PREDETERMINED MOTION TIME SYSTEMS (PMTS) ANALISA DAN PENGUKURAN KERJA

Ukuran: px
Mulai penontonan dengan halaman:

Download "PREDETERMINED MOTION TIME SYSTEMS (PMTS) ANALISA DAN PENGUKURAN KERJA"

Transkripsi

1 PREDETERMINED MOTION TIME SYSTEMS (PMTS) ANALISA DAN PENGUKURAN KERJA 13 Debrina Puspita Andriani debrina@ub.ac.id Blog :

2 METODE PENGUKURAN [WAKTU] KERJA PENGUKURAN [WAKTU] KERJA DIRECT INDIRECT STOPWATCH STANDARD DATA WORK SAMPLING PMTS Regression Analysis 2

3 An alternative time study that does not require performance rating. A database of basic motion elements and their associated normal time values, together with procedures for applying the data to analyze manual tasks and establish standard times for the tasks. PMTS defined

4 Basic motions include: Reach Grasp Move Release A set of tables that listing time values that corresponds to basic motion elements, the lowest level in hierarchy of manual work activity. PMTS defined

5 Frank B. Gilberth- 17 therbligs Asa B. Segur Mo;on Time Analysis (MTA) - the first commercial PMT system (1922) and base on Gilberth s 17 therbligs H. Quick Work-factor system ( ): cogni;ve work involved Harold B. Maynard Methods- Time Measurement (MTM) (1948): very successful and widely used G.Chris Hyde- Modular Arrangement of Predetermined Time Standards (MODAPTS) 1966 Kjell B. Zandin- Maynard OperaGons Sequence Technique (MOST)-(1970s) Computeriza;on of systems as commercial products 5 Historical Notes

6 Maynard Operation Sequence Time (MOST) Pengukuran Waktu Metode (MTM) Analisa waktu gerakan (MTA) Terdiri atas : Waktu Gerakan Baku (MTS) Waktu Gerakan Dimensi (DMT) Data Waktu Gerakan Faktor Kerja (WF) 6

7 PMTS Procedure 1. Synthesize/Analyze method that would be used to perform the task Ê The method is described in terms of basic motion elements 2. Retrieve normal time values for each motion element Ê Sum the element times to determine the task normal time 3. Evaluate method to make improvements by Ê Ê Ê eliminating motions reducing distances using both hands simultaneously etc. 4. Apply allowances to determine standard time 7

8 PMTS Levels and Generations First-level PMTS use the basic motion elements Reach, grasp, and move used separately to define the task Higher-level PMTS combine several motion elements into motion aggregates Reach and grasp combined into one element called get First-level systems were chronologically the first to be developed and are called first generation PMTS 8

9 Comparisons First-level PMTS Most accurate High application speed ratio Most suited to highly repetitive short cycles Basic motion elements Very detailed Highest flexibility Detailed M T M Higher-level PMTS Less accurate Less time to set standards Longer cycle times feasible Motion aggregates Less detailed Less flexible Simplified and condensed M O S T 9

10 METHODS TIME MEASUREMENT (MTM)

11 Methods-Time Measurement (MTM) ü Procedure which analyzes any manual operation or method into the basic motions required to perform it and assigns to each motion a predetermined time standard which is determined by the nature of the motion and the conditions under which it is made. ü Time units are TMUs 1 TMU = 10-6 hr = min = sec 1 sec = 27.8 TMU ü MTM is a family of products available through the MTM Association ( 11

12 MTM-1 Job Level Task Level Work Element Level Basic Motion Level ACTIVITY HIERARCHY OF WORK 12

13 M T M 1 (1948) Operates at the basic motion element level in our pyramidal structure of work Most MTM-1 basic motions involve hand and arm movements Also includes elements for eye, leg, foot, and body actions Many of the basic motion elements correspond to the original Therbligs developed by Frank Gilbreth More appropriate for tasks that are highly repetitive and cycle times are less than 1 min 13

14 Ê Reach (R) Ê Perpindahan tangan atau jari ke tujuan - dipengaruhi oleh panjang gerak dan jenis jangkauan. Ê Move (M) Ê Transportasi objek ke tujuan - dipengaruhi oleh panjang gerakan, berat benda dan jenis gerak. Ê Grasp (G) Ê Pengamanan dengan kontrol yang cukup pada satu atau lebih objek dengan jari atau tangan untuk mengizinkan kinerja gerakan yang diperlukan berikutnya - dipengaruhi oleh bentuk dan lokasi objek. Basic Elements Ê Position (P) Ê Pelurusan, orientasi, dan penglibatan obyek dengan obyek lain (bila hanya gerakan kecil diperlukan) - dipengaruhi oleh kemudahan penanganan, simetri, dan jumlah tekanan yang dibutuhkan untuk penyisipan. 14

15 Ê Release (RL) Ê Melepaskan kontrol dari sebuah objek dengan jari atau tangan. Ê Disengage (D) Ê Istirahat kontak antara satu objek dengan yang lain - dipengaruhi oleh jumlah usaha yang diperlukan. Ê Turn (T) Ê Gerak yang digunakan untuk mengubah keadaan tangan, kosong atau dimuat, dengan gerakan yang tangan berputar, pergelangan tangan, dan lengan bawah pada sumbu panjang lengan bawah - dipengaruhi oleh tingkat rotasi dan dengan berat benda. Basic Elements Ê Apply Pressure (AP) 15

16 Ê Eye Travel (ET) Ê Dianggap hanya ketika mata harus mengarahkan tangan atau gerakan tubuh (termasuk fokus mata dan mata waktu travel) - dipengaruhi oleh jarak antara titik-titik perjalanan dan jarak antara mata ke garis perjalanan. Ê Body of Leg and Foot Motion (BMF) Ê Gerakan lain yang berhubungan dengan tubuh dan kaki (berjalan, berdiri, membungkuk, dll). Basic Elements 16

17 Example : R10C = 12.9 TMUs 17

18 Example : G1C3 = 10.8 TMUs 18

19 Example : M6B

20 Motion Element : Move (M) Normal Time = constant + (dynamic * time in TMU) Example : M6B12 à Normal Time = (1.11 * 8.9) = 13.8 TMUs 20

21 Example : P3NSD = 53.4 TMUs Round peg in a round hole: S(ymmetrical) Key inserted in a lock: N(on)S(ymmetrical) 21

22 Example : RL1 = 2 TMUs Example : D2D = 11.8 TMUs 22

23 Example : T30L = 8.4 TMUs Example : APB = 16.2 TMUs 23

24 24

25 25

26 Notasi Gerakan Notasi umum untuk setiap gerakan pada MTM adalah: a b c dimana : a : gerakan dasar yang bekerja b : jarak yang ditempuh c : kelas dari gerak dasar yang bersangkutan 26

27 Notasi Gerakan Contoh : R 16 A = Reach, jarak 16 inches, description A G 1 A = Grasp, description 1A 27

28 MTM-2 (1965) Secondlevel PMTS in which basic motion elements are combined into motion aggregates (11 motions) GET combines Reach and Grasp PUT combines Move and Position For tasks that are not highly repetitive and cycle times are greater than 1 min MTM-3 (1970) Third-level PMTS which has four motion categories Handle Transport Step and foot motions Bend and arise Other MTM Systems MTM-V : Metal cutting operations MTM-C : clerical work 28

29 MTM Software ( 29

30 MAYNARD OPERATION SEQUENCE TECHNIQUE (MOST)

31 M O S T MOST is a high-level PMTS based on MTM o Same time units as MTM: TMU o Developed around 1967 under the direction of Kjell Zandin. o MOST is a product of H.B. Maynard and Company (an educational and consulting firm), Pittsburgh, Pennsylvania ( 31

32 MOST Job Level Task Level Work Element Level Basic Motion Level ACTIVITY HIERARCHY OF WORK 32

33 Ê MOST lebih cepat karena lebih sederhana, dengan membagi aktivitas kedalam pekerjaan yang umum dan tidak terlalu mendetail. Ê Dokumentasi yang diperlukan lebih sedikit, jadi juga menghemat biaya. Ê Hasil pengukuran sangat valid dan dapat diterima secara statistik Kelebihan MOST 33

34 Basic MOST Focused on work involving the movement of objects (e.g., parts, tools) from one location to another in the workplace Uses motion aggregates Called activity sequence models Three activity sequence models: 1. General move object moved freely in space 2. Controlled move object remains in contact with a surface 3. Tool use use of hand tools (e.g., hammer, screwdriver) 34

35 Activity Sequence Model Subactivities General Move ABG ABP A A - Action Distances B - Body Motion G - Gain Control P - Place Controlled Move ABG MXI A M - Move controlled X - Process time I - Align Tool Use ABG ABP * ABPA *F Fasten *L Loosen *C Cut *S Surface treat *R Record *M - Measure Basic MOST 35

36 1. General Move Consists of sequence model parameters, which correspond roughly to basic motion elements. Sequence model parameters for General Move: A : Action distance (move hands or feet) horizontal body motions B : Body motion (sit, stand up) vertical body motions G : Gain control (closely related to grasp) P : Placement (e.g., position, lay aside, orient) 36

37 1. General Move Standard sequence in General Move: A B G A B P A get move return ABG : to get an object; ABP : to move the object to a new location; A : return to original position 37

38 1 Index = 10 TMU 38

39 1. General Move Develop the activity sequence model and determine the normal time for the following work activity: A worker walks 5 steps, picks up a small part from the floor, returns to his original position, and places the part on his worktable. Solution : A 10 B 6 G 1 A 10 B 0 P 1 A 0 where A 10 =walk 5 steps; B 6 =bend and arise; G 1 =gain control of small part; A 10 =return back; B 0 =no body motion; P 1= lay aside part on table; A 0 =no motion The sum of index values: 28. Normal time: 10*28=280 TMUs 39

40 2. Controlled Move Used when an object is moved through a path that is somehow constrained. M : Move, controlled X : Process time I : Align 40

41 2. Controlled Move Standard sequence in Controlled Move: A B G M X I A get move return ABG : to get an object; MXI : to move the object followed by a process time and alignment, A : to return 41

42 42

43 2. Controlled move Develop the activity sequence model and determine the normal time for the following work activity: A worker takes 2 steps, grasp the waistlevel feed lever on the lathe, pulls up the lever approximately 15 cm to engage the feed. Process time to turn the part is 25 sec Solution: 25 sec.s = 25 * 2.78 = 69.5 TMU = 7 index A 3 B 0 G 1 M 1 X 7 I 0 A 0 where A 3 =walk 2 steps; B 0 =no body motion; G 1 =gain control of lever; M 1 =pull the lever up 15 cm: X 70 =process time of ; I 0 =no alignment; A 0 =no motion The sum of index values: 12. Normal time: 10*12=120 TMUs

44 3. Tool use Bagian yang memakai alat diisi dengan salah satu parameter: F : fasten (mengencangkan) L : loosen (mengendurkan) C : cut S : surface treat (misal: Ampelas) M : measure R : record T : think 44

45 3. Tool use Only one is used in a sequence: ABG ABP * ABP A ABG: to get the tool ABP: put the tool in the position *: tool use code ABP: put the tool aside A: return 45

46 Maxi MOST for work cycles performed fewer than 150 times per week and there are variations in the cycle Can be applied to tasks of several hours Clerical MOST similar to Basic MOST but designed for clerical tasks Mini MOST for highly repetitive work cycles performed more than 1500 times per week MOST for Windows Computerized technique that allows user to apply Basic MOST, Maxi MOST, or Mini MOST to the task Other Versions of MOST 46

47 Knowing exactly what you want to do, and then seeing that they do it the best and cheapest way. - Frederick W. Taylor-! 47

Pengukuran Kerja Tidak Langsung (Predetermined Motion-Time System)

Pengukuran Kerja Tidak Langsung (Predetermined Motion-Time System) Pengukuran Kerja Tidak Langsung (Predetermined Motion-Time System) Latar Belakang Stop watch harus terus menerus mengamati pekerjaan Work sampling butuh ratusan/ribuan pengamatan Data waktu baku hanya

Lebih terperinci

Method Time Measurement (MTM-1) Nurjannah

Method Time Measurement (MTM-1) Nurjannah Method Time Measurement (MTM-1) Nurjannah Definisi Basic Methods Time Measurement (MTM-1) adalah suatu sistem penetapan awal waktu baku yang dikembangkan berdasarkan studi gambar gerakan - gerakan kerja

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Pengukuran Waktu kerja Pengukuran waktu kerja adalah metode penetapan keseimbangan antara kegiatan manusia yang dikontribusikan dengan unit output yang dihasilkan. Berikut adalah

Lebih terperinci

PENGUKURAN WAKTU KERJA: METODE PENGUKURAN TIDAK LANGSUNG. Amalia, S.T., M.T.

PENGUKURAN WAKTU KERJA: METODE PENGUKURAN TIDAK LANGSUNG. Amalia, S.T., M.T. PENGUKURAN WAKTU KERJA: METODE PENGUKURAN TIDAK LANGSUNG Amalia, S.T., M.T. METODE PENGUKURAN KERJA Pengukuran Langsung Stop Watch Time Study Work Sampling Pengukuran Tidak Langsung Metode Standart Data/Formula

Lebih terperinci

FISIOLOGI DAN PENGUKURAN KERJA. tutorial 9. micromotion study

FISIOLOGI DAN PENGUKURAN KERJA. tutorial 9. micromotion study FISIOLOGI DAN PENGUKURAN KERJA tutorial 9 micromotion study Prodi Teknik Industri Fakultas Teknologi Industri Universitas Islam Indonesia Tahun Ajaran 2016/2017 www.labdske-uii.com MICROMOTION STUDY A.

Lebih terperinci

Analisis Operasional (Peta Kerja) ANALISA DAN PENGUKURAN KERJA

Analisis Operasional (Peta Kerja) ANALISA DAN PENGUKURAN KERJA Jurusan Teknik Industri Semester Genap 2015/2016 Analisis Operasional (Peta Kerja) ANALISA DAN PENGUKURAN KERJA 5 Debrina Puspita Andriani e-mail : debrina@ub.ac.id Blog : http://debrina.lecture.ub.ac.id/

Lebih terperinci

STOPWATCH TIME STUDY! ANALISA DAN PENGUKURAN KERJA. Debrina Puspita Andriani Blog':'http://debrina.lecture.ub.ac.

STOPWATCH TIME STUDY! ANALISA DAN PENGUKURAN KERJA. Debrina Puspita Andriani Blog':'http://debrina.lecture.ub.ac. STOPWATCH TIME STUDY! ANALISA DAN PENGUKURAN KERJA 10 Debrina Puspita Andriani e"mail':'debrina@ub.ac.id' Blog':'http://debrina.lecture.ub.ac.id/' METODE PENGUKURAN [WAKTU] KERJA PENGUKURAN)[WAKTU]) KERJA)

Lebih terperinci

BAB II LANDASAN TEORI

BAB II LANDASAN TEORI BAB II LANDASAN TEORI 2.1 Definisi Methods Time Measurement Pengukuran waktu metoda atau Methods Time Measurement adalah suatu sistem penetapan awal waktu baku yang dilakukan secara tidak langsung dan

Lebih terperinci

METODE KERJA MENGGUNAKAN MOST UNTUK MENINGKATKAN OUTPUT PRODUKSI MUKENA

METODE KERJA MENGGUNAKAN MOST UNTUK MENINGKATKAN OUTPUT PRODUKSI MUKENA METODE KERJA MENGGUNAKAN MOST UNTUK MENINGKATKAN OUTPUT PRODUKSI MUKENA Renny Septiari 1) dan Umi Nurillah 2) 1) Program Studi Teknik Industri, Program Pascasarjana, Institut Teknologi Nasional Jl. Bendungan

Lebih terperinci

PENGUKURAN WAKTU TIDAK LANGSUNG DATA WAKTU GERAKAN

PENGUKURAN WAKTU TIDAK LANGSUNG DATA WAKTU GERAKAN PENGUKURAN WAKTU TIDAK LANGSUNG DATA WAKTU GERAKAN Kegunaan/Kelebihan data waktu gerakan 1. waktu baku pekerjaan dapat diketahui sebelum pekerjaan tsb dijalankan 2. waktu baku pekerjaan dapat diketahui

Lebih terperinci

DEWI HARDININGTYAS, ST, MT, MBA #7_WORK MEASUREMENT ANALISA DAN PENGUKURAN KERJA

DEWI HARDININGTYAS, ST, MT, MBA #7_WORK MEASUREMENT ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA #7_WORK MEASUREMENT ANALISA DAN PENGUKURAN KERJA JOB DESIGN : METHODS STUDY + WORK MEASUREMENT WORK STUDY, ANALYSIS, DESIGN, or METHODS ENGINEERING METHODS STUDY Resulting

Lebih terperinci

WORK SAMPLING! ANALISA DAN PENGUKURAN KERJA. Debrina Puspita Andriani Blog':'http://debrina.lecture.ub.ac.

WORK SAMPLING! ANALISA DAN PENGUKURAN KERJA. Debrina Puspita Andriani Blog':'http://debrina.lecture.ub.ac. WORK SAMPLING! ANALISA DAN PENGUKURAN KERJA 11 Debrina Puspita Andriani e"mail':'debrina@ub.ac.id' Blog':'http://debrina.lecture.ub.ac.id/' METODE PENGUKURAN [WAKTU] KERJA PENGUKURAN)[WAKTU]) KERJA) DIRECT'

Lebih terperinci

DEWI HARDININGTYAS, ST, MT, MBA #8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA

DEWI HARDININGTYAS, ST, MT, MBA #8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA #8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA METODE PENGUKURAN [WAKTU] KERJA PENGUKURAN [WAKTU] KERJA DIRECT INDIRECT STOP-WATCH STANDARD DATA WORK SAMPLING PMTS

Lebih terperinci

#9_WORK SAMPLING ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA

#9_WORK SAMPLING ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA #9_WORK SAMPLING ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA METODE PENGUKURAN [WAKTU] KERJA PENGUKURAN [WAKTU] KERJA DIRECT INDIRECT STOP-WATCH STANDARD DATA WORK SAMPLING PMTS STOPWATCH

Lebih terperinci

Pengukuran Waktu kerja Metode (Methods Time Measurement)

Pengukuran Waktu kerja Metode (Methods Time Measurement) Pengukuran Waktu kerja Metode (Methods Time Measurement) Adriyana Dewi Mayasari 135060700111029 Amelia Handini 135060700111035 Virly SepFamarta 135060701111037 R Danang 135060701111048 Baiq Fani Maulina

Lebih terperinci

Apa itu MTM-2 dan MTM-3? MTM-2 dan MTM-3. Keuntungan pemakaian MTM-2 & MTM-3 dibandingkan MTM-1. Siapa yang layak menggunakan

Apa itu MTM-2 dan MTM-3? MTM-2 dan MTM-3. Keuntungan pemakaian MTM-2 & MTM-3 dibandingkan MTM-1. Siapa yang layak menggunakan Apa itu MTM-2 dan MTM-3? MTM-2 dan MTM-3 Disusun oleh : MTM-2 dan MTM-3 adalah metoda pengukuran waktu baku cara tak langsung melalui data waktu gerakan, yang dibuat berdasarkan metoda MTM-1. Tujuannya

Lebih terperinci

Nama Soal Pembagian Ring Road Batas Waktu 1 detik Nama Berkas Ringroad[1..10].out Batas Memori 32 MB Tipe [output only] Sumber Brian Marshal

Nama Soal Pembagian Ring Road Batas Waktu 1 detik Nama Berkas Ringroad[1..10].out Batas Memori 32 MB Tipe [output only] Sumber Brian Marshal Nama Soal Pembagian Ring Road Batas Waktu 1 detik Nama Berkas Ringroad[1..10].out Batas Memori 32 MB Tipe [output only] Sumber Brian Marshal Deskripsi Soal Dalam rangka mensukseskan program Visit Indonesia,

Lebih terperinci

Adam Hendra Brata Teknik Informatika FILKOM UB Semester Genap 2015/2016

Adam Hendra Brata Teknik Informatika FILKOM UB Semester Genap 2015/2016 Adam Hendra Brata Teknik Informatika FILKOM UB Semester Genap 2015/2016 TUJUAN PERKULIAHAN Memahami pemodelan perancangan dengan pendekatan berorientasi objek AGENDA PERKULIAHAN Pemodelan perancangan berorientasi

Lebih terperinci

Pemrograman Lanjut. Interface

Pemrograman Lanjut. Interface Pemrograman Lanjut Interface PTIIK - 2014 2 Objectives Interfaces Defining an Interface How a class implements an interface Public interfaces Implementing multiple interfaces Extending an interface 3 Introduction

Lebih terperinci

32-bit and 64-bit Windows: Frequently asked questions

32-bit and 64-bit Windows: Frequently asked questions 32-bit and 64-bit Windows: Frequently asked questions // // Here are answers to some common questions about the 32-bit and 64-bit versions of Windows. Frequently asked questions Collapse all What is the

Lebih terperinci

DEWI HARDININGTYAS, ST, MT, MBA #5_ANALISA OPERASIONAL (PETA KERJA) ANALISA DAN PENGUKURAN KERJA

DEWI HARDININGTYAS, ST, MT, MBA #5_ANALISA OPERASIONAL (PETA KERJA) ANALISA DAN PENGUKURAN KERJA DEWI HARDININGTYAS, ST, MT, MBA #5_ANALISA OPERASIONAL (PETA KERJA) ANALISA DAN PENGUKURAN KERJA O U T L I N E Peta Kerja Peta Kerja Keseluruhan Peta Kerja Setempat Standard Operation Procedure PETA KERJA

Lebih terperinci

KOMUNIKASI EFEKTIF. presented by : M Anang Firmansyah

KOMUNIKASI EFEKTIF. presented by : M Anang Firmansyah KOMUNIKASI EFEKTIF presented by : M Anang Firmansyah KOMUNIKASI EFEKTIF * Pada komunikasi personal/kelompok Audience mampu memahami pesan yang dikirim oleh Komunikator.setuju/tidak dg pesan. * Pada komunikasi

Lebih terperinci

ORGANISASI DAN ARSITEKTUR KOMPUTER

ORGANISASI DAN ARSITEKTUR KOMPUTER 1 ORGANISASI DAN ARSITEKTUR KOMPUTER Wisnu Djatmiko TM 2 Daftar Pustaka 2 1. Bab 1 Wisnu Djatmiko Daftar Pustaka 3 2. Bab 2 Wisnu Djatmiko TIK 4 Peserta MK Arsikom dapat menjelaskan definisi CPU Time dengan

Lebih terperinci

MODUL PRAKTIKUM ANALISIS DAN PENGUKURAN KERJA

MODUL PRAKTIKUM ANALISIS DAN PENGUKURAN KERJA MODUL PRAKTIKUM ANALISIS DAN PENGUKURAN KERJA LABORATORIUM MENENGAH TEKNIK INDUSTRI JURUSAN TEKNIK INDUSTRI FAKULTAS TEKNOLOGI INDUSTRI UNIVERSITAS GUNADARMA DEPOK/KALIMALANG 05 Modul Peta Peta Kerja (Work

Lebih terperinci

Solutions. SAM and SMV

Solutions. SAM and SMV Sales@threadsol.com Solutions Contact Us SAM and SMV Time is the most valuable resource. And when we look at our garment industry across the globe, we see that all manufacturers and consultants have woken

Lebih terperinci

BAB I PENDAHULUAN. practicum apk industrial engineering Latar Belakang

BAB I PENDAHULUAN. practicum apk industrial engineering Latar Belakang BAB I PENDAHULUAN 1.1 Latar Belakang Pengukuran waktu kerja merupakan kriteria yang paling banyak digunakan untuk mendapatkan ukuran performance kerja. Teknik pengukuran waktu kerja dapat dibedakan menjadi

Lebih terperinci

TUGAS SARJANA PENGUKURAN GAYA PEMOTONGAN PADA PROSES BUBUT DENGAN MENGGUNAKAN DYNAMOMETER

TUGAS SARJANA PENGUKURAN GAYA PEMOTONGAN PADA PROSES BUBUT DENGAN MENGGUNAKAN DYNAMOMETER TUGAS SARJANA PENGUKURAN GAYA PEMOTONGAN PADA PROSES BUBUT DENGAN MENGGUNAKAN DYNAMOMETER Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar Kesarjanaan Strata Satu (S-1) di Jurusan Teknik Mesin

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Peta Kerja Peta kerja adalah suatu alat yang menggambarkan kegiatan kerja secara sistematis dan jelas (biasanya kerja produksi). Lewat peta-peta ini kita bisa melihat semua langkah

Lebih terperinci

Software Quality Assurace 9/18/ :50 PM 1

Software Quality Assurace 9/18/ :50 PM 1 Software Quality Assurace 9/18/2012 12:50 PM 1 SQA activities 1. Aplikasi metode-metode teknikal (Application of technical methods) Kualitas software didesain kedalam produk atau sistem. SQA pada kenyataannya

Lebih terperinci

Keseimbangan Torsi Coulomb

Keseimbangan Torsi Coulomb Hukum Coulomb Keseimbangan Torsi Coulomb Perputaran ini untuk mencocokan dan mengukur torsi dalam serat dan sekaligus gaya yang menahan muatan Skala dipergunakan untuk membaca besarnya pemisahan muatan

Lebih terperinci

Predetermined Motion Time System (PMTS)

Predetermined Motion Time System (PMTS) Teknik Industri Predetermined Motion Time System (PMTS) Analisis dan Pengukuran Kerja Authors Farah Tsanyna ila (135060707111024) Yussy Fatma Rosyita (135060701111051) Mita Puspitasari 135060701111128

Lebih terperinci

TESIS MAGISTER. Oleh : Aan Heryadi Zulihadi Saputra

TESIS MAGISTER. Oleh : Aan Heryadi Zulihadi Saputra PENGAMBILAN KEPUTUSAN MULTI-ATRIBUT DENGAN MEMPERHITUNGKAN FAKTOR RISIKO DALAM PEMILIHAN TEKNOLOGI PRECAST CONCRETE TERHADAP TEKNOLOGI CAST-IN-SITU PADA KONSTRUKSI GEDUNG BERLANTAI BANYAK DI INDONESIA

Lebih terperinci

Mulyadi: Metode harga pokok pesanan merupakan metode pengumpulan biaya yang memperlakukan pesanan sebagai suatu unit

Mulyadi: Metode harga pokok pesanan merupakan metode pengumpulan biaya yang memperlakukan pesanan sebagai suatu unit Job order costing In job order costing, or job costing, production costs are accumulated for each separate job; a job is the output identified to fill a certain customer order or replenish an item of stock

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha ABSTRAK Dewasa ini persaingan di dunia usaha semakin meningkat seiring dengan semakin pesatnya perkembangan industri. Setiap perusahaan sudah pasti ingin mempertahankan keberadaannya di dunia usaha dan

Lebih terperinci

TUGAS BROWSING. Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1. Di susun oleh : INDRI SARI UTAMI PEND. FISIKA / B EFD-1 / C

TUGAS BROWSING. Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1. Di susun oleh : INDRI SARI UTAMI PEND. FISIKA / B EFD-1 / C TUGAS BROWSING Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1 Di susun oleh : INDRI SARI UTAMI 060888 PEND. FISIKA / B EFD-1 / C JURUSAN PENDIDIKAN FISIKA FAKULTAS PENDIDIKAN MATEMATIKA

Lebih terperinci

Rancang Bangun Aplikasi Perhitungan Predetermined Time System (Waktu Standar Tidak Langsung) Dengan Metode Brainstorming

Rancang Bangun Aplikasi Perhitungan Predetermined Time System (Waktu Standar Tidak Langsung) Dengan Metode Brainstorming Petunjuk Sitasi: Kusmindari, C. D., Muzakir, A., & Makmuri, M. K. (2017). Rancang Bangun Aplikasi Perhitungan Predetermined Time System (Waktu Standar Langsung) Dengan Metode Brainstorming. Prosiding SNTI

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI Penelitian cara kerja atau yang dikenal juga dengan nama methods analysis merupakan hal yang sangat penting dalam menentukan metode kerja yang akan dipilih untuk melakukan suatu pekerjaan.

Lebih terperinci

Outline. Struktur Data & Algoritme (Data Structures & Algorithms) Pengantar. Definisi. 2-3 Trees

Outline. Struktur Data & Algoritme (Data Structures & Algorithms) Pengantar. Definisi. 2-3 Trees Struktur Data & Algoritme (Data Structures & Algorithms) 2-3 Trees Outline Pengantar Definisi 2-3 Tree Operasi: Search Insert Delete (a,b)-tree Denny (denny@cs.ui.ac.id) Suryana Setiawan (setiawan@cs.ui.ac.id)

Lebih terperinci

ABSTRACT. Keyword: Algorithm, Depth First Search, Breadth First Search, backtracking, Maze, Rat Race, Web Peta. Universitas Kristen Maranatha

ABSTRACT. Keyword: Algorithm, Depth First Search, Breadth First Search, backtracking, Maze, Rat Race, Web Peta. Universitas Kristen Maranatha ABSTRACT In a Rat Race game, there is only one way in and one way out. The objective of this game is to find the shortest way to reach the finish. We use a rat character in this game, so the rat must walk

Lebih terperinci

WORK METHOD AND MOTION STUDY W O R K D E S I G N A N D E R G O N O M I C S

WORK METHOD AND MOTION STUDY W O R K D E S I G N A N D E R G O N O M I C S WORK METHOD AND MOTION STUDY W O R K D E S I G N A N D E R G O N O M I C S 1. VISUAL MOTION STUDY First classification of motion study commonly used because of the lesser cost than the micromotion study.

Lebih terperinci

REQUIREMENT ENGINEERING

REQUIREMENT ENGINEERING REQUIREMENT ENGINEERING Previous Chapter Poor Quality software? Not meet customer requirements Too complicated Not solve the problem Beyond expectation Requirement engineering is very important! Requirements

Lebih terperinci

Video A. Introduction

Video A. Introduction A. Introduction T (teacher): Good morning 1B! Ss (students): Good morning Ms. T: How are you today? Ss: I m fine thank you. T: 1B masih ingat tidak? One two eyes on me! Ss: One two eyes one you! T: Do

Lebih terperinci

Penalaan Parameter Walk Tuner pada Robot Humanoid untuk Berjalan pada Rumput Sintetis

Penalaan Parameter Walk Tuner pada Robot Humanoid untuk Berjalan pada Rumput Sintetis Penalaan Parameter Walk Tuner pada Robot Humanoid untuk Berjalan pada Rumput Sintetis Fernando Indrawan NRP : 1322044 email : fernandoindrawan1596@gmail.com ABSTRAK Pada masa kini, penggunaan robot humanoid

Lebih terperinci

(Studi Gerakan Mikro)

(Studi Gerakan Mikro) 131 PENGUKURAN WAKTU KERJA (Studi Gerakan Mikro) A. TUJUAN PRAKTIKUM 1. Tujuan Umum Memperkenalkan kepada Mahasiswa tentang metode Studi Gerakan Mikro dalam aplikasi pengukuran waktu baku dengan menganalisis

Lebih terperinci

PERANCANGAN PERANGKAT LUNAK UNTUK PENGUKURAN WAKTU KERJA MENGGUNAKAN TEKNOLOGI SPEECH RECOGNITION

PERANCANGAN PERANGKAT LUNAK UNTUK PENGUKURAN WAKTU KERJA MENGGUNAKAN TEKNOLOGI SPEECH RECOGNITION PERANCANGAN PERANGKAT LUNAK UNTUK PENGUKURAN WAKTU KERJA MENGGUNAKAN TEKNOLOGI SPEECH RECOGNITION Arief Rahman, Galih Febrianto, Adithya Sudiarno Laboratorium Ergonomi dan Perancangan Sistem Kerja Institut

Lebih terperinci

III. TINJAUAN PUSTAKA

III. TINJAUAN PUSTAKA III. TINJAUAN PUSTAKA A. Ergonomi Istilah ergonomi yang juga dikenal dengan human factors berasal dari bahasa Latin yaitu ergon yang berarti kerja, dan nomos yang berarti hukum alam. Sehingga, ergonomi

Lebih terperinci

2013 PENERAPAN METODE KERJA KELOMPOK UNTUK MENINGKATKAN PEMAHAMAN KONSEP OPERASI HITUNG BILANGAN BULAT PADA ANAK DIDIK

2013 PENERAPAN METODE KERJA KELOMPOK UNTUK MENINGKATKAN PEMAHAMAN KONSEP OPERASI HITUNG BILANGAN BULAT PADA ANAK DIDIK ABSTRAK Marlina, 2013. Penelitian ini berangkat dari permasalahan kurangnya prestasi belajar siswa pada pokok bahasan operasi hitung bilangan bulat SDN Paniis Kecamatan Tanjungkerta Kabupaten Sumedang

Lebih terperinci

2.2. Fitur Produk Perangkat Lunak Fitur Pengolahan Data Fakultas Fitur Pengolahan Data Jurusan

2.2. Fitur Produk Perangkat Lunak Fitur Pengolahan Data Fakultas Fitur Pengolahan Data Jurusan Abstract This search engine application is a tool used in topic research concerning practical work and final assignment made by Maranatha Christian University s students. The users can do research based

Lebih terperinci

7. Analisis Kebutuhan - 1 (System Actors & System Use Cases )

7. Analisis Kebutuhan - 1 (System Actors & System Use Cases ) 7. Analisis Kebutuhan - 1 (System Actors & System Use Cases ) SIF15001 Analisis dan Perancangan Sistem Informasi Agi Putra Kharisma, S.T., M.T. Genap 2014/2015 Desain slide ini dadaptasi dari University

Lebih terperinci

INDUSTRIAL ENGINEERING

INDUSTRIAL ENGINEERING INDUSTRIAL ENGINEERING ENGINEERING The application of scientific and mathematical principles to practical ends such as the design, manufacture, and operation of efficient and economical structures, machines,

Lebih terperinci

EVALUASI UMUR SISA DAN TEBAL OVERLAY STRUKTUR PERKERASAN LENTUR JALAN TOL JAKARTA CIKAMPEK (STUDI KASUS: RUAS CIBITUNG-CIKARANG) TESIS

EVALUASI UMUR SISA DAN TEBAL OVERLAY STRUKTUR PERKERASAN LENTUR JALAN TOL JAKARTA CIKAMPEK (STUDI KASUS: RUAS CIBITUNG-CIKARANG) TESIS EVALUASI UMUR SISA DAN TEBAL OVERLAY STRUKTUR PERKERASAN LENTUR JALAN TOL JAKARTA CIKAMPEK (STUDI KASUS: RUAS CIBITUNG-CIKARANG) TESIS Karya tulis sebagai salah satu syarat Untuk memperoleh gelar Magister

Lebih terperinci

GROWTH AND UNDERINVESTMENT PROGRAM STUDI ADMINISTRASI BISNIS UNIVERSITAS BRAWIJAYA

GROWTH AND UNDERINVESTMENT PROGRAM STUDI ADMINISTRASI BISNIS UNIVERSITAS BRAWIJAYA GROWTH AND UNDERINVESTMENT PROGRAM STUDI ADMINISTRASI BISNIS UNIVERSITAS BRAWIJAYA GROWTH AND UNDERINVESTMENT GROWTH AND UNDERINVESTMENT Pada situasi Growth and underinvestment", pendekatan pertumbuhan

Lebih terperinci

ALGORITMA PEMILIHAN DIAMETER PAHAT PROSES PEMESINAN POCKET 2-1/2D DENGAN METODA HIGH SPEED MACHINING

ALGORITMA PEMILIHAN DIAMETER PAHAT PROSES PEMESINAN POCKET 2-1/2D DENGAN METODA HIGH SPEED MACHINING ALGORITMA PEMILIHAN DIAMETER PAHAT PROSES PEMESINAN POCKET 2-1/2D DENGAN METODA HIGH SPEED MACHINING TUGAS AKHIR Oleh: Denny Nurkertamanda 23400006 BIDANG KHUSUS SISTEM MANUFAKTUR PROGRAM STUDI TEKNIK

Lebih terperinci

ABSTRACT. Keywords: Job orders, production scheduling, CDS, FCFS, makespan efficiency. Universitas Kristen Maranatha

ABSTRACT. Keywords: Job orders, production scheduling, CDS, FCFS, makespan efficiency. Universitas Kristen Maranatha i ABSTRACT Competition in the manufacturing companies continue to increase along times. Every company always tries to produce a quality product and match with consumer desire. Especially companies based

Lebih terperinci

ABSTRAK. Keywords: Balanced Scorecard, Low Cost Strategy, financial, sales volumes, customer, internal business processes, learning and growth.

ABSTRAK. Keywords: Balanced Scorecard, Low Cost Strategy, financial, sales volumes, customer, internal business processes, learning and growth. ABSTRAK The competition strategies between the ice beam components manufacturer at the time of globaliasasi the current look is increasingly competitive. Companies compete to improve its quality in order

Lebih terperinci

MODUL 1 PENGUKURAN WAKTU KERJA (MICROMOTION STUDY)

MODUL 1 PENGUKURAN WAKTU KERJA (MICROMOTION STUDY) 1 MODUL 1 PENGUKURAN WAKTU KERJA (MICROMOTION STUDY) I. TUJUAN PRAKTIKUM a. Tujuan Umum Memperkenalkan kepada Mahasiswa tentang metode Micromotion Study dalam aplikasi pengukuran waktu baku dengan menganalisis

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Pengukuran waktu kerja Pengukuran waktu kerja adalah metode penetapan keseimbangan antara kegiatan manusia yang dikontribusikan dengan unit output yang dihasilkan. Dari pengukuran

Lebih terperinci

Konsep Keseimbangan & Pemodelan Struktur

Konsep Keseimbangan & Pemodelan Struktur Mata Kuliah : Statika Kode : TSP 106 SKS : 3 SKS Konsep Keseimbangan & Pemodelan Struktur Pertemuan 3 & 4 TIU : Mahasiswa dapat menghitung reaksi perletakan pada struktur statis tertentu TIK : Mahasiswa

Lebih terperinci

6.MICROMOTION AND TIME STUDY

6.MICROMOTION AND TIME STUDY 6.MICROMOTION AND TIME STUDY A. DESKRIPSI Micromotion Study adalah teknik yang digunakan untuk menganalisa gerakan kerja secara detail (Wignjosoebroto, 1989). Teknik ini pertama kali dikembangkan oleh

Lebih terperinci

STUDY 07/01/2013 MOTION STUDY DAPAT DILAKUKAN DG: SEJARAH MUNCULNYA MOTION DEFINISI : 2. MEMOMOTION STUDY LANGKAH-LANGKAH MICROMOTION

STUDY 07/01/2013 MOTION STUDY DAPAT DILAKUKAN DG: SEJARAH MUNCULNYA MOTION DEFINISI : 2. MEMOMOTION STUDY LANGKAH-LANGKAH MICROMOTION TIME STUDY IS THE ONE ELEMENT IN SCIENTIFIC MANAGEMENT BEYOND ALL OTHERS MAKING POSSIBLE THE TRANSFER OF SKILL FROM MANAGEMENT TO MEN.. FREDERICK W. TAYLOR Etika Muslimah, ST, MT etika_muslimah@yahoo.com

Lebih terperinci

Teori Pengambilan Keputusan. Week 11 Analytical Hierarchy Process

Teori Pengambilan Keputusan. Week 11 Analytical Hierarchy Process Teori Pengambilan Keputusan Week 11 Analytical Hierarchy Process Analytical Hierarchy Process (AHP) AHP is a decision approach designed to aid in the solution of complex multiple criteria problems in a

Lebih terperinci

DAFTAR ISI. Kata Pengantar dan Ucapan Terima Kasih Daftar Isi Daftar Tabel Daftar Gambar Daftar Lampiran

DAFTAR ISI. Kata Pengantar dan Ucapan Terima Kasih Daftar Isi Daftar Tabel Daftar Gambar Daftar Lampiran ABSTRAK Pembangunan industri yang baik terutama harus memperhatikan faktor manusia sebagai penggerak utamanya. Manusia akan mampu melaksanakan kegiatan dengan baik bila ditunjang oleh sistem kerja dan

Lebih terperinci

ABSTRAK. semua ditentukan oleh kualitas dari sumber daya manusia yang terdapat di suatu perusahaan

ABSTRAK. semua ditentukan oleh kualitas dari sumber daya manusia yang terdapat di suatu perusahaan ABSTRAK Dalam suatu organisasi atau perusahaan sumber daya manusia merupakan elemen penting, yang perannya sebagai penggerak pemasaran, operasional, finansial. Akan tetapi itu semua ditentukan oleh kualitas

Lebih terperinci

Lecture #6. Dioda Semikonduktor (Semiconductor Diode) Rangkaian Peredam Sinyal (Filter) Filter lolos rendah pasif Filter lolos tinggi pasif

Lecture #6. Dioda Semikonduktor (Semiconductor Diode) Rangkaian Peredam Sinyal (Filter) Filter lolos rendah pasif Filter lolos tinggi pasif Lecture #6 Rangkaian Peredam Sinyal (Filter) Filter lolos rendah pasif Filter lolos tinggi pasif Dioda Semikonduktor (Semiconductor Diode) Basic electronic / Yohandri Contents : Semiconductor Theory P-N

Lebih terperinci

1/5. while and do Loops The remaining types of loops are while and do. As with for loops, while and do loops Praktikum Alpro Modul 3.

1/5. while and do Loops The remaining types of loops are while and do. As with for loops, while and do loops Praktikum Alpro Modul 3. Judul TIU TIK Materi Modul Perulangan Ganjil 204/205 Mahasiswa memahami Konsep Perulangan. Mahasiswa mampu menggunakan perintah perulangan For, While do, do While 2. Mahasiswa mampu menggunakan perintah

Lebih terperinci

PROGRAM ANALISIS STABILITAS LERENG Slope Stability Analysis Program

PROGRAM ANALISIS STABILITAS LERENG Slope Stability Analysis Program LEMBAR PENGESAHAN PROGRAM ANALISIS STABILITAS LERENG Slope Stability Analysis Program Disusun Oleh : SUSI HIDAYAH L2A 003 138 YOHAN ROY GRATIA L2A 003 152 Dosen Pembimbing I Disetujui Oleh, Dosen Pembimbing

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha. m 2 atau dapat melakukan efisiensi total luas area sebesar 34,56 %. Tata letak

ABSTRAK. Universitas Kristen Maranatha. m 2 atau dapat melakukan efisiensi total luas area sebesar 34,56 %. Tata letak ABSTRAK PT. Mirella Jaya Perkasa bergerak di bidang furniture khususnya springbed, memiliki banyak pesaing sehingga dibutuhkan perbaikan secara terus menerus baik secara internal maupun eksternal agar

Lebih terperinci

ABSTRACT. Keywords: Job orders, production scheduling, CDS, FCFS, makespan efficiency. Universitas Kristen Maranatha

ABSTRACT. Keywords: Job orders, production scheduling, CDS, FCFS, makespan efficiency. Universitas Kristen Maranatha v ABSTRACT Competition in the manufacturing companies continue to increase along times. Every company always tries to produce a quality product and match with consumer desire. Especially companies based

Lebih terperinci

E-R Diagram. Bagian IIb Relationship Terminologi

E-R Diagram. Bagian IIb Relationship Terminologi E-R Diagram Bagian IIb Relationship Terminologi Database Desain Conceptual perspective User s perspective Database Requirements The Entity Relationalship (ER) Model is one of the most widely used mthod

Lebih terperinci

DEBRINA PUSPITA ANDRIANI, ST., M.ENG.

DEBRINA PUSPITA ANDRIANI, ST., M.ENG. DEBRINA PUSPITA ANDRIANI, ST., M.ENG. @! debrina@ub.ac.id / debrina.ub@gmail.com!! Academic Background 2011 to Jul 2013 Master Degree of Mechanical System Engineering Dept., Kumamoto University, Japan

Lebih terperinci

ABSTRAK. Kata kunci :Flowchart, Gallery Application ERD, ER to Tabel, phpmyadmin. Universitas Kristen Maranatha

ABSTRAK. Kata kunci :Flowchart, Gallery Application ERD, ER to Tabel, phpmyadmin. Universitas Kristen Maranatha ABSTRAK Galeri merupakan salah satu hal atau obyek dalam melakukan promosi sekolah. Promosi ini dapat juga menggunakan brosur, pamflet dan lain-lainnya. Galeri manual tidak dapat melakukan sehingga menjadi

Lebih terperinci

LAPORAN RESMI PRAKTIKUM ANALISIS PERANCANGAN KERJA DAN ERGONOMI ACARA 1 PENGUKURAN WAKTU KERJA DENGAN JAM HENTI

LAPORAN RESMI PRAKTIKUM ANALISIS PERANCANGAN KERJA DAN ERGONOMI ACARA 1 PENGUKURAN WAKTU KERJA DENGAN JAM HENTI LAPORAN RESMI PRAKTIKUM ANALISIS PERANCANGAN KERJA DAN ERGONOMI ACARA 1 PENGUKURAN WAKTU KERJA DENGAN JAM HENTI OLEH: Marianus T. Dengi 122080139 LABORATORIUM ANALISIS PERANCANGAN KERJA & ERGONOMI JURUSAN

Lebih terperinci

Manajemen Operasi 2006 Aulia Ishak, ST, MT

Manajemen Operasi 2006 Aulia Ishak, ST, MT ANALISIS ALIRAN PROSES Oleh : 1 Outline Pemikiran tentang Sistem Tinjauan Proses Bisnis Analisis Peta Aliran Analisis Aliran Bahan Analisis Aliran Informasi Blue Printing Jasa Penggunaan Analisis Aliran

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha ABSTRAK Perusahaan percetakan di Bandung berkembang dengan pesat, dimana terdapat berbagai perusahaan percetakan dalam jumlah yang cukup banyak. Perkembangan jumlah perusahaan percetakan tersebut mengakibatkan

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha ABSTRAK Proses kelahiran bayi merupakan sesuatu yang sangat berkesan bagi para orang tua. Ini terjadi di beberapa Rumah Sakit atau Rumah Bersalin di seluruh dunia. Ada banyak cara yang dilakukan orang

Lebih terperinci

COMPARISON ANALYSIS OF WORK ON LAND AND UNDER WATER WITH STOP TIME AND MTM-1 METHOD

COMPARISON ANALYSIS OF WORK ON LAND AND UNDER WATER WITH STOP TIME AND MTM-1 METHOD COMPARISON ANALYSIS OF WORK ON LAND AND UNDER WATER WITH STOP TIME AND MTM-1 METHOD (Case Study of Pipe Assemblying on Water Chamber With One Meter Dept) Erika Kusuma Dewi Abstrak Work is a dominant thing

Lebih terperinci

PEMBELAJARAN KEMAMPUAN GERAK DASAR

PEMBELAJARAN KEMAMPUAN GERAK DASAR PEMBELAJARAN KEMAMPUAN GERAK DASAR State of Victoria, Department of Education (1996). Fundamental motor skills: A manual for classroom teacher. Melbourne: Community Information Service. (4-8) Back Next

Lebih terperinci

property

property desainkomunikasivisual http://ramakertamukti.wordpress.com Element of design Line, shape, negative space, volume, value, color, and texture are the elements of design. 1.Line Anak-anak menggunakan garis

Lebih terperinci

Designing Productive and Satisfying Work Merancang Pekerjaan yang Produktif dan Memuaskan. Pertemuan ke-4

Designing Productive and Satisfying Work Merancang Pekerjaan yang Produktif dan Memuaskan. Pertemuan ke-4 Designing Productive and Satisfying Work Merancang Pekerjaan yang Produktif dan Memuaskan Pertemuan ke-4 Learning Objectives How is work design strategic How are employee jobs determined How do we determine

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha ABSTRAK Penelitian ini dilakukan dengan tujuan untuk mengetahui analisis penerapan metode job order costing dalam menentukan harga pokok produk pada CV Jaya Jaya Mekar, yang memproduksi sweater rajut.

Lebih terperinci

RIWAYAT HIDUP UNIVERSITAS MEDAN AREA

RIWAYAT HIDUP UNIVERSITAS MEDAN AREA RIWAYAT HIDUP Penulis dilahirkan di Sikara-kara III pada tanggal 24 April 1993 dari ayah Suripto dan ibu Siti Masrifah, penulis merupakan putra ke 1 dari 3 bersaudara. Tahun 2010 penulis lulus dari SMA

Lebih terperinci

ABSTRAK SATUAN LINGUAL PENGISI FUNGSI PREDIKAT DALAM WACANA ADAM MALIK TETAP PAHLAWAN PADA RUBRIK TAJUK RENCANA HARIAN KOMPAS

ABSTRAK SATUAN LINGUAL PENGISI FUNGSI PREDIKAT DALAM WACANA ADAM MALIK TETAP PAHLAWAN PADA RUBRIK TAJUK RENCANA HARIAN KOMPAS ABSTRAK SATUAN LINGUAL PENGISI FUNGSI PREDIKAT DALAM WACANA ADAM MALIK TETAP PAHLAWAN PADA RUBRIK TAJUK RENCANA HARIAN KOMPAS EDISI SENIN 01 DESEMBER 2008 Adi Cahyono Universitas Sanata Dharma Yogyakarta

Lebih terperinci

Kata kunci: Posisi produk, strategi pemasaran, SWOT, Strategi Diversifikasi, AHP

Kata kunci: Posisi produk, strategi pemasaran, SWOT, Strategi Diversifikasi, AHP ABSTRAKSI PT. Mondrian merupakan salah satu industri konveksi garmen yang ada di Indonesia. Produk unggulan PT. Mondrian yaitu produk dengan merk Dadung. Produk Dadung pernah booming di pasaran pada tahun

Lebih terperinci

PEMANFAATAN TRANSFORMASI WAVELET SEBAGAI EKSTRAKSI CIRI PADA KLASIFIKASI BERTINGKAT SINYAL EKG

PEMANFAATAN TRANSFORMASI WAVELET SEBAGAI EKSTRAKSI CIRI PADA KLASIFIKASI BERTINGKAT SINYAL EKG PEMANFAATAN TRANSFORMASI WAVELET SEBAGAI EKSTRAKSI CIRI PADA KLASIFIKASI BERTINGKAT SINYAL EKG T 610.28 PUT Abstrak Penelitian ini bertujuan untuk memperlihatkan suatu metoda pengenalan multi pola dari

Lebih terperinci

STUDI PERBANDINGAN PENURUNAN KELOMPOK TIANG DITINJAU DARI FAKTOR INTERAKSI DENGAN PENDEKATAN ELASTIK TESIS

STUDI PERBANDINGAN PENURUNAN KELOMPOK TIANG DITINJAU DARI FAKTOR INTERAKSI DENGAN PENDEKATAN ELASTIK TESIS STUDI PERBANDINGAN PENURUNAN KELOMPOK TIANG DITINJAU DARI FAKTOR INTERAKSI DENGAN PENDEKATAN ELASTIK TESIS Karya tulis sebagai salah satu syarat untuk memperoleh gelar Magister dari Institut Teknologi

Lebih terperinci

Pemrograman Berorientasi Object. IMade Suartana, S.Kom, M.Kom

Pemrograman Berorientasi Object. IMade Suartana, S.Kom, M.Kom Pemrograman Berorientasi Object Interface IMade Suartana, S.Kom, M.Kom Materi Interface class Final class Encapsulasi/information i hiding Section 1 INTERFACE Intro Dalam pemrograman Berorientasi Objek

Lebih terperinci

Pengecoran logam. Pengecoran (casting)

Pengecoran logam. Pengecoran (casting) Pengecoran logam (casting) Pengecoran (casting) Adalah proses dimana logam cair mengalir dengan gaya gravitasi atau gaya lain, kedalam cetakan, yang kemudian akan memadat mengikuti bentuk dari ruang cetakan.

Lebih terperinci

ANALISA PERBANDINGAN PERENCANAAN TEBAL PERKERASAN KAKU ANTARA METODE AASHTO 1993 DENGAN METODE BINA MARGA 1983 TUGAS AKHIR

ANALISA PERBANDINGAN PERENCANAAN TEBAL PERKERASAN KAKU ANTARA METODE AASHTO 1993 DENGAN METODE BINA MARGA 1983 TUGAS AKHIR ANALISA PERBANDINGAN PERENCANAAN TEBAL PERKERASAN KAKU ANTARA METODE AASHTO 1993 DENGAN METODE BINA MARGA 1983 TUGAS AKHIR SEBAGAI SALAH SATU SYARAT UNTUK MENYELESAIKAN PENDIDIKAN SARJANA TEKNIK DI PROGRAM

Lebih terperinci

27/05/2013. Penyederhanaan Kerja PENYEDERHANAAN SISTEM KERJA (WORK SIMPLIFICATION) Tujuan penyederhanaan kerja :

27/05/2013. Penyederhanaan Kerja PENYEDERHANAAN SISTEM KERJA (WORK SIMPLIFICATION) Tujuan penyederhanaan kerja : Penyederhanaan Kerja PENYEDERHANAAN SISTEM KERJA (WORK SIMPLIFICATION) Winda Halim, ST., MT IE-402 Analisis Perancangan Kerja dan Ergonomi 2 Jurusan Teknik Industri Fakutas Teknik Universitas Kristen Maranatha

Lebih terperinci

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha ABSTRAK Perkembangan ekonomi nasional saat ini tak terlepas dari adanya peningkatan teknologi dan globalisasi yang sangat berpengaruh terhadap pertumbuhan perindustrian dalam negeri, baik itu industri

Lebih terperinci

KAJIAN MODEL PERKIRAAN AWAL BIAYA PADA-PROYEK PENINGKATAN JALAN KABUPATEN DI KABUPATEN SUMEDANG TESIS MAGISTER. Oleh: AGUS SUTOPO NIM :

KAJIAN MODEL PERKIRAAN AWAL BIAYA PADA-PROYEK PENINGKATAN JALAN KABUPATEN DI KABUPATEN SUMEDANG TESIS MAGISTER. Oleh: AGUS SUTOPO NIM : KAJIAN MODEL PERKIRAAN AWAL BIAYA PADA-PROYEK PENINGKATAN JALAN KABUPATEN DI KABUPATEN SUMEDANG TESIS MAGISTER Oleh: AGUS SUTOPO NIM : 250 92 043 MANAJEMEN REKAYASA KONSTRUKSI JURUSAN TEKNIK SIPIL PROGRAM

Lebih terperinci

IMPACT OF SEVERAL ROUTE CHOICE MODELS ON THE ACCURACY OF ESTIMATED O-D MATRICES FROM TRAFFIC COUNTS

IMPACT OF SEVERAL ROUTE CHOICE MODELS ON THE ACCURACY OF ESTIMATED O-D MATRICES FROM TRAFFIC COUNTS IMPACT OF SEVERAL ROUTE CHOICE MODELS ON THE ACCURACY OF ESTIMATED O-D MATRICES FROM TRAFFIC COUNTS S U M M A R Y IMPACT OF SEVERAL ROUTE CHOICE MODELS ON THE ACCURACY OF ESTIMATED O-D MATRICES FROM TRAFFIC

Lebih terperinci

PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N PADA ENGINEERING FLIGHT SIMULATOR

PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N PADA ENGINEERING FLIGHT SIMULATOR PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N250-100 PADA ENGINEERING FLIGHT SIMULATOR ABSTRAK Pesawat udara merupakan suatu sistem yang terdiri dari beberapa

Lebih terperinci

K-Means Clustering. Tim Asprak Metkuan. What is Clustering?

K-Means Clustering. Tim Asprak Metkuan. What is Clustering? K-Means Clustering Tim Asprak Metkuan What is Clustering? Also called unsupervised learning, sometimes called classification by statisticians and sorting by psychologists and segmentation by people in

Lebih terperinci

APLIKASI PERANGKAT AJAR PENGELOLAAN DAN PERHITUNGAN EKSPRESI MATEMATIKA DARYANTO

APLIKASI PERANGKAT AJAR PENGELOLAAN DAN PERHITUNGAN EKSPRESI MATEMATIKA DARYANTO APLIKASI PERANGKAT AJAR PENGELOLAAN DAN PERHITUNGAN EKSPRESI MATEMATIKA DARYANTO 41508110097 PROGRAM STUDI TEKNIK INFORMATIKA FAKULTAS ILMU KOMPUTER UNIVERSITAS MERCU BUANA JAKARTA 2012 APLIKASI PERANGKAT

Lebih terperinci

ABSTRAK. Kata-kata kunci: biaya pemasaran dan penjualan. viii. Universitas Kristen Maranatha

ABSTRAK. Kata-kata kunci: biaya pemasaran dan penjualan. viii. Universitas Kristen Maranatha ABSTRAK Dalam kegiatan operasional perusahaan, penggunaan biaya sangat berperan penting untuk kegiatan tersebut. Tanpa adanya biaya tersebut, maka perusahaan akan sangat sulit menjalankan usahanya. Salah

Lebih terperinci

catatan lapangan, dan dokumentasi. Analisis data yang digunakan mencakup reduksi data, penyajian data, dan penarikan kesimpulan.

catatan lapangan, dan dokumentasi. Analisis data yang digunakan mencakup reduksi data, penyajian data, dan penarikan kesimpulan. ABSTRAK Skripsi yang berjudul Penerapan Model Pembelajaran Kooperatif Tipe Index Card Match Untuk Meningkatkan Hasil Belajar Aqidah Akhlak Peserta Didik Kelas III MI Roudlotul Ulum Jabalsari Sumbergempol

Lebih terperinci

ABSTRACT. Keywords: Inventory, inventory control, ABC classification, EOI Multiple Item method, efficiency cost inventory. vii

ABSTRACT. Keywords: Inventory, inventory control, ABC classification, EOI Multiple Item method, efficiency cost inventory. vii ABSTRACT In performing its operation, a company must have inventory to satisfy the consumers needs. Inventory is needed to perform the production process, thus a company must control the inventory. One

Lebih terperinci

Perhitungan Kapasitas Kanal Pada Sistem CDMA. Arif Hidayat ST

Perhitungan Kapasitas Kanal Pada Sistem CDMA. Arif Hidayat ST Perhitungan Kapasitas Kanal Pada Sistem CDMA Arif Hidayat ST Overview System CDMA Kapasitas System CDMA tergantung dari bayaknya interferensi dari system tersebut Untuk memaksimalkan kapasitas dari system

Lebih terperinci

PENENTUAN PARAMETER KISI KRISTAL HEXAGONAL BERDASARKAN POLA DIFRAKSI SINAR-X SECARA KOMPUTASI. M. Misnawati 1, Erwin 2, Salomo 3

PENENTUAN PARAMETER KISI KRISTAL HEXAGONAL BERDASARKAN POLA DIFRAKSI SINAR-X SECARA KOMPUTASI. M. Misnawati 1, Erwin 2, Salomo 3 PENENTUAN PARAMETER KISI KRISTAL HEXAGONAL BERDASARKAN POLA DIFRAKSI SINAR-X SECARA KOMPUTASI M. Misnawati, Erwin, Salomo Mahasiswa Porgram Studi S Fisika Bidang Karakterisasi Material Jurusan Fisika Bidang

Lebih terperinci