Surat Permintaan Harga (SPH) / Request For Quotation (RFQ)
|
|
- Yulia Budiono
- 7 tahun lalu
- Tontonan:
Transkripsi
1 UNT 1 Vacum Cleaner I.A. Vacuum The frame is made of electro welded sheet stiffened to withstand the vacuum. The frame is lined with soundproof material to shot down the noise. Several opening allow the access to the internal parts: # Three lobes Roots type blower # Three phase electric motor # Vacuum relief valve # Valve to open the loop (vacuum is not allowed if open) # Filter cartridge # Star Delta starting device # Air silencers # Temperature probe of the blower air discharge # Level gauge of integrated hopper # Control board. I.B. Sleeve Chamber: The air/material mixture comes into the filter chamber in the lower part where the heaviest dust falls to the bottom. The lighter dusts are conveyed by the air to the sleeves where they are stopped. The inspection and maintenance operations are easy. Thes leeves can be extracted from the top of the machine. The sleeve filter type
2 allows a great filtering surface (springs maintain the sleeves completely outstretched) and hence a very slow air velocity. The sleeves# cleaning is done by injection air flow. The cleaning cycle is started each 10 minutes and is programmable. The air to lead this special cleaning device is supplied by a costumer, is not included in the equipment. I.C. Safety Cartridges Filter The safety cartridge has got a 10 m² surface. It is installed upward blower for avoid the incoming of particles into the lobes case damaging it. I.D. Integrated 1,3 m3 / 2 tons hopper with discharging butterfly valve: In electro welded steel, it is fixed and can be handled by a fork lift. It is provided of a discharging system by means of butterfly valve with manual operating. I.E. Automatic non stop discharge valve Dia. 300 # type VSC (OPTIONAL): # 2 butterfly valves DN 300, with steel shutter # 2 pneumatic, double effect, widely proportioned actuators # 2 electro-valves for pneumatic actuators operating # 1 intermediate #buffer# body, to connect the
3 two valve # 1 compressed air regulator with condense emission, complete with pneumatic connections I.F. Control board: As per CE normative with mechanical protection IP 54 is provided of: # Buttons # Pilot lights # Safety devices: max temperature blower discharge air, pressure switch air circuit for sleeves cleaning, maximum level gauge of integrated hopper, maximum level gauge of separator, thermal switches for electric motors I.G. Technical Data of UNIVAC SV37TAV Voltage / 50 Hz Power 37 / 50 KW/HP Type of the engine Root Blower Blower Roots no. 3 lobes Air flow rate 1,850 m³/h Maximum depression 491 m.bar / 7,000 mmh2o Primary sleeve filter surface 16 m² / 160,000 cm² Filtering sleeve material Felt Polyester Filter sleeve cleaning Counter Current Safety cartridge surface 10 m² Compressor for sleeve cleaning Included Compressor for leading the sleeve cleaning 0.55
4 KW Minimum compressed air pressure required 5 bar Compressor tank capacity 6 Liter Dry and with no oil air consumption 50 Liter/h Volume integrated hopper 1.3 m³ Manual electric discharge valve Included Allowed suction hoses (mm) Ø Sound pressure level 85 <dba Engine Cooling Air Vacuum Relief Valve Included Level Gauge Included Dimension 1500x1500x3500 mm Idling Weight 2,200 Kg I.H. Accessories kit SUPERFLEX POLYURETHANE ANTISTATIC HOSE Ø 70 mm length Hose Cuff Ø 70 mm AA pieces SCRAPING STEEL NOZZLE 1200 mm. LENGTH Catatan : 1.Termasuk Bahan dan jasa pemasangan instalasi jaringan pipa vacum cleaner di Wilayah Peleburan dan PBBT Kundur 2.Franco Gudang Kundur 3.Sertifikat keaslian ( COO ) RAPAT PENJELASAN ADMINISTRASI DAN TEKNIS DILAKSANAKAN PADA : HARI / TANGGAL : Rabu/ 24 September 2014
5 WAKTU TEMPAT : Pukul WIB s.d selesai : Pergudangan PT. TIMAH (Persero) Tbk Wilayah Kepri dan Riau. Jl. Hangtuah No. 04 Perayun Kundur Kab. Karimun Kep. Riau. Catatan#:# - Yang diperkenankan mengikuti rapat penjelasan adalah Pimpinan Perusahaan, bagi yang diwakilkan harus dengan Surat Kuasa bermaterai Rp.6.000,- - Dokumen lelang akan diberikan pada acara rapat penjelasan. - Biaya penggandaan dokumen lelang dan administrasi sebesar Rp ,- disetor melalui Panitia paling lambat sebelum rapat penjelasan dimulai (tanggal 24 September 2014) - Waktu pembukaan surat penawaran akan ditentukan pada acara rapat penjelasan. - Rapat Penjelasan ini dapat diikuti oleh seluruh peserta baik yang sudah terdaftar maupun yang belum terdaftar sebagai Mitra Usaha PT. TIMAH (Persero) Tbk - Bagi perusahaan yang belum terdaftar sebagai Mitra Usaha PT. TIMAH (Pesero) Tbk, dapat melengkapi persayaratan dan kelengkapan menjadi Mitra Usaha PT.TIMAH (Pesero) Tbk. Syarat dan ketentuan dapat di akses di ( - HPS Pengadaan ini Rp ,-
PT. Starindo Cleaning Technologies PRODUCT CATALOG
PT. Starindo Cleaning Technologies PRODUCT CATALOG Dirancang dan diproduksi untuk mampu menghisap berbagai macam / jenis serbuk, tepung atau partikel dalam jumlah yang besar. Mesin bertenaga listrik atau
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 UNT 1 Dust Colector Rotary Dryer To supply one unit of packed columnfume scrubber system integratewith venturi scrubber aspre-separator and quencher as perdescription below: -Design capacity
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 Filter Housing - Capacity : 32.000 m³/h- Operating Temp. ± 125 C- Size : 3400 mm(w)x6000mm(l)x9980 mm(h) - Tebal Plate untuk Housing Filter yang baru = 6 mm Permukaan Digalvanis - Detail
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Pangkalpinang 331 - Bangka Harga 0000000001 UNT 2 MARINE ENGINE YANMAR 500 HP KIP TIMAH ENGINE SPESIFICATION : - QUANTITY : 2 UNIT - MODEL : 6HYM-WET (CONFORM TO IMO TIER II EMISSIONS REGULATIONS) - MAKER
Lebih terperinciPENGUMUMAN PELELANGAN TERBUKA No Pm/600/PGD-UPMT/2017
PT PEMBANGKITAN JAWA BALI UNIT PEMBANGKITAN MUARA TAWAR Jl. PLTGU Muara Tawar No. 1, Desa Segara Jaya, Kec. Taruma Jaya, Bekasi Telp. (021) 88990052 (Hunting) Fax. (021) 88990055 PENGUMUMAN PELELANGAN
Lebih terperinciMARABUNTA MACHINDO Hydraulic and Hard Chrome Specialist CNC Miling and CNC Lathe
SPESIFIKASI PERALATAN Specification Equipment CAR LIFTING 1. HIDROLIS PLATFOR H West Model Piston : Standart Chrome 20 Mikron ( Hard Chrome Process ) Kapasitas angkat : 4000 Kg ( syarat dan ketentuan )*
Lebih terperinciRAJA GAS AUTOMOTIVE CNG CONVERSION SYSTEM PRODUCT CATALOG
RAJA GAS AUTOMOTIVE CNG CONVERSION SYSTEM PRODUCT CATALOG 16/17 3 4 1 2 9 18 10 5 11 6 12 14 7 8 CNG CONVERTER KIT TYPE : BIGAS CNG CONVERTER KIT - SEQUENTIAL / INJECTION TYPE / UP TO 4 CYLINDER ENGINE
Lebih terperinciAquaro. Oceans WS8821
Aquaro Oceans WS8821 Only connect the power cord to the voltage rating that matches with the rating plate to avoid danger such as electric outlet is in an inside location to protect from moisture. Be
Lebih terperinciJalan Erlangga No. 161 Sidoarjo Telp. : (031) Faks. : (031)
KEMENTERIAN KEUANGAN REPUBLIK INDONESIA DIREKTORAT JENDERAL KEKAYAAN NEGARA KANTOR WILAYAH X SURABAYA KANTOR PELAYANAN KEKAYAAN NEGARA DAN LELANG SIDOARJO Jalan Erlangga No. 161 Sidoarjo 61214 Telp. :
Lebih terperinciPEMERINTAH KABUPATEN KUNINGAN. Addendum. Dokumen Pengadaan Secara Elektronik. Pengadaan Barang. Metode Pelelangan sederhana dengan Pascakualifikasi
PEMERINTAH KABUPATEN KUNINGAN Addendum Dokumen Pengan Secara Elektronik Pengan Barang Metode Pelelangan sederhana dengan Pascakualifikasi A d d e n d u m D O K U M E N P E N G A D A A N Nomor 03 / eproc
Lebih terperinci: atmospheric air. : 1013 mbar abs. : mbar. : 3000 rpm (4800 rpm) : Max. 45 kw : 380 v, 50 Hz, 3 phase
TERM OF REFERENCE (TOR) Halaman : 1 dari 7 I. Maksud dan Tujuan Term of reference (TOR) ini dibuat untuk menjadi acuan dalam proses pengadaan berikut pemasangan Economizer Ash blower type lobe positive
Lebih terperinciUNIT LAYANAN PENGADAAN BARANG/JASA SEKRETARIAT DAERAH PROVINSI KEPULAUAN RIAU TAHUN ANGGARAN 2010 RISALAH AANWIJZING
UNIT LAYANAN PENGADAAN BARANG/JASA SEKRETARIAT DAERAH PROVINSI KEPULAUAN RIAU TAHUN ANGGARAN 2010 RISALAH AANWIJZING NOMOR : 19 / Risalah - AAn/ULPBJ-SETDA/APBD/V/2010 Kegiatan : Pengadaan Genset Kantor
Lebih terperinciPENGUMUMAN PELELANGAN UMUM No Pm/600/PGD-UPMT/2014
PT PEMBANGKITAN JAWA-BALI UNIT PEMBANGKITANMUARA TAWAR JI. PLTGU MuaraTawar No.1, DesaSegaraJaya, Kec.TarumaJaya, Bekasi Telp. (021) 88990052 (Hunting)Fax.(021) 88990055 PENGUMUMAN PELELANGAN UMUM No.
Lebih terperinciBERITA ACARA PENJELASAN PEKERJAAN Nomor : PL
BERITA ACARA PENJELASAN PEKERJAAN Nomor : PL.01.02.20.003.2011 Pada hari ini Rabu tanggal sembilan belas bulan oktober tahun dua ribu sebelas, dimulai pada pukul 10.00 WIB sampai dengan pukul 11.00 WIB,
Lebih terperinciBUKU PETUNJUK PENGGUNAAN
BUKU PETUNJUK PENGGUNAAN INCINERATOR TSN 96XX IC SERIES (9603 IC, 9605 IC, 960 IC, 960 IC) TS N TESENA PT. TESENA INOVINDO Local Industry General Supplier Importer Exporter Medical Laboratory Equipment
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 UNT 1 Alat Pengolahan Bijih Timah Primer I. BALL MILL - Ukuran unit diameter 900 mm x panjang 3000 mm - Rotation Speed : 23 s/d 25 rpm - Feed Size : 0-25 mm - Output Size : 0,075-0,89
Lebih terperinciTRAINING Operational, Maintenance & Trouble Air Cooled - Water Cooled Package
TRAINING Operational, Maintenance & Trouble Air Cooled - Water Cooled Package PENDAHULUAN Pendinginan adalah suatu proses penarikan kalor (Heat) dari suatu benda /zat sehingga temperaturnya lebih rendah
Lebih terperinciBAB III 1 METODE PENELITIAN
17 BAB III 1 METODE PENELITIAN 1.1 Prosedur Penelitian Prosedur yang dilakukan dalam penelitian ini terdiri dari beberapa langkah. Langkah pertama, yaitu melakukan studi literatur dari berbagi sumber terkait.
Lebih terperinciSTANDAR LATIHAN KERJA DAFTAR MODUL
STANDAR LATIHAN KERJA DAFTAR MODUL NO. KODE JUDUL 1. WLO 01 ETIKA PROFESI DAN ETOS KERJA 2. WLO 02 KESELAMATAN DAN KESEHATAN KERJA (K3) 3. WLO 03 STRUKTUR DAN FUNGSI WHEEL LOADER 4. WLO 04 PEMELIHARAAN
Lebih terperinciPraktikum Mesin-Mesin Fluida 2013 PENUNTUN PRAKTIKUM MESIN MESIN FLUIDA DISUSUN OLEH: MUHAMMAD HASBI, ST., MT
PENUNTUN PRAKTIKUM MESIN MESIN FLUIDA DISUSUN OLEH: MUHAMMAD HASBI, ST., MT KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN LABORATORIUM MEKANIKA FLUIDA JURUSAN TEKNIK MESIN - FAKULTAS TEKNIK UNIVERSITAS HALUOLEO
Lebih terperinciCleaning Solutions for Your Home Perawatan Rumah dan Taman
Cleaning Solutions for Your Home Perawatan Rumah dan Taman HIGH PRESSURE CLEANER K 1 Order Number 1.600-005.0 Rp. 1.000.000 K 1 high pressure cleaner sangat sempurna untuk membersihkan kendaraan, furnitur
Lebih terperinciBAB III METODE PENELITIAN
BAB III METODE PENELITIAN 3.1 Flow Chart Start 1. Melakukan pembelajaran,pencarian informasi, pengukuran, dan data mesin 2. Melakukan pembelajaran,pencarian informasi, pengukuran, dan data cooling tower
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
0000000001 UNT 1 Pengadaan Magnetic Separator Nama Barang MS Magnetic Separator, - Include Roll Magnetic Separator (Dry unit) - Capacity 2-5 Tph - Feed size 10-100 mesh - Reading 2 X 2 X 1000 mm X 160
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 UNT 1 Mesin Genset Baru PLTD with Radiator and Generator Spesifikasi : - Power Output = 1000-1100 kw - Electrical Output = 1250-1375 kva - Speed / Frequency = 1500 rpm / 50 Hz - Voltage
Lebih terperinciSIFAT, KEUNTUNGAN, DAN KERUGIAN UDARA BERTEKANAN
MATERI DEFINISI PNEUMATIK SIFAT, KEUNTUNGAN, DAN KERUGIAN UDARA BERTEKANAN HUKUM-HUKUM FISIKA DALAM PNEUMATIK PEMAHAMAN DAN PENGGAMBARAN SIMBOL KOMPONEN PNEUMATIK SESUAI DENGAN STANDARISASI ISO 1219 PENGENALAN
Lebih terperinciLEMBAR KERJA PENGOPERASIAN SIMULASI PEMBANGKIT LISTRIK TENAGA GAS
LEMBAR KERJA PENGOPERASIAN SIMULASI PEMBANGKIT LISTRIK TENAGA GAS Proses Nama Penanggung Jawab Jabatan Tanda tangan Perumusan Ainun Nidhar, A.Md Asisten Persetujuan Agus Sukandi, M.T. Ka. Lab Energi-Mekanik
Lebih terperinciPT PEMBANGKITAN JAWA BALI UNIT BISNIS JASA O & M PLTU PACITAN. PENGUMUMAN PELELANGAN SEDERHANA Nomor : 152.PM/612/UJPC/2014
PT PEMBANGKITAN JAWA BALI UNIT BISNIS JASA O & M PLTU PACITAN PENGUMUMAN PELELANGAN SEDERHANA Nomor : 152.PM/612/UJPC/2014 Panitia Pengadaan Barang/Jasa PT PJB UBJ O&M PLTU PACITAN mengundang penyedia
Lebih terperinciPOWER ACCESSORIES SOCKET ASSEMBLIES CIGARETTE LIGHTER PLUGS BATTERY DISCHARGE PROTECTOR VOLTAGE REDUCERS VOLTAGE CONVERTER VOLTAGE BOOSTER INVERTERS
SOCKET ASSEMBLIES CIGARETTE LIGHTER PLUGS BATTERY DISCHARGE PROTECTOR VOLTAGE REDUCERS VOLTAGE CONVERTER VOLTAGE BOOSTER INVERTERS SOCKET ASSEMBLIES 853010BL Blister Pack Surface Mount Aluminum Accessory
Lebih terperinciMEMBUAT STANDAR OPERASIONAL PROSEDUR PADA UNIT WATER TRUCK
BAB III MEMBUAT STANDAR OPERA SIONA L PR OSEDUR PADA UNIT WA TER TRUC K MEMBUAT STANDAR OPERASIONAL PROSEDUR PADA UNIT WATER TRUCK 1.1 Bagian-Bagian Utama water truck. Pada bagian ini dijelaskan nama-nama
Lebih terperinciS E L O S A K T I JL.RAYA NAROGONG KM 12,5 PANGKALAN 3 CIKIWUL, BANTAR GEBANG BEKASI
SELO SAKTI Selo Sakti adalah perusahaan yang bergerak dibidang usaha kontruksi, Perdagangan Umum dan Industry. Secara khusus lingkup usaha kami adalah manufaktur Asphalt Mixing Plant (AMP) merk SELO SAKTI.
Lebih terperinciBAB IV PELAKSANAAN DAN PEMBAHASAN
31 BAB IV PELAKSANAAN DAN PEMBAHASAN 4.1 ALUR PROSES PELAKSANAAN Mulai perawatan Pemeriksaan dan penyetelan pada mesin oil sealed rotary vacuum pump model P450 Membongkar dan memperbaiki komponen tersebut
Lebih terperinciKERANGKA ACUAN KEGIATAN PENGADAAN TRAKTOR KANTOR KETAHANAN PANGAN DAN PENYULUHAN KABUPATEN KUTAI BARAT TAHUN 2015 BAB I URAIAN PEKERJAAN
KERANGKA ACUAN KEGIATAN PENGADAAN TRAKTOR KANTOR KETAHANAN PANGAN DAN PENYULUHAN KABUPATEN KUTAI BARAT TAHUN 2015 BAB I URAIAN PEKERJAAN A. LATAR BELAKANG Program peningkatan ketahanan pangan merupakan
Lebih terperinciHANDTRACTOR QUICK BOXER G1000
HANDTRACTOR QUICK BOXER G1000 Spesifikasi: TRAKTOR TANGAN Merk/Model QUICK / G 1000 BOXER Kecepatan 1 Kecepatan Maju (2 ganti jalur pulley) Transmisi Kombinasi (Gear- Chain) / 4 Tingkat Gear Case Penggerak
Lebih terperinciBERITA ACARA PENJELASAN (ADENDA)
BERITA ACARA PENJELASAN (ADENDA) Pekerjaan Pengadaan Peralatan Dapur Rumah Sakit Panitia Pengadaan Barang dan Jasa RSUD Undata Palu Tahun 2011 Jl. Trans Sulawesi Tondo Palu PANITIA PENGADAAN BARANG DAN
Lebih terperinciCOOLING SYSTEM ( Sistim Pendinginan )
COOLING SYSTEM ( Sistim Pendinginan ) Adalah sistim dalam engine diesel yang berfungsi: 1. Mendinginkan engine untuk mencegah Over Heating.. 2. Memelihara suhu kerja engine. 3. Mempercepat dan meratakan
Lebih terperinciRAGAM PILIHAN DAN HARGA
RAGAM PILIHAN DAN HARGA BLUE WESTERN UNION AMERICA JACK SINGLE POST LIFT SPRAYER SANCHIN JET SPRAYER BIKE LIFT AHASS HIGH SPEED COMPRESSOR SNOW CAR WASH NO PAKET DIAMOND HARGA 1 Hidrolis Import " JACK
Lebih terperinciBAB IV PERHITUNGAN SISTEM HIDRAULIK
BAB IV PERHITUNGAN SISTEM HIDRAULIK 4.1 Perhitungan Beban Operasi System Gaya yang dibutuhkan untuk mengangkat movable bridge kapasitas 100 ton yang akan diangkat oleh dua buah silinder hidraulik kanan
Lebih terperinciBAB III. PERENCANAAN BAGIAN BAGIAN UTAMA CHEMICAL INJECTION PACKAGE DAN PERHITUNGAN PERENCANAAN
BAB III. PERENCANAAN BAGIAN BAGIAN UTAMA CHEMICAL INJECTION PACKAGE DAN PERHITUNGAN PERENCANAAN III.1 Bagian Bagian Utama Chemical Injection Package Pada bab ini dilakukan perencanaan untuk mendesign bagian
Lebih terperinciGenerator Gasoline 1200w 1ph Open
HOME AND PORTABLE Open Frame Gasoline Generator Set 10039414 900W KW2600851 1200W 2700W KW2600003 10061211 3800W Generator Gasoline 900w 1ph 220v Generator Gasoline 1200w Generator Gasoline 2700w Gasoline
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
0000000001 UNT 1 Dry Magnetic Separator (Include roll high intensity magnetic separator) * Size/Model : 6 x 130mm dia. X 760mm Length Laminated Separation roller Configurated Into 2-Feed star in 2 separating
Lebih terperinciPETUNJUK PENGOPERASIAN
PETUNJUK PENGOPERASIAN UNIT PENGOLAHAN LIMBAH CHEMICAL WASTEWATER TREATMENT (CWWTP) FAKULTAS KEDOKTERAN PROYEK PENGEMBANGAN UNIVERSITAS GADJAH MADA OECF LOAN IP - 494 PT. BESTINDO PUTRA MANDIRI 2003 DAFTAR
Lebih terperinciPERPANJANGAN PENGUMUMAN PELELANGAN SEDERHANA DENGAN PASCAKUALIFIKASI Nomor : 0985.Pm/612/UPGRK/2014
PERPANJANGAN PENGUMUMAN PELELANGAN SEDERHANA DENGAN PASCAKUALIFIKASI Nomor : 0985.Pm/612/UPGRK/2014 Dengan ini diumumkan bahwa PT PJB Unit Pembangkitan Gresik akan melaksanakan Pelelangan Sederhana dengan
Lebih terperinciPERANCANGAN SISTEM PEMADAM TERINTEGRASI DAN ANALISA KESELAMATAN DAN KESEHATAN KERJA LISTRIK PADA ELECTRICITY BUILDING PLANT DAN SERVER ROOM (PT
ASSALAMMUALAIKUM PERANCANGAN SISTEM PEMADAM TERINTEGRASI DAN ANALISA KESELAMATAN DAN KESEHATAN KERJA LISTRIK PADA ELECTRICITY BUILDING PLANT DAN SERVER ROOM (PT.SCHERING-PLOUGH)) HANA FATMA WT LATAR BELAKANG
Lebih terperinciCV. HIDAYAH TEKNIK WATER FILTER & WATER TREATMENT
Bebekan Masjid Gg.III/33 Sepanjang, Sidoarjo, Jawa Timur Counter : Bebekan Masjid No. 61 Sepanjang - Sidoarjo Telepon : (031) 72424324 HP : 0812 3377 6464 Email: info@pabrik-amdk.com www.pabrik-amdk.com
Lebih terperinciCV. HIDAYAH TEKNIK WATER FILTER & WATER TREATMENT
Bebekan Masjid Gg.III/33 Sepanjang, Sidoarjo Counter : Bebekan Masjid No. 61 Sepanjang Sidoarjo, Jawa Timur Telepon: (031) 72424324 HP: 0812 3377 6464 Email: info@pabrik-amdk.com www.pabrik-amdk.com PENAWARAN
Lebih terperinciANALISA KEBOCORAN PIPA PADA HYDRAULIC GATE BEAM SHEARING MACHINE di PT. INKA
ANALISA KEBOCORAN PIPA PADA HYDRAULIC GATE BEAM SHEARING MACHINE di PT. INKA Oleh : MOHAMMAD ILHAM NRP : 6308.030.018 Jurusan : Teknik Permesinan Kapal Politeknik Perkapalan Negeri Surabaya Institut Teknologi
Lebih terperinciCLEANING TECHNOLOGY FOR PROFESSIONALS INDUSTRIAL GRADE
CLEANING TECHNOLOGY FOR S INDUSTRIAL GRADE 2016 COLD WATER -HIGH PRESSURE CLEANERS HD 605 CLASSIC Order Number : 1.118-865.0 Rp. - HD 605 CLASSIC Merupakan kelas pemula di kategori profesional. Dirancang
Lebih terperinciAnalisa Laju Erosi dan Perhitungan Lifetime Terhadap Material Stainless Steel 304, 310, dan 321
Analisa Laju Erosi dan Perhitungan Lifetime Terhadap Stainless Steel, 310, dan 321 pada Aliran Reject 1st Cleaner to 2nd Cleaner OCC Line Voith Unit SP 3-5 di PT. PAKERIN (Pabrik Kertas Indonesia) Budi
Lebih terperinciBAB II LANDASAN TEORI
BAB II LANDASAN TEORI 2.1 PENDAHULUAN Heavy Dump Truck (HD) merupakan produk Komatsu yang mempunyai ukuran yang berbeda-beda dan salah satunya adalah Heavy Dump Truck Komatsu 465-7R, yang mempunyai arti:
Lebih terperinciBAB III METODOLOGI PENELITIAN
BAB III METODOLOGI PENELITIAN 3.1 Garis Besar Penelitian Penelitian yang dilakukan pada tugas akhir ini adalah melakukan pengujian pengaruh putaran mesin terhadap performansi sistem pengkondisian udara
Lebih terperinciBAB III PROSEDUR PENGUJIAN
BAB III PROSEDUR PENGUJIAN Pengambilan sampel pelumas yang sudah terpakai secara periodik akan menghasilkan laporan tentang pola kecepatan keausan dan pola kecepatan terjadinya kontaminasi. Jadi sangat
Lebih terperinciMETODA UPDRAFT YANG DITERAPKAN PADA MAXPELL TYPE 2000 MX MENGHASILKAN PEMBAKARAN YANG LEBIH CEPAT DAN HEMAT BAHAN BAKAR.
HEMAT CEPAT & RAMAH LINGKUNGAN DILENGKAPI SERTIFIKAT UJI EMISI METODA UPDRAFT YANG DITERAPKAN PADA MAXPELL TYPE 2 MX MENGHASILKAN PEMBAKARAN YANG LEBIH CEPAT DAN HEMAT BAHAN BAKAR. PENERAPAN HYDROPROCES
Lebih terperinciBAB I PENDAHULUAN. Penyusunan tugas akhir ini terinspirasi berawal dari terjadinya kerusakan
1 BAB I PENDAHULUAN 1.1 Latar Belakang Masalah Penyusunan tugas akhir ini terinspirasi berawal dari terjadinya kerusakan pada mesin boiler satu burner dengan dua bahan bakar natural gas dan solar bekapasitas
Lebih terperinci"CAP COMBI 2600 CL" (10,000 L tangki lumpur L air, total 15,250 L)
"CAP COMBI 2600 CL" (10,000 L tangki lumpur + 5250 L air, total 15,250 L) Peralatan kombinasi yang diperuntukkan untuk menyedot & membersihkan saluran dan cairan apapun (tidak termasuk limbah berbahaya),
Lebih terperinci2.3.1.PERBAIKAN BAGIAN ATAS MESIN. (TOP OVERHAUL)
BAB VII 2.3.1.PERBAIKAN BAGIAN ATAS MESIN. (TOP OVERHAUL) Perbaikan bagian atas adalah yang meliputi bagian. atas dari motor Diesel, yaitu seluruh bagian pada kepala silinder (Cylinder head) atau seluruh
Lebih terperinciSession 4. Diesel Power Plant. 1. Siklus Otto dan Diesel 2. Prinsip PLTD 3. Proses PLTD 4. Komponen PLTD 5. Kelebihan dan Kekurangan PLTD
Session 4 Diesel Power Plant 1. Siklus Otto dan Diesel 2. Prinsip PLTD 3. Proses PLTD 4. Komponen PLTD 5. Kelebihan dan Kekurangan PLTD Siklus Otto Four-stroke Spark Ignition Engine. Siklus Otto 4 langkah
Lebih terperinciBAB IV PENGUJIAN DAN ANALISA
BAB IV PENGUJIAN DAN ANALISA 4.1 Pendahuluan Evaluasi performansi efesiensi pompa dilakukan untuk mengetahui efisiensi sebuah sistim pemompaan sehingga bisa dilakukan penghematan energi. 4.2 Pemasangan
Lebih terperinciTUGAS FARMASI RUMAH SAKIT PENGELOLAAN GAS MEDIS DI RUMAH SAKIT. Disusun oleh : Meryza Sonia Farmasi 7-B
TUGAS FARMASI RUMAH SAKIT PENGELOLAAN GAS MEDIS DI RUMAH SAKIT Disusun oleh : Meryza Sonia 1111102000052 Farmasi 7-B PROGRAM STUDI FARMASI FAKULTAS KEDOKTERAN DAN ILMU KESEHATAN UNIVERSITAS ISLAM NEGERI
Lebih terperinciMaterial : Stainless Steel AISI 304; Besi karbon yang dicat (penutup depan & belakang)
CAP COMBI 1400 CL (4,400 L Tangki Lumpur + 2,450 L Air, total 6,850 L) Peralatan kombinasi yang diperuntukkan untuk menyedot & membersihkan saluran dan cairan apapun (tidak termasuk limbah berbahaya),
Lebih terperinciGambar 2.32 Full pneumatik element
2. Two control valve Katup dua tekanan mempunyaidua saluran masuk X dan Y satu saluran keluar A. udara kempaan dapat mengalir melaluinya jika sinyal masukan ke X dan Y alirannya akan tertutup. Jika sinyal
Lebih terperinciBAB III CARA KERJA MESIN PERAKIT RADIATOR
BAB III CARA KERJA MESIN PERAKIT RADIATOR 3.1 Mesin Perakit Radiator Mesin perakit radiator adalah mesin yang di gunakan untuk merakit radiator, yang terdiri dari tube, fin, end plate, dan side plate.
Lebih terperinciBAB II DASAR TEORI Pemborosan Energi Compressor. membutuhkan energi selama beroperasi. Gambar 2.1. Diagram Flow Energi Compressor
BAB II DASAR TEORI 2.1. Pemborosan Energi Compressor Mesin dengan penggerak pneumatic bekerja berdasakan dorongan atau tekanan dari udara yang bertekanan. Untuk mendapatkan udara yang bertekanan, dimanfaatkannya
Lebih terperinciBAB V ANALISA DAN PEMECAHAN MASALAH
BAB V ANALISA DAN PEMECAHAN MASALAH 5.1 Analisa Kerusakan Mesin dan Keputusan Modifikasi Filter Oli Dari data data yang ada di BAB sebelumnya, sudah bisa diketahui bahwa kerusakan mesin khususnya komponen
Lebih terperinciBAB III METODOLOGI PENELITIAN
54 BAB III METODOLOGI PENELITIAN Pada perancangan modifikasi sistem kontrol panel mesin boiler ini, selain menggunakan metodologi studi pustaka dan eksperimen, metodologi penelitian yang dominan digunakan
Lebih terperinciBAB III METODOLOGI PENELITIAN. Proses Thermoforming Mesin Noack N921 Dengan 2 Desain
BAB III METODOLOGI PENELITIAN Penelitian dilakukan untuk mendapatkan data-data yang dibutuhkan yang nantinya digunakan dalam penyelesaian pembahasan yang berkaitan dengan analisa yang penulis ambil dengan
Lebih terperinciBAB III METODOLOGI PENELITIAN
T u g a s A k h i r BAB III METODOLOGI PENELITIAN 2.1. Diagram Alir Penelitian Mulai Observasi Study pustaka Pemilihan bahan dan alat Prosedur pambongkaran alat 1.Pengenalan Excavator Halla HE 280. 2.Pengenalan
Lebih terperinciDAFTAR ISI. DAFTAR ISI i. BAB I. PENDAHULUAN Apakah instrumentasi dan Pengendalian Proses itu? Tujuan Penulisan 1
DAFTAR ISI DAFTAR ISI i. BAB I. PENDAHULUAN 1 1.1. Apakah instrumentasi dan Pengendalian Proses itu? 1 1.2. Tujuan Penulisan 1 BAB II. SEJARAH PERKEMBANGAN INSTRUMENTASI & SISTEM KONTROL 3 2.1. Mengapa
Lebih terperinciBAB V ANALISA KERJA RANGKAIAN KONTROL
82 BAB V ANALISA KERJA RANGKAIAN KONTROL Analisa rangkaian kontrol pada rangkaian yang penulis buat adalah gabungan antara rangkaian kontrol dari smart relay dan rangkaian kontrol konvensional yang terdapat
Lebih terperinciFUEL SYSTEM. Oleh: Muhammad Agung Prabowo, S.Pd Instructure of Aircraft Maintenance Engineer
FUEL SYSTEM Oleh: Muhammad Agung Prabowo, S.Pd Instructure of Aircraft Maintenance Engineer FUEL SYSTEM adalah sistem pengisian, penyimpanan dan pendistribusian fuel ke ssistem engine dan APU Pada normalnya
Lebih terperinciPERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK
TUGAS AKHIR KONVERSI ENERGI PERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK Putra Aditiawan 2108030043 Dosen pembinmbing: Dr.Ir.Heru Mirmanto,MT GAMBAR INSTALASI
Lebih terperinciAnalisa Performansi Sistem Air Conditioning Mobil tipe ET 450 dengan Variasi Tekanan Kerja Kompresor
Jurnal Ilmiah Teknik Mesin Analisa Performansi Sistem Air Conditioning Mobil tipe ET 450 dengan Variasi Tekanan Kerja Kompresor Adi Purnawan, Suarnadwipa dan I K.G. Wirawan Jurusan Teknik Mesin, Fakultas
Lebih terperinciPLTMG/PLTD Dual Fuel. By: Eko Sarwono 14 April 2016
PLTMG/PLTD Dual Fuel By: Eko Sarwono 14 April 2016 Tujuan Mengetahui perbedaan antara PLTMG dan PLTD dual Fuel Memahami prinsip kerja engine untuk memutar generator Mengetahui pembakuan Skala PLTMG/PLTD
Lebih terperinciBAB IV ANALISA DAN HASIL DATA. Flight controls hydraulic modular package adalah suatu komponen yang
BAB IV ANALISA DAN HASIL DATA 4.1. Analisa Data 4.1.1. Umum Flight controls hydraulic modular package adalah suatu komponen yang berfungsi sebagai pengontrol dari tenaga hydraulic untuk aileron, rudder,
Lebih terperinciSession 11 Steam Turbine Protection
Session 11 Steam Turbine Protection Pendahuluan Kesalahan dan kondisi tidak normal pada turbin dapat menyebabkan kerusakan pada plant ataupun komponen lain dari pembangkit. Dibutuhkan sistem pengaman untuk
Lebih terperinciELEKTRONIC FUEL INJECTION
ELEKTRONIC FUEL INJECTION 1 Pada zaman dahulu sistim supply bahan bakar pada mesin masih convensional (manual) yang dikenal dengan sistim Carburator, kemudian setelah tahun 1960-an ditemukan Electronic
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 10002716 COLLAR SUS 304; P/N 02201024 PC 10 1800 HC;P/N 02201024; DYNAMIC OIL; P/N 02201024 0000000002 10002717 RING SEAL 240x270x15 VITON; PN 415016700 1800 HC;P/N 415016700; DYNAMIC
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga Gross Price 0000000001 2 Guide, Valve P/N. 32A0101600 0000000002 Seat, Valve I P/N. 32A0103100 0000000003 Seat, Valve E P/N. 32A0103200 0000000004 Valve, Inlet P/N. 32A0420100 0000000005 Valve, Exhaust
Lebih terperinciBAB IX POMPA BAHAN BAKAR (FUEL PUMP)
BAB IX POMPA BAHAN BAKAR (FUEL PUMP) Pompa bahan bakar dikelompokan kepada : 1. Pompa bahan bakar tekanan rendah, dengan tekanan injeksi ± 150 bar yang menggunakan pengabut udara (air injection). 2. Pompa
Lebih terperinciKERINGANAN BEA MASUK ATAS IMPOR BARANG DAN BAHAN UNTUK PEMBUATAN KOMPONEN, PERALATAN DAN KAROSERI KENDARAAN BERMOTOR KHUSUS
KERINGANAN BEA MASUK ATAS IMPOR BARANG DAN BAHAN UNTUK PEMBUATAN KOMPONEN, PERALATAN DAN KAROSERI KENDARAAN BERMOTOR KHUSUS (Keputusan Menteri Keuangan RI No. 100/KMK.05/2000 tanggal 31 Maret 2000) MENTERI
Lebih terperinciBAB V SPESIFIKASI TEKNIS
BAB V SPESIFIKASI TEKNIS 1.1 Modul Surya Modul Surya berfungsi sebagai catudaya yang menghasilkan energi listrik dari energi matahari. Spesifikasi Modul Surya : Jenis Module : Polycristaline Type : LEN
Lebih terperinciLaporan Kerja Praktek PT.Cometa Can 2013
BAB III SISTEM KERJA MESIN AUTOMATIC WELDING BODYMAKER CASTOR VAA-K 3.1 Requierment Kondisi penyetelan yang harus dipenuhi untuk memastikan pengoperasian mesin bebas dari problem : 1. Penyetelan pressure
Lebih terperinciII. TECHNICAL SPECIFICATION / SPESIFIKASI TEKNIK
I. INTRODUCTION / PENDAHULUAN ICA Inverter type INV1000, INV2000, INV3000, INV4000 are advanced true sinewave output inverter with high voltage PWM (Pulse Width Modulation) technology. The Inverter can
Lebih terperinciSPESIFIKASI TEKNIS BELANJA MODAL PENGADAAN MESIN POMPA AIR TAHUN ANGGARAN 2017 BADAN PENANGGULANGAN BENCANA DAERAH PROVINSI RIAU
SPESIFIKASI TEKNIS BELANJA MODAL PENGADAAN MESIN POMPA AIR TAHUN ANGGARAN 2017 BADAN PENANGGULANGAN BENCANA DAERAH PROVINSI RIAU NO NAMA BARANG SPESIFIKASI JUMLAH 1 Mesin Pompa portable Mesin Penggerak
Lebih terperinciBAB III METODOLOGI PENELITIAN Bahan Penelitian Pada penelitian ini refrigeran yang digunakan adalah Yescool TM R-134a.
3.1. Lokasi Penelitian BAB III METODOLOGI PENELITIAN Penelitian ini dilakukan di Laboratorium Motor Bakar Jurusan Teknik Mesin Universitas Sebelas Maret Surakarta. 3.2. Bahan Penelitian Pada penelitian
Lebih terperinci2. KLASIFIKASI PMT Berdasarkan besar / kelas tegangan (Um)
2. KLASIFIKASI PMT Klasifikasi Pemutus Tenaga dapat dibagi atas beberapa jenis, antara lain berdasarkan tegangan rating/nominal, jumlah mekanik penggerak, media isolasi, dan proses pemadaman busur api
Lebih terperinciKATA PENGANTAR. Taufik Hidayat
KATA PENGANTAR D alam rangka peningkatan kualitas maintenance, khususnya operator PH, maka perlu kiranya dibuatkan buku panduan yang berisi tentang peralatan yang menjadi tanggung jawabnya - dalam hal
Lebih terperinciSISTEM PENGAMAN KENDARAAN BERMOTOR DENGAN SMS (SHORT MESSAGE SERVICE)
SISTEM PENGAMAN KENDARAAN BERMOTOR DENGAN SMS (SHORT MESSAGE SERVICE) LAPORAN AKHIR Dibuat untuk memenuhi syarat menyelesaikan pendidikan Diploma III pada Jurusan Teknik Elektro Program Studi Teknik Elektronika
Lebih terperinciBAB IV ANALISA DAN PERANCANGAN
BAB IV ANALISA DAN PERANCANGAN 4.1 Kondisi sistem yang terpasang. Batubara di pindahkan dari conveyor E4 & E5 menuju conveyor G1 & G2, Sistemnya seperti terlihat di bawah ini Material masuk Sudah terpasang
Lebih terperinci7 KEUNTUNGAN MENGGUNAKAN GENERATOR LPG INI :
7 KEUNTUNGAN MENGGUNAKAN GENERATOR LPG INI : Lebih aman Perlindungan tiga kali lipat memastikan tidak adanya kebocoran gas. Pengamanan 1 : Tutup tangki elpiji atau tombol pemasok gas untuk mematikan pasokan
Lebih terperinciKEMENTERIAN HUKUM DAN HAK ASASI MANUSIA REPUBLIK INDONESIA SEKRETARIAT JENDERAL
KEMENTERIAN HUKUM DAN HAK ASASI MANUSIA REPUBLIK INDONESIA SEKRETARIAT JENDERAL Jalan H. R. Rasuna Said Kav. 6-7, Kuningan Jakarta Selatan Telp. (021) 5253004, website : www.kemenkumham.go.id ADDENDUM
Lebih terperinciTECHNICAL MANUAL PANDUAN TEKNIS
8 1 2 3 8 9 4 6 5 10 11 7 TECHNICAL MANUAL PANDUAN TEKNIS 12 DISMANTLING PB T400 CARA MEMBONGKAR PB T400 A. Make sure the cord has been unplugged from the electrical outlet. A. Pastikan kabel konektor
Lebih terperinciBAB III METODE PENELITIAN
75 BAB III METODE PENELITIAN Pada penelitian ini penulis meneliti tentang Analisa BBM Pertamina pada Yamaha Mio M3 dengan membandingkan 3 jenis BBM pertamina yaitu : Premium (RON 88), Pertalite (RON 90),
Lebih terperinciHASIL KOREKSI ARITMATIKA URAIAN PEKERJAAN SELISIH
HASIL KOREKSI ARITMATIKA PROGRAM : PERENCANAAN DAN SURVEY GEOLISTRIK SUMBER AIR TANAH YANG SIAP DIKONSUMSI MASYARAKAT PEKERJAAN : PERENCANAAN DAN SURVEY GEOLISTRIK SUMBER AIR TANAH LOKASI : DESA SURYA
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Harga 0000000001 10002716 COLLAR SUS 304; P/N 02201024 PC 10 P/N 02201024; DYNAMIC OIL; P/N 02201024 0000000002 10002717 RING SEAL 240x270x15 VITON; PN 415016700 PC 20 P/N 415016700; DYNAMIC OIL; P/N 415016700
Lebih terperinciKATA PENGANTAR Analisis Penggunaan Bahan Bakar dengan Fluktuasi Beban pada Mesin Gas Rolls Royce Kapasitas 8,5 MW di PLTMG Panaran-Batam
KATA PENGANTAR Puji dan syukur penulis ucapkan kepada Tuhan Yang Maha Esa atas rahmat dan karunia yang diberikan-nya kepada penulis sehingga dapat menyelesaikan Tugas Akhir ini, mulai dari awal penyusunan
Lebih terperinciSESSION 3 GAS-TURBINE POWER PLANT
SESSION 3 GAS-TURBINE POWER PLANT Outline 1. Dasar Teori Turbin Gas 2. Proses PLTG dan PLTGU 3. Klasifikasi Turbin Gas 4. Komponen PLTG 5. Kelebihan dan Kekurangan 1. Dasar Teori Turbin Gas Turbin gas
Lebih terperinciAddendum Dokumen Pengadaan UPS Untuk Keperluan CAT T.A 2013 Nomor : 003/ADD-DP/PS-UPS/KR.V-BKN/IV/2013
PANITIA PENGADAAN DILINGKUNGAN KANTOR REGIONAL V BKN T.A 2013 Addendum Dokumen Pengadaan UPS Untuk Keperluan CAT T.A 2013 Nomor : 003/ADD-DP/PS-UPS/KR.V-BKN/IV/2013 Pada hari ini, Senin tanggal Dua puluh
Lebih terperinciBAB 7. PLC = Programmable Logic Controller
DIKTAT KULIAH Elektronika Industri & Otomasi (IE-204) BAB 7. PLC = Programmable Logic Controller Diktat ini digunakan bagi mahasiswa Jurusan Teknik Industri Fakultas Teknik Universitas Kristen Maranatha
Lebih terperinciPENGUMUMAN PELELANGAN UMUM DENGAN PASCAKUALIFIKASI Nomor : 1422.Pm/612/UPGRK/2015
PENGUMUMAN PELELANGAN UMUM DENGAN PASCAKUALIFIKASI Nomor : 1422.Pm/612/UPGRK/2015 Dengan ini diumumkan bahwa PT PJB Unit Pembangkitan Gresik akan melaksanakan Pelelangan Umum dengan Pascakualifikasi sebagai
Lebih terperinciBAB IV BAGIAN PENTING MODIFIKASI
75 BAB IV BAGIAN PENTING MODIFIKASI Pada bab IV ada beberapa hal penting yang akan disampaikan terkait dengan perancangan modifikasi sistem kontrol panel mesin boiler ini, terutama mengenai penggantian,
Lebih terperinci