TOTAL PRICE (IDR) NO. DESCRIPTION. Annex 2A-Recapitulation

dokumen-dokumen yang mirip
I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Total Remuneration (I.1 + I.2 + Fee)

REMUNERATION I.1 INDIVIDUAL CONSULTANT SUB PROFF & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.

PT. KOGAS DRIYAP KONSULTAN in JV with PT. PERENTJANA DJAJA

REMUNERATION I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.2])

WALIKOTA PONTIANAK PERATURAN WALIKOTA PONTIANAK NOMOR 40 TAHUN 2012 TENTANG

WALIKOTA PONTIANAK PROVINSI KALIMANTAN BARAT PERATURAN WALIKOTA PONTIANAK NOMOR 65 TAHUN 2015 TENTANG

BAB V ANALISA DATA. kenaikan hampir 26% dari estimation cost saat tender. Hal tersebut tentu saja

PEDOMAN STANDAR MINIMAL

DIRECT REIMBURSABLE COST FOR BOP TIM KOORDINATOR KOTA #REF!

CONTRACT AMENDMENT NO. 7 I REMUNERATION ( SUB TOTAL I ) 4,397,025,000

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Kementerian Pekerjaan Umum

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

1.1.1 PROFFESIONAL STAFF (EXPERTS) Sub-PROFFESIONAL STAFF (EXPERTS) STUDY TEAM

PT. KOGAS DRIYAP KONSULTAN REKAPITULASI INVOICE NO. 6 Periode : Agustus 2010 s/d September 2010

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

TOTAL I 17,681,446,000 16,759,395, ,000,000 17,053,395, ,051,000

BAB V KESIMPULAN DAN SARAN

Application form. Information on your organisation:

KOMPOSISI BIAYA I REMUNERATION II DIRECT REIMBURSABLE COST TOTAL

Mempelajari Audit Internal Untuk Bagian Service Advisor Pada PT. KIA Mobil Indonesia

Inisiasi, Perencanan dan Esekusi dalam Proyek

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

Penanggulangan Kemiskinan Di Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

Penanggulangan Kemiskinan Di Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

BAB VI PENGENDALIAN PROYEK. Pengawasan (controlling) adalah suatu penilaian kegiatan dengan

HELPDESK (IT) Isi: - New Ticket: - New Ticket - My Open Ticket - My Closed Ticket - Open Tickets - Tickets To Do - Closed Tickets

Hibah Riset IA-ITB (HR IA-ITB )

Sistem Kompensasi SDM Perkebunan

SURAT EDARAN BERSAMA TENTANG RENCANA ANGGARAN BIAYA (RAB)

MANAJEMEN PENGADAAN DALAM PROYEK. Chapter 12

What is your Target????

TOR ASISTENSI TEKNIS TASY#06 CAPACITY BUILDING SUB RECIPIENT (SR) DIBAWAH PRINCIPAL RECIPIENT (PR) TB AISYIYAH

IS Role in The Enterprises DS 2004

Project Procurement Management. Fajar Pradana S.ST., M.Eng

BAB I PENDAHULUAN. 1.1 Latar Belakang.

LOGO DIAN SURYA ADI PUTRI Affco Branch MT Account Supervisor

PROJECT CLOSURE (MATA KULIAH MANAJEMEN PROYEK PERANGKAT LUNAK) Sufa atin Program Studi Teknik Informatika Universitas Komputer Indonesia

KONTEKS & PROSES MANAJEMEN PROYEK. PERTEMUAN 2 Heru Lestiawan, M.Kom

AMENDMENT NO. 4 TO THE CONTRACT (Dated April 21, 2015)

BAB 3 PERENCANAAN PROYEK

DAFTAR ISIAN PERMOHONAN SERTIFIKASI TIPE 1/N APPLICATION FOR CERTIFICATION TYPE 1/N

MINGGU KE-12 MANAJEMEN RESIKO

Project Integration Management

BAB VI. KERANGKA ACUAN KERJA (KAK)

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM

Benefit and Cost Information Anticipated Benefits: Ketika wisatawan datang ke Jakarta, mungkin akan merasakan kebingungan yang disebabkan karena kuran

ESTIMASI ANGGARAN BIAYA PEKERJAAN STRUKTUR DAN PENJADWALAN PADA PROYEK PEMBANGUNAN GEDUNG KCU BCA DI JALAN ASIA MEDAN

BAB 3 PERENCANAAN PROYEK

PROCEDURE No. Dok : PR-MEK-01 Revisi : 01 Tanggal : 28/08/15 Halaman : 1 dari 7 MEKANIK. Departement Name Signature. Manager PT.

BAB VI PENGENDALIAN PROYEK

UNIT LAYANAN PENGADAAN

Aktifitas. Materi Program. Luar Ruang (outdoor) dengan dasar: Permainan berstruktur. Skenario yang beralur. Aturan main, sangsi dan penghargaan

FASE PERENCANAAN. MPSI sesi 4

KEMENTERIAN PERHUBUNGAN BADAN PENGEMBANGAN SUMBER DAYA MANUSIA PERHUBUNGAN

PERTEMUAN 2 MANAJEMEN PROYEK DENGAN PENGGUNAAN MICROSOFT PROJECT

SISTEM INFORMASI MANAJEMEN BIAYA PROYEK PADA PT. AGMANTARA MEDIA PRATAMA SEMARANG

ACTIVITY BASED COSTING (ABC) Ways to Determine Project Cost Intuition Educated Guessing Traditional Cost Accounting (TCA) What is ABC

BAB IV SIMPULAN DAN SARAN

PERKEMBANGAN BAKI DEBET KREDIT USAHA MIKRO, USAHA KECIL, DAN USAHA MENENGAH (UMKM) PERBANKAN 1

Baucau Administration Assistant

PRIYANTO D

PERKIRAAN PENGHUBUNG (ACCOUNT INTERFACE)

PROJECT MANAGEMENT IN CONSTRUCTION

Steps. Defining the project scope. Establishing project priorities Creating WBS Integrating WBS with OBS Coding the WBS for the IS

BAB II. PROFIL PT. HEXINDO ADIPERKASA Tbk. Notaris Mohamad Ali, S.H., No.37 tanggal 28 November Perusahaan

LAPORAN PELATIHAN DEPARTEMEN HSE (HSE DEPARTEMENT TRAINING REPORT)

* ANY CHANGE OF SCHEDULE AND LOCATION SHOULD BE SUBMITTED THROUGH THE INDONESIAN CONSULATE GENERAL IN LOS ANGELES

PEMERINTAH KABUPATEN BANTAENG UNIT LAYANAN PENGADAAN T.A Jalan A. Mannappiang No. 5 Kab. Bantaeng BERITA ACARA PENJELASAN PELELANGAN

ABSTRAK. Kata kunci: Kontrol Menejemen, Operasi Menejemen, E-Procurement, PT Pos Indonesia

KERANGKA ACUAN KERJA (KAK)

CONTRACTOR HSE MANAGEMENT SYSTEM HEALTH, SAFETY AND ENVIRONMENTAL MANAGEMENT PLAN REQUIREMENT AND STANDARD

TESIS. Oleh : DIDI WINARSYAH NIM :

Project Integration Management. Inda Annisa Fauzani Indri Mahadiraka Rumamby

SISTEM INFORMASI PEMESANAN PADA AGEN PERJALANAN ABSTRAK


ABSTRAK. Kata kunci : Teknologi Informasi, Proses Bisnis, Analisis, Evaluasi.

BAB IV ANALISA DAN PEMBAHASAN

DATA PACKAGE VOLUME, PRICE AND TERM CONDITION. INDONESIA PETROLEUM BIDDING 2 nd ROUND 2010

Aspar Djafar, S.KOM. MTCNA. M

PT. INTRACO PENTA, TBK

SMS hotline : Web site : rshs.or.id

BAB VI PENGENDALIAN PROYEK

Transkripsi:

Annex ARecapitulation BUDGET PROPOSE CONSTRUCTION OF FIRE LOOKOUT TOWER IN RIAU, JAMBI AND WEST KALIMANTAN PROVINCES RECAPITULATION NO. DESCRIPTION 1 3 A. PERSONEL DIRECT COST 1 CORE TEAM Other Support B. NON PERSONEL DIRECT COST 1 OFFICE RENT/ACCOMODATION TRAVEL COST 3 CAR RENTAL IN HEAD OFFICE C REPORTS TOTAL (A+B+C) ROUND UP/DOWN TOTAL PRICE (IDR) Jakarta, August... 016 : VENDOR NAME...... DIRECTOR

Annex B Personel Detail Cost BUDGET DETAIL CONSTRUCTION OF FIRE LOOKOUT TOWER IN RIAU, JAMBI AND WEST KALIMANTAN PROVINCES A. PERSONEL DIRECT COST NO PERSON MONTH VOL UNIT UNIT PRICE (IDR) 1 3 4 5 6 7 8 1 CORE TEAM 1.1 Team Leader (Teknik Sipil) 1 3 3 month 1. Technical Advisor Quality Control (Teknik Sipil/Arsitek) 1 month 1.3 Inspector (Field Staff) DESIGNATION/AREA APPOITMENT 1.3.1. LOT1A 1 month 1.3.. LOT1B 1 month 1.3.3. LOT1C 1 month 1.3.4. LOT1D 1 month 1.3.5. LOTA 1 month 1.3.6. LOTB 1 month 1.3.7. LOTC 1 month 1.3.8. LOTD 1 month 1.3.9. LOT3A 1 month 1.3.10. LOT3B 1 month UNIT UNIT TOTAL UNIT PRICE (IDR)

1.3.11. LOT3C 1 month 1.3.1. LOT3D 1 month Other Support.1 Computer Operator/Administrator 1 3 3 month TOTAL

Annex C Non Personel Detail Cost B. NON PERSONEL DIRECT COST BUDGET DETAIL CONSTRUCTION OF FIRE LOOKOUT TOWER IN RIAU, JAMBI AND WEST KALIMANTAN PROVINCES NO. DESCRIPTION UNIT PRICE (IDR) 1 3 4 5 7 TOTAL UNIT PRICE (IDR) 1 OFFICE RENT/ACCOMODATION 1.1.1. Head Office 1 location 0 m x 3 month m/month 3 1.1.. Accomodation Inspector 1 location 1 m x month month 10 1.. Office equipment: 1..1. computer and printer (head office ): 1...1. Desktop komputer head office unit x 3 month unitmonth 5 1...3. Printer head office 1 unit x 3 month unitmonth 3 1..4. Digital Camera field 1 unit x month unitmonth 4 1.3. Communication: 1.3.1. Telephone and Faxmail 1.3.1.1. Communication cost (head office) person x month unitmonth 4 1.3..1. Communication cost for Inspector (1 Locations) 5 person x month unitmonth 10 1.3.. Internet cost 1.3..1. Head office 1 location x 3 month unitmonth 3 1.3... Field Inspector (5 Locations) 1 location x month unitmonth 4 1.4 Office running cost 1.4.1. Head Office 1 locatiton x 3 month unitmonth 3 TRAVEL COST.1. Core Team ( Person).1.1. Travel to West Kalimantan :.1.1.1. Air Ticket to Pontianak person x time persontime 4.1.1.. Local Transportation person x time persontime 4.1.1.3. Accomodation person x time 3 hari persontime 1.1.1.4. Perdiem person x time 3 hari persontime 1.1.1.5. Car Rental 1 unit x time 3 hari persontime 6.1..Travel to Riau Province:.1..1. Air Tiket to Pekan Baru person x time persontime 4.1... Local Transportation person x time persontime 4.1..3. Accomodation person x time 3 hari persontime 1.1..4. Perdiem person x time 3 hari persontime 1.1..5. Car Rental 1 unit x time 3 hari persontime 6 UNIT VOLUME

.1..Travel to Jambi Province:.1..1. Air Tiket to Jambi person x time persontime 4.1... Local Transportation person x time persontime 4.1..3. Accomodation person x time 3 hari persontime 1.1..4. Perdiem person x time 3 hari persontime 1.1..5. Car Rental 1 unit x time 3 hari persontime 6. Mobilization and Demobilization Personnel:..1. Mobilization 1 perso x 1 time persontime 1... Demobilization 1 perso x 1 time persontime 1 3 CAR RENTAL IN HEAD OFFICE 3.1. Car rental in Head Office 1 unit x 1 time bln Unitmonth 4 REPORTS 6.1. Weekly Report 8 week x time 16 6.. Monthly Report month x time 4 6.3. Final Report 1 time 1 TOTAL REIMBURSABLE

Annex D Person In Charge PIC CONSTRUCTION OF FIRE LOOKOUT TOWER IN RIAU, JAMBI AND WEST KALIMANTAN PROVINCES NO TENAGA AHLI KUALIFIKASI TENAGA AHLI JUMLAH KEBUTUHAN TENAGA AHLI Nama JUMLAH BULAN BULAN 1 BULAN BULAN 3 1 3 4 1 3 4 1 3 4 1 Team Leader (Teknik Sipil) 3 Technical Advisor Quality Control (Teknik Sipil/Arsitek) INSPECTOR LOT1A INSPECTOR LOT1B INSPECTOR LOT1C INSPECTOR LOT1D INSPECTOR LOTA INSPECTOR LOTB INSPECTOR LOTC INSPECTOR LOTD INSPECTOR LOTA INSPECTOR LOT3A INSPECTOR LOT3B INSPECTOR LOT3C INSPECTOR LOT3D S1 Teknik Sipil Pengalaman 7 Tahun, SKA 1 3 S1 Teknik Sipil / Arsitektur 5 Tahun, MINIMAL SKT 1 Pengalaman 4 Tahun 1 4 Computer Operator/Administrator S1 IT/KOMPUTER 1

Annex E Schedule No. I. Preparation 1 Team Inspector Mobilization Work volume verification (Opnaam) Lot 1A 3 Work volume verification (Opnaam) Lot 1B 4 Work volume verification (Opnaam) Lot A 5 Work volume verification (Opnaam) Lot B 6 Work volume verification (Opnaam) Lot C 7 Core Team Field Visit 8 First week Report of Lot 1A 9 First week Report of Lot 1B 10 First week Report of Lot A 11 First week Report of Lot B 1 First week Report of Lot C 4...ect (SAMPLE) TIMELINE SCHEDULE CONSTRUCTION OF FIRE LOOKOUT TOWER IN RIAU, JAMBI AND WEST KALIMANTAN Month /Day Activities 1 3 4 5 6 7 8 9 10 11 1 13 14 15 16 17 18 19 0 1 3 4