1 EMERGENCY ISOLATION SYSTEMS CONTROLLER POWER DISTRIBUTION SYSTEMS
2 EMERGENCY ISOLATION SYSTEMS Emergency Isolation Stations Increase Safety, Reduce Maintenance and Comply with All Safety Protocol Configurations. Robust Housing, Clearly labeled, Designed for each individual machine, incorporating all metal switching and housings, fully seled-chassis mounted harnesses make Asiareps Emergency Isolation Stations (EIS) Safer and more reliable. One Central location. Including Battery Isolation, Emergency Stop, Starter Motor Isolation and Any other emergency function such as Fire Suppression Activation or Pressure Release Systems. Starter Motor Isolation refers to the isolation of the machine starting circuit only. This provides power to the machines electrical systems to enable the live testing of electrical circuits and systems. This form of isolation is used during scheduled or any other services. Emergency Stop refers to instant shutdown of an operating machine in an emergency situation such as fire, rollover, collision where the operator of the machine may be incapacitated or unaware of a developing emergency situation. Battery Isolation refers to compelete isolation of all power from the batteries to the electrical systems on the machine. This isolation is generally required during maintenance services such as welding, major component replacement and or major component repairs. EIS can be configured to comply with all national and or internasional safety protocols and procedures all. Harnesses are routed with fully sealed glands and harness protection, deutsch connectors, chassis clamps and electrical anti corrosion grease. 332
3 EMERGENCY ISOLATION SYSTEMS Are configured to accomodate a multitude of isolation safety switches. Can be redesigned to suit any machine EIS Including Battery Isolation, Emergency Stop, Starter Motor Isolation and any other emergency function such as Fire Suppression Activation or Pressure Release Systems. 333
4 EMERGENCY ISOLATION SYSTEMS Are configured to accomodate a multitude of isolation safety switches. Can be redesigned to suit any machine EIS Including Emergency Stop and Starter Motor Isolation. 334
5 EMERGENCY ISOLATION SYSTEMS Are configured to accomodate a multitude of isolation safety switches. Can be redesigned to suit any machine EIS Including Starter Motor Isolation. 335
6 CONTROLLER Intellex CIC Controller Intellex Critical Incline Shut Down is a system used to prevent accidents due to falling unit for sideways while traveling. System will give prior warning signal to theoperator indicating the slope of the unit on the danger status. The operator must immediately position the unit in order not constantly in a state of tilt Intellex Switch Group The use of the Intellex switch group for enable and disable lighting group among them, work lamp, strobe light amber, strobe light blue and option lamp. To control system Idle timer, LED indicator functions, if LED indicator indicates system Idle Timer turns on. And reset switch function, to overide system idle timer Intellex Fatique Alarm Intellex Fatigue Alarm works by checking the condition of a heavy equipment operator on a periodic basis by means of a visual warning LED lights red (Visual Warning) Intellex Idle Timer Controller Keep the engine idling for a time period after the ignition is switched off. This maintains the oil pressure to the turbo unit for lubrication and cooling as it winds down after running Intellex Dual Air Conditioner Controller The Dual Air Conditioner Controller The Intellex Dual AC Controller was specifically designed to reduce maintenance where 2 Air Conditioning Systems are installed on Heavy Equipment. The Intellex Dual AC Controller (DACC) continually alternates the time of operation of each Air Conditioning System. This Alternating Operation both extends the life of the Air Conditioning System Components by reducing each systems total operating hours and ensures that correct regular lubrication of the system components is conducted. 336
7 CONTROLLER Diff. Lock Control System To suit graders with electric diff. lock system. A system that will not allow diff. lock to e ngage unless the grader as been returned to the neutral position. This eliminates the possibility of diff. lock being engaged under extreme load. The system works of existing switches in the machine and so is easily installed. The system can be installed by a mechanic/ electrician in under 2 hours. The system comes complete with the control module, harnessing and fitting instructions Coolant Level Indicator Coolant Level Indicators prevent premature engine Failure. The system electronically monitors radiator water levels. Available for all types of engines and radiators. Kit comes complete with Alarm, LED Indicator, Radiator Insertion Probe, Label and Installation instructions V Heavy Duty Series Dual Probes V Heavy Duty Series 1 Probes V Light Duty Metal Radiator V Light Duty Plastic Radiator Excavator Proximity System Excavator Proximity System alert excavator and face shovel operators to safe operating distances to trucks, High Walls and Loading Point Floor or Obstacles on the loading point floor. The system utilizes Sonar Sensor mounted the left hand and right hand side of the counterweight to monitor the proximity of all obstacles that can cause impact damage to the excavator. Protecting Ladders, counterweights, and Fast Fill Stations. Pressure Switch On 5m Grease Pump On 6m 4m 6 4 7m 3m 3 7 Delay On 8 2 8m 2m 9 1 Fault On Timer On Grease Pump 9m 1m 1s Power On Bypass to Grease Pump AUTO LUBE CONTROLLER m Timer Off Grease Pump 6m 4m 6 4 7m 3m m 2m 9 1 9m 1m 1s Auto Lube Controller Automatic lubrication system (Auto Lube) can be applied in a lot of equipment and machinery such as diggers, trucks, buses, dozers, forklifts, loaders, pumps, crusher machine installation and preparation of materials, dumptrucks, road graders, loaders, conveyor belt, etc. The advantage of this system is to improve the lubrication life of all components that work several times in the same period. 337
8 CONTROLLER Speed Limit Protection System The Intellex Speed Limit Protection System is an additional system that can be applied to the mobile unit with a maximum speed that can be adjusted in accordance with the request of the customer. The main function is to limit the speed and maintain maximum speed on the unit. Speed limit works when a speed sensor is already reading the maximum limit (ex. 5 km/h) by means of the sensor provides a signal to the solenoid cut off to reduce the supply of fuel to the injection pump so that the rotation rpm will drop in the idle position. Speed limits will also provide an alarm/ warning at a predetermined maximum speed. POWER DISTRIBUTION SYSTEMS Power Distribution Unit 2 Systems Safety power all your machine accessories and standardizes all accessories associated harness routing and termination. Maintenance eliminates damage to OEM harnesses and ignition circuit, reduces downtime and reduces repair time. Safety reduces fire risk and accessories system failure. Production increases machine availability Power Distribution Unit 3 Systems Safety power all your machine accessories and standardizes all accessories associated harness routing and termination. Maintenance eliminates damage to OEM harnesses and ignition circuit, reduces downtime and reduces repair time. Safety reduces fire risk and accessories system failure. Production increases machine availability. 338
LEMBAR KERJA PENGOPERASIAN SIMULASI PEMBANGKIT LISTRIK TENAGA GAS
LEMBAR KERJA PENGOPERASIAN SIMULASI PEMBANGKIT LISTRIK TENAGA GAS Proses Nama Penanggung Jawab Jabatan Tanda tangan Perumusan Ainun Nidhar, A.Md Asisten Persetujuan Agus Sukandi, M.T. Ka. Lab Energi-Mekanik
Lebih terperinciSTANDAR LATIHAN KERJA DAFTAR MODUL
STANDAR LATIHAN KERJA DAFTAR MODUL NO. KODE JUDUL 1. WLO 01 ETIKA PROFESI DAN ETOS KERJA 2. WLO 02 KESELAMATAN DAN KESEHATAN KERJA (K3) 3. WLO 03 STRUKTUR DAN FUNGSI WHEEL LOADER 4. WLO 04 PEMELIHARAAN
Lebih terperinciIMPORTANT SAFETY INSTRUCTIONS. - To reduce the risk of electric shock : DANGER WARNING
IMPORTANT SAFETY INSTRUCTIONS DANGER WARNING - To reduce the risk of electric shock : - Do not allow to be used as a toy. Close attention is necessary when this sewing machine is used by or near children.
Lebih terperinciREVERSING ALARMS REVERSING ALARMS HORNS
REVERSING ALARMS HORNS 405110 Night Breaker 87dB(A) 12 to 24 VDC Compact size and universal mounting maximize location option reliability in a cost-effective back up alarm. Self grounding : no grounding
Lebih terperinciRAJA GAS AUTOMOTIVE CNG CONVERSION SYSTEM PRODUCT CATALOG
RAJA GAS AUTOMOTIVE CNG CONVERSION SYSTEM PRODUCT CATALOG 16/17 3 4 1 2 9 18 10 5 11 6 12 14 7 8 CNG CONVERTER KIT TYPE : BIGAS CNG CONVERTER KIT - SEQUENTIAL / INJECTION TYPE / UP TO 4 CYLINDER ENGINE
Lebih terperinciBATTERY CHARGING SYSTEM FOR AUTOMATICALLY OWN DEVICES EDUCATION AND RESEARCH DEVELOPMENT OF ELECTRIC BICYCLE ABSTRACT
BATTERY CHARGING SYSTEM FOR AUTOMATICALLY OWN DEVICES EDUCATION AND RESEARCH DEVELOPMENT OF ELECTRIC BICYCLE ABSTRACT Hari Raharjo, Ahmad Agus Setiawan, Wikan Sakarinto Electric bicycle or electric bike
Lebih terperinciABSTRACT. Universitas Kristen Maranatha
ABSTRACT Machine is a facility that is absolutely needed by manufacturing company in production. By using machines, production can be done efficiently and meets the plans. Machines that continuously used
Lebih terperinciRANCANG BANGUN PROTEKSI BEBAN BERLEBIH DAN OTOMATISASI LAMPU MENGGUNAKAN SENSOR LDR
RANCANG BANGUN PROTEKSI BEBAN BERLEBIH DAN OTOMATISASI LAMPU MENGGUNAKAN SENSOR LDR TUGAS AKHIR Disusun Oleh: DIANA NUR FITASARI J0D 006 007 PROGRAM STUDI DIPLOMA III INSTRUMENTASI DAN ELEKTRONIKA FAKULTAS
Lebih terperinciREFURBISHING PENGENDALI ARUS LISTRIK PENGELASAN PADA MESIN LAS RESISTANCE SPOT WELDING ME-25 UNTUK PERAKITAN KELONGSONG BAHAN BAKAR NUKLIR PLTN
PRIMA Volume 10, Nomor 1, Juni 2013 ISSN: 1411-0296 REFURBISHING PENGENDALI ARUS LISTRIK PENGELASAN PADA MESIN LAS RESISTANCE SPOT WELDING ME-25 UNTUK PERAKITAN KELONGSONG BAHAN BAKAR NUKLIR PLTN ABSTRAK
Lebih terperinciRing Bus. Ring Bus System
Ring Bus The Ring Bus configuration is shown in Fig-F. The breakers are so connected and forms a ring. There are isolators on both sides of each breaker. Circuits terminate between the breakers. The number
Lebih terperinciII. TECHNICAL SPECIFICATION / SPESIFIKASI TEKNIK
I. INTRODUCTION / PENDAHULUAN ICA Inverter type INV1000, INV2000, INV3000, INV4000 are advanced true sinewave output inverter with high voltage PWM (Pulse Width Modulation) technology. The Inverter can
Lebih terperinciBAB IV PENGUJIAN ALAT
BAB IV PENGUJIAN ALAT Dalam uji coba ini penulis akan melakukan simulasi alat dari kerja rangkaian sistem pengeruk sampah secara otomatis ini. Pengujian ini dilakukan untuk menguji sekaligus membuktikan
Lebih terperinciSaher System. English. indonesia. Road Safety 996
Saher System English 2 1 4 3 indonesia 6 5 Road Safety 996 What is the Saher System? Saher is a automated traffic control and management system that uses a network of digital cameras connected to the
Lebih terperinciPLTMG/PLTD Dual Fuel. By: Eko Sarwono 14 April 2016
PLTMG/PLTD Dual Fuel By: Eko Sarwono 14 April 2016 Tujuan Mengetahui perbedaan antara PLTMG dan PLTD dual Fuel Memahami prinsip kerja engine untuk memutar generator Mengetahui pembakuan Skala PLTMG/PLTD
Lebih terperinciT U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi
T U G A S A K H I R P e n e n t u a n I n t e r v a l P e r a w a t a n G u n a M e n u r u n k a n D o w n t i m e M e s i n P e n g e r i n g O v e n B o t o l D i PT. P h a r o s I n d o n e s i a Diajukan
Lebih terperinciProposal Proyek Akhir Program Studi Teknik Listrik. Jurusan Teknik Elektro. Politeknik Negeri Bandung
Proposal Proyek Akhir 2007 Program Studi Teknik Listrik Jurusan Teknik Elektro Politeknik Negeri Bandung 2007 PERANCANGAN UNIT RANGKAIAN INSTALASI GENSET DI PT AICHI TEX INDONESIA Nama Mahasiswa : Hidayah
Lebih terperinciBAB V ANALISA KERJA RANGKAIAN KONTROL
82 BAB V ANALISA KERJA RANGKAIAN KONTROL Analisa rangkaian kontrol pada rangkaian yang penulis buat adalah gabungan antara rangkaian kontrol dari smart relay dan rangkaian kontrol konvensional yang terdapat
Lebih terperinciPengantar Listrik Kapal
Pengantar Listrik Kapal Scope Yang termasuk dalam shipboard electrical system adalah Electric power plant Penerangan Interior communications dan control Eksterior communications Navigation system dan sistem
Lebih terperinciSimulasi Pengontrol Intensitas Cahaya Pada Lahan Parkir P2a Bekasi Cyber Park Dengan Kontrol On-Off
Simulasi Pengontrol Intensitas Cahaya Pada Lahan Parkir P2a Bekasi Cyber Park Dengan Kontrol On-Off Disusun Oleh: David Putra (0922020) Jurusan Teknik Elektro, Fakultas Teknik Universitas Kristen Maranatha
Lebih terperinciPada semua Kendaraan Megane II dipasang air conditioning (manual atau automatic), management pendinginan lakukan oleh injection computer, melalui
AIR CONDITIONING RENAULT Mégane II has 3 air conditioning functions, depending on the equipment level: - conventional heating (without air conditioning), - manual air conditioning, - automatic air conditioning.
Lebih terperinciBAB II LANDASAN TEORI...
ABSTRACT The development of production in industrial s world requires an automatic control system to get maximum result with most minimum fault. One of automatic control system in packed beverage s production
Lebih terperinci3.3.2 Konsep Eksekusi Desain Antarmuka...26 Handphone...27 Laptop...27 Bab IV...29 Pengembangan Sistem Perencanaan Tahap
Daftar Isi Pernyataan Orisinalitas Laporan... ii Kata Pengantar... iv Daftar Isi...v Daftar Gambar... vii Daftar Tabel... viii Abstrak...1 Abstract...2 Bab I...3 Persyaratan Produk...3 1.1 Pendahuluan...3
Lebih terperinciJADWAL PERAWATAN MESIN - YANMAR
JADWAL PERAWATAN MESIN - YANMAR Untuk Genset dgn Aplikasi Standby Perawatan harian dan mingguan : 1. Periksa Level Oli Mesin 2. Periksa air radiator 3. Periksa indikator filter udara 4. Periksa level bahan
Lebih terperinciManufacturing Systems Evolution
L/O/G/O SISTEM MANUFAKTUR FLEKSIBEL (FLEXIBLE MANUFACTURING SYSTEMS) WEEK 5 KHAMDI MUBAROK, S.T., M.Eng TEKNIK INDUSTRI - FT - UTM Manufacturing Systems Evolution Sistem manufaktur menggambarkan bagaimana
Lebih terperinciBAB III TEORI DASAR. 3.1 CAT 320D2 Excavator
BAB III TEORI DASAR 3.1 CAT 320D2 Excavator Terdapat berbagai jenis alat berat yang diproduksi oleh Caterpillar. Salah satunya adalah unit Excavator yang diaplikasikan sebagai unit loading maupun penggalian
Lebih terperinciKARAKTERISTIK MCB SEBAGAI PEMUTUS dan PENGHUBUNG MERESPONS TERJADINYA GANGGUAN CATU DAYA INSTALASI PENGELOLAAN LIMBAH RADIOAKTIF
KARAKTERISTIK SEBAGAI PEMUTUS dan PENGHUBUNG MERESPONS TERJADINYA GANGGUAN CATU DAYA INSTALASI PENGELOLAAN LIMBAH RADIOAKTIF ABSTRAK Jonner Sitompul Pusat Teknologi Limbah Radioaktif BATAN KARAKTERISTIK
Lebih terperinciPengisi Baterai 12 Volt dan 6 Volt Dengan Tampilan LCD. Bebasis Mikrokontroler ATmega8. Alfian Romadhan. Dosen pembimbing : Dr.
Pengisi Baterai 12 Volt dan 6 Volt Dengan Tampilan LCD Bebasis Mikrokontroler ATmega8 Alfian Romadhan Dosen pembimbing : Dr. Edy Supriyadi Jurusan Pendidikan Teknik Elektro, Fakultas Teknik, UNY ABSTRAK
Lebih terperinciEasyPact MVS Tipe N Air Circuit Breaker 800 s/d 4000 A 50kA
Tipe N Air Circuit Breaker 800 s/d 4000 A 50kA + Electronic Trip 2.0A Kapasitas Pemutusan : 50 ka pada 80/440V. Trip unit Electronic Trip 2.0A, memiliki setelan : - instantaneous protection (proteksi hubung
Lebih terperinciHASBER F. H. SITANGGANG
KAJIAN TOTAL PRODUCTIVE MAINTENANCE PADA PEMBANGKIT LISTRIK TENAGA GAS DAN UAP BLOK I ST 1.0 SICANANG BELAWAN DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS SKRIPSI Skripsi Yang Diajukan Untuk Melengkapi
Lebih terperinciSKRIPSI PROGRAM STUDI TEKNIK INDUSTRI FAKULTAS TEKNIK UNIVERSITAS BHAYANGKARA JAKARTA RAYA
SKRIPSI USULAN PERBAIKAN UNTUK PENINGKATAN EFEKTIVITAS KINERJA MESIN CRUSHER DI INCINERATOR 2 DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (STUDI KASUS PADA PT. FAJAR SURYA WISESA TBK) Disusun oleh :
Lebih terperinciLAPORAN HASIL PENELITIAN HIBAH PENELITIAN STRATEGIS NASIONAL DIPA UNIVERSITAS BRAWIJAYA TAHUN 2010
KETAHANAN PANGAN LAPORAN HASIL PENELITIAN HIBAH PENELITIAN STRATEGIS NASIONAL DIPA UNIVERSITAS BRAWIJAYA TAHUN 2010 Judul Ketua Anggota : Rancang Bangun Alat Penyiram Otomatis dengan Pengendali Mikrokontroler
Lebih terperinciBATTERY MAINTENANCE PRODUCTS
BATTERY MAINTENANCE PRODUCTS BATTERY TERMINALS BATTERY DISTRIBUTION TERMINALS BATTERY STARTER CABLES BATTERY STARTER TERMINALS BATTERY STRAIGHT CLAMP CABLES BATTERY ISOLATOR BATTERY SURGE PROTECTORS BATTERY
Lebih terperinciDaftar Isi. Halaman judul... Lembar Nomor Persoalan... Lembar Pengesahan... Lembar Motto... Lembar Persembahan... Kata Pengantar... Intisari...
Daftar Isi Halaman judul... Lembar Nomor Persoalan... Lembar Pengesahan... Lembar Motto... Lembar Persembahan... Kata Pengantar... i ii iii iv v vi Intisari... viii Abstract... ix Surat Pernyataan... Daftar
Lebih terperinciPERTAMINA LUBRICANTS GUIDE
164 GREASE GREASE PERTAMINA SGX-NL GREASE PERTAMINA SGX-NL is multipurpose grease for bearing of vehicles, formulated from lithium 12-hydroxystearate soap base and additives such as: antioxidant, anti
Lebih terperinciABSTRAK Kata Kunci :
ABSTRAK Perkembangan teknologi khususnya elektronika telah merambah hampir ke semua aspek kehidupan. Seperti halnya beragam peralatan listrik yang tersebar di berbagai tempat. Apabila beragam peralatan
Lebih terperinciPENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N PADA ENGINEERING FLIGHT SIMULATOR
PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N250-100 PADA ENGINEERING FLIGHT SIMULATOR ABSTRAK Pesawat udara merupakan suatu sistem yang terdiri dari beberapa
Lebih terperinciBAB V ANALISA DAN PEMECAHAN MASALAH
43 BAB V ANALISA DAN PEMECAHAN MASALAH 1.1 Analisa Sistem ATS Seperti yang sudah dikemukakan dalam bab sebelumnya dapat disimpulkan bahwa kontributor terbanyak masalah ketersediaan jaringan adalah masalah
Lebih terperinciBAB III METODOLOGI PENELITIAN
54 BAB III METODOLOGI PENELITIAN Pada perancangan modifikasi sistem kontrol panel mesin boiler ini, selain menggunakan metodologi studi pustaka dan eksperimen, metodologi penelitian yang dominan digunakan
Lebih terperinciSTUDI PERANCANGAN PENGONTROL NEURO-FUZZY PADA PEMBANGKIT LISTRIK TENAGA SURYA
STUDI PERANCANGAN PENGONTROL NEURO-FUZZY PADA PEMBANGKIT LISTRIK TENAGA SURYA T 621.312 44 WIT ABSTRAK Pengontrol neuro-fuzzy (NFC) yang menirukan invers dari sistem dinamik merupakan salah satu alternatif
Lebih terperinciFANS, BLOWERS, SEAT BELTS
THERMATIC FANS CABIN FANS AUTOMATIC LOCKING RETRACTING SEAT BELTS THERMATIC FANS 425110 Thermo Fan 12V 9 Inch Universal 12V 9 inch thermatic fan, with 10 blades. 425111 Thermo Fan 12V 10 Inch Universal
Lebih terperinciANALYSIS OF ROAD TRAFFIC ACCIDENTS ON THE JAGORAWI TOLL ROAD
ANALYSIS OF ROAD TRAFFIC ACCIDENTS ON THE JAGORAWI TOLL ROAD SUMMARY This thesis was concerned with the classification and analysis of 480 road traffic accidents on the Jagorawi Toll Road in the years
Lebih terperinciPERAWATAN UNINTERRUPTIBLE POWER SYSTEM PUSAT TEKNOLOGI LIMBAH RADIOAKTIF. Harwata Pusat Teknologi Limbah Radioaktif-BATAN
. ABSTRAK PERAWATAN UNINTERRUPTIBLE POWER SYSTEM PUSAT TEKNOLOGI LIMBAH RADIOAKTIF Harwata Pusat Teknologi Limbah Radioaktif-BATAN PERAWATAN UNINTERRUPTIBLE POWER SYSTEM PUSAT TEKNOLOGI LIMBAH RADIOAKTIF.
Lebih terperinciINTISARI TINGKAT KESIAPAN INSTALASI GAWAT DARURAT DALAM PELAKSANAAN SASARAN KESELAMATAN PASIEN DI RUMAH SAKIT BEDAH SINDUADI
INTISARI TINGKAT KESIAPAN INSTALASI GAWAT DARURAT DALAM PELAKSANAAN SASARAN KESELAMATAN PASIEN DI RUMAH SAKIT BEDAH SINDUADI Ayu Lidya Rahmah 1, Elsye Maria Rosa 2, Ekorini Listiowati 3 Magister Manajemen
Lebih terperinciDATA PARAMETER MESIN COMMON RAIL :
DATA PARAMETER MESIN COMMON RAIL : CARA PEMAKAIAN DISPLAY MFR : Saat mesin di-on, display akan menunjukkan kecepatan aktual saat ini Ada beberapa tombol menu di display : Paling atas ada 3 lampu indikator,
Lebih terperinciPerancangan Remote Control Terpadu untuk Pengaturan Fasilitas Kamar Hotel
Perancangan Remote Control Terpadu untuk Pengaturan Nama Fasilitas Kamar Hotel Disusun oleh: : Indra Ardian NRP : 1022037 Jurusan Teknik Elektro, Fakultas Teknik, Universitas Kristen Maranatha, Jl. Prof.Drg.Suria
Lebih terperinciAquaro. Oceans WS8821
Aquaro Oceans WS8821 Only connect the power cord to the voltage rating that matches with the rating plate to avoid danger such as electric outlet is in an inside location to protect from moisture. Be
Lebih terperinciABSTRAK. Kata Kunci : Informed Consent dalam keadaan darurat, Perlindungan Hukum bagi Dokter
TINJAUAN YURIDIS PERLINDUNGAN HUKUM BAGI DOKTER DIHUBUNGKAN DENGAN PERATURAN MENGENAI PERSETUJUAN TINDAKAN KEDOKTERAN DALAM KEADAAN DARURAT YANG MEMBUTUHKAN PEMBEDAHAN BERDASARKAN UNDANG-UNDANG NOMOR 29
Lebih terperinciPEMBUATAN POV (PERSISTENCE OF VISION) PROGRAMMABLE DENGAN MENGGUNAKAN MIKROKONTROLER ATMEGA 8
PEMBUATAN POV (PERSISTENCE OF VISION) PROGRAMMABLE DENGAN MENGGUNAKAN MIKROKONTROLER ATMEGA 8 Nama : Yusak Andre Setia NRP : 0622041 Jurusan Teknik Elektro, Fakultas Teknik, Universitas Kristen Maranatha
Lebih terperinciSession 11 Steam Turbine Protection
Session 11 Steam Turbine Protection Pendahuluan Kesalahan dan kondisi tidak normal pada turbin dapat menyebabkan kerusakan pada plant ataupun komponen lain dari pembangkit. Dibutuhkan sistem pengaman untuk
Lebih terperinciABSTRAK. Kata kunci: Arduino, Switch, Access Point, LED, LCD, Buzzer, . i Universitas Kristen Maranatha
ABSTRAK Dewasa ini komputer menjadi hal yang umum dalam dunia teknologi dan informasi. Komputer berkembang sangat pesat dan hampir seluruh aspek kehidupan manusia membutuhkan teknologi ini. Hal tersebut
Lebih terperinciSISTEM PENGAMAN KENDARAAN BERMOTOR DENGAN SMS (SHORT MESSAGE SERVICE)
SISTEM PENGAMAN KENDARAAN BERMOTOR DENGAN SMS (SHORT MESSAGE SERVICE) LAPORAN AKHIR Dibuat untuk memenuhi syarat menyelesaikan pendidikan Diploma III pada Jurusan Teknik Elektro Program Studi Teknik Elektronika
Lebih terperinciPEMERINTAH KABUPATEN KUNINGAN. Addendum. Dokumen Pengadaan Secara Elektronik. Pengadaan Barang. Metode Pelelangan sederhana dengan Pascakualifikasi
PEMERINTAH KABUPATEN KUNINGAN Addendum Dokumen Pengan Secara Elektronik Pengan Barang Metode Pelelangan sederhana dengan Pascakualifikasi A d d e n d u m D O K U M E N P E N G A D A A N Nomor 03 / eproc
Lebih terperinciSAFETY INDUCTION TAMU DIKANTOR PUSAT GUNUNG MALANG
SAFETY INDUCTION TAMU DIKANTOR PUSAT GUNUNG MALANG Selamat pagi / siang / Ibu-2 & Bapak-2 Selamat datang di kantor utama IPM Good morning / afternoon / ladies & gentlemen Welcome to the main office of
Lebih terperinciELEKTRONIC FUEL INJECTION
ELEKTRONIC FUEL INJECTION 1 Pada zaman dahulu sistim supply bahan bakar pada mesin masih convensional (manual) yang dikenal dengan sistim Carburator, kemudian setelah tahun 1960-an ditemukan Electronic
Lebih terperinciLAPORAN AKHIR ALAT PENGISI ULANG (CHARGER) PORTABLE BATTERAI SEPEDA MOTOR DENGAN INDIKATOR TAMPILAN MELALUI LCD 16 X 2
LAPORAN AKHIR ALAT PENGISI ULANG (CHARGER) PORTABLE BATTERAI SEPEDA MOTOR DENGAN INDIKATOR TAMPILAN MELALUI LCD 16 X 2 Diajukan Sebagai Persyaratan Untuk Menyelesaikan Pendidikan Diploma III Jurusan Teknik
Lebih terperinciSKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II)
SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II) (STUDI KASUS PADA PT. BRIDGESTONE TIRE INDONESIA) Disusun oleh : RIAN JANUARSYAH 2012.10.215.130
Lebih terperinciSJ2 1. English. Bahasa Indonesia
English IMPORTANT: Follow these part replacement instructions: 1 Match the part you received to the illustration on the next page. 2 Go to the page number indicated ( #) for that part. 3 Complete only
Lebih terperinciREALISASI SISTEM PENGONTROLAN DAN MONITORING MINIATUR LIFT BERBASIS PC (PERSONAL COMPUTER) Disusun Oleh : PANDAPOTAN MAHARADJA
REALISASI SISTEM PENGONTROLAN DAN MONITORING MINIATUR LIFT BERBASIS PC (PERSONAL COMPUTER) Disusun Oleh : PANDAPOTAN MAHARADJA 0522110 Jurusan Teknik Elektro, Fakultas Teknik, Jln. Prof. drg. Surya Sumantri,
Lebih terperinciABSTRAK. air, dalam hal ini mesin yang dipakai untuk melakukan suatu proses produksi
ABSTRAK Kemajuan teknologi sangat berpengaruh terhadap dunia industri ditanah air, dalam hal ini mesin yang dipakai untuk melakukan suatu proses produksi dituntut dapat menghasilkan suatu hasil produksi
Lebih terperinciPetunjuk Pengoperasian Pendingin Ruangan
F569009 Petunjuk Pengoperasian Pendingin Ruangan CS-C18FFP CU-C18FFP ENGLISH Before operating the unit, read these operating instructions thoroughly and keep them for future reference. CONTENTS....2....3....5....7...8
Lebih terperinciMENTERI KEUANGAN REPUBLIK INDONESIA
SALINAN PERATURAN MENTERI KEUANGAN NOMOR 26 /PMK.010/2005 TENTANG PEMBEBASAN BEA MASUK ATAS IMPOR BARANG UNTUK KEGIATAN USAHA PANAS BUMI MENTERI KEUANGAN, Menimbang : a. bahwa untuk mendorong kegiatan
Lebih terperinciBAB V PENUTUP 5.1 Simpulan Saran DAFTAR PUSTAKA LAMPIRAN LAMPIRAN
DAFTAR ISI HALAMAN SAMPUL DALAM... i PRASYARAT GELAR... ii LEMBAR PERNYATAAN ORISINALITAS... iii LEMBAR PERSETUJUAN PEMBIMBING... iv UCAPAN TERIMAKASIH... v ABSTRAK... vii ABSTRACT... viii DAFTAR ISI...
Lebih terperinciPEMBUATAN SISTEM KONTROL MESIN CAULKING ROD GUIDE OTOMATIS MENGGUNAKAN PLC OMRON CPM1A
ISSN: 1410-233 PEMBUATAN SISTEM KONTROL MESIN CAULKING ROD GUIDE OTOMATIS MENGGUNAKAN PLC OMRON CPM1A Syahril Ardi, Heru Suprapto, Hendrik Program Studi Teknik Produksi & Proses Manufaktur (Mekatronika)
Lebih terperinciABSTRAK. iii. Universitas Kristen Maranatha
ABSTRAK Persediaan merupakan salah satu aktiva yang paling penting yang dimiliki perusahaan. Karena persediaan itu penting, maka harus dilakukan pengendalian yang baik untuk menjaga persediaan berada pada
Lebih terperinciKiswanto, Teguh Sulistyo, Muhammad Taufiq, Yuyut S
KEHANDALAN SISTEM HIDRAN GEDUNG RSG-GAS DENGAN CARA PENAMBAHAN CATU DAYA LISTRIK DARI DISEL BRV 30 Kiswanto, Teguh Sulistyo, Muhammad Taufiq, Yuyut S Sub Bidang Sistem Elektrik Bidang Sistem Reaktor Pusat
Lebih terperinciTUGAS AKHIR ANALISA KERUSAKAN SISTEM HIDROLIK PADA CYLINDER HYDRAULIK DAN TRAVEL MOTOR PADA RUBBER CRAWLER CARRIER MOROOKA MST-600VD
TUGAS AKHIR ANALISA KERUSAKAN SISTEM HIDROLIK PADA CYLINDER HYDRAULIK DAN TRAVEL MOTOR PADA RUBBER CRAWLER CARRIER MOROOKA MST-600VD Disusun Sebagai Syarat Untuk Mencapai Gelar Sarjana Teknik Jurusan Teknik
Lebih terperinciTI-3222: Otomasi Sistem Produksi
TI-: Otomasi Sistem Produksi Hasil Pembelajaran Umum ahasiwa mampu untuk melakukan proses perancangan sistem otomasi, sistem mesin NC, serta merancang dan mengimplementasikan sistem kontrol logika. Diagram
Lebih terperinciBAB IV ANALISA DAN HASIL DATA. Flight controls hydraulic modular package adalah suatu komponen yang
BAB IV ANALISA DAN HASIL DATA 4.1. Analisa Data 4.1.1. Umum Flight controls hydraulic modular package adalah suatu komponen yang berfungsi sebagai pengontrol dari tenaga hydraulic untuk aileron, rudder,
Lebih terperinciKORELASI NILAI INTERNATIONAL ROUGHNESS INDEX (IRI) HASIL PENGUKURAN ALAT MERLIN DAN BUMP INTEGRATOR
KORELASI NILAI INTERNATIONAL ROUGHNESS INDEX (IRI) HASIL PENGUKURAN ALAT MERLIN DAN BUMP INTEGRATOR ABSTRAK KORELASI NILAI INTERNATIONAL ROUGHNESS INDEX (IRI) HASIL PENGUKURAN ALAT MERLIN DAN BUMP INTEGRATOR
Lebih terperinciPT. KORINDO HEAVY INDUSTRY BALARAJA PLANT
1 dari / of 3 2 dari / of 3 1. TUJUAN Untuk memastikan bahwa pesawat angkat dan angkut memenuhi Standar Keselamatan Kerja 2. RUANG LINGKUP Seluruh aktifitas di lingkungan PT Korindo Heavy Industry. 3.
Lebih terperinciKeseimbangan Torsi Coulomb
Hukum Coulomb Keseimbangan Torsi Coulomb Perputaran ini untuk mencocokan dan mengukur torsi dalam serat dan sekaligus gaya yang menahan muatan Skala dipergunakan untuk membaca besarnya pemisahan muatan
Lebih terperinciTUGAS AKHIR ANALISIS PENGUKURAN PRODUKTIVITAS MESIN CNC DI PT. RAJA PRESISI SUKSES MAKMUR DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE)
TUGAS AKHIR ANALISIS PENGUKURAN PRODUKTIVITAS MESIN CNC DI PT. RAJA PRESISI SUKSES MAKMUR DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) Oleh : MOCHAMAD ROMADHANI NBI : 411306085 PROGRAM STUDI TEKNIK
Lebih terperinciI. INTRODUCTION / PENDAHULUAN
ICA I. INTRODUCTION / PENDAHULUAN UPS (Uninterruptible Power Supplies) can provide full protection against all of power problem for your sensitive equipment ranging from computer, computerized instrument,
Lebih terperinciPENERAPAN HACCP PADA INDUSTRI CRACKER MAKALAH KOMPREHENSIF OLEH: STEPHANIE HANS
PENERAPAN HACCP PADA INDUSTRI CRACKER MAKALAH KOMPREHENSIF OLEH: STEPHANIE HANS 6103009034 PROGRAM STUDI TEKNOLOGI PANGAN FAKULTAS TEKNOLOGI PERTANIAN UNIVERSITAS KATOLIK WIDYA MANDALA SURABAYA SURABAYA
Lebih terperinciRANCANG BANGUN SISTEM SIMULASI PENDINGIN MESIN SECARA OTOMATIS BERBASIS MIKROKONTROLER AVR ATmega128L TUGAS AKHIR
RANCANG BANGUN SISTEM SIMULASI PENDINGIN MESIN SECARA OTOMATIS BERBASIS MIKROKONTROLER AVR ATmega128L TUGAS AKHIR Disusun Guna Memenuhi Persyaratan Untuk Mencapai Pendidikan Diploma III Program Studi Instrumentasi
Lebih terperinciABSTRAK. Kata kunci: Arduino UNO, SW420, Alarm Gempa. Universitas Kristen Maranatha
ABSTRAK Seiring dengan semakin rusaknya alam yang manusia tinggali, kejadian alam dan bencana alam semakin sering terjadi. Salah satu bencana alam yang pada akhir-akhir ini semakin sering terjadi adalah
Lebih terperinciBAB IV PENGUJIAN DAN ANALISA
123 BAB IV PENGUJIAN DAN ANALISA Bab ini berisi mengenai hasil pengujian mesin Heat Press 110 Ton 2RT 2P1U yang telah mengalami perubahan basis kontrol dengan PLC FX3U-80M dan HMI Proface AGP3300. Pengujian
Lebih terperinciAPLIKASI PENGINGAT PERBAIKAN MOTOR BERBASIS ANDROID
L A P O R A N S K R I P S I APLIKASI PENGINGAT PERBAIKAN MOTOR BERBASIS ANDROID MUHAMAD ARIFIN NIM. 201351113 DOSEN PEMBIMBING Endang Supriyati, M.Kom Ratih Nindyasari, M.Kom PROGRAM STUDI TEKNIK INFORMATIKA
Lebih terperinciSend us your feed back
Send us your feed back Ticker Range Signal IHSG 4.100-4.200 Neutral 3.950 4.050 4.250 4.355 Usai menguji level psikologis di angka 4,100 akhirnya IHSG kemarin berhasil menguju level psikologis berikutnya
Lebih terperinciRANCANG BANGUN OTOMATISASI PROSES MIXING PADA SISTEM OTOMATISASI PENYAJIAN KOPI SUSU BERBASIS MIKROKONTROLER AT89S51 TUGAS AKHIR
RANCANG BANGUN OTOMATISASI PROSES MIXING PADA SISTEM OTOMATISASI PENYAJIAN KOPI SUSU BERBASIS MIKROKONTROLER AT89S51 TUGAS AKHIR Diajukan guna melengkapi persyaratan dalam menyelesaikan pendidikan tingkat
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
Pangkalpinang 331 - Bangka Harga 0000000001 UNT 2 MARINE ENGINE YANMAR 500 HP KIP TIMAH ENGINE SPESIFICATION : - QUANTITY : 2 UNIT - MODEL : 6HYM-WET (CONFORM TO IMO TIER II EMISSIONS REGULATIONS) - MAKER
Lebih terperinciABSTRAK. Universitas Kristen Maranatha
ABSTRAK CV.Niagara dalam melaksanakan aktivitas, tidak terlepas dari penggunaan peralatan-peralatan yang termasuk kedalam kelompok aktiva tetap dan dikarenakan bahwa peralatan-peralatan yang digunakan
Lebih terperinciPROJECT TEST BIDANG LOMBA INDUSTRIAL CONTROL KESELAMATAN DAN KESEHATAN
PROJECT TEST BIDANG LOMBA INDUSTRIAL CONTROL KESELAMATAN DAN KESEHATAN 1. Setiap kompetitor bertanggung jawab atas keselamatan dirinya 2. Setiap ckmpetitor wajib menjaga agar area kerjanya bebas dari kotoran
Lebih terperinciKonsep Dasar Persediaan
Konsep Dasar Persediaan Outline: 1. What is Inventory? 2. Key Factors in Inventory Management Decision 3. Financial Inventory Performances 4. ABC Analysis. Kuliah ke-6: Rabu, 22 Okt 2008 I. What is Inventory
Lebih terperinciANALISIS CAPAIAN OPTIMASI NILAI SUKU BUNGA BANK SENTRAL INDONESIA: SUATU PENGENALAN METODE BARU DALAM MENGANALISIS 47 VARIABEL EKONOMI UNTU
ANALISIS CAPAIAN OPTIMASI NILAI SUKU BUNGA BANK SENTRAL INDONESIA: SUATU PENGENALAN METODE BARU DALAM MENGANALISIS 47 VARIABEL EKONOMI UNTU READ ONLINE AND DOWNLOAD EBOOK : ANALISIS CAPAIAN OPTIMASI NILAI
Lebih terperinciKONSERVASI PEMANFAATAN AIR SITU CEDE - TASIKMALAYA DALAM RANGKA RESTORASI FUNGSI TESIS
KONSERVASI PEMANFAATAN AIR SITU CEDE - TASIKMALAYA DALAM RANGKA RESTORASI FUNGSI TESIS Karya tulis sebagai salah satu syarat untuk memperoleh gelar Magister dari Institut Teknologi Bandung Oleh : LULU
Lebih terperinciSurat Permintaan Harga (SPH) / Request For Quotation (RFQ)
0000000001 UNT 1 Dry Magnetic Separator (Include roll high intensity magnetic separator) * Size/Model : 6 x 130mm dia. X 760mm Length Laminated Separation roller Configurated Into 2-Feed star in 2 separating
Lebih terperinciST 531 C ST 831 C ST 1231 C ST 1631 C I. INTRODUCTION / PENDAHULUAN 1 II. TECHNICAL SPECIFICATION / SPESIFIKASI TEKNIK... 2
UNINTERRUPTIBLE POWER SYSTEMS ST 531 C ST 831 C ST 1231 C ST 1631 C ICA 481-1180020-131 CONTENT / DAFTAR ISI Page / Halaman I. INTRODUCTION / PENDAHULUAN 1 II. TECHNICAL SPECIFICATION / SPESIFIKASI TEKNIK...
Lebih terperinci1/5. while and do Loops The remaining types of loops are while and do. As with for loops, while and do loops Praktikum Alpro Modul 3.
Judul TIU TIK Materi Modul Perulangan Ganjil 204/205 Mahasiswa memahami Konsep Perulangan. Mahasiswa mampu menggunakan perintah perulangan For, While do, do While 2. Mahasiswa mampu menggunakan perintah
Lebih terperinciIMPLEMENTASI KONTROL PID PADA PENDULUM TERBALIK MENGGUNAKAN PENGONTROL MIKRO AVR ATMEGA 16 ABSTRAK
IMPLEMENTASI KONTROL PID PADA PENDULUM TERBALIK MENGGUNAKAN PENGONTROL MIKRO AVR ATMEGA 16 Disusun Oleh: Nama : Earline Ignacia Sutanto NRP : 0622012 Jurusan Teknik Elektro, Fakultas Teknik, Universitas
Lebih terperinciAnalisis Availability Mesin Kompressor Dengan Penerapan TPM Dalam Produksi Blowing Agent Di PT. Dong Jin
Analisis Availability Mesin Kompressor Dengan Penerapan TPM Dalam Produksi Blowing Agent Di PT. Dong Jin http://www.gunadarma.ac.id/ Randy Kusmandanu 30405591 Pendahuluan Latar Belakang Agar Perusahaan
Lebih terperinciEFISIENSI JUMLAH ARMADA BUS PATAS AC ANTAR BEBERAPA PERUSAHAAN BERDASARKAN METODE PERTUKARAN TRAYEK DI DKI JAKARTA TESIS
EFISIENSI JUMLAH ARMADA BUS PATAS AC ANTAR BEBERAPA PERUSAHAAN BERDASARKAN METODE PERTUKARAN TRAYEK DI DKI JAKARTA TESIS Karya tulis sebagai salah satu syarat untuk memperoleh gelar Magister dari Institut
Lebih terperinciLAPORAN PROYEK AKHIR STANDAR OPERASIONAL PROSEDUR DAN PENGUJIAN MESIN HYBRID POWDER SPRAY CNC 2 AXIS
LAPORAN PROYEK AKHIR STANDAR OPERASIONAL PROSEDUR DAN PENGUJIAN MESIN HYBRID POWDER SPRAY CNC 2 AXIS Disusun guna memenuhi sebagian syarat Untuk menyelesaikan studi dan mendapatkan gelar Ahli Madya Teknik
Lebih terperinciPetunjuk Pengoperasian Pendingin Ruangan
F569011 Petunjuk Pengoperasian Pendingin Ruangan CS-C45FFP8 CU-C45FFP8 ENGLISH Before operating the unit, read these operating instructions thoroughly and keep them for future reference. CONTENTS....2....3....5....7...8
Lebih terperinciBAB IV PROSES GENERAL INSPECTION
15 BAB IV PROSES GENERAL INSPECTION 4.1 ALUR PROSES GENERAL INSPECTION Mulai Persiapan alat dan kelengkapan Pengecekan unit Visual check Test performance Check seluruh komponen Engine test Hydraulic system
Lebih terperinciANALISIS INVESTASI PENGADAAN ALAT BERAT DI PT. KARBINDO ABESYAPRADHI DENGAN METODE NPV DAN IRR
ANALISIS INVESTASI PENGADAAN ALAT BERAT DI PT. KARBINDO ABESYAPRADHI DENGAN METODE NPV DAN IRR RIZTO SALIA ZAKRI PROGRAM STUDI STRATA-1 TEKNIK PERTAMBANGAN FAKULTAS TEKNIK UNIVERSITAS NEGERI PADANG Wisuda
Lebih terperinciUniversitas Kristen Maranatha ABSTRAK
ABSTRAK LANGKAH-LANGKAH HUKUM YANG DAPAT DILAKUKAN OLEH BANK TERKAIT MUSNAHNYA BARANG JAMINAN FIDUSIA BERDASARKAN UNDANG-UNDANG NOMOR 42 TAHUN 1999 TENTANG JAMINAN FIDUSIA JUNCTO UNDANG-UNDANG NOMOR 40
Lebih terperinciTI3105 Otomasi Sistem Produksi
TI105 Otomasi Sistem Produksi Diagram Elektrik Laboratorium Sistem Produksi Prodi. Teknik Industri @01 Umum Hasil Pembelajaran ahasiwa mampu untuk melakukan proses perancangan sistem otomasi, sistem mesin
Lebih terperinciABSTRAK. i Universitras Kristen Maranatha
ABSTRAK Kemudahan dalam bertransaksi merupakan hal yang didambakan oleh semua orang. Tidak hanya kemudahan dalam transaksi jual beli saja, namun dalam hal sewa-menyewa sebuah barang pun diharapkan adanya
Lebih terperinciStandard Operating Procedure. Penyalaan Turbin Jetcat P160
Halaman : 1 Tahapan Persiapan adalah sebagai berikut : 1. Letakan turbin pada tesbed (ikuti SOP tesbed) 2. Lakukan Ceklist komponen atau perlengkapan untuk penyalaan turbin jetcat dengan mengisi form 1.
Lebih terperinci