ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT

dokumen-dokumen yang mirip
PERHITUNGAN DAYA DUKUNG PONDASI JACK PILE MENGGUNAKAN DATA N-SPT PADA PROYEK PEMBANGUNAN GEDUNG U-CITY di JL. BRIGJEND KATAMSO MEDAN

LAPORAN. Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III. PROGRAM DIPLOMA III oleh:

BAB I PENDAHULUAN. 1.1 Latar Belakang. Tanah selalu mempunyai peranan yang penting pada suatu lokasi

PONDASI AN PDA PATIMURA- LAPORAN. oleh: SONIA HOTMA MEDAN

STUDI LITERATUR PERANCANGAN DIMENSI RANGKA BATANG BAJA RINGAN BERDASARKAN ANALISIS LENDUTAN DAN KEKUATAN BAHAN

PERBANDINGAN ESTIMASI BIAYA PEKERJAAN BALOK PADA PROYEK ITC POLONIA MEDAN MENGGUNAKAN HARGA PEMKO MEDAN DAN HARGA SURVEY PASAR LAPORAN.

PERHITUNGAN DAN METODE PELAKSANAAN PONDASI SUMURAN PADA PROYEK PEMBANGUNAN JEMBATAN AEK SIMARE TAPANULI UTARA PROVINSI SUMATERA UTARA LAPORAN

AS 3C-3F LAPORAN PROGRAM

ANALISA STRUKTUR DAN KONTROL KEKUATAN KOLOM PORTAL AS-C1 DAN AS-C4 PADA BANGUNAN RUKO KASUARI INDAH MEDAN

KONTROL PERHITUNGAN DIMENSI BALOK PORTAL AS-2 RUKO R9 DI PROYEK PEMBANGUNAN RUKO CITRALAND BAGYA CITY MEDAN LAPORAN

METODE PELAKSANAAN DAN ANALISIS PERBANDINGAN KEBUTUHAN TULANGAN ANTARA GAMBAR KERJA DENGAN SNI 7394:2008 PADA PEMBANGUNAN RUKO R2 NO

TAHAPAN PELAKSANAAN DAN PERHITUNGAN ANGGARAN BIAYA PEKERJAAN KOLOM BALOK DAN PLAT LANTAI PADA PROYEK ITC POLONIA MEDAN LAPORAN

TEKNIK PELAKSANAAN DAN PERHITUNGAN DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK CITRALAND BAGYA CITY

LAPORAN. Ditulis untuk Menyelesaikan. Mata Kuliah Tugas Akhir Semester VI. Pendidikan Program Diploma III. oleh: NIM NIM.

PENGENDALIAN MUTU DAN PROSES PEMBUATAN TIANG PANCANG SENTRIFUGAL PADA PT WIJAYA KARYA BETON JL. RAYA BINJAI KM 15,5 DELI SERDANG

PERBANDINGAN JUMLAH TENAGA KERJA, WAKTU, DAN BIAYA PELAT LANTAI DAN BALOK RUKO R8 DENGAN METODE PRECAST

BAB I PENDAHULUAN. beberapa macam tipe pondasi. Pemilihan tipe pondasi ini didasarkan atas :

APLIKASI PENJADWALAN MENGGUNAKAN MICROSOFT PROJECT PADA PROYEK PEMBANGUNAN ASRAMA BRIMOB POLDA SUMUT

LAPORAN. Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III. oleh: NIM : NIM :

BAB I PENDAHULUAN. kelapisan tanah di bawahnya. Ditinjau dari segi pelaksanaan, ada beberapa. kondisi tanah pondasi dan batasan batasan struktur.

BAB I PENDAHULUAN. Pondasi merupakan bagian paling bawah dari konstruksi bangunan yang

PERBANDINGAN PERHITUNGAN RENCANA ANGGARAN BIAYA LANJUTAN PEMBANGUNAN GEDUNG KULIAH FAKULTAS EKONOMI UNIVERSITAS SUMATERA UTARA

Analisis Pile Cap AS B1 Pada Proyek Pembangunan Gedung Kuliah Wilmar Business Institute Medan Dengan Metode Konvensional danmetodestrut and Tie

ESTIMASI ANGGARAN BIAYA PEKERJAAN STRUKTUR DAN PENJADWALAN PADA PROYEK PEMBANGUNAN GEDUNG KCU BCA DI JALAN ASIA MEDAN

TINJAUAN PERHITUNGAN TULANGAN KOLOM LANTAI 1 DAN LANTAI 2 PADA PORTAL AS-C PADA PROYEK ITC POLONIA MEDAN

BAB I PENDAHULUAN. Salah satu masalah yang sedang dihadapi masyarakat di Provinsi Sumatera

METODE PELAKSANAAN PEKERJAANPADA PAKET PELEBARAN JALAN SIDIKALANG BATAS PROVINSI NAD LAPORAN

STUDI ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG

I. PENDAHULUAN. Sejalan dengan program pemerintah dalam meningkatkan taraf pembangunan,

PERANCANGAN PERKUATAN LONGSORAN BADAN JALAN PADA RUAS JALAN SUMEDANG-CIJELAG KM MENGGUNAKAN TIANG BOR TUGAS AKHIR. Oleh :

LAPORAN. Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III. oleh: NIM NIM.

MEDAN PROGRAM MEDAN LAPORAN. oleh:

KEBUTUHAN AIR SAWAH UNTUK TANAMAN PADI PADA DAERAH IRIGASI PERBAUNGAN KABUPATEN SERDANG BEDAGAI

BAB I PENDAHULUAN Latar Belakang

KEBUTUHAN AIR SAWAH DAERAH IRIGASI JAWA MARAJA BAH JAMBI KABUPATEN SIMALUNGUN

BAB I PENDAHULUAN 1.1 Latar Belakang

TUGAS AKHIR PENINJAUAN ULANG DAYA DUKUNG PONDASI BORED PILE DAN PILE CAP PROYEK JALAN TOL SEMARANG BATANG SEKSI I OVERPASS TULIS STA.

PENGUJIAN PENGENDALIAN MUTU CAMPURAN HOTMIX PERKERASAN AC-BC PADA PROYEK PENINGKATAN STRUKTUR JALAN BATAS KOTA MEDAN- BATAS KABUPATEN TANAH KARO

BAB I PENDAHULUAN. 1.1 Latar Belakang

TUGAS AKHIR. Disusun Sebagai Persyaratan Untuk Mendapatkan Gelar Sarjana

PERHITUNGAN ABUTMENT DAN PONDASI PADA JEMBATAN WEIH KANIS KABUPATEN BENER MERIAH TUGAS AKHIR

KONTROL PERHITUNGAN DIMENSI SALURAN PRIMER DAN DIMENSI KOLAM OLAK BANGUNAN TERJUN 13 SALURAN SEKUNDER DI BENDUNG NAMU SIRA SIRA

ANALISA STRUKTUR DAN KONTROL KEKUATAN BALOK DAN KOLOM PORTAL AS L1-L4 PADA GEDUNG S POLITEKNIK NEGERI MEDAN

REGIONAL I DENGAN RANCANGAN SISTEM PENGGAJIAN MICROSOFT VISUAL BASIC

ANALISA PERBEDAAN HARGA RAB DENGAN RAP UNTUK PEKERJAAN BETON BERTULANG PADA PROYEK ITC POLONIA MEDAN

PERENCANAAN STRUKTUR GEDUNG BERTINGKAT MENGGUNAKAN SAP2000

BAB I PENDAHULUAN. 1.1 Latar Belakang

BAB I PENDAHULUAN. alternatif ruas jalan dengan melakukan pembukaan jalan lingkar luar (outer ring road).

ANALISIS DAYA DUKUNG PONDASI TIANG BOR KELOMPOK PADA PROYEK PEMBANGUNAN GEDUNG GRHA 165 JALAN : TB. SIMATUPANG - JAKARTA

PERENCANAAN PONDASI TIANG PANCANG PADA PEMBANGUNAN HOTEL IBIS MANADO

MENGHITUNG KEBUTUHAN AIR SAWAH PADA DAERAH PERCUT SEI TUAN

METODE PELAKSANAAN PONDASI INTAKE TOWER PADA BANGUNAN SILO PROYEK PT.CERESTAR FLOUR MILLS MEDAN

BAB I PENDAHULUAN. 1.1 Latar Belakang

LAPORAN SKRIPSI OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN DESAIN TIANG PANCANG. Oleh : JALIL MULYANTO

FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI GEDUNG DI KOTA MEDAN TUGAS AKHIR

Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III. oleh:

TINJAUAN DEBIT PEMAKAIAN DAN PERENCANAAN AIR BERSIH PDAM TIRTA MALEM KABANJAHE

ANALISIS DAYA DUKUNG KELOMPOK TIANG BOR PADA PEMBANGUNAN GEDUNG SERBA GUNA UNIVERSITAS KRISTEN MARANATHA ABSTRAK

PERENCANAAN STRUKTUR GUDANG PUPUK KOTA PRABUMULIH LAPORAN AKHIR. Diploma III pada Jurusan Teknik Sipil (Gedung) Politeknik Negeri Sriwijaya OLEH :

PERENCANAAN BANGUNAN ATAS JEMBATAN PADA PROYEK JEMBATAN JALUR PIPA GAS PERTAMINA PANGKALAN BRANDAN KABUPATEN LANGKAT

PERBANDINGAN DAYA DUKUNG AKSIAL TIANG PANCANG TUNGGAL BERDASARKAN DATA SONDIR DAN DATA STANDARD PENETRATION TEST

ABSTRAK. viii Universitas Kristen Maranatha

LAPORAN. Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III NIM NIM

PENDIMENSIAN SERTA RAB PONDASI DAN KOLOM PORTAL G PADA PROYEK PEKERJAAN RENOVASI TOTAL GEDUNG GEREJA JEMAAT BNKP TELADAN MEDAN

ANALISIS KOMPOSISI BIAYA DOMINAN PADA PROYEK BANGUNAN GEDUNG DI KOTA MEDAN

BAB I PENDAHULUAN Latar Belakang. Pemerintah Provinsi DKI Jakarta menyiapkan pembangunan rumah susun

ANALISIS PERENCANAAN DIAPHRAGM WALL SEBAGAI DINDING PENAHAN TANAH PADA PROYEK PODOMORO CITY DELI MEDAN

PERENCANAAN BANGUNAN INTAKE PADA PROYEK PEMBANGUNAN INTAKE DAN JARINGAN TRANSMISI AIR BAKU KEC. SEI RAMPAH KAB. SERDANG BEDAGAI

ANALISIS KEBUTUHAN AIR SAWAH DAERAH SEKITAR PANEI TENGAH KABUPATEN SIMALUNGUN

IDENTIFIKASI FAKTOR PEMILIHAN SUPPLIER OLEH PERUSAHAAN KONSTRUKSI DI KOTA MEDAN JEFRY SUWANDA NIM:

PERENCANAAN BANGUNAN TINGKAT TINGGI DENGAN SISTEM STRUKTUR FLAT PLATE CORE WALL

EVALUASI KAPASITAS DRAINASE JL. PELITA II, KECAMATAN MEDAN PERJUANGAN KOTA MEDAN

Disusun sebagai salah satu syarat menyelesaikan Program Studi Strata I pada Jurusan Teknik Sipil Fakultas Teknik. Oleh :

ANALISIS SISTEM PONDASI PILE RAFT PADA PEMBANGUNAN PROYEK SILOAM HOSPITAL MEDAN

PERANCANGAN DAN PEMBUATAN SISTEM PENGGAJIAN PEGAWAI DENGAN MENGGUNAKAN MICROSOFT VISUAL BASIC 6.0. PADA PT DAYA ANUGRAH MANDIRI

TUGAS AKHIR. Oleh: EVA HARIANTO NIM: JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS KATOLIK SOEGIJAPRANATA SEMARANG JUNI 2007

I. PENDAHULUAN. Bangunan sipil terbagi atas dua bagian yaitu bangunan di atas tanah (upper

BAB I PENDAHULUAN Latar Belakang

ANALISIS DAYA DUKUNG PONDASI BORED PILE TUNGGAL DIAMETER 100 cm PADA PROYEK PEMBANGUNAN HOTEL GRANDHIKA, MEDAN TUGAS AKHIR

TINJAUAN TENTANG PENEMPATAN PEGAWAI PADA KANTOR KEPOLISIAN DAERAH SUMATERA UTARA

PERENCANAAN PENINGKATAN JALAN BATAS DELI SERDANG DOLOK MASIHUL-BATAS TEBING TINGGI PROVINSI SUMATERA UTARA

SISTEM PENGENDALIAN INTERN PENGELUARAN KAS PADA BADAN PERENCANAAN PEMBANGUNAN DAERAH PROVINSI SUMATERA UTARA

PERHITUNGAN KEGAGALAN SHEET PILE

TINJAUAN TERHADAP TUGAS ADMINISTRASI KEPEGAWAIAN BADAN KETAHANAN PANGAN PROVINSI SUMATERA UTARA

METODE PELAKSANAAN PADA PELEBARAN JALAN BARUS BATAS KOTA SIBOLGA

TUGAS AKHIR. Ditulis sebagai Syarat Menyelesaikan Pendidikan Program Sarjana Sains Terapan. Oleh: TUA M. LBN. TORUAN NIM :

BAB I PENDAHULUAN. Pondasi merupakan bagian dari struktur bawah kontruksi yang memiliki

KATA PENGANTAR. Dengan mengucapkan puji dan syukur kehadirat Tuhan Yang Maha Esa atas segala berkat

PENERAPAN KESEHATAN DAN KESELAMATAN KERJA (K3) PADA PROYEK PEMBANGUNAN PABRIK PT. UNILEVER DI PERDAGANGAN SUMATERA UTARA

ANGGUN. P. PUTRI

QUALITY CONTROL PERKERASAN LENTUR PADA PROYEK PENINGKATAN KAPASITAS/PELEBARAN JALAN KUTABULUH-LAWEPAKAM (MYC)

PERANCANGAN DAN PEMBUATAN SISTEM PENGGAJIAN PEGAWAI DENGAN MENGGUNAKAN MICROSOFT VISUAL BASIC 6

ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG KELOMPOK PADA PROYEK PEMBANGUNAN GEDUNG DPRD SUMATERA UTARA MEDAN

PERANAN KOMPUTER DALAM MEMBANTU TUGAS PEGAWAI DI BAGIAN PROGRAM PADA DINAS PERIKANAN DAN KELAUTAN PROVINSI SUMATERA UTARA

PERHITUNGAN TEBAL LAPIS PERKERASAN LENTUR PADA RUAS JALAN SISINGAMANGARAJA PADANG SIDEMPUAN (STA ) DENGAN METODE Pt-T B LAPORAN

TINJAUAN MENGENAI PERANAN SEKRETARIS PADA PT PLN (Persero) PEMBANGKITAN SUMBAGUT SEKTOR PEMBANGKITAN MEDAN

LAPORAN. Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III. oleh: ANDOAN SILABAN NIM.

Analisis Kinerja Fondasi Kelompok Tiang Bor Gedung Museum Pendidikan Universitas Pendidikan Indonesia

QUALITY CONTROL PERKERASAN LENTUR LAPIS AC-BC PADA PROYEK PELEBARAN RUAS JALAN SIDIKALANG BATAS KOTA BULUH LAPORAN. oleh :

BAB I PENDAHULUAN 1.1. Latar Belakang

Transkripsi:

ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT LAPORAN Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III oleh : LERIASNI KABEAKAN NIM. 1005022119 ERMADI NIM. 1005022098 PROGRAM STUDI TEKNIK SIPIL JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI MEDAN MEDAN 2013

ABSTRAK ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT Oleh: Leriasni Kabeakan (1005022119) dan Ermadi (1005022098) Pembangunan Gedung Perkantoran di Patimura merupakan salah satu pembangunan Gedung Perkantoran yang bergerak dibidang konstruksi. Pembangunan gedung ini bertujuan agar perusahaan ini bisa berperan dalam pembangunan di Indonesia. Topik bahasan ini dititik beratkan pada perhitungan daya dukung pile cap. Tujuannya adalah untuk mengetahui perbandingan hasil perhitungan tersebut dengan ukuran diameter dan kedalaman yang sama. Laporan tugas akhir ini diharapkan bermanfaat bagi mahasiswa yang membahas hal yang sama, pihak yang akan melaksanakan proyek yang sama, dan terutama bagi penulis sendiri. Sebab perhitungannya dan teknik pelaksanaannya dapat dijadikan bahan masukan dan bahan perbandingan bila nanti terjun ke lapangan. Hasil akhir perhitungan daya dukung tiang pancang tunggal dengan bore pile untuk perhitungan efisiensi kelompok tiang pancang dengan metode uniform building code adalah 0.727. Daya dukung tiang untuk kedalaman 2.50 m = 146.46 Ton pile group (BH 01), 222.79 Ton (BH - 02). Untuk kedalaman 32.50 m = 1198.15 Ton (BH-01), 1181.57 Ton (BH-02). Daya dukung tiang untuk kedalaman 2.45 m = 235.59 Ton pile group (BH-03), 133.01 Ton (BH-04). Untuk kedalaman 34.45 m = 1189.31 Ton (BH-03), 1126.38 Ton (BH-04). Kata kunci : Daya Dukung Tiang Pancang Tunggal.

ABSTRACT ANALYSIS CALCULATION OF POWER POLE SUPPORTS SINGLE PANCANG SPT DATA BASED ON DEVELOPMENT PROJECT DEVELOPMENT OFFICE BUILDING MEGA PRIMA By: Leriasni Kabeakan (1005022119) and Ermadi (1005022098) Construction of Office Building at Patimura is one of the Office Building development in the field of construction. Construction of the building is intended that these companies could play a role in the development of Indonesia. This topic concentrated on the calculation of the carrying capacity of pile cap. The goal is to compare the results of these calculations with the size and depth of the same diameter. Final report is expected to be useful for students who are discussing the same thing, those who will carry out the same project, and especially for the writer himself. Because the calculation and implementation techniques can be used as an input and a comparison when you later go into the field. The final calculation of single pile bearing capacity with bore pile to pile group efficiency calculation method is uniform building code 0727. Pile bearing capacity to a depth of 2:50 m = 146.46 Tons of pile group (BH - 01), 222.79 Ton (BH - 02). To a depth of 32.50 m = 1198.15 Ton (BH-01), 1181.57 Ton (BH-02). Pile bearing capacity to a depth of 2.45 m = 235.59 Tons of pile group (BH-03), 133.01 Ton (BH-04). To a depth of 34.45 m = 1189.31 Ton (BH-03), 1126.38 Ton (BH-04). Keywords: Carrying Capacity of Single Piles.

KATA PENGANTAR Puji dan syukur Penulis ucapkan kepada Tuhan Yang Maha Esa, atas segala berkat dan karunia yang dilimpahkan-nya sehingga penulis dapat menyelesaikan Laporan Tugas Akhir ini. Laporan yang berjudul Analisa Perhitungan Daya Dukung Tiang Pancang Tunggal Berdasarkan Data SPT pada Proyek Pembangunan Gedung Perkantoran Mega Prima Development ini dimaksudkan sebagai syarat untuk menyelesaikan matakuliah Tugas Akhir Pendidikan Program Diploma III Politeknik Negeri Medan. Sesuai dengan judulnya, dalam laporan ini membahas tentang perhitungan Analisa Daya Dukung pile cap. Penyusunan laporan ini dapat terselesaikan berkat dukungan, motivasi, bantuan, bimbingan serta arahan dari berbagai pihak baik bersifat material, spiritual, informasi maupun administrasi sehingga penulis dapat menyelesaikan laporan ini. Oleh karena itu sudah sepantasnya penulis mengucapkan terima kasih banyak kepada: 1. Bapak M. Syahrudin, M.T., Direktur Politeknik Negeri Medan; 2. Bapak Ir. Abu Basyir,M.T., Pembantu Direktur I Politeknik Negeri Medan; 3. Bapak Abdul Rahman, S.E.K., M.Si., Pembantu Direktur II Politeknik Negeri Medan; 4. Ibu Delisma Siregar,S.T.,M.T., Pembantu Direktur III Politeknik Negeri Medan; 5. Bapak Cipto Darma,S.E., Pembantu Direktur IV Politeknik Negeri Medan 6. Bapak Drs. Syaiful Hazmi, M.T., Ketua Jurusan Teknik Sipil Politeknik Negeri Medan; 7. Bapak Mhd. Ari Subhan, S.T. M.T., sebagai Dosen Pembimbing Laporan Tugas Akhir; 8. Bapak Sudarto, M.T., sebagai Kepala program Studi; 9. Bapak/Ibu Dosen Penguji; 10. Bapak Samiran, S.S.T., selaku Dosen Wali Kelas SI-6F; 11. Bapak dan Ibu Dosen jurusan Teknik Sipil; 12. Selurus sivitas akademik Politeknik Negeri Medan; 13. Orang tua dan keluarga yang telah memberi dukungan secara material, motivasi dan doa; 14. Teman teman kelas SI-6F Politeknik Negeri Medan.

Walaupun penulis sudah berusaha semaksimal mungkin, namun penulis juga menyadari kemungkinan terdapat kekurangan dan kesilapan. Oleh sebab itu, penulis sangat mengharapkan kritik dan saran yang dapat membangun kemampuan penulis untuk penulisan yang akan datang. Penulis berharap semoga laporan ini bermanfaat meningkatkan informasi dan pengetahuan tentang pekerjaan proyek gedung. Medan, April 2013 Hormat penulis, Leriasni Kabeakan Ermadi NIM: 1005022119 NIM: 1005022098

DAFTAR ISI LEMBAR PERSETUJUAN LEMBAR PENGESAHAN ABSTRAK... i KATA PENGANTAR... ii DAFTAR ISI... iv DAFTAR GAMBAR... vi DAFTAR TABEL... vii BAB I PENDAHULUAN... 1 A. Latar Belakang Pemilihan Judul... 2 B. Perumusan Masalah... 2 C. Pembatasan Masalah... 2 D. Tujuan Pembahasan... 3 E. Manfaat Pembahasan... 3 F. Teknik Pengumpulan dan Pengolahan Data... 4 G. Jadwal Studi Kasus dan Penulisan... 5 H. Sistematika Penulisan... BAB II TINJAUAN PERUSAHAAN... 6 A. Latar Belakang Perusahaan... 6 B. Data Umum Proyek... 7 C. Organisasi Proyek... 8 D. Struktur Organisasi Proyek... 9

BAB III TINJAUAN KEPUSTAKAAN... 10 A. Umum... 10 B. Pondasi Tiang Pancang... 13 C. Pondasi Bore Pile... 15 D. Pile Cap... 18 E. Kolom... 20 F. Jenis Pengujian Tanah... 23 BAB IV PERHITUNGAN... 25 A. Pondasi Tiang Pancang Terhadap Beban Vertikal... 25 B. Efesiensi Kelompok Tiang Pancang... 26 C. Kestabilan Pondasi Terhadap Gaya Teka... 27 BAB V PENUTUP... 33 A. Simpulan... 33 B. Saran... 33 DAFTAR KEPUSTAKAAN... 34 LAMPIRAN

DAFTAR GAMBAR Gambar III. 1 Jenis Pondasi Bore Pile... 18 Gambar III. 2 Bentuk Pile Cap... 19

DAFTAR TABEL Table I. 1 Jadwal Studi Kasus dan Laporan Tugas Akhir... 4 Table III. 1 Macam macam Pondasi Secara Umum... 12 Table III. 2 Nilai nilai Faktor Aman Oleh Reese dan O Neill... 15 Table III. 3 Nilai nilai Beban Maksimum Tiang Beton Pracetak... 20 Table III. 4 Hasil Pengujian Sondir... 24 Table IV. 1 Daya Dukung Tiang Bor Titik 01... 27 Table IV. 2 Daya Dukung Tiang Bor Titik 02... 28 Table IV. 3 Daya Dukung Tiang Bor Titik 03... 29 Table IV. 4 Daya Dukung Tiang Bor Titik 04... 30 Table V. 1 Rekapitulasi... 34

BAB I PENDAHULUAN A. Latar Belakang Pemilihan Judul Perkembangan dibidang pembangunan baik pembangunan berupa bangunan gedung ataupun bangunan rumah tinggal terasa sangat meningkat. Pembangunan di Indonesia telah menyebar, tidak hanya terpusat di kota kota besar saja, tapi telah merambah ke daerah daerah diseluruh pelosok tanah air. Dalam pembangunan tersebut banyak bangunan besar seperti gedung, jembatan, menara dan bangunan lain didirikan. Untuk menahan beban bangunan yang berat tersebut tentunya diperlukan pile cap yang kokoh. Bentuk dan struktur tanah merupakan suatu peranan yang penting dalam suatu pekerjaan konstruksi yang perlu dicermati karena kondisi ketidaktentuan dari tanah berbeda-beda. Sebelum melakukan suatu pembangunan konstruksi yang pertama-tama dilaksanakan di lapangan adalah pekerjaan pemancangan kemudian dilanjutkan denga pekerjaan pondasi ( struktur bawah ) setelah itu diteruskan denga pekerjaan pile cap. Adapun jenis pondasi menurut kedalamannya dibagi dua yaitu pondasi dalam dan dangkal. Apabila kondisi tanah di permukaan tidak mampu menahan bangunan tersebut, maka beban bangunan harus diteruskan ke lapisan tanah keras di bawahnya. Untuk itu sering dipakai konstruksi pondasi dalam berupa tiang pancang atau bored pile. Dalam pemilihan jenis pile cap yang akan digunakan dapat ditinjau berdasarkan nilai ekonomis. Dengan alasan tersebut maka penulis tertarik untuk membahas Analisa Perhitungan Daya Dukung Tiang pancang Tunggal. Proses perencanaan pembuatan pile cap diperlukan analisa perhitunga yang akurat, hal itu juga melatarbelakangi penulis untuk mengangkat judul ini sebagai ungkapan keingintahuan akan perhitungan pile cap yang lebih ekonomis. Penyelidikan standart penetrasi test (SPT) bertujuan untuk mendapatkan gambaran lapisan tanah berdasarkan jenis dan warna tanah melalui pengamatan secara visual dan karakteristik tanah. Data standart penetrasi test (SPT) dapat digunakan untuk menghitung daya dukung.

Disamping rasa ketertarikan kami untuk membahas hal ini, data yang sesuai dengan topik juga dapat diperoleh dari pihak owner yang menangani proyek ini dan lokasi proyek yang tidak terlalu jauh dari tempat tinggal kami, kemudian kami merasa mampu melakukannya. Untuk itu penulis memutuskan memilih topik bahasan yang berjudul Analisa Perhitungan Daya Dukung Tiang Pancang Tunggal Berdasarkan Data SPT Pada Proyek Pembangunan Gedung Perkantoran Mega Prima Development. B. Perumusan Masalah Adapun perumusan masalah yang diteliti Bagaimana mengetahui perhitungan daya dukung Tiang Pancang Tunggal Berdasarkan Data SPT pada proyek pembangunan gedung perkantoran Mega Prima Development? C. Pembatasan Masalah Pada pelaksanaan proyek pembangunan Gedung Perkantoran Mega Prima Development terdapat banyak permasalahan yang dapat ditinjau dan dibahas. Maka di dalam laporan ini sangatlah perlu kiranya diadakan suatu pembatasan masalah. Hal ini bertujuan untuk menghindari kekaburan serta penyimpangan dari masalah yang dikemukakan sehingga segala sesuatunya yang dipaparkan tidak menyimpang dari tujuan semula. Walaupun demikian, hal ini tidaklah berarti akan memperkecil pokok-pokok masalah yang dibahas di sini, melainkan hanya karena keterbatasan belaka. Permasalahan yang ditinjau dalam penulisan laporan ini dibatasi hanya pada: a. Perhitungan dilakukan berdasarkan data tanah yang peroleh dari data pile cap pada pembangunan Gedung Perkantoran Mega Prima Development; b. Bagaimana perhitungan daya dukung tiang tunggal berdasarkan data SPT D. Tujuan Pembahasan Tujuan pembahasan laporan ini adalah Untuk mengetahui perhitungan daya dukung tiang pancang tunggal berdasarkan data SPT pada proyek pembangunan Gedung Perkantoran Mega Prima Development.

E. Manfaat Pembahasan Manfaat Praktis: 1. Mahasiswa teknik sipil konsentrasi bangunan gedung khususnya manahasiswa teknik sipil yang ingin mengangkat topik yang sama; 2. Pihak perencana dan pelaksana yang akan melaksanakan proyek dengan jenis pile cap yang sama; 3. Penulis sendiri untuk menambah pengetahuan dan wawasan tentang pile cap sebelum terjun ke lapangan 4. Penulis sendiri, karena penulis memperoleh langsung pengalaman di lapangan dan dapat membandingkannya antara teori yang diterima penulis selama berada di bangku perkuliahan dengan pelaksanaan di lapangan. Manfaat Teoritis 1. Dapat memberi wawasan khususnya kepada penulis tentang Perhitungan Daya Dukung Tiang Pancang Tunggal sehingga ke depannya dapat menjadi suatu pilihan dalam merencanakan suatu bangunan. 2. Sebagai bahan koreksi bagi proyek dan perusahaan 3. Sebagai referensi bagi Politeknik Negeri Medan F. Teknik Pengumpulan dan Pengolahan Data 1. Teknik Pengumpulan Data Dalam mengumpulkan data penulis menggunakan metode : a. Studi kepustakaan (library research ) sesuai dengan judul yang dibahas. b. Melakukan pengamatan langsung ke lapangan. c. Meminta data kepada pihak owner ( pemilik ), seperti data SPT, dan data-data lainnya. d. Konsultasi dengan dosen pembimbing. e. Melakukan tanya jawab dan konsultasi dengan pihak owner (pemilik). f. Pengambilan gambar di lapangan.

2. Teknik Pengolahan Data Pengolahan data pada Tugas Akhir ini antara lain adalah sebagai berikut: a. Menggunakan program komputer Microsoft Office untuk perhitungan pile cap dan menggunakan rumus rumus. b. Menghitung Daya Dukng dari Pile Cap menggunakan data SPT c. Menyusun bagian laporan Tugas Akhir ( TA ) sesuai pedoman Tugas Akhir. G. Jadwal Studi Kasus dan Penulisan Laporan Tugas Akhir Kegiatan ini dimulai pada tanggal 6 Mei 2013 sampai 16 Agustus 2013 NO. KEGIATAN BULAN KE 1 2 3 4 5 6 A. PERSIAPAN 1 Survei objek TA (Perencanaan) mendapatkan topik TA 2 Mendapatkan Dobing TA 3 Bimbingan untuk pelaksanaa TA dari Dobing B. PELAKSANAAN 4 Bimbingan untuk pengumpulan data 5 Pengumpulan data (ke lokasi STK) 6 Bimbingan untuk pengolahan data 7 Pengolahan data C. PELAPORAN 8 Bimbingan untuk penulisan bab I 9 Penulisan bab I (Pendahuluan) 10 Bimbingan untuk penulisan bab II 11 Penulisan bab II (Tinjauan Pustaka) 12 Bimbingan untuk penulisan bab III 13 Penulisan bab III (Perhitungan) 14 Bimbingan untuk penulisan bab VI 15 Penulisan bab IV (Kesimpulan dan Saran) 16 Bimbingan tahap akhir

(Penyempurnaan TA) 17 Penyempurnaan Laporan Tugas Akhir Tabel I.1 Jadwal Studi Kasus dan Penulisan Laporan Tugas Akhir. H. Sistematika Penulisan BAB I : Pendahuluan, berisi Latar Belakang, Rumusan Masalah, Tujuan Penelitian, Sistematika Penulisan. BAB II : Tinjauan Perusahaan, berisi Latar Belakang Perusahaan, Data Umum Proyek, Struktur Organisasi Proyek. BAB III : Berisikan Pembahasan Analisa Perhitungan Daya Dukung Tiang Pancang Tunggal. BAB IV : Berisika Analisa Perhitungan Daya Dukung Tiang Pancag Tunggal Berdasarkan Data SPT pada Pembangunan Gedung Perkantoran Mega Prima Development. BAB V : Penutup, berisi Simpulan dan Saran