2 Standard Specifcation API SL (*) ASTM A252 ASTM A139 ASTM A283 Application Chemical Composition (%) Mechanical Strength C Mn P S Ultimate Tensile Strength max max max max Psi N/mm2 Psi N/mm2 A , , A , , B , , X , , X46 Oil & Gas , , X52 Line Pipe , , X , , X , , X , , X , , Steel Pipe , , Piles , , A , , B , , Steel Pipe C , , Piles D , , E , , A , , , B , , Steel pipe 65, C Piles , , , D , , , ASTM A53 A Electric , , Resistance Welded B , , ASTM A134 JIS A5525 JIS A5530 SKK 41/400 Steel Pipe SKK Piles 50/490 SKY 41/400 Steel Pipe SKY Piles 50/490 The Steel Conform to ASTM A , , , , , , , , JIS G3444 JIS G3101 AWWA C200 STK 30/290 STK 41/400 STK 51/500 STK 50/490 STK 55/540 General Structural Purpose , , , , , , , , , SS , , , SS 400 General , , Structural 73, SS 490 Purpose , , , SS , , The Steel Conform to ASTM A283 BS EN 10025** S 355 J0 S 355 Jr General Structural Purpose 0.20 (2)(3) , / , / / /630
3 Nominal Size : Dia. 1/2" - 20" Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa 1/ /STD / /STD /STD / /STD / /STD /STD / /STD /STD /STD /STD , /STD /STD
4 Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa STD /STD /STD /XS STD XS
5 Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa /STD /XS ASTM A53 Carbon Manganase Phosphorus Sulfur Copper Nickel Chronium Molybdenum Vanadium Cu+Ni+Cr+Mo+V A B Yield Strength (mm) Tensile Strength (mm) A 30,000 ps (205 Mpa) 48,000 psi (330 Mpa) B 35,000 ps (240 Mpa) 60,000 psi (415 Mpa)
6 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT
7 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (mm) (in) (kg/m) d (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT
8 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT
9 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT
10 Medium Luar Nominal Size Minimum Maximum Tebal Berat In mm in mm in mm mm Kg/m 1/ / / / / Karbon Manganase Sulfur Phasporus 0.20 % Max 1.20 % Max % Max % Max Batas Mulur (N/mm2) Kuat Tarik (N/mm2) Regangan (Min) %
11 1. Spiral Line Pipe In Oil & Gas Industry No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. PT JOB Pertamina-Medco E&P Tomori Sulawesi /Konstruksi Sipil Tomori Sulawesi 36, , ASTM A252 Gr PT Tripatra Engineers & Constructors/Senoro Development Project 30 17, API 5 L PSL PT PGN, Tbk/CP 10 project 24 14, API 5 L X65 4. PT Pertagas/ Arun Belawan Project 24 12, API 5 L X52 5. PT Pertamina EP ASTM A252 Gr Medco Tomori 36 19, ASTM A252 Gr Total E&P Indonesie 16 12,7 421 ASTM A252 Gr PT. PGN Region Jawa 16 16, API 5 L X Byucksan Engineering Co. Tld, KSO 16 12, API 5 L X Spiral SAW Pile Pipe No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. Mitsui & co (Australia) Ltd/LNG-PNG Papua Nugini 12,18,24 12, ASTM A252 Gr PT Adhi Karya/Pelabuhan Teluk Lamong, Jawa Timur 32,40 12,14, ASTM A PT. Posco E&C Indonesia/Krakatau-Posco, Cilegon 22,28 9, ASTM A252 Gr Performance Pipe Sdn. Bhd/SLNG Secondary Berth, Malaysia 56, 36 22, BSEN PT KBS/ Jetty Dermaga 5, 6 & access road project, 35, 40 12, ASTM A252 Gr PT Agro Nusa Abadi/ Astra Agro Project ASTM A252 Gr PT Great Color Energy/ PLTM Bungin 47 6 dan AWWA C PT Wijaya Karya (Persero), Tbk/ Tanjung Uban 36,40 14, 16, 18, ASTM A252 Gr PT Wijaya Karya (Persero), Tbk/ Pulau Sambu 28, 32, 40 14, ASTM A252 Gr PT Waskita Karya/ Pelabuhan Kuala Tanjung ASTM A252 Gr PT Pembangunan Perumahan (Persero)/ Pelabuhan Kuala Tanjung ASTM A252 Gr
12 3. ERW/HFRW line Pipe No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. PT Tripatra/NGL Project-Pertagas ,898 API 5L Gr. B PT. Energi Equity Epic (Sengkang) /CoatedLinepipe Project ,276 API 5L Gr. B PT. Chevron Pasivic Indonesia /Blanket Purchase Contract ,000 API 5L Gr. B & ASTM A.252 Gr Conoco Philips /Letang Tengah Rawa Optimization (LTRO) ,804 API 5L X-52 (Sour Service) PT PGN (Persero), Tbk 12, ,12.7 3,659 API 5 L PSL PT Chevron Pasivic Indonesia/Blanket Purchase Contract API 5L Gr. B & ASTM A.252 Gr Conoco Philips/ Letang Tengah Rawa Optimization (LTRO) API 5L X-52 (Sour Service) PT PGN (Persero), Tbk 12, , API 5 L PSL Salamander Energy (Bangkanai) Ltd 4 6, API 5 L X PT Pertamina/ Pertamina gas kota project 8 8, API 5L Gr.B 11. PT PGN Tbk/PGN SBU II Project 12 9, API 5L Gr.B PT Wijaya Karya (Persero), Tbk/ Tanjung Uban ASTM A53 Gr A&B PT Wijaya Karya (Persero), Tbk/ Pulau Sambu API 5 L PSL PT Chevron Pacific Indonesia/ Petapahan Kota Batak Project & API 5 L X PT Pertamina (Persero)/ Avtur Soekarno Hatta Terminal , API 5L Gr.B Coating No. Customer / Coating Type 0D (inch) Volume (Ton) Year 1. Conoco Philips/Letang Tengah Rawa Optimization (LTRO)/ 3LPE PT Pertagas/3LPE CV Cahaya Budi Perkasa/TOTAL E&P INDONESIE/CWC PT PGN, Tbk/ CP 7, 9 & 10 Project/ 3LPE & Internal Epoxy PT Citra Panji Manunggal/ Talisman Project/ FBE& CWC PT Pertamina/ Pertamina gas kota project/ Asphalt Enemel PT Raga Perkasa Ekaguna/ CNOOC Project/3LPE&CWC PT. PGN Region Jawa Konsorsium WIKA - Rabana Kelsri/ Gresik Semarang - Pertagas Project PT Menara Gading Putih/ Porong Grati - Pertagas Project JO. Consorsium PCS/ Husky Project
13
14
15
16
Steel Pipe Product Specifications Electric Resistance Welded (ERW) Pipe
ASTM A 53 (A) Outside Test Pressure Sch DN NPS Psi Kg/cm 2 3/4" 26.7 2.87 700 49 25 1" 33.4 3.38 700 49 * Carbon (C) : 0.25 % max 32 11/4" 42.2 3.56 10 85 * Pospor (p) : 0.05 % max 11/2" 48.3 3.68 10 85
Lebih terperinci1.1 PENGALAMAN KERJA SEJENIS 10 TAHUN TERAKHIR
1.1 PENGALAMAN KERJA SEJENIS 10 TAHUN TERAKHIR Tabel Error! No text of specified style in document..1 Daftar Pengalaman Sejenis 10 (Sepuluh) Tahun Terakhir No. Pengguna Jasa / 1 2 3 4 5 6 7 8 1 PT Surveyor
Lebih terperinciBAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk
BAB I PENDAHULUAN Sistem Perpipaan merupakan bagian yang selalu ada dalam industri masa kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk mentransportasikan fluida adalah dengan
Lebih terperinciBAB I TINJAUAN UMUM PT. OSTRADA INDONESIA
BAB I TINJAUAN UMUM PT. OSTRADA INDONESIA 1.1. Sejarah Perusahaan PT. Ostrada Indonesia didirikan pada tahun 2013 di Jakarta. PT. Ostrada Indonesia adalah Konsultan dan Jasa Engineering yang memiliki kemampuan
Lebih terperinciBAB III METODE PENELITIAN. Diagram alir studi perencanaan jalur perpipaan dari free water knock out. Mulai
BAB III METODE PENELITIAN 3.1. Diagram Alir ( Flow Chart ) Diagram alir studi perencanaan jalur perpipaan dari free water knock out (FWKO) ke pump suction diberikan pada Gambar 3.1 Mulai Perumusan Masalah
Lebih terperinciBAB III ANALISA DAN PEMBAHASAN
BAB III ANALISA DAN PEMBAHASAN 3.1. Perhitungan Ketebalan Pipa (Thickness) Penentuan ketebalan pipa (thickness) adalah suatu proses dimana akan ditentukan schedule pipa yang akan digunakan. Diameter pipa
Lebih terperinciGambar 5. 1 Sistem Pipeline milik Vico Indonesia
BAB IV Studi Kasus Pada bab ini dilakukan studi kasus untuk menghitung kategori resiko dalam sebuah pipeline. Pada kesempatan kali ini penulis mengambil pipeline milik Vico Indonesia sebagai contoh untuk
Lebih terperinciBAB IV ANALISA DAN PEMBAHASAN. dalam tugas akhir ini adalah sebagai berikut : Document/Drawing Number. 2. TEP-TMP-SPE-001 Piping Desain Spec
BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem pemipaan dengan menggunakan program Caesar
Lebih terperinciBAB IV DATA SISTEM PERPIPAAN HANGTUAH
BAB IV DATA SISTEM PERPIPAAN HANGTUAH 4.1. Sistem Perpipaan 4.1.1. Lokasi Sistem Perpipaan Sistem perpipaan yang dianalisis sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan milik Conoco
Lebih terperinciTabel III-2 Perusahaan-perusahaan sektor hulu perminyakan di Indonesia
LAMPIRAN 1 Tabel III-2 Perusahaan-perusahaan sektor hulu perminyakan di Indonesia No. NAMA PERUSAHAAN LOKASI PERUSAHAAN 1 Amerada Hess 2 Anadarko 3 Asia Petroleum 4 PT BOB Bumi Siak Pusako-Pertamina EP
Lebih terperinciBESI ASSENTAL (ST 41) SHAFTING 6M
BESI ASSENTAL (ST 41) SHAFTING BAR @ 6M SIZE WEIGHT D 1/4" (6 mm) = 6 M 1.50 Kg 5/16" (8 mm) = 6 M 2.50 Kg 3/8" (10 mm) = 6 M 3.50 Kg 1/2" (13 mm) = 6 M 6.00 Kg 5/8" (16 mm) = 6 M 9.50 Kg 3/4" (19 mm)
Lebih terperinciANALISA PENGARUH FLYWHEEL DAN FIRING ORDER TERHADAP PROSES KERJA MESIN DIESEL
ANALISA PENGARUH FLYWHEEL DAN FIRING ORDER TERHADAP PROSES KERJA MESIN DIESEL Oleh: Adin Putra Rachmawan (4210 100 086) Pembimbing 1 : DR. I Made Ariana, S.T., M.T. Pembimbing 2 : Ir. Indrajaya Gerianto,
Lebih terperinciBAB III DATA DESAIN DAN HASIL INSPEKSI
BAB III DATA DESAIN DAN HASIL INSPEKSI III. 1 DATA DESAIN Data yang digunakan pada penelitian ini adalah merupakan data dari sebuah offshore platform yang terletak pada perairan Laut Jawa, di utara Propinsi
Lebih terperinciPT. INDO KAYA ENERGI
PT. INDO KAYA ENERGI EXECUTIVE SUMMARY PT. INDO KAYA ENERGI (IKE) TELAH BERDIRI DI INDONESIA PADA TAHUN 2005 UNTUK MENYEDIAKAN KEBUTUHAN BARANG DAN JASA INDUSTRI MIGAS DI INDONESIA. IKE MERUPAKAN PERUSAHAAN
Lebih terperinciBAB IV PERHITUNGAN ANALISA DAN PEMBAHASAN
BAB IV PERHITUNGAN ANALISA DAN PEMBAHASAN 4.1 Perhitungan Bejana Tekan Seperti yang diuraikan pada BAB II, bahwa bejana tekan yang dimaksud dalam penyusunan tugas akhir ini adalah suatu tabung tertutup
Lebih terperinciANALISA KEGAGALAN PIPA BAJA TAHAN KARAT 316L DI BANGUNAN LEPAS PANTAI PANGKAH-GRESIK
ANALISA KEGAGALAN PIPA BAJA TAHAN KARAT 316L DI BANGUNAN LEPAS PANTAI PANGKAH-GRESIK SALMON PASKALIS SIHOMBING NRP 2709100068 Dosen Pembimbing: Dr. Hosta Ardhyananta S.T., M.Sc. NIP. 198012072005011004
Lebih terperinciBAJA TULANGAN BETON BERSTANDAR SNI 2052:2014
BAJA TULANGAN BETON BERSTANDAR SNI 2052:2014 Video Hot Rolling pabrik DELI Baja berbentuk batang berpenampang bundar dengan permukaan polos dan sirip yang digunakan untuk penulangan beton, yang
Lebih terperinciPANDUAN PERHITUNGAN TEBAL PIPA
PANDUAN PERHITUNGAN TEBAL PIPA 1.1 Alur Analisa Untuk mendesain sebuah pipa yang akan digunakan untuk moda distribusi, hal pertama yang perlu dilakukan adalah menghitung tebal pipa minimum yang paling
Lebih terperinciAbstrak. Kata kunci: Hydrotest, Faktor Keamanan, Pipa, FEM ( Finite Element Method )
PERBANDINGAN PRESSURE AKTUAL HYDROTEST WELDING PIPE API 5L B PSL 1 ERW SCH 10 Ø30 TERHADAP TEGANGAN LULUH DENGAN SIMULASI NUMERIK METODE FEM ( FINITE ELEMENT METHOD ) Muhammad Irawan *, Nurul Laili Arifin
Lebih terperinciALTERNATIF PENGGUNAAN PIPA PSL 1 SEBAGAI PENGGANTI PIPA PSL 2 PADA PROYEK DEPOT LPG Galuh Renggani Wilis Prodi Teknik Mesin Fakultas Teknik Universitas Pancasakti Tegal Jalan Halmahera KM.1 Tegal,Telp
Lebih terperinciNAJA HIMAWAN
NAJA HIMAWAN 4306 100 093 Ir. Imam Rochani, M.Sc. Ir. Hasan Ikhwani, M.Sc. ANALISIS PERBANDINGAN PERANCANGAN PADA ONSHORE PIPELINE MENGGUNAKAN MATERIAL GLASS-REINFORCED POLYMER (GRP) DAN CARBON STEEL BERBASIS
Lebih terperinciBAB IV ANALISA DAN PEMBAHASAN. melakukan perancangan sistem perpipaan dengan menggunakan program Caesar
BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem perpipaan dengan menggunakan program Caesar
Lebih terperinciBAB IV PENGUMPULAN DAN PENGOLAHAN DATA
BAB IV PENGUMPULAN DAN PENGOLAHAN DATA 4.1. Data-data Awal ( input ) untuk Caesar II Adapun parameter-parameter yang menjadi data masukan (di input) ke dalam program Caesar II sebagai data yang akan diproses
Lebih terperinciAnalisa Resiko Penggelaran Pipa Penyalur Bawah Laut Ø 6 inch
Analisa Resiko Penggelaran Pipa Penyalur Bawah Laut Ø 6 inch Oleh : NOURMALITA AFIFAH 4306 100 068 Dosen Pembimbing : Ir. Jusuf Sutomo, M.Sc Prof. Ir. Daniel M. Rosyid, Ph.D Agenda Presentasi : Latar Belakang
Lebih terperinciBAB IV ANALISA DAN PERHITUNGAN
BAB IV ANALISA DAN PERHITUNGAN 4.1 Perhitungan Ketebalan Minimum ( Minimum Wall Thickess) Dari persamaan 2.13 perhitungan ketebalan minimum dapat dihitung dan persamaan 2.15 dan 2.16 untuk pipa bending
Lebih terperinciANALISIS PENGARUH PEMOTONGAN PLASMA FLAME CUTTING BAJA PLAT JIS G 3101 SS 400 TERHADAP KEKUATAN TARIKNYA
ANALISIS PENGARUH PEMOTONGAN PLASMA FLAME CUTTING BAJA PLAT JIS G 3101 SS 400 TERHADAP KEKUATAN TARIKNYA Sahlan Jurusan Teknik Mesin S1 STT-PLN Email: Sahlan_1956@yahoo.com Abstrak Pada analisis pengaruh
Lebih terperinciSIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI. Arif Rahman H ( )
SIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI Arif Rahman H (4305 100 064) Dosen Pembimbing : 1. Ir. Hasan Ikhwani, M.Sc 2. Ir. Daniel M. Rosyid, Ph.D Materi
Lebih terperinciANALISA TROUBLESHOOTING PENYUMBATAN PIPA PRODUKSI DENGAN METODE FLUSHING PADA SUMUR KW 71 PT PERTAMINA EP FIELD CEPU
LAPORAN FIELD PROJECT ANALISA TROUBLESHOOTING PENYUMBATAN PIPA PRODUKSI DENGAN METODE FLUSHING PADA SUMUR KW 71 PT PERTAMINA EP FIELD CEPU OLEH: WILDHAN ARIF KURNIAWAN NRP. 6308030017 DOSEN PEMBIMBING
Lebih terperinciPIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR
P3 PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR II P3 PIPELINE STRESS ANALYSIS ON THE ONSHORE DESIGN
Lebih terperinciBAB I. PENDAHULUAN. Minyak bumi adalah suatu senyawa hydrocarbon yang terdiri dari karbon (83-87%),
BAB I. PENDAHULUAN 1.1. Latar Belakang Masalah Minyak bumi adalah suatu senyawa hydrocarbon yang terdiri dari karbon (83-87%), Hydrogen (11-14%), Nitrogen (0.2 0.5%), Sulfur (0-6%), dan Oksigen (0-5%).
Lebih terperinciineka Inovasi Nusantara
ineka Inovasi Nusantara Tentang Kami PT. Bineka Inovasi Nusantara adalah perusahaan berkembang di indonesia. Saat ini kami menyediakan layanan jasa teknis, konsultasi, Instalasi dan konstruksi dalam dunia
Lebih terperinciPENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa?
PENDAHULUAN Korosi yang menyerang sebuah pipa akan berbeda kedalaman dan ukurannya Jarak antara korosi satu dengan yang lain juga akan mempengaruhi kondisi pipa. Dibutuhkan analisa lebih lanjut mengenai
Lebih terperinciPENGARUH PWHT DAN NON PWHT DENGAN LAS SMAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A-106 GRADE B
SIDANG TUGAS AKHIR PENGARUH PWHT DAN NON PWHT DENGAN LAS SMAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A-106 GRADE B P E M B I M B I N G : I R. R O C H M A N R O C H I E M, M. S C Oleh
Lebih terperinciOPTIMASI DESAIN ELBOW PIPE
OPTIMASI DESAIN ELBOW PIPE PADA JARINGAN PIPA TRANSPORTASI MIGAS MILIK JOINT OPERATING BODY PERTAMINA-PETROCHINA EAST JAVA (JOB P-PEJ) TUBAN DENGAN BERBASIS KEANDALAN S. M. Yusuf 1, D. M. Rosyid 2, H.
Lebih terperinciBAB III METODE PENELITIAN
BAB III METODE PENELITIAN 3.1. Diagram Alir ( Flow Chart ) Mulai Perumusan Masalah Mengetahui tegangan pada system perpipaan & mengetahui jumlah penyangga pipa (pipe support) Penyiapan data yang di masukan
Lebih terperinciSEPARATOR. Nama Anggota: PITRI YANTI ( } KARINDAH ADE SYAPUTRI ( ) LISA ARIYANTI ( )
SEPARATOR Nama Anggota: PITRI YANTI (03121403032} KARINDAH ADE SYAPUTRI (03121403042) LISA ARIYANTI (03121403058) 1.Separator Separator merupakan peralatan awal dalam industri minyak yang digunakan untuk
Lebih terperinciANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE
ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE Oleh: WIRA YUDHA NATA 4305 100 014 JURUSAN TEKNIK KELAUTAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2010 ANALISA
Lebih terperinciANDHIKA HARIS NUGROHO NRP
LABORATORIUM KEANDALAN DAN KESELAMATAN JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER ANALISIS TEGANGAN TERHADAP RISIKO TERJADINYA BUCKLING PADA PROSES
Lebih terperinciBaja profil kanal U proses canai panas (Bj P kanal U)
Standar Nasional Indonesia Baja profil kanal U proses canai panas (Bj P kanal U) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii 1 Ruang lingkup... 1 2 Acuan normatif...
Lebih terperinciH R L T Length of a structural bolt is measured from the underhead bearing surface to the extreme end of the bolt. Width Across Corners
Cap Screws & Bolts Head and Thread Dimensions A325 & A490 Structural Bolts H R H R F E E G o 30 +0-15 Y L Cut Thread L T o 30 +0-15 Y L T L Rolled Thread Length of a structural bolt is measured from the
Lebih terperinciBab 3 Data Operasi Sistem Perpipaan pada Topside Platform
Bab 3 Data Operasi Sistem Perpipaan pada Topside Platform Pada area pengeboran minyak dan gas bumi Lima, Laut Jawa milik British Petrolium, diketahui telah mengalami fenomena subsidence pada kedalaman
Lebih terperinciPERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA ABSTRAK
PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA Dedy Haryanto, Sagino, Riswan Djambiar Pusat Teknologi Reaktor dan Keselamatan Nuklir ABSTRAK PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA. Telah dilakukan
Lebih terperinciBaja profil siku sama kaki proses canai panas (Bj P Siku sama kaki)
Standar Nasional Indonesia Baja profil siku sama kaki proses canai panas (Bj P Siku sama kaki) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii 1 Ruang lingkup... 1
Lebih terperinciBAB III METODOLOGI PENELITIAN
BAB III METODOLOGI PENELITIAN 3.1 Nilai-nilai Desain Dalam melakukan suatu proses kerja, maka diperlukan suatu perencanaan yang benar-benar matang. Hal ini sangat penting guna memberi arahan dalam proses
Lebih terperinciBAB I LATAR BELAKANG
1 BAB I LATAR BELAKANG 1.1. Latar Belakang Dalam pengalokasian sumber dana untuk pelaksanaan proyek, material merupakan sumber daya yang mengadopsi terbesar sumber dana proyek. Manajemen material di bidang
Lebih terperinciANALISA STABILITAS SUBSEA CROSSING GAS PIPELINE DENGAN SUPPORT PIPA BERUPA CONCRETE MATTRESS DAN SLEEPER
ANALISA STABILITAS SUBSEA CROSSING GAS PIPELINE DENGAN SUPPORT PIPA BERUPA CONCRETE MATTRESS DAN SLEEPER (Studi Kasus Crossing Pipa South Sumatera West Java (SSWJ) milik PT.Perusahaan Gas Negara (Persero)
Lebih terperinciWorkshop CIVD (Centralized Integrated Vendor Database)
SATUAN KERJA KHUSUS PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI (SKKMIGAS) Workshop CIVD (Centralized Integrated Vendor Database) VENDORS DAY BERSAMA EAST JAVA 2017 Batu - Malang, 28 July 2017 Latar
Lebih terperinciLAMPIRAN 1 Data Perusahaan yang Terdaftar di IICG yang Mempublikasikan Laporan Keuangan Periode
LAMPIRAN 1 Data Perusahaan yang Terdaftar di IICG yang Mempublikasikan Laporan Keuangan Periode 2010-2012 No Nama Perusahaan Terdaftar di CGPI Mempublikasikan Laporan Keterangan Periode 2010-2012 Keuangan
Lebih terperinciLAMPIRAN A SPESIFIKASI TEKNIS AIR MINUM PARAMETER STANDARD DAN SPESIFIKASI. Unit Air Baku
LAMPIRAN A SPESIFIKASI TEKNIS AIR MINUM NO PARAMETER STANDARD DAN SPESIFIKASI 1 Unit Air Baku 1. 1.Peraturan Pemerintah No 82/2001 tentang Pengelolaan Kualitas Air dan Pengendalian Pencem 2. 2.Metode Pengambilan
Lebih terperinciBab III Data Perancangan GRP Pipeline
Bab III Data Perancangan GRP Pipeline 3.2 Sistem Perpipaan Sistem perpipaan yang dirancang sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan penyalur fluida cair yaitu crude dan well fluid
Lebih terperinciKAJIAN TEGANGAN DAN KEAMANAN TABUNG GAS ELPIJI BRIGHT GAS 5,5 KG MELALUI SIMULASI SOFTWARE SOLID WORK
KAJIAN TEGANGAN DAN KEAMANAN TABUNG GAS ELPIJI BRIGHT GAS 5,5 KG MELALUI SIMULASI SOFTWARE SOLID WORK Iwan Agustiawan1*, Muhammad Noor Widdy 2 1,2 Teknik Mesin Institut Teknologi Nasional Bandung, Jalan
Lebih terperinci4 BAB IV PERHITUNGAN DAN ANALISA
4 BAB IV PERHITUNGAN DAN ANALISA 4.1 Data Penelitian Data material pipa API-5L Gr B ditunjukkan pada Tabel 4.1, sedangkan kondisi kerja pada sistem perpipaan unloading line dari jetty menuju plan ditunjukan
Lebih terperinciANALISA SISA UMUR PEMAKAIAN (REMAINING LIFE ASSESMENT) AIR RECEIVER COMPRESSOR TANK MENGGUNAKAN METODE ULTRASONIC TEST ABSTRAK
ANALISA SISA UMUR PEMAKAIAN (REMAINING LIFE ASSESMENT) AIR RECEIVER COMPRESSOR TANK MENGGUNAKAN METODE ULTRASONIC TEST Fuad Khoirul 1, Muh Amin 2, Muhammad Subri 3 ABSTRAK Pengurangan ketebalan material
Lebih terperinciANALISIS KEKUATAN COMPRESIVE NATURAL GAS (CNG) CYLINDERS MENGGUNAKAN METODE ELEMEN HINGGA
ANALISIS KEKUATAN COMPRESIVE NATURAL GAS (CNG) CYLINDERS MENGGUNAKAN METODE ELEMEN HINGGA Khoirul Huda 1), Luchyto Chandra Permadi 2) 1),2) Pendidikan Teknik Mesin Jl. Semarang 6 Malang Email :khoirul9huda@gmail.com
Lebih terperinciPOTENSI GAS ALAM DI INDONESIA
POTENSI GAS ALAM DI INDONESIA POTENSI GAS ALAM DI INDONESIA M. Hasan Syukur *) ABSTRAK Gas bumi merupakan sumber daya alam dengan cadangan terbesar ketiga di dunia setelah batu bara dan minyak bumi. Gas
Lebih terperinciBab 6 DESAIN PENULANGAN
Bab 6 DESAIN PENULANGAN Laporan Tugas Akhir (KL-40Z0) Desain Dermaga General Cargo dan Trestle Tipe Deck On Pile di Pulau Kalukalukuang Provinsi Sulawesi Selatan 6.1 Teori Dasar Perhitungan Kapasitas Lentur
Lebih terperinciTEKNIK MESIN MESIN COMPRESSION MOLDING No 1 A3
LMPIRN 8 6 F F E DETIL SCLE : DETIL SCLE : E D 8 0 0 9 8 8 Spring olt & nut JIS M Selang PVC Tanki tekan Katup Kontrol Piston kompressor ST Generic D C 9 6 6 9 0 6 0 9 8 6 No Jml Klem Tubular Heater Mold
Lebih terperinciOleh I Komang Ardo Awamasu Dosen Pembimbing : Ir. Rochman Rochiem, M.Sc.
PENGARUH PWHT DAN NON PWHT DENGAN LAS GTAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A106 GRADE B Oleh I Komang Ardo Awamasu 270910009 Dosen Pembimbing : Ir. Rochman Rochiem, M.Sc. Jurusan
Lebih terperinciUJIAN P3 TUGAS AKHIR 20 JULI 2010
UJIAN P3 TUGAS AKHIR 20 JULI 2010 ANALISA RISIKO TERHADAP PIPA GAS BAWAH LAUT KODECO AKIBAT SCOURING SEDIMEN DASAR LAUT OLEH : REZHA RUBBYANTO 4306.100.026 DOSEN PEMBIMBING : 1. Dr. Ir. Wahyudi, M. Sc
Lebih terperinciSpesifikasi baut mutu tinggi untuk penyambung struktur baja
Spesifikasi baut mutu tinggi untuk penyambung struktur baja 1 Ruang lingkup Spesifikasi ini memuat dua tipe baut mutu tinggi yaitu ukuran 1 dan lebih kecil untuk minimum kekuatan tarik 120 ksi dan 1 1½
Lebih terperinciBAB IV ANALISA DAN PEMBAHASAN. Ketebalan pipa dapat berbeda-beda sesuai keadaan suatu sistem perpipaan.
BAB IV ANALISA DAN PEMBAHASAN 4.1 Perhitungan dan Analisa Tegangan 4.1.1 Perhitungan Ketebalan Minimum Ketebalan pipa dapat berbeda-beda sesuai keadaan suatu sistem perpipaan. Perbedaan ketebalan pipa
Lebih terperinciDosen Pembimbing: 1. Ir. Imam Rochani, M.Sc. 2. Ir. Handayanu, M.Sc., Ph.D.
Sidang Tugas Akhir (P3) Surabaya, 7 Agustus 2014 PERANCANGAN RISER DAN EXPANSION SPOOL PIPA BAWAH LAUT: STUDI KASUS KILO FIELD PT. PERTAMINA HULU ENERGI OFFSHORE NORTHWEST JAVA Oleh: Hidayat Wusta Lesmana
Lebih terperinciAnalisis Kekuatan Struktur Konstruksi Tower untuk Catwalk dan Chain Conveyor pada Silo (Studi Kasus di PT. Srikaya Putra Mas)
Analisis Kekuatan Struktur Konstruksi Tower untuk Catwalk dan Chain Conveyor pada Silo (Studi Kasus di PT. Srikaya Putra Mas) Nur Azizah 1*, Muhamad Ari 2, Ruddianto 3 1 Program Studi Teknik Desain dan
Lebih terperinciRSU KASIH IBU - EXTENSION STRUKTUR : BAB - 06 DAFTAR ISI PEKERJAAN KONSTRUKSI BAJA 01. LINGKUP PEKERJAAN BAHAN - BAHAN..
DAFTAR ISI 01. LINGKUP PEKERJAAN.. 127 02. BAHAN - BAHAN.. 127 03. SYARAT-SYARAT PELAKSANAAN...... 127 PT. Jasa Ferrie Pratama 126 01. Lingkup Pekerjaan Pekerjaan ini meliputi seluruh pekerjaan Konstruksi
Lebih terperinciAnalisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan Caesar II
JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: 2337-3539 (2301-9271 Print) F-168 Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan
Lebih terperinciPerhitungan Teknis LITERATUR MULAI STUDI SELESAI. DATA LAPANGAN : -Data Onshore Pipeline -Data Lingkungan -Mapping Sector HASIL DESAIN
MULAI STUDI LITERATUR DATA LAPANGAN : -Data Onshore Pipeline -Data Lingkungan -Mapping Sector DATA NON LAPANGAN : -Data Dimensi Anode -Data Harga Anode DESAIN MATERIAL ANODE DESAIN TIPE ANODE Perhitungan
Lebih terperinciLAPORAN TUGAS AKHIR (KL-40Z0) Perancangan Dermaga dan Trestle Tipe Deck On Pile di Pelabuhan Garongkong, Propinsi Sulawesi Selatan. Bab 6.
LAPORAN TUGAS AKHIR (KL-40Z0) Perancangan Dermaga dan Trestle Tipe Deck On Pile di Pelabuhan Garongkong, Propinsi Sulawesi Selatan Bab 6 Penulangan Bab 6 Penulangan Perancangan Dermaga dan Trestle Tipe
Lebih terperinciCREEP. Contoh komponen-komponen yang potensial mengalami creep adalah.
CREEP Def. Deformasi Plastis yang terjadi sebagai akibat dari lingkungan yang bertemperatur tinggi dan tegangan static yang tetap dalam kurun waktu yang lama. Contoh komponen-komponen yang potensial mengalami
Lebih terperinciBAB I PENDAHULUAN. digunakan di Indonesia dalam pembangunan fisik. Karena sifat nya yang unik. pembuatan, cara evaluasi dan variasi penambahan bahan.
BAB I PENDAHULUAN I.1 Latar Belakang Masalah Beton merupakan salah satu bahan bangunan yang pada saat ini banyak digunakan di Indonesia dalam pembangunan fisik. Karena sifat nya yang unik diperlukan pengetahuan
Lebih terperinciPERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK
TUGAS AKHIR KONVERSI ENERGI PERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK Putra Aditiawan 2108030043 Dosen pembinmbing: Dr.Ir.Heru Mirmanto,MT GAMBAR INSTALASI
Lebih terperinciKEBIJAKAN ALOKASI GAS BUMI UNTUK DALAM NEGERI
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEBIJAKAN ALOKASI GAS BUMI UNTUK DALAM NEGERI Jakarta, 6 Februari 2014 I KONDISI HULU MIGAS 2 CADANGAN GAS BUMI (Status
Lebih terperinciDisampaikan Dalam Rangka Diskusi Meja Bundar Tinjauan Persiapan Penerapan Standard EURO II Kendaraan Type Baru 2005
Disampaikan Dalam Rangka Diskusi Meja Bundar Tinjauan Persiapan Penerapan Standard EURO II Kendaraan Type Baru 2005 Direktorat Pengolahan dan Niaga Migas Direktorat Jenderal Minyak dan Gas Bumi Jakarta
Lebih terperinciCOMPANY PROFILE PT. CIDAS SUPRA METALINDO
COMPANY PROFILE PT. CIDAS SUPRA METALINDO COMPANY PROFILE Name : PT. CIDAS SUPRA METALINDO Established : February 1998 Bussines Line : Precision Metal Works Share Holders : PT. Banten Java Persada President
Lebih terperinciBaja profil I-beam proses canai panas (Bj.P I-beam)
Standar Nasional Indonesia Baja profil I-beam proses canai panas (Bj.P I-beam) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii Pendahuluan... iii 1 Ruang lingkup...
Lebih terperinciPENGARUH AIR LIMBAH PADA ADUKAN BETON TERHADAP KUAT TEKAN BETON NORMAL
PENGARUH AIR LIMBAH PADA ADUKAN BETON TERHADAP KUAT TEKAN BETON NORMAL Oleh : Armeyn Dosen Teknik Sipil Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Padang Abstrak Penggunaan air untuk campuran
Lebih terperinciLAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II
LAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II Diajukan Guna Memenuhi Syarat Kelulusan Mata Kuliah Tugas Akhir
Lebih terperinciMODUL 5. Addendum Perencanaan Lantai Kenderaan Dengan Corrugated Steel Plate STRUKTUR BAJA II. Dosen Pengasuh : Ir.
STRUKTUR BAJA II MODUL 5 Addendum Perencanaan Lantai Kenderaan Dengan Corrugated Steel Plate Dosen Pengasuh : Materi Pembelajaran : 1. Lantai dengan baja gelombang (Corrugated steel plate, CSP).. Material.
Lebih terperinciSpesifikasi material baja tahan karat unit instalasi pengolahan air
Standar Nasional Indonesia Spesifikasi material baja tahan karat unit instalasi pengolahan air ICS 91.140.60; 77.140.01 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii Pendahuluan...
Lebih terperinciPOTENSI GAS ALAM DI INDONESIA
POTENSI GAS ALAM DI INDONESIA M. Hasan Syukur *) ABSTRAK Gas bumi merupakan sumber daya alam dengan cadangan terbesar ketiga di dunia setelah batu bara dan minyak bumi. Gas alam pada awalnya tidak dikonsumsi
Lebih terperinciBAB I PENDAHULUAN. 1.1 Latar Belakang. Sebagai salah satu komoditi strategis didalam pembangunan tidak dapat
BAB I PENDAHULUAN 1.1 Latar Belakang Sebagai salah satu komoditi strategis didalam pembangunan tidak dapat dipungkiri bahwa ketersediaan bahan bakar minyak didalam negeri merupakan hal yang amat penting
Lebih terperinciTUGAS PERANCANGAN PABRIK METHANOL DARI GAS ALAM DENGAN PROSES LURGI KAPASITAS TON PER TAHUN
EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA TUGAS PERANCANGAN PABRIK METHANOL DARI GAS ALAM DENGAN PROSES LURGI KAPASITAS 230000 TON PER TAHUN Oleh: ISNANI SA DIYAH L2C 008 064 MUHAMAD ZAINUDIN L2C
Lebih terperinciIII. METODE PENELITIAN. Penelitian dilakukan dibeberapa tempat, sebagai berikut:
III. METODE PENELITIAN A. Tempat Penelitian Penelitian dilakukan dibeberapa tempat, sebagai berikut: 1. Pembuatan kampuh dan proses pengelasan dilakukan di Politeknik Negeri Lampung, Bandar Lampung, 2.
Lebih terperinciEXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA
EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA TUGAS PERANCANGAN PABRIK AMONIUM NITRAT DENGAN PROSES UHDE Oleh : Tika Pratiwi Lis Pudiastuti NIM NIM Y. Saptiana Oktari NIM L2C0 06 112 Zulfatus Saadah
Lebih terperinciBAB I PENDAHULUAN. Teknik Material dan Metalurgi FTI-ITS
BAB I PENDAHULUAN I.1 Latar Belakang Baja (steel) adalah material yang paling banyak dan umum digunakan di dunia industri, hal ini karena baja memberikan keuntungan keuntungan yang banyak yaitu pembuatannya
Lebih terperinciPERANCANGAN TEKNIS BAUT BATUAN BERDIAMETER 39 mm DENGAN KEKUATAN PENOPANGAN kn LOGO
www.designfreebies.org PERANCANGAN TEKNIS BAUT BATUAN BERDIAMETER 39 mm DENGAN KEKUATAN PENOPANGAN 130-150 kn Latar Belakang Kestabilan batuan Tolok ukur keselamatan kerja di pertambangan bawah tanah Perencanaan
Lebih terperinciVIRTUAL BURSTING TEST ELBOW 16 LR 90 DENGAN METODE ELEMEN HINGGA MENGGUNAKAN SOFTWARE ANSYS WORKBENCH
VIRTUAL BURSTING TEST ELBOW 16 LR 90 DENGAN METODE ELEMEN HINGGA MENGGUNAKAN SOFTWARE ANSYS WORKBENCH Muhammad Salem Abdul Ajes Teknik Mesin, Sekolah Tinggi Teknologi Fatahillah Cilegon, Kota Cilegon,
Lebih terperinci2. PT Kaltim Methanol Industri
- 7- LAM PI RAN I PERATURAN MENTERI ENERGI DAN SUMBER DAY A MINERAL REPUBLIK INDONESIA NOMOR 40 TAHUN 2016 TENTANG HARGA GAS BUMI UNTUK INDUSTRI TERTENTU PERU BAHAN HARGA GAS BUMI DI PINTU PABRIK PEMBELI
Lebih terperinciSTUDI PARAMETER PENGARUH TEMPERATUR, KEDALAMAN TANAH, DAN TIPE TANAH TERHADAP TERJADINYA UPHEAVAL BUCKLING PADA BURRIED OFFSHORE PIPELINE
1 STUDI PARAMETER PENGARUH TEMPERATUR, KEDALAMAN TANAH, DAN TIPE TANAH TERHADAP TERJADINYA UPHEAVAL BUCKLING PADA BURRIED OFFSHORE PIPELINE Saiful Rizal 1), Yoyok S. Hadiwidodo. 2), dan Joswan J. Soedjono
Lebih terperinciPRARANCANGAN PABRIK UREA FORMALDEHID PROSES FORMOX KAPASITAS TON / TAHUN
EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA PRARANCANGAN PABRIK UREA FORMALDEHID PROSES FORMOX KAPASITAS 44.000 TON / TAHUN MURTIHASTUTI Oleh: SHINTA NOOR RAHAYU L2C008084 L2C008104 JURUSAN TEKNIK
Lebih terperinciPERHITUNGAN SPESIFIKASI PENYAMBUNGAN PIPA GAS DAN INSTALASI PIPELINE GAS PADA PIPELINE PROJECT BOJONEGARA - CIKANDE
PERHITUNGAN SPESIFIKASI PENYAMBUNGAN PIPA GAS DAN INSTALASI PIPELINE GAS PADA PIPELINE PROJECT BOJONEGARA - CIKANDE Oleh Nama : Roby Pratomo NPM : 26409806 Fakultas : Teknologi Industri Jurusan : Teknik
Lebih terperinciPELAKSANAAN PROPER Sekretariat PROPER Kementerian Lingkungan Hidup
PELAKSANAAN PROPER 2012-2013 Sekretariat PROPER Kementerian Lingkungan Hidup MEKANISME DAN KRITERIA PROPER X KEUNGGULAN LINGKUNGAN S U B N I L A I Sistem Manajemen Lingkungan Efisiensi Energi Penurunan
Lebih terperinciBAB V KESIMPULAN DAN SARAN
83 BAB V KESIMPULAN DAN SARAN 5.1 Kesimpulan Dari perancangan berdasarkan perhitungan yang telah dilakukan, dapat diambil kesimpulan: 1. Untuk Organic Rankine Cycle alat penukar kalor yang biasa digunakan
Lebih terperinciBab IV Analisis Perancangan Struktur GRP Pipeline Berdasarkan ISO 14692
Bab IV Analisis Perancangan Struktur GRP Pipeline Berdasarkan ISO 14692 4.1 Flowchart Perancangan GRP Pipeline Menurut ISO 14692-3 bagian 7.10 perancangan sistem perpipaan dengan menggunakan material komposit
Lebih terperinciPERENCANAAN STRUKTUR DERMAGA PETI KEMAS TELUK LAMONG TANJUNG PERAK SURABAYA JAWA TIMUR
PERENCANAAN STRUKTUR DERMAGA PETI KEMAS TELUK LAMONG TANJUNG PERAK SURABAYA JAWA TIMUR Faris Muhammad Abdurrahim 1 Pembimbing : Andojo Wurjanto, Ph.D 2 Program Studi Sarjana Teknik Kelautan Fakultas Teknik
Lebih terperinciJurnal Pengembangan Teknologi Informasi dan Ilmu Komputer e-issn: X
Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer e-issn: 2548-964X Vol. 2, No. 1, Januari 2018, hlm. 184-189 http://j-ptiik.ub.ac.id Klasifikasi Standar Produk Baja PT. Krakatau Steel (Persero)
Lebih terperinciBAB IV DATA SISTEM PIPELINE DAERAH PORONG
BAB IV DATA SISTEM PIPELINE DAERAH PORONG Sistem pipeline yang dipilih sebagai studi kasus adalah sistem pipeline yang terdapat di daerah Porong, Siodarjo, Jawa Timur yang lokasinya berdekatan dengan daerah
Lebih terperinciPREHEATER ENGINEERING. MANUFACTURING Material According to ASME BPV Code Section II Manufacturing by precision machine (CNC)
PREHEATER Heat Exchange: up to 500 kw MAWP: up to 25 bar Design Pressure: 30 bar Test Pressure: 32 bar Hot Fluid: Brine Water Cold Fluid: Hydrocarbon CONDENSOR Heat Exchange: 0.1 up 200 MW MAWP: max 1.5
Lebih terperinciAnalisa Kegagalan U Fire Tube Heater Treater di Santan Terminal Chevron Indonesia Company
JURNAL TEKNIK POMITS Vol. 1, No. 1, (2013) 1-5 1 Analisa Kegagalan U Fire Tube Heater Treater di Santan Terminal Chevron Indonesia Company Dyan Ratna Mayangsari dan Rochman Rochiem Teknik Material dan
Lebih terperinciRC Evaluasi dan Re-Design Breakwater Untuk Pelabuhan Penyeberangan (Feri) Waikelo, Kabupaten Sumba Barat, Nusa Tenggara Timur.
RC09-1336 Evaluasi dan Re-Design Breakwater Untuk Pelabuhan Penyeberangan (Feri) Waikelo, Kabupaten Sumba Barat, Nusa Tenggara Timur. Oleh: Gorbachev Partahi Bonar 3110100106 Dosen Pembimbing : Ir. Fuddoly,
Lebih terperinciPENGARUH TULANGAN CRT DAN TULANGAN BJTD PADA KOMPONEN LENTUR DENGAN MUTU BETON F C 24,52 MPA (182S)
PENGARUH TULANGAN CRT DAN TULANGAN BJTD PADA KOMPONEN LENTUR DENGAN MUTU BETON F C 24,52 MPA (182S) Eri Andrian Yudianto, Sudiman Indra Dosen Program Studi Sipil S-1, Fakultas Teknik Sipil dan Perencanaan,
Lebih terperinci