REKAPITULASI BILL OF QUANTITY (BOQ) TA. 2013 KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN : BADAN LAYANAN UMUM RSUP Prof. Dr.R.D. Kandou Manado : PEMBANGUNAN GEDUNG RUMAH SAKIT PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER (PEKERJAAN ARSITEKTUR,MEKANIKAL DAN ELEKTRIKAL) : RSUP Prof.D.R. Kandou Manado : 2013 NO. URAIAN PEKERJAAN JUMLAH (Rp) I PRELIMINARIES GEDUNG CARDIAC CENTRE II PEKERJAAN ARSITEKTUR CARDIAC CENTRE III PEKERJAAN ELEKTRIKAL CARDIAC CENTRE IV PEKERJAAN MEKANIKAL CARDIAC CENTRE JUMLAH PPN 10% TOTAL DIBULATKAN MENGETAHUI/MENYETUJUI : PT./CV. Manado,...2013 DIBUAT: PIMPINAN TEKNIK/SITE MANAGER. Direktur utama/direktur 1 REVISI (ARS,ME)
BILL OF QUANTITY (BOQ) PRELIMINARIES KEGIATAN PEKERJAAN LOKASI TAHUN ANGGARAN : BADAN LAYANAN UMUM RSUP Prof. Dr.R.D. Kandou Manado : PEMBANGUNAN GEDUNG RUMAH SAKIT PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER (PEKERJAAN ARSITEKTUR,MEKANIKAL DAN ELEKTRIKAL) : RSUP Prof.D.R. Kandou Manado : 2013 NO. URAIAN PEKERJAAN VOLUME (Rp) JUMLAH (Rp) A PRELIMINARIES 137.600.000 1 Pembersihan Lokasi 1,00 Ls 5.000.000 5.000.000 2 Papan Nama Proyek 1,00 Ls 1.100.000 1.100.000 3 Listrik Proyek 1,00 Ls 15.000.000 15.000.000 4 Air Proyek 1,00 Ls 20.000.000 20.000.000 5 P3K (Cardiac Centre) 1,00 Ls 13.500.000 13.500.000 6 Testing material & commisioning (termasuk ME) 1,00 Ls 35.000.000 35.000.000 7 Shop Drawing & As Build Drawing 1,00 Ls 10.000.000 10.000.000 8 Mobilisasi & Demobilisasi 1,00 Ls 33.000.000 33.000.000 9 Pembersihan Akhir 1,00 Ls 5.000.000 5.000.000 TOTAL PRELIMINARIE 137.600.000 2 REVISI (ARS,ME)
KEGIATAN PEKERJAAN BILL OF QUANTITY (BOQ) PEKERJAAN ARSITEKTUR : BADAN LAYANAN UMUM RSUP Prof. Dr.R.D. Kandou Manado : PEMBANGUNAN GEDUNG RUMAH SAKIT PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER (PEKERJAAN ARSITEKTUR,MEKANIKAL DAN ELEKTRIKAL) LOKASI : RSUP Prof.D.R. Kandou Manado TAHUN ANGGARAN : 2013 NO. URAIAN PEKERJAAN sat (Rp) JUMLAH (Rp) A PEKERJAAN PENUTUP CELAH ANTAR RUANGAN 1 Penutup Kalsiboard lengkap dengan pengecetan M2 37,67 Pada Lantai 2,3,4 B PENYEMPURNAAN RG CATH LAB (2 RG) 1 Medical Insulated panel untuk Dinding +lapis Timah Hitam 188,00 m2 2 medical Insulated panel untuk celling 100,00 m2 3 Pintu Besi Double Swing lapis Timbal 2,00 unit Dimensi 2100 mm H x (800 + 800) mmw 4 Pintu Besi Single Swing Lapis Timbal 5,00 unit Dimensi 2100 mm H x 900 mmw 5 Pekerjaan Pasangan lantai Finil 100,00 m2 TOTAL PEKERJAAN ARSITEKTUR 3 REVISI (ARS,ME)
BILL OF QUANTITY (BOQ) PEKERJAAN ELEKTRIKAL KEGIATAN PEKERJAAN : : BADAN LAYANAN UMUM RSUP Prof. Dr.R.D. Kandou Manado PEMBANGUNAN GEDUNG RUMAH SAKIT PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER (PEKERJAAN ARSITEKTUR,MEKANIKAL DAN ELEKTRIKAL) LOKASI : RSUP Prof.D.R. Kandou Manado TAHUN ANGGARAN : 2013 NO. URAIAN PEKERJAAN Volume (Rp) JUMLAH (Rp) A Pemasangan Transformer 800 KVA 1,00 lot 12.180.000 B Pemasangan Panel Tegangan Menengah (PTM) - 1 incoming, 1 metering, 2 outgoing 1,00 lot 7.770.000 C Pemasangan Power Quality Compensator (PQC) 1,00 lot 8.790.000 8.790.000 dan Pengetesan D Pengadaan & Pemasangan PUTR 1,00 unit 660.000.000 660.000.000 (Panel Utama Tegangan Rendah) E Pekerjaan Elektronik Fire Alarm Sytem 1 Lantai Satu - MCFA Kaps. 16 Zone c/w Battery 1,00 lot - Annunciator kaps. 16 Zone 1,00 bh - JBFA 1,00 unt - UPS 5 KVA 1,00 unt - Photoelectric Smoke Detector 35,00 bh - Heat Detector 43,00 bh - Manual Call Point 2,00 bh - Indicator Lamp 2,00 bh - Alarm Bell 2,00 bh 1.210.000 2 LANTAI DUA - JBFA 1,00 unt - Photoelectric Smoke Detector 17,00 unt - Heat Detector 26,00 bh - Fixed Temperatur Heat Detector 1,00 bh - Manual Call Point 2,00 bh - Indicator Lamp 2,00 bh - Alarm Bell 2,00 bh 3 LANTAI TIGA - JBFA 1,00 unt 1.210.000 1.210.000 - Photoelectric Smoke Detector 18,00 unt - Heat Detector 26,00 bh - Manual Call Point 2,00 bh - Indicator Lamp 2,00 bh - Alarm Bell 2,00 bh 4 REVISI (ARS,ME)
Volume 4 LANTAI EMPAT - JBFA 1,00 unt - Photoelectric Smoke Detector 17,00 unt - Heat Detector 21,00 ttk - Manual Call Point 2,00 bh - Indicator Lamp 2,00 bh - Alarm Bell 2,00 bh 5 Sound System UPS 10 KVA (2x5kVA) 1,00 unit 6 MATV System Lantai 1,2, & 3 master Station W/Handset 7,00 unit (Rp) JUMLAH (Rp) F PENGADAAN JARINGAN PLN & AKLI (Cardiac Centre) 1 Biaya Pengujian & Sertifikasi Instalasi Listrik 690.000 VA 2 Pekerjaan Kabel Feeder - Kabel dari Cubicle ke Trafo XLPE 1 x 3 x 35 mm2 20,00 m - Instalasi Pentanahan Pengaman (Trafo & Panel-panel) 12,00 m - Pek. Kabel Power TM dari Gardu Induk Ke PTM Cardiac 1,00 Lot (kabel N2XSEFGbY-3x95 mm2 ) - Kabel N2XSY - 3 x 1 c x 70 mm2 dari PTM 15,00 m' ke Trafo 800 kva - Kabel NYY 4 (4 x 1 x 185 mm2)+bc 70 mm dari Trafo ke PUTR 15,00 m' 9.870.000 148.050.000 - Kabel NYY 3( 4x1x185 mm2) + BC 70 mm2 150,00 mtr 5.120.000 768.000.000 dari PKG ke PUTR - kabel dari PUTR ke: PP Hydrant -FRC 4 x 70 mm2 110,00 mtr PP Jockey -FRC 4 x 6 mm2 110,00 mtr PP SP - NYY 4 x 10 mm2 24,00 mtr - PP-SP.CR Ke: LCP-SP1 -NYY 4 X 6mm2 36,00 mtr LCP-SP2 -NYY 4 X 6 mm2 65,00 mtr LCP-SP3 - NYY 4 X 6 mm2 57,00 mtr 3 Pembangunan gardu PLN 16 M2 4 PENYAMBUNGAN DAYA 690 KVA 690.000 VA 5 REVISI (ARS,ME)
Volume (Rp) JUMLAH (Rp) G PEKERJAAN ELEKTRIKAL GEDUNG CARDIAC CENTRE - 1 LANTAI - DASAR LAMPU PENERANGAN & ACCESSORIES - Lampu TL - 2 x 36 w TKI 134,00 bh - Lampu TL - 1 x 36 w 4,00 bh - Lampu TL - 1 x 36 w + Nicad Battery 2,00 bh - Lampu Wash basin TL - 1 x 18 w 4,00 bh - Lampu TL - 2 x 18 w V shape 15,00 bh - Lampu Exit TL - 1 x 10 w + Nicad Battery 5,00 bh - Lampu Tangga TL - 1 x 18 w + Nicad Battery 4,00 bh - Lampu Down Light PLC - 2 x 13 w 271,00 bh - Lampu Down Light PLC - 2 x 13 w + Nicad Batrtery 10,00 bh - Lampu Down Light PLC - 1 x 13 w 84,00 bh - Lampu Down Light PLC - 1 x 13 w + Nicad Batrtery 10,00 bh 2 LANTAI - DUA LAMPU PENERANGAN & ACCESSORIES - Lampu TL - 2 x 36 w TKI 101,00 bh - Lampu Wash basin TL - 1 x 18 w 4,00 bh - Lampu 3 x TL 36 termasuk Box Plate Steel & acrylic lengkp 20,00 bh Instlalasi Titik lampu pada Rg Cathlab - Lampu TL - 2 x 18 w V shape 15,00 bh 726.000 - Lampu Exit TL - 1 x 10 w + Nicad Battery 3,00 bh - Lampu Tangga TL - 1 x 18 w + Nicad Battery 9,00 bh - Lampu Down Light PLC - 2 x 13 w 76,00 bh - Lampu Down Light PLC - 1 x 13 w 30,00 bh 3 LANTAI - TIGA LAMPU PENERANGAN & ACCESSORIES - Lampu TL - 2 x 36 w TKI 52,00 bh - Lampu Wash basin TL - 1 x 18 w 2,00 bh - Lampu TL - 2 x 18 w V shape 11,00 bh - Lampu TL - 2 x 36 w V shape 5,00 bh - Lampu Exit TL - 1 x 10 w + Nicad Battery 3,00 bh - Lampu Tangga TL - 1 x 18 w + Nicad Battery 5,00 bh - Lampu Down Light PLC - 2 x 13 w 79,00 bh - Lampu Down Light PLC - 1 x 13 w 43,00 bh 4 LANTAI - EMPAT LAMPU PENERANGAN & ACCESSORIES - Lampu TL - 2 x 36 w TKI 34,00 bh - Lampu TL - 1 x 36 w + Nicad Battery 1,00 bh - Lampu TL - 2 x 18 w V shape 5,00 bh - Lampu TL - 2 x 36 w V shape 5,00 bh - Lampu Exit TL - 1 x 10 w + Nicad Battery 1,00 bh - Lampu Tangga TL - 1 x 18 w + Nicad Battery 5,00 bh - Lampu Down Light PLC - 2 x 13 w 142,00 bh - Lampu Down Light PLC - 1 x 13 w 33,00 bh - Lampu Down Light PLC - 1 x 13 w + Nicad Batrtery 4,00 bh - Lampu PAR 80w 10,00 bh 5 LANTAI - ATAP LAMPU PENERANGAN & ACCESSORIES - Lampu Tangga TL - 1 x 18 w + Nicad Battery 2,00 bh - Lampu TL - 1 x 36 w 6,00 bh - Lampu kapal (termasuk pengadaan lampu) 8,00 bh TOTAL ELEKTRIKAL 6 REVISI (ARS,ME)
KEGIATAN PEKERJAAN : : BILL OF QUANTITY (BOQ) PEKERJAAN MEKANIKAL BADAN LAYANAN UMUM RSUP Prof. Dr.R.D. Kandou Manado PEMBANGUNAN GEDUNG RUMAH SAKIT PEKERJAAN LANJUTAN PEMBANGUNAN GEDUNG CARDIAC CENTER (PEKERJAAN ARSITEKTUR,MEKANIKAL DAN ELEKTRIKAL) LOKASI : RSUP Prof.D.R. Kandou Manado TAHUN ANGGARAN : 2013 NO. URAIAN PEKERJAAN Volume (Rp) JUMLAH (Rp) H MECHANICAL UTILITIES 1 Pekerjaan Pemadam Kebakaran (Lanscape)& Instalasi Air Bersih 355.850.122 1 Pengadaan & Pemasangan Pipa BSP (Black Steel) SCh 40 standard ASTM dari ruang pompa sampai ke hydrant pilar di area site plan, di cat besi, flinkute jacketing karung lengkap fitting, galian dan urugan tanah kembali serta peralatan bantu lainnya. - BSP Sch 40 diameter 4" 400,00 m 475.400 190.160.000 - fitting 1,00 ls 22.000.000 22.000.000 2 Hydrant pilar, lengkap dengan hose nozzle gate valve dan peralatan bantu yang diperlukan, pilar hydrant 4,00 Unit 12.790.166 51.160.664 2 way uk.4"x2 1/2"x21/2" 3 Seamese connection lengkap dengan check valve dan peralatan bantu yang diperlukan 1,00 Unit 12.150.658 12.150.658 4 Hydrant box / fire hose cabinet type out door, lengkap dengan hose nozzle, gate valve, dan peralatan bantu box ukuran 95 x 66 x 20 cm tebal plat 1.5 mm lengkap 4,00 Unit 12.532.200 50.128.800 1 roll fire hose machino coupling ukr 2 1/2" x 30 m 1 bh strigh nozle, 1 set hose rack 2 1/2. 5 Lanjutan Pekerjaan Instalasi air Bersih Pengadaan & Pemasangan Pipa PE 2" lengkap Aceeciries dari Rumah 110,00 m' 275.000 30.250.000 pompa ke gedung Cardiac Centre lengkap dengan galian Tanah (60 cm) timbunan Pasir bekas galian,timbunan tanah kembali. 2 UPS LIFT UPS untuk Bed Liff & Pass. Lift (IGD & CARDIAC) 6 bh 67.500.000 405.000.000 I Penangkal petir Non Radioaktif 1,00 lot 137.000.000 137.000.000 J Pengadaan & Pemasangan AC 7.481.470.568 M PEKERJAAN ASESORIESTOTAL MEKANIKAL 8.379.320.690 7 REVISI (ARS,ME)
J PENGADAAN & PEMASANGAN AC PEKERJAAN AIR CONDITIONING SISTEM SETARA VRF (SISTEM KERJA OUTDOOR KE INDOOR JARAKNYA 50-100 M,SMART SOFWARE) I UNIT A LANTAI 1 I INDOOR 1.1 1 Code : IU.1-6, 1-46, 1-47, 1-51, 1-55,1-45,1-52,1-53 8 unit 12.567.150 100.537.200 Cooling Cap. : 7.500 BTU/h 2 Code : IU.1-57 1 unit 12.818.600 12.818.600 Cooling Cap. : 9.600 BTU/h 3 Code : IU.1-9,1-8 2 unit 18.221.030 36.442.060 4 Code : IU 1-54, 1-56 2 unit 18.904.760 37.809.520 Cooling Cap. : 19.000 BTU/h 5 Code : IU.1-7, 1-48 2 unit 20.968.790 41.937.580 Cooling Cap. : 24.900 BTU/h 6 Code : IU.1-49, 1-43, 1-44 3 unit 20.676.680 62.030.040 Cooling Cap. : 20.400 BTU/h 7 Code : IU.1-1 S/D 1-5,1-50 6 unit 25.512.010 153.072.060 Cooling Cap. : 36.000 BTU/h OUTDOOR 1 Code : OU.1-1 1 unit 500.819.920 500.819.920 : VRF (SETARA) Cooling Cap. : 443.700 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 24 unit 1.300.050 31.201.200 Join Kit Indoor 23 unit 2.557.300 58.817.900 Join Kit Outdoor 2 unit 2.557.300 5.114.600 8 REVISI (ARS,ME)
INDOOR 1.2 1 Code : IU.1-10,1-11,1-20,1-25,1-27,1-30,1-31,1-32,1-33,1-37,1-38,1-39 12 unit 12.567.150 150.805.800 Cooling Cap. : 7.500 BTU/h 2 Code : IU.1-58 1 unit 13.979.550 13.979.550 Cooling Cap. : 12.000 BTU/h 3 Code : IU.1-12,1-12,1-13,1-15,1-16,1-17,1-21,1-23,1-24,1-35,1-36 10 unit 16.879.250 168.792.500 Cooling Cap. : 12.000 BTU/h 4 Code : IU.1-18,1-28,1-40,1-41 4 unit 18.904.760 75.619.040 Cooling Cap. : 19.000 BTU/h 5 Code : IU.1-19,1-26,1-34 3 unit 20.968.790 62.906.370 Cooling Cap. : 24.900 BTU/h 6 Code : IU.1-42 1 unit 20.676.680 20.676.680 Cooling Cap. : 20.400 BTU/h 7 Code : IU.1-29 1 unit 18.221.030 18.221.030 8 Code : IU.1-14,1-22 2 unit 22.818.820 45.637.640 Cooling Cap. : 30.700 BTU/h OUTDOOR 1 Code : OU.1-2 1 unit 500.819.920 500.819.920 : VRF (SETARA) Cooling Cap. : 443.700 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 34 unit 1.300.050 44.201.700 Join Kit Indoor 33 unit 2.557.300 84.390.900 Join Kit Outdoor 2 unit 2.557.300 5.114.600 9 REVISI (ARS,ME)
B LANTAI 2 I INDOOR 2.1 1 Code : IU.2-4 1 unit 19.046.000 19.046.000 Cooling Cap. : 7.500 BTU/h 2 Code : IU.2-11 1 unit 16.879.250 16.879.250 Cooling Cap. : 9.600 BTU/h 3 Code : IU.2-9, 2-12, 2-13 3 unit 18.221.030 54.663.090 4 Code : IU.2-2, 2-3, 2-7, 2-8 4 unit 18.904.760 75.619.040 Cooling Cap. : 19.000 BTU/h 5 Code : IU.2-5, 2-10 2 unit 20.968.790 41.937.580 Cooling Cap. : 24.900 BTU/h 6 Code : IU.2-1A, 2-1B,2-6A,2-6B 4 unit 28.400.000 113.600.000 : High Static pressure Ducted Cooling Cap. : 47.800 BTU/h OUTDOOR 1 Code : OU.2-1 1 unit 397.139.060 397.139.060 : VRF (SETARA) Cooling Cap. : 344.700 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 15 unit 1.300.050 19.500.750 Join Kit Indoor 14 unit 2.557.300 35.802.200 Join Kit Outdoor 1 unit 2.557.300 2.557.300 10 REVISI (ARS,ME)
I INDOOR 2.2 1 Code : IU.2-18 1 unit 12.567.150 12.567.150 Cooling Cap. : 7.500 BTU/h 2 Code : IU.2-14,2-15,2-19 3 unit 16.879.250 50.637.750 Cooling Cap. : 12.000 BTU/h 3 Code : IU.2-16, 2-17 2 unit 18.904.760 37.809.520 Cooling Cap. : 19.000 BTU/h 4 Code : IU.2-20,2-21,2-22,2-23 4 unit 28.400.000 113.600.000 : High Static Pressure Ducted Cooling Cap. : 47.800 BTU/h OUTDOOR 1 Code : OU.2-2 1 unit 290.028.850 290.028.850 : VRF(SETARA) Cooling Cap. : 249.100 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 10 unit 1.300.000 13.000.000 Join Kit Indoor 9 unit 2.557.300 23.015.700 Join Kit Outdoor 1 unit 2.557.300 2.557.300 C LANTAI 3 I INDOOR 3.1 1 Code : IU.3-26,3-27 2 unit 12.567.150 25.134.300 Cooling Cap. : 7.500 BTU/h 2 Code : IU.3-1, 3-2, 3-3, 3-4, 3-5, 3-28 6 unit 14.198.900 85.193.400 3 Code : IU.3-10, 3-11, 3-12, 3-29, 3-30 5 unit 18.904.760 94.523.800 4 Code : IU.3-25 1 unit 20.968.790 20.968.790 Cooling Cap. : 24.900 BTU/h 11 REVISI (ARS,ME)
OUTDOOR 1 Code : OU.3-1 1 unit 223.817.250 223.817.250 Cooling Cap. : VRF (SETARA) : 191.100 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 14 unit 1.300.050 18.200.700 Join Kit Indoor 13 unit 2.557.300 33.244.900 Join Kit Outdoor 1 unit 2.557.300 2.557.300 I INDOOR 3.2 1 Code : IU.3-6, 3-7, 3-8, 3-9, 4 unit 14.198.900 56.795.600 2 Code : IU.3-21,3-22,3-23 3 unit 13.979.550 41.938.650 Cooling Cap. : 12.000 BTU/h 3 Code : IU.3-15,3-16,3-17 3 unit 16.879.250 50.637.750 4 Code : IU.3-18,3-19,3-20 3 unit 18.221.030 54.663.090 5 Code : IU.3-13,3-14 2 unit 18.904.760 37.809.520 6 Code : IU.3-24 1 unit 20.968.790 20.968.790 Cooling Cap. : 24.900 BTU/h OUTDOOR 1 Code : OU.3-2 1 unit 255.107.260 255.107.260 : VRF (SETARA) Cooling Cap. : 209.900 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 16 unit 1.300.050 20.800.800 Join Kit Indoor 15 unit 2.557.360 38.360.400 Join Kit Outdoor 1 unit 2.557.300 2.557.300 12 REVISI (ARS,ME)
D LANTAI 4 I INDOOR 4.1 1 Code : IU.4-12 1 unit 12.567.150 12.567.150 Cooling Cap. : 7.500 BTU/h 2 Code : IU.4-10 1 unit 12.818.600 12.818.600 Cooling Cap. : 9.600 BTU/h 3 Code : IU.4-3, 4-4, 4-5 3 unit 13.979.550 41.938.650 Cooling Cap. : 12.000 BTU/h 4 Code : IU.4-11 1 unit 18.904.760 18.904.760 Cooling Cap. : 19.000 BTU/h 5 Code : IU.4-1, 4-2, 4-8, 4-9 4 unit 25.512.010 102.048.040 Cooling Cap. : 36.000 BTU/h 6 Code : IU.4-7 1 unit 26.060.920 26.060.920 Cooling Cap. : 47.800 BTU/h OUTDOOR 1 Code : OU.4-1 1 unit 290.028.850 290.028.850 : VRF (SETARA) Cooling Cap. : 267.900 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 11 unit 1.300.050 14.300.550 Join Kit Indoor 10 unit 2.557.300 25.573.000 Join Kit Outdoor 1 unit 2.557.300 2.557.300 13 REVISI (ARS,ME)
II INDOOR 4.2 1 Code : IU.4-17 1 unit 12.567.150 12.567.150 Cooling Cap. : 7.500 BTU/h 2 Code : IU.4-16 1 unit 22.818.820 22.818.820 Cooling Cap. : 30.700 BTU/h 3 Code : IU.4-15 1 unit 16.879.250 16.879.250 Cooling Cap. : 12.000 BTU/h 4 Code : IU.4-13,4-14,4-18,4-19 4 unit 20.968.790 83.875.160 Cooling Cap. : 24.900 BTU/h 5 Code : IU.4-6 1 unit 13.979.550 13.979.550 Cooling Cap. : 12.000 BTU/h 6 Code : IU.4-20 1 unit 18.904.760 18.904.760 Cooling Cap. : 19.000 BTU/h OUTDOOR 1 Code : OU.4-2 1 unit 194.622.300 194.622.300 : VRF (SETARA) Cooling Cap. : 170.600 BTU/h : 3Ph/380V/50Hz ACCESSORIES Wired Remote Control 9 unit 1.300.050 11.700.450 Join Kit Indoor 8 unit 2.557.300 20.458.400 Join Kit Outdoor 1 unit 2.557.300 2.557.300 14 REVISI (ARS,ME)
II INSTALASI UNIT AC A Pipa Refrigerant & Accessories 1 LOT 478.873.685 478.873.685 1 Pipa refrigerant Ø 1/4" 325 m 2 Pipa refrigerant Ø 3/8" 612 m 3 Pipa refrigerant Ø 1/2" 555 m 4 Pipa refrigerant Ø 5/8" 446 m 5 Pipa refrigerant Ø 3/4" 219 m 6 Pipa refrigerant Ø 7/8" 180 m 7 Pipa refrigerant Ø 1 1/8" 305 m 8 Pipa refrigerant Ø 1 3/8" 87 m 9 Pipa refrigerant Ø 1 5/8" 188 m 10 Elbow tembaga Ø 3/8" 120 bh 11 Elbow tembaga Ø 1/2" 89 bh 12 Elbow tembaga Ø 5/8" 76 bh 13 Elbow tembaga Ø 3/4" 40 bh 14 Elbow tembaga Ø 7/8" 40 bh 15 Elbow tembaga Ø 1 1/8" 51 bh 16 Elbow tembaga Ø 1 3/8" 16 bh 17 Elbow tembaga Ø 1 5/8" 37 bh 18 Sock tembaga Ø 3/8" 120 bh 19 Sock tembaga Ø 1/2" 89 bh 20 Sock tembaga Ø 5/8" 76 bh 21 Sock tembaga Ø 3/4" 40 bh 22 Sock tembaga Ø 7/8" 40 bh 23 Sock tembaga Ø 1 1/8" 51 bh 24 Sock tembaga Ø 1 3/8" 16 bh 25 Sock tembaga Ø 1 5/8" 15 bh 26 Isolasi Pipa refrigerant Ø 1/4" x 13mm 325 m 27 Isolasi Pipa refrigerant Ø 3/8" x 13mm 612 m 28 Isolasi Pipa refrigerant Ø 1/2" x 19mm 555 m 29 Isolasi Pipa refrigerant Ø 5/8" x 19mm 446 m 30 Isolasi Pipa refrigerant Ø 3/4" x 19mm 219 m 31 Isolasi Pipa refrigerant Ø 7/8" x 19mm 180 m 32 Isolasi Pipa refrigerant Ø 1 1/8" x 19mm 305 m 33 Isolasi Pipa refrigerant Ø 1 3/8" x 19mm 87 m 34 Isolasi Pipa refrigerant Ø 1 5/8" x 19mm 188 m B Drain 1 LOT 49.313.382 49.313.382 1 Pipa PVC Ø 3/4" 198 btg 2 Pipa PVC Ø 1" 186 btg 3 Pipa PVC Ø 2" 120 btg 4 Pipa PVC Ø 4" 18 btg 5 Knie PVC Ø 3/4" 262 bh 6 Knie PVC Ø 1" 87 bh 7 Knie PVC Ø 2" 32 bh 8 Tee PVC Ø 3/4" X 1" 131 bh 9 Tee PVC Ø 1" X 2" 16 bh 10 Tee PVC Ø 2" X 4" 8 bh 15 REVISI (ARS,ME)
C Elektrikal 1 LOT 275.708.602 275.708.602 1 Kabel Power Outdoor 391 mtr 2 Kabel Power Indoor 5.240 mtr 3 Kabel Kontrol 2.802 btg 4 Pipa Conduit 20mm 933 btg 5 Klem Conduit 623 bh 6 Pipa Flexible 1 rol D Supporting Material 1 LOT 214.107.389 214.107.389 1 Kable Tray 40cmX10cm + Tutup 25 mt 2 Siku 40x40 59 btg 3 UNP-50 1 btg 4 Longdrat 10mm 332 mt 5 Mur 10mm + Ring Plat 664 set 6 Dinaset M10 332 bh 7 Syncromate 1 klg 8 Thinner 3 klg 9 Dynabolt M12 108 bh 10 Karet Mounting Outdoor 18 bh 11 Pondasi Outdoor 108 unit 12 Kawat Las 430 btg 13 Freon R410 24 can 14 Oksigen (O2) 2 tbg 15 LPG 2 tbg 16 Duct tape non lem 283 roll 17 Duct tape lem 94 roll 18 Lem PVC 2 klg 19 Fisher + Screw S6 6 dos E Ducting & Hepa Filter 4 LOT 170.200.000 680.800.000 F. Jasa Pemasangan Unit AC 1 Lot 202.500.000 202.500.000 - Outdoor 17 Unit 17 unit - Indoor 133 Unit 133 unit Total 2 1.901.303.058 Total 1+2 #REF! 16 REVISI (ARS,ME)