiguna, MT, Ph.D Yusronia Eka Putri, ST. MT Oleh: Ali Musa Arrasyid Hasibuan

Dosen Pembimbing: Ir.putu Artama Wiguna, MT, Ph.D Yusronia Eka Putri, ST. MT Oleh: Ali Musa Arrasyid Hasibuan PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN BANK JATIM KEDIRI Dosen Pembimbing: Ir.putu Artama Wiguna, MT, Ph.D Yusronia Eka Putri, ST. MT Oleh: Ali Musa Arrasyid Hasibuan LATAR BELAKANG o Pembangunan

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG RESEARCH CENTER ITS SURABAYA. Oleh: Andreas Dean Anderson

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG RESEARCH CENTER ITS SURABAYA. Oleh: Andreas Dean Anderson PADA PROYEK PEMBANGUNAN GEDUNG RESEARCH CENTER ITS SURABAYA Oleh: Andreas Dean Anderson 30900067 PENDAHULUAN Latar Belakang universitas riset 07 BIAYA CUKUP BESAR 3 tahun konsep modern green building Butuh

Lebih terperinci

DAFTAR ANALISA PEKERJAAN

DAFTAR ANALISA PEKERJAAN DAFTAR ANALISA PEKERJAAN SATUAN HARGA Harga Harga I PEKERJAAN PERSIAPAN 1.4 1 M' Pengukuran dan Pemasangan Bouwplank 0.012 M 3 Kayu 5/7 kelas III 0.020 Kg Paku Biasa 0.007 M 3 Kayu Papan 3/20 0.100 Oh

Lebih terperinci

JURUSAN TEKNIK SIPIL INSTITUT TEKNOLOGI SEPULUH NOPEMBER

JURUSAN TEKNIK SIPIL INSTITUT TEKNOLOGI SEPULUH NOPEMBER PENERAPAN METODE REKAYASA NILAI PADA PEMBANGUNAN PROYEK RUSUNAWA MAHASISWA UNIVERSITAS ISLAM MALANG 7/21/2013 Oleh : Andhika Mahendra S.P NRP : 3109100047 Dosen Pembimbing : Farida Rachmawati, ST., MT.

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN GEDUNG RSUD GAMBIRAN TAHAP II KOTA KEDIRI

PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN GEDUNG RSUD GAMBIRAN TAHAP II KOTA KEDIRI MAKALAH TUGAS AKHIR RC 091380 PENERAPAN REKAYASA NILAI PADA PEMBANGUNAN GEDUNG RSUD GAMBIRAN TAHAP II KOTA KEDIRI UTUS HARI PRISTIANTI NRP. 3107 100 549 Dosen Pembimbing Ir. Putu Artama Wiguna, MT, PhD

Lebih terperinci

REKAPITULASI NO URAIAN PEKERJAAN JUMLAH HARGA A PEKERJAAN PERSIAPAN - B PEKERJAAN TANAH - C PEKERJAAN PASANGAN - D PEKERJAAN BETON -

REKAPITULASI NO URAIAN PEKERJAAN JUMLAH HARGA A PEKERJAAN PERSIAPAN - B PEKERJAAN TANAH - C PEKERJAAN PASANGAN - D PEKERJAAN BETON - INTANSI REKAPITULASI : DINAS PU DAN PERUMAHAN KOTANJARBARU Tahun 2009 NO URAIAN JUMLAH HARGA A PERSIAPAN - B TANAH - PASANGAN - D BETON - E AT-ATAN - F LAIN-LAIN - JUMLAH - DIBULATKAN.. - RENANA ANGGARAN

Lebih terperinci

Penerapan Rekayasa Nilai pada Proyek. Elektronika Negeri Surabaya

Penerapan Rekayasa Nilai pada Proyek. Elektronika Negeri Surabaya 1 Penerapan Rekayasa Nilai pada Proyek Elektronika Negeri Surabaya Septyarini Putri Ayudya, Cahyono Bintang Nurcahyo Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh

Lebih terperinci

Penerapan Rekayasa Nilai pada Proyek Pembangunan Rumah Tipe 39 di Perumahan Sapphire Park Regency Surabaya

Penerapan Rekayasa Nilai pada Proyek Pembangunan Rumah Tipe 39 di Perumahan Sapphire Park Regency Surabaya Penerapan Rekayasa Nilai pada Proyek Pembangunan Rumah Tipe 39 di Perumahan Sapphire Park Regency Surabaya Herimurtti Paramastya Manggala dan Christiono Utomo, ST.,MT.,Ph.D Jurusan Teknik Sipil, Fakultas

Lebih terperinci

Penerapan Metode Rekayasa Nilai Pada Pembangunan Proyek Rusunawa Mahasiswa Universitas Islam Malang

Penerapan Metode Rekayasa Nilai Pada Pembangunan Proyek Rusunawa Mahasiswa Universitas Islam Malang JURNAL TEKNIK POMITS Vol. 1,. 1, (2012) 1-6 1 Penerapan Metode Rekayasa Nilai Pada Pembangunan Proyek Rusunawa Mahasiswa Universitas Islam Malang Andhika Mahendra, Farida Rachmawati Jurusan Teknik Sipil,

Lebih terperinci

JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: ( Print) D-137

JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: ( Print) D-137 JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: 2337-3539 (2301-9271 Print) D-137 Penerapan Rekayasa Nilai pada Proyek Pembangunan Rumah Tipe 39 di Perumahan Sapphire Park Regency Surabaya Herimurtti

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN ASRAMA X PROVINSI BALI

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN ASRAMA X PROVINSI BALI JURNAL TEKNIK POMITS Vol.,, (203) 6 PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN ASRAMA X PROVINSI BALI Tatia Ardilla, Cahyono Bintang Nurcahyo Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan

Lebih terperinci

KOP PERUSAHAAN R E K A P I T U L A S I

KOP PERUSAHAAN R E K A P I T U L A S I KOP PERUSAHAAN R E K A P I T U L A S I Pekerjaan : Pembangunan Gedung Perpustakaan SD Negeri 1 Gumanano Lokasi : Kecamatan Mawasangka Tahun Anggaran : 2016 NO JUMLAH (Rp.) 1 2 3 I PEKERJAAN PENDAHULUAN

Lebih terperinci

REKAPITULASI ANGGARAN BIAYA. NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

REKAPITULASI ANGGARAN BIAYA. NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp) REKAPITULASI ANGGARAN BIAYA NO. URAIAN PEKERJAAN 1 LANTAI 2 2 LANTAI 3 3 LANTAI 4 4 LANTAI 5 5 ROOFTOP 6 MECHANICAL ELECTRICAL JUMLAH= PPN= setelah PPN= HARGA LANTAI 2 1 ABK bangunan gedung dan perumahan

Lebih terperinci

BAB IV HASIL & ANALISIS. Pada proyek pembangunan rusunawa 4 lantai ini penulis memiliki beberapa. Bangunan berupa bangunan bertingkat 4 lantai

BAB IV HASIL & ANALISIS. Pada proyek pembangunan rusunawa 4 lantai ini penulis memiliki beberapa. Bangunan berupa bangunan bertingkat 4 lantai BAB IV HASIL & ANALISIS 4.1 Metode Konstruksi Pada proyek pembangunan rusunawa 4 lantai ini penulis memiliki beberapa kondisi kriteria proyek sebagai berikut : Bangunan berupa bangunan bertingkat 4 lantai

Lebih terperinci

Lampiran RKS : 2190/ LL/KCJ/RKS/IX/2015

Lampiran RKS : 2190/ LL/KCJ/RKS/IX/2015 Lampiran RKS : 2190/ LL/KCJ/RKS/IX/2015 ANALISA HARGA SATUAN MEMBUAT RUANG KS, TANGGA DAN POS KESEHATAN DI ST. SUDIRMAN UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2 Upah: 0.333 oh

Lebih terperinci

Kata Kunci: Rekayasa Nilai, Biaya, Alternatif

Kata Kunci: Rekayasa Nilai, Biaya, Alternatif PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GEDUNG KANTOR PERTANAHAN KOTA PAREPARE M Asad Abdurahman, A Subhan Mustari, Ferdiansyah I Halim Abstrak Penelitian ini mencoba untuk menganalisis bahwa

Lebih terperinci

ANALISA HARGA SATUAN RENOVASI TOILET KHUSUS WANITA DAN MEMBUAT TOILET BARU KHUSUS PRIA STASIUN SUDIRMAN

ANALISA HARGA SATUAN RENOVASI TOILET KHUSUS WANITA DAN MEMBUAT TOILET BARU KHUSUS PRIA STASIUN SUDIRMAN Lampiran RKS : 1767/LL/KCJ/RKS/VII/2015 ANALISA HARGA SATUAN RENOVASI TOILET KHUSUS WANITA DAN MEMBUAT TOILET BARU KHUSUS PRIA STASIUN SUDIRMAN 1 MEMBUAT GUDANG ALAT KERJA/M2 Upah: 0.333 Oh Pekerja x Rp.

Lebih terperinci

DAFTAR ANALISA HARGA SATUAN

DAFTAR ANALISA HARGA SATUAN DAFTAR ANALISA HARGA SATUAN ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH PT.6,1 1 m3 Galian tanah biasa sedalam 1 meter Pekerja 0,750 Org/hr Mandor 0,025 Org/hr Jumlah PT.6,1 - PT.6,9 1 m3 Urugan kembali Pekerja

Lebih terperinci

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH 4 Pasir Timbunan / Urugan (Lokal) m 3 Pasangan (Luar) m 3 Beton m 3 5 Kerikil m 3 6 Sirtu Saring m 3 7 Sirtu Sungai m 3 9 Semen PC Semen PC 50 Semen Putih (50 ) Semen PC 40 Semen Warna 10 Batu Merah (5.5

Lebih terperinci

REKAPITULASI BIAYA NO URAIAN SUB TOTAL

REKAPITULASI BIAYA NO URAIAN SUB TOTAL REKAPITULASI BIAYA KEGIATAN : PEMBANGUNAN GEDUNG KANTOR PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR TAHAP III LOKASI : BINCAU MARTAPURA KABUPATEN BANJAR NO URAIAN SUB TOTAL I. PEKERJAAN PERSIAPAN Rp. II. PEKERJAAN

Lebih terperinci

Panduan Menghitung Volume Pekerjaan Pondasi

Panduan Menghitung Volume Pekerjaan Pondasi Panduan Menghitung Volume Pekerjaan Pondasi Pekerjaan pondasi yang telah disetting dalam software rab meliputi pekerjaanpekerjaan sebagai berikut: 1. Galian tanah pondasi 2. Pasangan Pondasi Batu Kosong

Lebih terperinci

Sub total : Dibulatkan : Dibulatkan : Sub total : Dibulatkan :

Sub total : Dibulatkan : Dibulatkan : Sub total : Dibulatkan : Lampiran Daftar Kuantitas Dan Harga ANALISA HARGA BANGUNAN EDUKASI DEPO KRL DEPOK 1 1 m2 Pembuatan bedeng 1.25000 Btg Dolken kayu Ø 8-10 / 400 cm @ Rp. 0.18600 m3 Kayu Meranti Terentang/Meranti @ Rp. 0.30000

Lebih terperinci

REKAPITULASI RENCANA ANGGARA BIAYA (RAB)

REKAPITULASI RENCANA ANGGARA BIAYA (RAB) REKAPITULASI RENCANA ANGGARA BIAYA (RAB) PROGRAM KEGIATAN LOKASI : PENDIDIKAN ISLAM : PEMBANGUNAN 3 RUANG KELAS BARU : MAN SAMPANG JL. JAKSA AGUNG NO.88 SAMPANG NO URAIAN KEGIATAN JUMLAH HARGA A PEKERJAAN

Lebih terperinci

No Uraian Pekerjaan Volume Sat Harga Satuan (Rp) Jumlah Harga (Rp) A Pekerjaan Persiapan. Pekerjaan Tanah. Pekerjaan Pondasi. Pekerjaan Struktur

No Uraian Pekerjaan Volume Sat Harga Satuan (Rp) Jumlah Harga (Rp) A Pekerjaan Persiapan. Pekerjaan Tanah. Pekerjaan Pondasi. Pekerjaan Struktur RENCANA ANGGARAN BIAYA ( RAB ) Pekerjaan : Pembangunan Gedung kantor UPPD dan SAMSAT Semarang I Lokasi : Jl. Majapahit Semarang, No 428 Pedurungan Semarang A Pekerjaan Persiapan B C D 1 Pembersihan lahan

Lebih terperinci

ANALISA HARGA SATUAN PENGADAAN PEKERJAAN RENOVASI LOKET ST. LENTENG AGUNG UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2

ANALISA HARGA SATUAN PENGADAAN PEKERJAAN RENOVASI LOKET ST. LENTENG AGUNG UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2 Lampiran RKS No : 2413/LL/KCJ/RKS/X/2015, tanggal 21 Oktober 2015 ANALISA HARGA SATUAN PENGADAAN PEKERJAAN RENOVASI LOKET ST. LENTENG AGUNG UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2

Lebih terperinci

RENCANA ANGGARAN BIAYA

RENCANA ANGGARAN BIAYA RENCANA ANGGARAN BIAYA KEGIATAN : PEMBANGUNAN GEDUNG PENGADILAN NEGERI SURABAYA LOKASI : SURABAYA No. C. PEKERJAAN ARSITEKTUR I. LANTAI 1 I.1 PEKERJAAN PASANGAN DAN PLESTERAN 1 Pas. Batu Kali 1 Pc : 5

Lebih terperinci

ESTIMASI BIAYA. Program Studi Teknik Sipil Jurusan Teknik Sipil Politeknik Negeri Banjarmasin ESTIMASI BIAYA DAN MANAJEMEN WAKTU

ESTIMASI BIAYA. Program Studi Teknik Sipil Jurusan Teknik Sipil Politeknik Negeri Banjarmasin ESTIMASI BIAYA DAN MANAJEMEN WAKTU ESTIMASI BIAYA Program Studi Teknik Sipil Jurusan Teknik Sipil Politeknik Negeri Banjarmasin DAFTAR HARGA SATUAN UPAH ESTIMASI BIAYA DAN MANAJEMEN WAKTU No. Macam Pekerja Upah Tenaga 1 Pekerja /hari 2

Lebih terperinci

BAB 8 RENCANA ANGGARAN BIAYA

BAB 8 RENCANA ANGGARAN BIAYA BAB 8 RENCANA ANGGARAN BIAYA 8.1. Rencana Anggaran Biaya (RAB) Rencana anggaran biaya (RAB) adalah tolok ukur dalam perencanaan pembangunan,baik ruma htinggal,ruko,rukan maupun gedung lainya. Dengan RAB

Lebih terperinci

A. METODE PELAKSANAAN GEDUNG 2 TINGKAT PONDASI TIANG PANCANG. Adapun metode pelaksanaan yang digunakan adalah sebagai berikut:

A. METODE PELAKSANAAN GEDUNG 2 TINGKAT PONDASI TIANG PANCANG. Adapun metode pelaksanaan yang digunakan adalah sebagai berikut: A. METODE PELAKSANAAN GEDUNG 2 TINGKAT PONDASI TIANG PANCANG Adapun metode pelaksanaan yang digunakan adalah sebagai berikut: 1. Pekerjaan Pendahuluan Pekerjaan pendahuluan merupakan pekerjaan persiapan

Lebih terperinci

REKAPITULASI BILL OF QUANTITY (BOQ)

REKAPITULASI BILL OF QUANTITY (BOQ) REKAPITULASI BILL OF QUANTITY (BOQ) PEKERJAAN : PEMBANGUNAN GEDUNG PERTEMUAN KANTOR BADAN KETAHANAN PANGAN (BKP) KAB. DONGGALA LOKASI : KEL. GUNUNG BALE KEC. BANAWA KAB. DONGGALA TAHUN ANGGARAN : 2013

Lebih terperinci

PSD III Desain Ars Undip TA 31

PSD III Desain Ars Undip TA 31 RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG KANTOR BANK TABUNGAN NEGARA ( PERSERO ) CABANG BALIK PAPAN TAHUN 2012 I. PEKERJAAN PERSIAPAN : 1 Pembersihan lapangan 2,023.75 m² 6,300.00 12,749,625.00 2

Lebih terperinci

LAMPIRAN RENCANA ANGGARAN BIAYA PENAWARAN DAN ANGGARAN BIAYA PELAKSANAAN

LAMPIRAN RENCANA ANGGARAN BIAYA PENAWARAN DAN ANGGARAN BIAYA PELAKSANAAN 82 LAMPIRAN RENCANA ANGGARAN BIAYA PENAWARAN DAN ANGGARAN BIAYA PELAKSANAAN 83 REKAPITULASI RENCANA ANGGARAN BIAYA PENAWARAN KSDA No. URAIAN TOTALJUMLAH BIAYA I PERSIAPAN 19,022,204.00 II TANAH & PASIR

Lebih terperinci

REKAPITULASI TOTAL 1. PEKERJAAN STRUKTUR GEDUNG KANTOR DISPENDA 2. PEKERJAAN ARSITEKTUR GEDUNG KANTOR DISPENDA

REKAPITULASI TOTAL 1. PEKERJAAN STRUKTUR GEDUNG KANTOR DISPENDA 2. PEKERJAAN ARSITEKTUR GEDUNG KANTOR DISPENDA REKAPITULASI TOTAL Kegiatan : Pembangunan Gedung Kantor Pekerjaan : Pembangunan Gedung Kantor Dispenda Prov. Kaltim Tahap II Lokasi : Jl. MT. Haryono Sumber Dana : APBD Provinsi Tahun Anggaran : 2011 NO

Lebih terperinci

PT / CV. Alamat :. LOGO PT / CV. Kegiatan Pekerjaan Lokasi Sumber Dana

PT / CV. Alamat :. LOGO PT / CV. Kegiatan Pekerjaan Lokasi Sumber Dana LOGO PT / CV PT / CV. Alamat :. REKAPITULASI DAFTAR KUANTITAS DAN HARGA No Uraian 1 2 3 A PEKERJAAN BANGUNAN GEDUNG I Persiapan dan Tanah II Pondasi dan Beton III Dinding dan Plesteran IV Lantai V Pekerjaaan

Lebih terperinci

URAIAN. Tenaga Oh Tukang 90, Oh Kepala Tukang 110, Oh Pekerja 75, Oh Mandor 120,000.

URAIAN. Tenaga Oh Tukang 90, Oh Kepala Tukang 110, Oh Pekerja 75, Oh Mandor 120,000. NO URAIAN HARGA SATUAN (RP) I PEKERJAAN PERSIAPAN 1 M' Pasangan Bouwplank + Pengukuran 0.012 M3 Kayu kls.iv 5/7 1,600,000.00 0.007 Btg Kayu kls.iv papan 1,300,000.00 0.020 Kg Paku biasa 18,000.00 0.100

Lebih terperinci

DAFTAR ANALISA SNI DINAS PU CIPTA KARYA DAN TATA RUANG KABUPATEN JEMBER TAHUN ANGGARAN 2012

DAFTAR ANALISA SNI DINAS PU CIPTA KARYA DAN TATA RUANG KABUPATEN JEMBER TAHUN ANGGARAN 2012 DAFTAR ANALISA SNI DINAS PU CIPTA KARYA DAN TATA RUANG KABUPATEN JEMBER TAHUN ANGGARAN 202 Wilayah Jember NO. JENIS PEKERJAAN BAHAN UPAH JUMLAH BULAT 2 B. PEKERJAAN TANAH Analisa SNI Dinas PU. Cipta Karya

Lebih terperinci

ANALISA HARGA SATUAN

ANALISA HARGA SATUAN 1 1 m2 Pembuatan gudang material kerja 1,70000 Btg Kayu dolken 8 / 10 cm panjang 4 meter @ Rp. = Rp 0,21000 M³ Kayu klas 1 usuk ukuran 4/6 ; 5/7 panjang 2 meter @ Rp. = Rp 0,30000 Kg Paku usuk kayu 7 cm

Lebih terperinci

BILL OF QUANTITY (BQ)

BILL OF QUANTITY (BQ) BILL OF QUANTITY (BQ) Rekapitulasi Program : Wajib Belajar Pendidikan Sembilan Tahun Lokasi : SMP N 1 Palmatak Kec.Palmatak NO URAIAN PEKERJAAN Rp. HARGA I PEKERJAAN PENDAHULUAN Rp. II PEKERJAAN GALIAN

Lebih terperinci

DAFTAR ISI. Halaman Judul Pengesahan Persetujuan ABSTRAK ABSTRACT KATA PENGANTAR

DAFTAR ISI. Halaman Judul Pengesahan Persetujuan ABSTRAK ABSTRACT KATA PENGANTAR DAFTAR ISI Halaman Judul i Pengesahan ii Persetujuan iii ABSTRAK iv ABSTRACT v KATA PENGANTAR vi DAFTAR ISI viii DAFTAR TABEL xi DAFTAR GAMBAR xiii DAFTAR LAMPIRAN xv BAB I PENDAHULUAN 1 1.1 LATAR BELAKANG

Lebih terperinci

DAFTAR ANALISA SNI HARGA SATUAN PEKERJAAN

DAFTAR ANALISA SNI HARGA SATUAN PEKERJAAN DAFTAR ANALISA SNI HARGA SATUAN PEKERJAAN ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN SNI.01.2.6.1 1 m² Membersihkan lapangan dengan peralatan 0,1000 Oh Pekerja Rp. - - 0,0500 Oh Mandor Rp. - - SNI.01.2.6.

Lebih terperinci

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH PEMERINTA A BAHAN DASAR 1 Batu Kali 100.000,00 Utuh m 3 200.000,00 Split / Pecah 3-5 cm m 3 2 4 Pasir Split / Pecah 2-3 cm m 3 Split / Pecah 1-2 cm m 3 Split / Pecah 0,51-1 cm 2 Batu Gunung m 3 3 Tanah

Lebih terperinci

DAFTAR HARGA SATUAN ANALISA PEKERJAAN

DAFTAR HARGA SATUAN ANALISA PEKERJAAN DAFTAR SATUAN ANALISA PEKERJAAN No SATUAN UPAH BAHAN A PEKERJAAN PERSIAPAN 1 PEMASANGAN BOWPLANK/ 10 M' 0,01000 Kepala Tukang 0,10000 Tukang 0,10000 Pekerja 0,05000 Mandor 0,01200 M3 Balok Klas IV 0,02000

Lebih terperinci

BUPATI PURBALINGGA PROVINSI JAWA TENGAH PERATURAN BUPATI PURBALINGGA NOMOR 12 TAHUN 2017 TENTANG

BUPATI PURBALINGGA PROVINSI JAWA TENGAH PERATURAN BUPATI PURBALINGGA NOMOR 12 TAHUN 2017 TENTANG SALINAN BUPATI PURBALINGGA PROVINSI JAWA TENGAH PERATURAN BUPATI PURBALINGGA NOMOR 12 TAHUN 2017 TENTANG HARGA KOMPONEN BANGUNAN DAN UPAH TENAGA KERJA SEBAGAI DASAR PENYESUAIAN NILAI JUAL OBJEK PAJAK BANGUNAN

Lebih terperinci

RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG PENGADILAN AGAMA MUNGKID MAGELANG TAHUN 2012

RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG PENGADILAN AGAMA MUNGKID MAGELANG TAHUN 2012 RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG PENGADILAN AGAMA MUNGKID MAGELANG TAHUN 2012 No. Uraian Pekerjaan Volume Satuan Rp. Rp. Rp. I. PEKERJAAN PERSIAPAN : 1 Pembersihan lapangan 2,325.78 m² 6,300.00

Lebih terperinci

REKAPITULASI RENCANA ANGGARAN BIAYA

REKAPITULASI RENCANA ANGGARAN BIAYA REKAPITULASI RENCANA ANGGARAN BIAYA Kegiatan : 0 PEKERJAAN : PENGEMBANGAN PENETASAN LOKASI : BPTU KDI KEC. TAMBANG ULANG NO URAIAN PEKERJAAN JUMLAH (Rp) I. PEKERJAAN PERSIAPAN II. PEKERJAAN TANAH DAN PONDASI

Lebih terperinci

PT. WIKA REALTY BIRO TEKNIK dan PENGEMBANGAN USAHA SPESIFIKASI BAHAN

PT. WIKA REALTY BIRO TEKNIK dan PENGEMBANGAN USAHA SPESIFIKASI BAHAN PT. WIKA REALTY BIRO TEKNIK dan PENGEMBANGAN USAHA SPESIFIKASI BAHAN Kawasan : THE HILLS, SEMARANG RUMAH TYPE 45 No. Spek : NO. URAIAN ITEM PEKERJAAN SPESIFIKASI MATERIAL FINISHING KETERANGAN 01. Pondasi

Lebih terperinci

Addendum dokumen pengadaan dapat diambil dalam aplikasi SPSE melalui website Addendum dokumen berupa Gambar Rencana.

Addendum dokumen pengadaan dapat diambil dalam aplikasi SPSE melalui website  Addendum dokumen berupa Gambar Rencana. PEMERINTAH KOTA BAUBAU SEKRETARIAT DAERAH UNIT LAYANAN PENGADAAN BARANG JASA Gd. Maedani Lt. 1, Jln. Sijawangkati No. - Website: setda.baubaukota.go.id Email:ulp@baubaukota.go.id; ulp.baubaukota@gmail.com

Lebih terperinci

DAFTAR SATUAN UPAH DAN BAHAN

DAFTAR SATUAN UPAH DAN BAHAN DAFTAR SATUAN UPAH DAN BAHAN NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA TENAGA 1 Tukang kayu hari 2 Kepala tukang kayu hari 3 Tukang batu hari 4 Kepala tukang batu hari 5 Tukang besi hari 6 Kepala tukang

Lebih terperinci

BAB 8 RENCANA ANGGARAN BIAYA

BAB 8 RENCANA ANGGARAN BIAYA BAB 8 RENCANA ANGGARAN BIAYA 8.1. Rencana Anggaran Biaya (RAB) Rencana anggaran biaya (RAB) merupakan perhitungan banyaknya biaya yang diperlukan untuk bahan dan upah, serta biaya-biaya lain yang berhubungan

Lebih terperinci

Perubahan Aktivitas. Aktivitas 1. Pengukuran (Sama dengan aktivitas awal)

Perubahan Aktivitas. Aktivitas 1. Pengukuran (Sama dengan aktivitas awal) Perubahan Aktivitas Aktivitas 1. Pengukuran (Sama dengan aktivitas awal) (Rp) 1 1ls Pengukuran 1 Kepala Tukang Org 1,000 40000 40000 2 Pekerja Org 1,000 27500 27500 3 Perlengkapan ls 1,000 349200 349200

Lebih terperinci

PERENCANAAN PEMBANGUNAN DISPERINDAGSAR BOYOLALI (DINAS PERINDUSTRIAN DAN PERDAGANGAN PASAR) PT WIDHA DYAH AYU PURBO SIWI 2B314953

PERENCANAAN PEMBANGUNAN DISPERINDAGSAR BOYOLALI (DINAS PERINDUSTRIAN DAN PERDAGANGAN PASAR) PT WIDHA DYAH AYU PURBO SIWI 2B314953 PERENCANAAN PEMBANGUNAN DISPERINDAGSAR BOYOLALI (DINAS PERINDUSTRIAN DAN PERDAGANGAN PASAR) PT WIDHA DYAH AYU PURBO SIWI 2B314953 Seperti yang telah diketahui perbedaan pemahaman dan pengetahuan antara

Lebih terperinci

Penerapan Rekayasa Nilai (Value Engineering) Pekerjaan Arsitektural Pada Proyek Pembangunan Transmart Carrefour Padang

Penerapan Rekayasa Nilai (Value Engineering) Pekerjaan Arsitektural Pada Proyek Pembangunan Transmart Carrefour Padang D1 Penerapan Rekayasa Nilai (Value Engineering) Pekerjaan Arsitektural Pada Proyek Pembangunan Transmart Carrefour Padang Khaerul Bahri, dan Retno Indryani Departemen Teknik Sipil, Fakultas Teknik Sipil,

Lebih terperinci

BAB IV DATA DAN ANALISIS

BAB IV DATA DAN ANALISIS BAB IV DATA DAN ANALISIS 4.1 Data Proyek 4.1.1 Data Umum Nama Proyek Lokasi Proyek : Pembangunan Rumah Kost 3 Lantai : Taman Permata Blok A3 No 35, Lippo Village, Tangerang, Banten Peruntukan Luas Bangunan

Lebih terperinci

69/ /120 BRONZE. LB/LT Standar LB/LT Standar dengan Kantor. tipe

69/ /120 BRONZE. LB/LT Standar LB/LT Standar dengan Kantor. tipe tipe BRONZE LB/LT Standar LB/LT Standar dengan Kantor 69/120 139/120 5.00 1.25 9.00 1.75 3.00 1.00 3.00 1.22 4.78 5.00 1.25 9.00 1.75 3.00 1.00 3.00 POTONGAN MELINTANG DEPAN DENAH TIPE STANDAR DENAH TIPE

Lebih terperinci

BAB V HASIL DAN PEMBAHASAN

BAB V HASIL DAN PEMBAHASAN 30 BAB V HASIL DAN PEMBAHASAN 5.1. Gambar Struktur R. Makan Karyawan LPJ Instalation Genset Garbage Laundry Reseiver Security Water Treatment Cold Storange (Freser) Cold Storange (Freser) Cold Storange

Lebih terperinci

Permulaan Hikmat adalah takut akan Tuhan, Dan Mengenal Yang Mahakudus adalah Pengertian ( Amsal 9:10 )

Permulaan Hikmat adalah takut akan Tuhan, Dan Mengenal Yang Mahakudus adalah Pengertian ( Amsal 9:10 ) Permulaan Hikmat adalah takut akan Tuhan, Dan Mengenal Yang Mahakudus adalah Pengertian ( Amsal 9:10 ) Kupersembahkan untuk Ayah, Ibu Dan semua orang yang Kusayangi Lampiran 1 81 ANALISA HARGA SATUAN PEKERJAAN

Lebih terperinci

BAB IV ANALISA DATA. Karya Mortar Pasangan Bata 50 Kg

BAB IV ANALISA DATA. Karya Mortar Pasangan Bata 50 Kg BAB IV ANALISA DATA IV. 1. ANALISA DATA Data data yang diperlukan untuk di analisa dalam pembahasan skripsi studi kasus pengaruh material material alternatif terhadap proyek konstruksi perumahan Taman

Lebih terperinci

Panduan Menghitung Volume Pekerjaan Atap

Panduan Menghitung Volume Pekerjaan Atap Panduan Menghitung Volume Pekerjaan Atap Pekerjaan atap yang diseting pada software rab meliputi pekerjaan sbb: 1. Rangka atap baja ringan 2. Tutup atap genting plentong 3. Genting bubung plentong 4. Listplang

Lebih terperinci

The Dream of a Golden Lavish Living

The Dream of a Golden Lavish Living The Dream of a Golden Lavish Living The Dream of a Golden Lavish Living The Dream of a Golden Lavish Living Perpaduan gaya hidup sehat dan modern di lingkungan yang hijau, aman dan nyaman selalu menjadi

Lebih terperinci

BILL OF QUANTITY ( BQ )

BILL OF QUANTITY ( BQ ) BILL OF QUANTITY ( BQ ) KEGIATAN : PENINGKATAN FASILITAS RUMAH SAKIT PEKERJAAN : PENGADAAN KONSTRUKSI BANGUNAN AULA DAN ASRAMA DIKLAT RSUD TUGUREJO LOKASI : JL. TUGUREJO SEMARANG SUMBER DANA : APBD TAHUN

Lebih terperinci

MM-100 PEREKAT PASANGAN BATA RINGAN THIN BED

MM-100 PEREKAT PASANGAN BATA RINGAN THIN BED MM-100 PEREKAT PASANGAN BATA RINGAN THIN BED DESKRIPSI Semen Instan sebagai perekat untuk pemasangan Bata Ringan (AAC Block) dengan bahan dasar semen, pasir silika, filler dan adi>f yang dcampur secara

Lebih terperinci

ek SIPIL MESIN ARSITEKTUR ELEKTRO

ek SIPIL MESIN ARSITEKTUR ELEKTRO ek SIPIL MESIN ARSITEKTUR ELEKTRO PENERAPAN REKAYASA NILAI (VALUE ENGINEERING) PADA KONSTRUKSI BANGUNAN Mastura Labombang * Abstract The goal of this research is to obtained the cheapert and the best solution

Lebih terperinci

BAB V. SIMPULAN dan SARAN

BAB V. SIMPULAN dan SARAN BAB V SIMPULAN dan SARAN 5.1 Simpulan Berdasarkan hasil penelitian dan pembahasan tentang analisis rencana life cycle cost gedung hostel pada kawasan rumah sakit jimbun medika Kediri, maka dapat diambil

Lebih terperinci

DAFTAR KUANTITAS - Bill of Quantity ( BQ )

DAFTAR KUANTITAS - Bill of Quantity ( BQ ) DAFTAR KUANTITAS - Bill of Quantity ( BQ ) Pekerjaan Lokasi : Pembangunan Gudang Arsip 2 lantai GKN Surabaya I Pada GKN Surabaya I Tahun 2010 : JL Indrapura no 5 Surabaya NO URAIAN PEKERJAAN JUMLAH A I

Lebih terperinci

LAPORAN PEKERJAAN BANGUNAN PENGHUBUNG

LAPORAN PEKERJAAN BANGUNAN PENGHUBUNG LAPORAN PEKERJAAN BANGUNAN PENGHUBUNG 1. Latar Belakang Perguruan Tinggi Raharja memiliki 2 gedung yaitu Gedung Modern dan Gedung Lake View dimana mobilitas sivitas pribadi Raharja pada dua bangunan ini

Lebih terperinci

RENCANA ANGGARAN BIAYA (RAB)

RENCANA ANGGARAN BIAYA (RAB) RENCANA ANGGARAN BIAYA (RAB) PROYEK : PEMBANGUNAN/RENOVASI GEDUNG LABORATORIUM DAN KANTOR PEKERJAAN : RENOVASI DAN PEMBANGUNAN LABORATORIUM MIKROBIOLOGI 260 M2 LOKASI : JL. NUR ATMADIBRATA NO. 11 TELANAI

Lebih terperinci

ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI

ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI NO. URAIAN KOEF SAT. TOTAL 1 1 M2 PEK. PENGUKURAN KEMBALI (SITE) Tukang Batu 0,0100 org P e k e r j a 0,0200 org Peralatan 0,5000 lot 2 1 M1 PEK. PASANGAN BOUWPLANK

Lebih terperinci

BAB XIII. DAFTAR KUANTITAS DAN HARGA PEMBANGUNAN GEDUNG ARSIP

BAB XIII. DAFTAR KUANTITAS DAN HARGA PEMBANGUNAN GEDUNG ARSIP BAB XIII. DAFTAR KUANTITAS DAN HARGA REKAPITULASI PEMBANGUNAN GEDUNG ARSIP Lokasi : KANTOR SYAHBANDAR KELAS UTAMA TANJUNG PRIOK T.A : 2012 No Jenis Pekerjaan (Rp) I PEKERJAAN PERSIAPAN - II PEKERJAAN STRUKTUR

Lebih terperinci

PERNYATAAN ANTI PLAGIAT..

PERNYATAAN ANTI PLAGIAT.. DAFTAR ISI ABSTRAK... PERNYATAAN ANTI PLAGIAT.. KATA PENGANTAR... DAFTAR ISI... DAFTAR LAMPIRAN... DAFTAR TABEL... DAFTAR DIGRAM... DAFTAR GAMBAR... BAB I PENDAHULUAN... 1 A. LATAR BELAKANG... 1 B. IDENTIFIKASI

Lebih terperinci

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN BANK JATIM KEDIRI

PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN BANK JATIM KEDIRI PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN BANK JATIM KEDIRI Ali Musa Arrasyid Hasibuan, I Putu Artama Wiguna, dan Yusronia Eka Putri Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanan, Institut

Lebih terperinci

RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN : PEMBANGUNAN RUMAH IBU INDRI : BREBES, JAWA TENGAH

RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN : PEMBANGUNAN RUMAH IBU INDRI : BREBES, JAWA TENGAH RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN : PEMBANGUNAN RUMAH IBU INDRI LOKASI : BREBES, JAWA TENGAH NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA I PEKERJAAN PERSIAPAN 1 Pembuatan Direksi Keet dan

Lebih terperinci

DAFTAR HARGA TENAGA KERJA DAN BAHAN

DAFTAR HARGA TENAGA KERJA DAN BAHAN DAFTAR HARGA TENAGA KERJA DAN BAHAN No. Uraian Satuan I HARGA TENAGA KERJA 1 Pekerja Org/hr - 2 Tukang Org/hr - 3 Kepala tukang Org/hr - 4 Mandor Org/hr - II HARGA BAHAN A. BAHAN PASANGAN 1 Pasir beton

Lebih terperinci

: Pembangunan Gedung Pengadilan Negeri Surabaya : DAFTAR HARGA SATUAN BAHAN & UPAH SATUAN / UNIT JENIS BARANG / JASA HARGA SATUAN

: Pembangunan Gedung Pengadilan Negeri Surabaya : DAFTAR HARGA SATUAN BAHAN & UPAH SATUAN / UNIT JENIS BARANG / JASA HARGA SATUAN : DAFTAR BAHAN & UPAH DAFTAR HARGA BAHAN 1 Abu Batu m3 Rp 60.600,00 2 Alumunium foil 920 DS m2 Rp 9.300,00 3 Air ltr Rp 175,00 4 Angkur dia19 mm x 45 cm bh Rp 5 Balok Kayu Kelas II m3 Rp 6.526.250,00 6

Lebih terperinci

Penerapan Rekayasa Nilai Pada Proyek Apartemen Taman Melati Margonda Depok

Penerapan Rekayasa Nilai Pada Proyek Apartemen Taman Melati Margonda Depok 1 Penerapan Rekayasa Nilai Pada Apartemen Taman Melati Margonda Depok Dennis Adipratama Pohan, Christiono Utomo ST, MT, PhD Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanan, Institut Teknologi

Lebih terperinci

SURAT PERJANJIAN KERJA

SURAT PERJANJIAN KERJA SURAT PERJANJIAN KERJA PROYEK UD. MITRA DUTA KONSTRUKSI JAYA ABADI, cv General Contractor Steel Building Constructor Consulting Engineering Taman Cibaduyut Indah Blok A No.108 Telp. (022)- 92570509-081220282868

Lebih terperinci

ANALISA HARGA SATUAN MEMBUAT TOILET DAN MUSHOLAH DI ST. BOJONGGEDE UNTUK MENDUKUNG PELAYANAN PENUMPANG

ANALISA HARGA SATUAN MEMBUAT TOILET DAN MUSHOLAH DI ST. BOJONGGEDE UNTUK MENDUKUNG PELAYANAN PENUMPANG Lampiran RKS nomor : 2356/ LL/KCJ/RKS/X/2015 ANALISA HARGA SATUAN MEMBUAT TOILET DAN MUSHOLAH DI ST. BOJONGGEDE UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2 : 0.333 Oh Pekerja x Rp.

Lebih terperinci

NO. JENIS / URAIAN SATUAN SAB BATANG 2015 SAB BATANG 2015 MINUS PPN 10% HARGA PERENCANAAN DIPAKAI

NO. JENIS / URAIAN SATUAN SAB BATANG 2015 SAB BATANG 2015 MINUS PPN 10% HARGA PERENCANAAN DIPAKAI NO. JENIS / URAIAN SATUAN SAB BATANG 2015 SAB BATANG 2015 MINUS PPN 10% HARGA PERENCANAAN DIPAKAI (Rp) 1 2 3 5 6 7 I BAHAN A MATERIAL DASAR 1 Abu Batu m3 198,250 180,227 196,000 2 Batu Belah m3 148,000

Lebih terperinci

PROYEK : APARTEMEN TREE PARK BSD SERPONG LOKASI : TANGERANG SELATAN BANTEN. Bobot Oct-14 Nov-14 Dec-14 Jan-15 (%)

PROYEK : APARTEMEN TREE PARK BSD SERPONG LOKASI : TANGERANG SELATAN BANTEN. Bobot Oct-14 Nov-14 Dec-14 Jan-15 (%) PROYEK : APARTEMEN TREE PARK BSD SERPONG LOKASI : TANGERANG SELATAN BANTEN No Uraian Pekerjaan Jumlah Harga Bobot Oct-14 Nov-14 Dec-14 Jan-15 (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A PEKERJAAN PERSIAPAN

Lebih terperinci

REKAPITULASI TOTAL BILL of QUANTITY (BOQ) REKAPITULASI

REKAPITULASI TOTAL BILL of QUANTITY (BOQ) REKAPITULASI REKAPITULASI TOTAL BILL of QUANTITY (BOQ) PROGRAM : PENINGKATAN EFISIENSI PERDAGANGAN DALAM NEGERI KEGIATAN : PENINGKATAN SARANA DAN PRASARANA PASAR PEKERJAAN : PEMBANGUNAN PASAR LELANG KARET LOS 15 X

Lebih terperinci

DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJA

DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJA DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJA NO URAIAN HARGA SATUAN I. BAHAN 1 Batu plonos Rp 52,400.00 / m 3 2 Batu belah 10/15 Rp 61,400.00 / m 3 3 Batu pecah 2/3 Rp 99,200.00 / m 3 4 Sirtu Rp 42,400.00

Lebih terperinci

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH SURAKARTA 2012

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH SURAKARTA 2012 STUDI PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN DINDING MENGGUNAKAN BLOK HEBEL DENGAN BATA MERAH KLATEN PADA PROYEK PEMBANGUNAN KANTOR PT. AERO PRIMA 3 LANTAI DI BOYOLALI Naskah Publikasi untuk

Lebih terperinci

DINAS PEKERJAAN UMUM PERUMAHAN DAN KAWASAN PERMUKIMAN REKAPITULASI HASIL SURVAI BAHAN / MATERIAL TAHUN 2017

DINAS PEKERJAAN UMUM PERUMAHAN DAN KAWASAN PERMUKIMAN REKAPITULASI HASIL SURVAI BAHAN / MATERIAL TAHUN 2017 DINAS PEKERJAAN UMUM PERUMAHAN DAN KAWASAN PERMUKIMAN REKAPITULASI HASIL SURVAI BAHAN / MATERIAL TAHUN 2017 NO NAMA BARANG 1 Alluminium Foil roll #DIV/0! 2 Alluminium (Plepet Alumunium) btg 32.000 3 Alkasit

Lebih terperinci

BAB 8 RENCANA ANGGARAN BIAYA

BAB 8 RENCANA ANGGARAN BIAYA BAB 8 RENCANA ANGGARAN BIAYA 8.1 Volume Pekerjaan 8.1.1 Perkerjaan Persiapan 8.1.1.1 Pembersihan Lokasi panjang bangunan (p) = 40 m lebar bangunan (l) = 40 m Luas Pembersihan Lokasi = p x l = 1600 m2 8.1.1.2

Lebih terperinci

REKAPITULASI RENCANA ANGGARAN BIAYA

REKAPITULASI RENCANA ANGGARAN BIAYA REKAPITULASI RENCANA ANGGARAN BIAYA PROGRAM KEGIATAN PEKERJAAN LOKASI : PERENCANAAN DAN PENGEMBANGAN HUTAN : PENGEMBANGAN SARANA DAN PRASARANA OPERASIONAL KPHL DAN KPHP (DAK DAN PENDAMPING : PEMBANGUNAN

Lebih terperinci

LAPORAN PERTANGGUNGJAWABAN AKHIR PELAKSANAAN KEGIATAN REHABILITASI SEKOLAH DASAR TAHUN 2012

LAPORAN PERTANGGUNGJAWABAN AKHIR PELAKSANAAN KEGIATAN REHABILITASI SEKOLAH DASAR TAHUN 2012 LAPORAN PERTANGGUNGJAWABAN AKHIR PELAKSANAAN KEGIATAN REHABILITASI SEKOLAH DASAR TAHUN 2012 SEKOLAH DASAR NEGERI KLENDER 24 PAGI KEL. KLENDER - KEC. DUREN SAWIT DINAS PENDIDIKAN PROVINSI DAERAH KHUSUS

Lebih terperinci

Analisis Value Engineering dengan Metode Zero-One pada Proyek Pembangunan Gedung Laboratorium Komputer Kampus 3 Universitas Ahmad Dahlan Yogyakarta

Analisis Value Engineering dengan Metode Zero-One pada Proyek Pembangunan Gedung Laboratorium Komputer Kampus 3 Universitas Ahmad Dahlan Yogyakarta Analisis Value Engineering dengan Metode Zero-One pada Proyek Pembangunan Gedung Laboratorium Komputer Kampus 3 Universitas Ahmad Dahlan Yogyakarta Diyar Rahma 1) Widi Hartono 2) Sugiyarto 3) 1) Mahasiswa

Lebih terperinci

BILL OF QUANTITY ( B O Q )

BILL OF QUANTITY ( B O Q ) PEMERINTAH KABUPATEN ROKAN HULU DINAS TATA RUANG DAN CIPTA KARYA KOMPLEK PERKANTORAN PEMDA ROKAN HULU PASIR PENGARAIAN BILL OF QUANTITY ( B O Q ) KEGIATAN PEMBANGUNAN GEDUNG SOSIAL KEMASYARAKATAN PEKERJAAN

Lebih terperinci

Modifikasi Struktur pada Proyek Mall dan Apartemen Seasons City Jakarta Menggunakan Value Engineering

Modifikasi Struktur pada Proyek Mall dan Apartemen Seasons City Jakarta Menggunakan Value Engineering Modifikasi Struktur pada Proyek Mall dan Apartemen Seasons City Jakarta Menggunakan Value Engineering Oleh : Ivan Kurniawan 3107 100 025 Dosen Pembimbing : Trijoko Wahyu Adi, ST.MT.Ph.D. BAB P endahuluan

Lebih terperinci

PERNYATAAN. Yang bertanda tangan di bawah ini, saya: NIM :

PERNYATAAN. Yang bertanda tangan di bawah ini, saya: NIM : i PERNYATAAN Yang bertanda tangan di bawah ini, saya: N a m a : Made Ady Widyatmikha NIM : 1219151029 Judul TA : Analisis Perbandingan Biaya Dan Waktu Pelaksanaan Pasangan Bata Ringan Blesscon Dan Bata

Lebih terperinci

Penerapan Rekayasa Nilai pada Proyek Pembangunan Hotel Ciputra World di Surabaya

Penerapan Rekayasa Nilai pada Proyek Pembangunan Hotel Ciputra World di Surabaya Penerapan Rekayasa Nilai pada Proyek Pembangunan Hotel Ciputra World di Surabaya D-65 Adinegoro Choliq dan Retno Indryani Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Institut Teknologi

Lebih terperinci

NO URAIAN SATUAN HARGA KETERANGAN

NO URAIAN SATUAN HARGA KETERANGAN F. DAFTAR HARGA SATUAN BAHAN BANGUNAN NO URAIAN SATUAN HARGA KETERANGAN 1 Air m3 35.000 Belum termasuk 2 Aluminum foil m2 75.000 Pajak dan 3 Aspal curah kg 11.230 retribusi bahan Aspal drum AC 60/70 kg