Standard Specifcation

Ukuran: px
Mulai penontonan dengan halaman:

Download "Standard Specifcation"

Transkripsi

1

2 Standard Specifcation API SL (*) ASTM A252 ASTM A139 ASTM A283 Application Chemical Composition (%) Mechanical Strength C Mn P S Ultimate Tensile Strength max max max max Psi N/mm2 Psi N/mm2 A , , A , , B , , X , , X46 Oil & Gas , , X52 Line Pipe , , X , , X , , X , , X , , Steel Pipe , , Piles , , A , , B , , Steel Pipe C , , Piles D , , E , , A , , , B , , Steel pipe 65, C Piles , , , D , , , ASTM A53 A Electric , , Resistance Welded B , , ASTM A134 JIS A5525 JIS A5530 SKK 41/400 Steel Pipe SKK Piles 50/490 SKY 41/400 Steel Pipe SKY Piles 50/490 The Steel Conform to ASTM A , , , , , , , , JIS G3444 JIS G3101 AWWA C200 STK 30/290 STK 41/400 STK 51/500 STK 50/490 STK 55/540 General Structural Purpose , , , , , , , , , SS , , , SS 400 General , , Structural 73, SS 490 Purpose , , , SS , , The Steel Conform to ASTM A283 BS EN 10025** S 355 J0 S 355 Jr General Structural Purpose 0.20 (2)(3) , / , / / /630

3 Nominal Size : Dia. 1/2" - 20" Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa 1/ /STD / /STD /STD / /STD / /STD /STD / /STD /STD /STD /STD , /STD /STD

4 Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa STD /STD /STD /XS STD XS

5 Nominal Size In Outside Wall Test Pressure Weight Thickness Sch.No. A B In mm In mm lbs/ft kg/m psi kpa psi kpa /STD /XS ASTM A53 Carbon Manganase Phosphorus Sulfur Copper Nickel Chronium Molybdenum Vanadium Cu+Ni+Cr+Mo+V A B Yield Strength (mm) Tensile Strength (mm) A 30,000 ps (205 Mpa) 48,000 psi (330 Mpa) B 35,000 ps (240 Mpa) 60,000 psi (415 Mpa)

6 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT

7 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (mm) (in) (kg/m) d (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT

8 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT

9 Nominal Size Specified Outside Specified Wall Thickness Weight Calculated Inside Minimum Test Pressure (kpa x 100) D (mm) (in) (kg/m) d (mm) (mm) A B X42 X46 X52 X56 X60 X65 X70 X STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT STD ALT

10 Medium Luar Nominal Size Minimum Maximum Tebal Berat In mm in mm in mm mm Kg/m 1/ / / / / Karbon Manganase Sulfur Phasporus 0.20 % Max 1.20 % Max % Max % Max Batas Mulur (N/mm2) Kuat Tarik (N/mm2) Regangan (Min) %

11 1. Spiral Line Pipe In Oil & Gas Industry No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. PT JOB Pertamina-Medco E&P Tomori Sulawesi /Konstruksi Sipil Tomori Sulawesi 36, , ASTM A252 Gr PT Tripatra Engineers & Constructors/Senoro Development Project 30 17, API 5 L PSL PT PGN, Tbk/CP 10 project 24 14, API 5 L X65 4. PT Pertagas/ Arun Belawan Project 24 12, API 5 L X52 5. PT Pertamina EP ASTM A252 Gr Medco Tomori 36 19, ASTM A252 Gr Total E&P Indonesie 16 12,7 421 ASTM A252 Gr PT. PGN Region Jawa 16 16, API 5 L X Byucksan Engineering Co. Tld, KSO 16 12, API 5 L X Spiral SAW Pile Pipe No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. Mitsui & co (Australia) Ltd/LNG-PNG Papua Nugini 12,18,24 12, ASTM A252 Gr PT Adhi Karya/Pelabuhan Teluk Lamong, Jawa Timur 32,40 12,14, ASTM A PT. Posco E&C Indonesia/Krakatau-Posco, Cilegon 22,28 9, ASTM A252 Gr Performance Pipe Sdn. Bhd/SLNG Secondary Berth, Malaysia 56, 36 22, BSEN PT KBS/ Jetty Dermaga 5, 6 & access road project, 35, 40 12, ASTM A252 Gr PT Agro Nusa Abadi/ Astra Agro Project ASTM A252 Gr PT Great Color Energy/ PLTM Bungin 47 6 dan AWWA C PT Wijaya Karya (Persero), Tbk/ Tanjung Uban 36,40 14, 16, 18, ASTM A252 Gr PT Wijaya Karya (Persero), Tbk/ Pulau Sambu 28, 32, 40 14, ASTM A252 Gr PT Waskita Karya/ Pelabuhan Kuala Tanjung ASTM A252 Gr PT Pembangunan Perumahan (Persero)/ Pelabuhan Kuala Tanjung ASTM A252 Gr

12 3. ERW/HFRW line Pipe No. Customer / Project 0D (inch) Thickness (mm) Volume (Ton) Spec Year 1. PT Tripatra/NGL Project-Pertagas ,898 API 5L Gr. B PT. Energi Equity Epic (Sengkang) /CoatedLinepipe Project ,276 API 5L Gr. B PT. Chevron Pasivic Indonesia /Blanket Purchase Contract ,000 API 5L Gr. B & ASTM A.252 Gr Conoco Philips /Letang Tengah Rawa Optimization (LTRO) ,804 API 5L X-52 (Sour Service) PT PGN (Persero), Tbk 12, ,12.7 3,659 API 5 L PSL PT Chevron Pasivic Indonesia/Blanket Purchase Contract API 5L Gr. B & ASTM A.252 Gr Conoco Philips/ Letang Tengah Rawa Optimization (LTRO) API 5L X-52 (Sour Service) PT PGN (Persero), Tbk 12, , API 5 L PSL Salamander Energy (Bangkanai) Ltd 4 6, API 5 L X PT Pertamina/ Pertamina gas kota project 8 8, API 5L Gr.B 11. PT PGN Tbk/PGN SBU II Project 12 9, API 5L Gr.B PT Wijaya Karya (Persero), Tbk/ Tanjung Uban ASTM A53 Gr A&B PT Wijaya Karya (Persero), Tbk/ Pulau Sambu API 5 L PSL PT Chevron Pacific Indonesia/ Petapahan Kota Batak Project & API 5 L X PT Pertamina (Persero)/ Avtur Soekarno Hatta Terminal , API 5L Gr.B Coating No. Customer / Coating Type 0D (inch) Volume (Ton) Year 1. Conoco Philips/Letang Tengah Rawa Optimization (LTRO)/ 3LPE PT Pertagas/3LPE CV Cahaya Budi Perkasa/TOTAL E&P INDONESIE/CWC PT PGN, Tbk/ CP 7, 9 & 10 Project/ 3LPE & Internal Epoxy PT Citra Panji Manunggal/ Talisman Project/ FBE& CWC PT Pertamina/ Pertamina gas kota project/ Asphalt Enemel PT Raga Perkasa Ekaguna/ CNOOC Project/3LPE&CWC PT. PGN Region Jawa Konsorsium WIKA - Rabana Kelsri/ Gresik Semarang - Pertagas Project PT Menara Gading Putih/ Porong Grati - Pertagas Project JO. Consorsium PCS/ Husky Project

13

14

15

16

Steel Pipe Product Specifications Electric Resistance Welded (ERW) Pipe

Steel Pipe Product Specifications Electric Resistance Welded (ERW) Pipe ASTM A 53 (A) Outside Test Pressure Sch DN NPS Psi Kg/cm 2 3/4" 26.7 2.87 700 49 25 1" 33.4 3.38 700 49 * Carbon (C) : 0.25 % max 32 11/4" 42.2 3.56 10 85 * Pospor (p) : 0.05 % max 11/2" 48.3 3.68 10 85

Lebih terperinci

1.1 PENGALAMAN KERJA SEJENIS 10 TAHUN TERAKHIR

1.1 PENGALAMAN KERJA SEJENIS 10 TAHUN TERAKHIR 1.1 PENGALAMAN KERJA SEJENIS 10 TAHUN TERAKHIR Tabel Error! No text of specified style in document..1 Daftar Pengalaman Sejenis 10 (Sepuluh) Tahun Terakhir No. Pengguna Jasa / 1 2 3 4 5 6 7 8 1 PT Surveyor

Lebih terperinci

BAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk

BAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk BAB I PENDAHULUAN Sistem Perpipaan merupakan bagian yang selalu ada dalam industri masa kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk mentransportasikan fluida adalah dengan

Lebih terperinci

BAB I TINJAUAN UMUM PT. OSTRADA INDONESIA

BAB I TINJAUAN UMUM PT. OSTRADA INDONESIA BAB I TINJAUAN UMUM PT. OSTRADA INDONESIA 1.1. Sejarah Perusahaan PT. Ostrada Indonesia didirikan pada tahun 2013 di Jakarta. PT. Ostrada Indonesia adalah Konsultan dan Jasa Engineering yang memiliki kemampuan

Lebih terperinci

BAB III METODE PENELITIAN. Diagram alir studi perencanaan jalur perpipaan dari free water knock out. Mulai

BAB III METODE PENELITIAN. Diagram alir studi perencanaan jalur perpipaan dari free water knock out. Mulai BAB III METODE PENELITIAN 3.1. Diagram Alir ( Flow Chart ) Diagram alir studi perencanaan jalur perpipaan dari free water knock out (FWKO) ke pump suction diberikan pada Gambar 3.1 Mulai Perumusan Masalah

Lebih terperinci

BAB III ANALISA DAN PEMBAHASAN

BAB III ANALISA DAN PEMBAHASAN BAB III ANALISA DAN PEMBAHASAN 3.1. Perhitungan Ketebalan Pipa (Thickness) Penentuan ketebalan pipa (thickness) adalah suatu proses dimana akan ditentukan schedule pipa yang akan digunakan. Diameter pipa

Lebih terperinci

Gambar 5. 1 Sistem Pipeline milik Vico Indonesia

Gambar 5. 1 Sistem Pipeline milik Vico Indonesia BAB IV Studi Kasus Pada bab ini dilakukan studi kasus untuk menghitung kategori resiko dalam sebuah pipeline. Pada kesempatan kali ini penulis mengambil pipeline milik Vico Indonesia sebagai contoh untuk

Lebih terperinci

BAB IV ANALISA DAN PEMBAHASAN. dalam tugas akhir ini adalah sebagai berikut : Document/Drawing Number. 2. TEP-TMP-SPE-001 Piping Desain Spec

BAB IV ANALISA DAN PEMBAHASAN. dalam tugas akhir ini adalah sebagai berikut : Document/Drawing Number. 2. TEP-TMP-SPE-001 Piping Desain Spec BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem pemipaan dengan menggunakan program Caesar

Lebih terperinci

BAB IV DATA SISTEM PERPIPAAN HANGTUAH

BAB IV DATA SISTEM PERPIPAAN HANGTUAH BAB IV DATA SISTEM PERPIPAAN HANGTUAH 4.1. Sistem Perpipaan 4.1.1. Lokasi Sistem Perpipaan Sistem perpipaan yang dianalisis sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan milik Conoco

Lebih terperinci

Tabel III-2 Perusahaan-perusahaan sektor hulu perminyakan di Indonesia

Tabel III-2 Perusahaan-perusahaan sektor hulu perminyakan di Indonesia LAMPIRAN 1 Tabel III-2 Perusahaan-perusahaan sektor hulu perminyakan di Indonesia No. NAMA PERUSAHAAN LOKASI PERUSAHAAN 1 Amerada Hess 2 Anadarko 3 Asia Petroleum 4 PT BOB Bumi Siak Pusako-Pertamina EP

Lebih terperinci

BESI ASSENTAL (ST 41) SHAFTING 6M

BESI ASSENTAL (ST 41) SHAFTING 6M BESI ASSENTAL (ST 41) SHAFTING BAR @ 6M SIZE WEIGHT D 1/4" (6 mm) = 6 M 1.50 Kg 5/16" (8 mm) = 6 M 2.50 Kg 3/8" (10 mm) = 6 M 3.50 Kg 1/2" (13 mm) = 6 M 6.00 Kg 5/8" (16 mm) = 6 M 9.50 Kg 3/4" (19 mm)

Lebih terperinci

ANALISA PENGARUH FLYWHEEL DAN FIRING ORDER TERHADAP PROSES KERJA MESIN DIESEL

ANALISA PENGARUH FLYWHEEL DAN FIRING ORDER TERHADAP PROSES KERJA MESIN DIESEL ANALISA PENGARUH FLYWHEEL DAN FIRING ORDER TERHADAP PROSES KERJA MESIN DIESEL Oleh: Adin Putra Rachmawan (4210 100 086) Pembimbing 1 : DR. I Made Ariana, S.T., M.T. Pembimbing 2 : Ir. Indrajaya Gerianto,

Lebih terperinci

BAB III DATA DESAIN DAN HASIL INSPEKSI

BAB III DATA DESAIN DAN HASIL INSPEKSI BAB III DATA DESAIN DAN HASIL INSPEKSI III. 1 DATA DESAIN Data yang digunakan pada penelitian ini adalah merupakan data dari sebuah offshore platform yang terletak pada perairan Laut Jawa, di utara Propinsi

Lebih terperinci

PT. INDO KAYA ENERGI

PT. INDO KAYA ENERGI PT. INDO KAYA ENERGI EXECUTIVE SUMMARY PT. INDO KAYA ENERGI (IKE) TELAH BERDIRI DI INDONESIA PADA TAHUN 2005 UNTUK MENYEDIAKAN KEBUTUHAN BARANG DAN JASA INDUSTRI MIGAS DI INDONESIA. IKE MERUPAKAN PERUSAHAAN

Lebih terperinci

BAB IV PERHITUNGAN ANALISA DAN PEMBAHASAN

BAB IV PERHITUNGAN ANALISA DAN PEMBAHASAN BAB IV PERHITUNGAN ANALISA DAN PEMBAHASAN 4.1 Perhitungan Bejana Tekan Seperti yang diuraikan pada BAB II, bahwa bejana tekan yang dimaksud dalam penyusunan tugas akhir ini adalah suatu tabung tertutup

Lebih terperinci

ANALISA KEGAGALAN PIPA BAJA TAHAN KARAT 316L DI BANGUNAN LEPAS PANTAI PANGKAH-GRESIK

ANALISA KEGAGALAN PIPA BAJA TAHAN KARAT 316L DI BANGUNAN LEPAS PANTAI PANGKAH-GRESIK ANALISA KEGAGALAN PIPA BAJA TAHAN KARAT 316L DI BANGUNAN LEPAS PANTAI PANGKAH-GRESIK SALMON PASKALIS SIHOMBING NRP 2709100068 Dosen Pembimbing: Dr. Hosta Ardhyananta S.T., M.Sc. NIP. 198012072005011004

Lebih terperinci

BAJA TULANGAN BETON BERSTANDAR SNI 2052:2014

BAJA TULANGAN BETON BERSTANDAR SNI 2052:2014 BAJA TULANGAN BETON BERSTANDAR SNI 2052:2014 Video Hot Rolling pabrik DELI Baja berbentuk batang berpenampang bundar dengan permukaan polos dan sirip yang digunakan untuk penulangan beton, yang

Lebih terperinci

PANDUAN PERHITUNGAN TEBAL PIPA

PANDUAN PERHITUNGAN TEBAL PIPA PANDUAN PERHITUNGAN TEBAL PIPA 1.1 Alur Analisa Untuk mendesain sebuah pipa yang akan digunakan untuk moda distribusi, hal pertama yang perlu dilakukan adalah menghitung tebal pipa minimum yang paling

Lebih terperinci

Abstrak. Kata kunci: Hydrotest, Faktor Keamanan, Pipa, FEM ( Finite Element Method )

Abstrak. Kata kunci: Hydrotest, Faktor Keamanan, Pipa, FEM ( Finite Element Method ) PERBANDINGAN PRESSURE AKTUAL HYDROTEST WELDING PIPE API 5L B PSL 1 ERW SCH 10 Ø30 TERHADAP TEGANGAN LULUH DENGAN SIMULASI NUMERIK METODE FEM ( FINITE ELEMENT METHOD ) Muhammad Irawan *, Nurul Laili Arifin

Lebih terperinci

ALTERNATIF PENGGUNAAN PIPA PSL 1 SEBAGAI PENGGANTI PIPA PSL 2 PADA PROYEK DEPOT LPG Galuh Renggani Wilis Prodi Teknik Mesin Fakultas Teknik Universitas Pancasakti Tegal Jalan Halmahera KM.1 Tegal,Telp

Lebih terperinci

NAJA HIMAWAN

NAJA HIMAWAN NAJA HIMAWAN 4306 100 093 Ir. Imam Rochani, M.Sc. Ir. Hasan Ikhwani, M.Sc. ANALISIS PERBANDINGAN PERANCANGAN PADA ONSHORE PIPELINE MENGGUNAKAN MATERIAL GLASS-REINFORCED POLYMER (GRP) DAN CARBON STEEL BERBASIS

Lebih terperinci

BAB IV ANALISA DAN PEMBAHASAN. melakukan perancangan sistem perpipaan dengan menggunakan program Caesar

BAB IV ANALISA DAN PEMBAHASAN. melakukan perancangan sistem perpipaan dengan menggunakan program Caesar BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem perpipaan dengan menggunakan program Caesar

Lebih terperinci

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA BAB IV PENGUMPULAN DAN PENGOLAHAN DATA 4.1. Data-data Awal ( input ) untuk Caesar II Adapun parameter-parameter yang menjadi data masukan (di input) ke dalam program Caesar II sebagai data yang akan diproses

Lebih terperinci

Analisa Resiko Penggelaran Pipa Penyalur Bawah Laut Ø 6 inch

Analisa Resiko Penggelaran Pipa Penyalur Bawah Laut Ø 6 inch Analisa Resiko Penggelaran Pipa Penyalur Bawah Laut Ø 6 inch Oleh : NOURMALITA AFIFAH 4306 100 068 Dosen Pembimbing : Ir. Jusuf Sutomo, M.Sc Prof. Ir. Daniel M. Rosyid, Ph.D Agenda Presentasi : Latar Belakang

Lebih terperinci

BAB IV ANALISA DAN PERHITUNGAN

BAB IV ANALISA DAN PERHITUNGAN BAB IV ANALISA DAN PERHITUNGAN 4.1 Perhitungan Ketebalan Minimum ( Minimum Wall Thickess) Dari persamaan 2.13 perhitungan ketebalan minimum dapat dihitung dan persamaan 2.15 dan 2.16 untuk pipa bending

Lebih terperinci

ANALISIS PENGARUH PEMOTONGAN PLASMA FLAME CUTTING BAJA PLAT JIS G 3101 SS 400 TERHADAP KEKUATAN TARIKNYA

ANALISIS PENGARUH PEMOTONGAN PLASMA FLAME CUTTING BAJA PLAT JIS G 3101 SS 400 TERHADAP KEKUATAN TARIKNYA ANALISIS PENGARUH PEMOTONGAN PLASMA FLAME CUTTING BAJA PLAT JIS G 3101 SS 400 TERHADAP KEKUATAN TARIKNYA Sahlan Jurusan Teknik Mesin S1 STT-PLN Email: Sahlan_1956@yahoo.com Abstrak Pada analisis pengaruh

Lebih terperinci

SIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI. Arif Rahman H ( )

SIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI. Arif Rahman H ( ) SIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI Arif Rahman H (4305 100 064) Dosen Pembimbing : 1. Ir. Hasan Ikhwani, M.Sc 2. Ir. Daniel M. Rosyid, Ph.D Materi

Lebih terperinci

ANALISA TROUBLESHOOTING PENYUMBATAN PIPA PRODUKSI DENGAN METODE FLUSHING PADA SUMUR KW 71 PT PERTAMINA EP FIELD CEPU

ANALISA TROUBLESHOOTING PENYUMBATAN PIPA PRODUKSI DENGAN METODE FLUSHING PADA SUMUR KW 71 PT PERTAMINA EP FIELD CEPU LAPORAN FIELD PROJECT ANALISA TROUBLESHOOTING PENYUMBATAN PIPA PRODUKSI DENGAN METODE FLUSHING PADA SUMUR KW 71 PT PERTAMINA EP FIELD CEPU OLEH: WILDHAN ARIF KURNIAWAN NRP. 6308030017 DOSEN PEMBIMBING

Lebih terperinci

PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR

PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR P3 PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR II P3 PIPELINE STRESS ANALYSIS ON THE ONSHORE DESIGN

Lebih terperinci

BAB I. PENDAHULUAN. Minyak bumi adalah suatu senyawa hydrocarbon yang terdiri dari karbon (83-87%),

BAB I. PENDAHULUAN. Minyak bumi adalah suatu senyawa hydrocarbon yang terdiri dari karbon (83-87%), BAB I. PENDAHULUAN 1.1. Latar Belakang Masalah Minyak bumi adalah suatu senyawa hydrocarbon yang terdiri dari karbon (83-87%), Hydrogen (11-14%), Nitrogen (0.2 0.5%), Sulfur (0-6%), dan Oksigen (0-5%).

Lebih terperinci

ineka Inovasi Nusantara

ineka Inovasi Nusantara ineka Inovasi Nusantara Tentang Kami PT. Bineka Inovasi Nusantara adalah perusahaan berkembang di indonesia. Saat ini kami menyediakan layanan jasa teknis, konsultasi, Instalasi dan konstruksi dalam dunia

Lebih terperinci

PENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa?

PENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa? PENDAHULUAN Korosi yang menyerang sebuah pipa akan berbeda kedalaman dan ukurannya Jarak antara korosi satu dengan yang lain juga akan mempengaruhi kondisi pipa. Dibutuhkan analisa lebih lanjut mengenai

Lebih terperinci

PENGARUH PWHT DAN NON PWHT DENGAN LAS SMAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A-106 GRADE B

PENGARUH PWHT DAN NON PWHT DENGAN LAS SMAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A-106 GRADE B SIDANG TUGAS AKHIR PENGARUH PWHT DAN NON PWHT DENGAN LAS SMAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A-106 GRADE B P E M B I M B I N G : I R. R O C H M A N R O C H I E M, M. S C Oleh

Lebih terperinci

OPTIMASI DESAIN ELBOW PIPE

OPTIMASI DESAIN ELBOW PIPE OPTIMASI DESAIN ELBOW PIPE PADA JARINGAN PIPA TRANSPORTASI MIGAS MILIK JOINT OPERATING BODY PERTAMINA-PETROCHINA EAST JAVA (JOB P-PEJ) TUBAN DENGAN BERBASIS KEANDALAN S. M. Yusuf 1, D. M. Rosyid 2, H.

Lebih terperinci

BAB III METODE PENELITIAN

BAB III METODE PENELITIAN BAB III METODE PENELITIAN 3.1. Diagram Alir ( Flow Chart ) Mulai Perumusan Masalah Mengetahui tegangan pada system perpipaan & mengetahui jumlah penyangga pipa (pipe support) Penyiapan data yang di masukan

Lebih terperinci

SEPARATOR. Nama Anggota: PITRI YANTI ( } KARINDAH ADE SYAPUTRI ( ) LISA ARIYANTI ( )

SEPARATOR. Nama Anggota: PITRI YANTI ( } KARINDAH ADE SYAPUTRI ( ) LISA ARIYANTI ( ) SEPARATOR Nama Anggota: PITRI YANTI (03121403032} KARINDAH ADE SYAPUTRI (03121403042) LISA ARIYANTI (03121403058) 1.Separator Separator merupakan peralatan awal dalam industri minyak yang digunakan untuk

Lebih terperinci

ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE

ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE Oleh: WIRA YUDHA NATA 4305 100 014 JURUSAN TEKNIK KELAUTAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2010 ANALISA

Lebih terperinci

ANDHIKA HARIS NUGROHO NRP

ANDHIKA HARIS NUGROHO NRP LABORATORIUM KEANDALAN DAN KESELAMATAN JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER ANALISIS TEGANGAN TERHADAP RISIKO TERJADINYA BUCKLING PADA PROSES

Lebih terperinci

Baja profil kanal U proses canai panas (Bj P kanal U)

Baja profil kanal U proses canai panas (Bj P kanal U) Standar Nasional Indonesia Baja profil kanal U proses canai panas (Bj P kanal U) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii 1 Ruang lingkup... 1 2 Acuan normatif...

Lebih terperinci

H R L T Length of a structural bolt is measured from the underhead bearing surface to the extreme end of the bolt. Width Across Corners

H R L T Length of a structural bolt is measured from the underhead bearing surface to the extreme end of the bolt. Width Across Corners Cap Screws & Bolts Head and Thread Dimensions A325 & A490 Structural Bolts H R H R F E E G o 30 +0-15 Y L Cut Thread L T o 30 +0-15 Y L T L Rolled Thread Length of a structural bolt is measured from the

Lebih terperinci

Bab 3 Data Operasi Sistem Perpipaan pada Topside Platform

Bab 3 Data Operasi Sistem Perpipaan pada Topside Platform Bab 3 Data Operasi Sistem Perpipaan pada Topside Platform Pada area pengeboran minyak dan gas bumi Lima, Laut Jawa milik British Petrolium, diketahui telah mengalami fenomena subsidence pada kedalaman

Lebih terperinci

PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA ABSTRAK

PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA ABSTRAK PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA Dedy Haryanto, Sagino, Riswan Djambiar Pusat Teknologi Reaktor dan Keselamatan Nuklir ABSTRAK PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA. Telah dilakukan

Lebih terperinci

Baja profil siku sama kaki proses canai panas (Bj P Siku sama kaki)

Baja profil siku sama kaki proses canai panas (Bj P Siku sama kaki) Standar Nasional Indonesia Baja profil siku sama kaki proses canai panas (Bj P Siku sama kaki) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii 1 Ruang lingkup... 1

Lebih terperinci

BAB III METODOLOGI PENELITIAN

BAB III METODOLOGI PENELITIAN BAB III METODOLOGI PENELITIAN 3.1 Nilai-nilai Desain Dalam melakukan suatu proses kerja, maka diperlukan suatu perencanaan yang benar-benar matang. Hal ini sangat penting guna memberi arahan dalam proses

Lebih terperinci

BAB I LATAR BELAKANG

BAB I LATAR BELAKANG 1 BAB I LATAR BELAKANG 1.1. Latar Belakang Dalam pengalokasian sumber dana untuk pelaksanaan proyek, material merupakan sumber daya yang mengadopsi terbesar sumber dana proyek. Manajemen material di bidang

Lebih terperinci

ANALISA STABILITAS SUBSEA CROSSING GAS PIPELINE DENGAN SUPPORT PIPA BERUPA CONCRETE MATTRESS DAN SLEEPER

ANALISA STABILITAS SUBSEA CROSSING GAS PIPELINE DENGAN SUPPORT PIPA BERUPA CONCRETE MATTRESS DAN SLEEPER ANALISA STABILITAS SUBSEA CROSSING GAS PIPELINE DENGAN SUPPORT PIPA BERUPA CONCRETE MATTRESS DAN SLEEPER (Studi Kasus Crossing Pipa South Sumatera West Java (SSWJ) milik PT.Perusahaan Gas Negara (Persero)

Lebih terperinci

Workshop CIVD (Centralized Integrated Vendor Database)

Workshop CIVD (Centralized Integrated Vendor Database) SATUAN KERJA KHUSUS PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI (SKKMIGAS) Workshop CIVD (Centralized Integrated Vendor Database) VENDORS DAY BERSAMA EAST JAVA 2017 Batu - Malang, 28 July 2017 Latar

Lebih terperinci

LAMPIRAN 1 Data Perusahaan yang Terdaftar di IICG yang Mempublikasikan Laporan Keuangan Periode

LAMPIRAN 1 Data Perusahaan yang Terdaftar di IICG yang Mempublikasikan Laporan Keuangan Periode LAMPIRAN 1 Data Perusahaan yang Terdaftar di IICG yang Mempublikasikan Laporan Keuangan Periode 2010-2012 No Nama Perusahaan Terdaftar di CGPI Mempublikasikan Laporan Keterangan Periode 2010-2012 Keuangan

Lebih terperinci

LAMPIRAN A SPESIFIKASI TEKNIS AIR MINUM PARAMETER STANDARD DAN SPESIFIKASI. Unit Air Baku

LAMPIRAN A SPESIFIKASI TEKNIS AIR MINUM PARAMETER STANDARD DAN SPESIFIKASI. Unit Air Baku LAMPIRAN A SPESIFIKASI TEKNIS AIR MINUM NO PARAMETER STANDARD DAN SPESIFIKASI 1 Unit Air Baku 1. 1.Peraturan Pemerintah No 82/2001 tentang Pengelolaan Kualitas Air dan Pengendalian Pencem 2. 2.Metode Pengambilan

Lebih terperinci

Bab III Data Perancangan GRP Pipeline

Bab III Data Perancangan GRP Pipeline Bab III Data Perancangan GRP Pipeline 3.2 Sistem Perpipaan Sistem perpipaan yang dirancang sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan penyalur fluida cair yaitu crude dan well fluid

Lebih terperinci

KAJIAN TEGANGAN DAN KEAMANAN TABUNG GAS ELPIJI BRIGHT GAS 5,5 KG MELALUI SIMULASI SOFTWARE SOLID WORK

KAJIAN TEGANGAN DAN KEAMANAN TABUNG GAS ELPIJI BRIGHT GAS 5,5 KG MELALUI SIMULASI SOFTWARE SOLID WORK KAJIAN TEGANGAN DAN KEAMANAN TABUNG GAS ELPIJI BRIGHT GAS 5,5 KG MELALUI SIMULASI SOFTWARE SOLID WORK Iwan Agustiawan1*, Muhammad Noor Widdy 2 1,2 Teknik Mesin Institut Teknologi Nasional Bandung, Jalan

Lebih terperinci

4 BAB IV PERHITUNGAN DAN ANALISA

4 BAB IV PERHITUNGAN DAN ANALISA 4 BAB IV PERHITUNGAN DAN ANALISA 4.1 Data Penelitian Data material pipa API-5L Gr B ditunjukkan pada Tabel 4.1, sedangkan kondisi kerja pada sistem perpipaan unloading line dari jetty menuju plan ditunjukan

Lebih terperinci

ANALISA SISA UMUR PEMAKAIAN (REMAINING LIFE ASSESMENT) AIR RECEIVER COMPRESSOR TANK MENGGUNAKAN METODE ULTRASONIC TEST ABSTRAK

ANALISA SISA UMUR PEMAKAIAN (REMAINING LIFE ASSESMENT) AIR RECEIVER COMPRESSOR TANK MENGGUNAKAN METODE ULTRASONIC TEST ABSTRAK ANALISA SISA UMUR PEMAKAIAN (REMAINING LIFE ASSESMENT) AIR RECEIVER COMPRESSOR TANK MENGGUNAKAN METODE ULTRASONIC TEST Fuad Khoirul 1, Muh Amin 2, Muhammad Subri 3 ABSTRAK Pengurangan ketebalan material

Lebih terperinci

ANALISIS KEKUATAN COMPRESIVE NATURAL GAS (CNG) CYLINDERS MENGGUNAKAN METODE ELEMEN HINGGA

ANALISIS KEKUATAN COMPRESIVE NATURAL GAS (CNG) CYLINDERS MENGGUNAKAN METODE ELEMEN HINGGA ANALISIS KEKUATAN COMPRESIVE NATURAL GAS (CNG) CYLINDERS MENGGUNAKAN METODE ELEMEN HINGGA Khoirul Huda 1), Luchyto Chandra Permadi 2) 1),2) Pendidikan Teknik Mesin Jl. Semarang 6 Malang Email :khoirul9huda@gmail.com

Lebih terperinci

POTENSI GAS ALAM DI INDONESIA

POTENSI GAS ALAM DI INDONESIA POTENSI GAS ALAM DI INDONESIA POTENSI GAS ALAM DI INDONESIA M. Hasan Syukur *) ABSTRAK Gas bumi merupakan sumber daya alam dengan cadangan terbesar ketiga di dunia setelah batu bara dan minyak bumi. Gas

Lebih terperinci

Bab 6 DESAIN PENULANGAN

Bab 6 DESAIN PENULANGAN Bab 6 DESAIN PENULANGAN Laporan Tugas Akhir (KL-40Z0) Desain Dermaga General Cargo dan Trestle Tipe Deck On Pile di Pulau Kalukalukuang Provinsi Sulawesi Selatan 6.1 Teori Dasar Perhitungan Kapasitas Lentur

Lebih terperinci

TEKNIK MESIN MESIN COMPRESSION MOLDING No 1 A3

TEKNIK MESIN MESIN COMPRESSION MOLDING No 1 A3 LMPIRN 8 6 F F E DETIL SCLE : DETIL SCLE : E D 8 0 0 9 8 8 Spring olt & nut JIS M Selang PVC Tanki tekan Katup Kontrol Piston kompressor ST Generic D C 9 6 6 9 0 6 0 9 8 6 No Jml Klem Tubular Heater Mold

Lebih terperinci

Oleh I Komang Ardo Awamasu Dosen Pembimbing : Ir. Rochman Rochiem, M.Sc.

Oleh I Komang Ardo Awamasu Dosen Pembimbing : Ir. Rochman Rochiem, M.Sc. PENGARUH PWHT DAN NON PWHT DENGAN LAS GTAW TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO PADA PIPA ASTM A106 GRADE B Oleh I Komang Ardo Awamasu 270910009 Dosen Pembimbing : Ir. Rochman Rochiem, M.Sc. Jurusan

Lebih terperinci

UJIAN P3 TUGAS AKHIR 20 JULI 2010

UJIAN P3 TUGAS AKHIR 20 JULI 2010 UJIAN P3 TUGAS AKHIR 20 JULI 2010 ANALISA RISIKO TERHADAP PIPA GAS BAWAH LAUT KODECO AKIBAT SCOURING SEDIMEN DASAR LAUT OLEH : REZHA RUBBYANTO 4306.100.026 DOSEN PEMBIMBING : 1. Dr. Ir. Wahyudi, M. Sc

Lebih terperinci

Spesifikasi baut mutu tinggi untuk penyambung struktur baja

Spesifikasi baut mutu tinggi untuk penyambung struktur baja Spesifikasi baut mutu tinggi untuk penyambung struktur baja 1 Ruang lingkup Spesifikasi ini memuat dua tipe baut mutu tinggi yaitu ukuran 1 dan lebih kecil untuk minimum kekuatan tarik 120 ksi dan 1 1½

Lebih terperinci

BAB IV ANALISA DAN PEMBAHASAN. Ketebalan pipa dapat berbeda-beda sesuai keadaan suatu sistem perpipaan.

BAB IV ANALISA DAN PEMBAHASAN. Ketebalan pipa dapat berbeda-beda sesuai keadaan suatu sistem perpipaan. BAB IV ANALISA DAN PEMBAHASAN 4.1 Perhitungan dan Analisa Tegangan 4.1.1 Perhitungan Ketebalan Minimum Ketebalan pipa dapat berbeda-beda sesuai keadaan suatu sistem perpipaan. Perbedaan ketebalan pipa

Lebih terperinci

Dosen Pembimbing: 1. Ir. Imam Rochani, M.Sc. 2. Ir. Handayanu, M.Sc., Ph.D.

Dosen Pembimbing: 1. Ir. Imam Rochani, M.Sc. 2. Ir. Handayanu, M.Sc., Ph.D. Sidang Tugas Akhir (P3) Surabaya, 7 Agustus 2014 PERANCANGAN RISER DAN EXPANSION SPOOL PIPA BAWAH LAUT: STUDI KASUS KILO FIELD PT. PERTAMINA HULU ENERGI OFFSHORE NORTHWEST JAVA Oleh: Hidayat Wusta Lesmana

Lebih terperinci

Analisis Kekuatan Struktur Konstruksi Tower untuk Catwalk dan Chain Conveyor pada Silo (Studi Kasus di PT. Srikaya Putra Mas)

Analisis Kekuatan Struktur Konstruksi Tower untuk Catwalk dan Chain Conveyor pada Silo (Studi Kasus di PT. Srikaya Putra Mas) Analisis Kekuatan Struktur Konstruksi Tower untuk Catwalk dan Chain Conveyor pada Silo (Studi Kasus di PT. Srikaya Putra Mas) Nur Azizah 1*, Muhamad Ari 2, Ruddianto 3 1 Program Studi Teknik Desain dan

Lebih terperinci

RSU KASIH IBU - EXTENSION STRUKTUR : BAB - 06 DAFTAR ISI PEKERJAAN KONSTRUKSI BAJA 01. LINGKUP PEKERJAAN BAHAN - BAHAN..

RSU KASIH IBU - EXTENSION STRUKTUR : BAB - 06 DAFTAR ISI PEKERJAAN KONSTRUKSI BAJA 01. LINGKUP PEKERJAAN BAHAN - BAHAN.. DAFTAR ISI 01. LINGKUP PEKERJAAN.. 127 02. BAHAN - BAHAN.. 127 03. SYARAT-SYARAT PELAKSANAAN...... 127 PT. Jasa Ferrie Pratama 126 01. Lingkup Pekerjaan Pekerjaan ini meliputi seluruh pekerjaan Konstruksi

Lebih terperinci

Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan Caesar II

Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan Caesar II JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: 2337-3539 (2301-9271 Print) F-168 Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan

Lebih terperinci

Perhitungan Teknis LITERATUR MULAI STUDI SELESAI. DATA LAPANGAN : -Data Onshore Pipeline -Data Lingkungan -Mapping Sector HASIL DESAIN

Perhitungan Teknis LITERATUR MULAI STUDI SELESAI. DATA LAPANGAN : -Data Onshore Pipeline -Data Lingkungan -Mapping Sector HASIL DESAIN MULAI STUDI LITERATUR DATA LAPANGAN : -Data Onshore Pipeline -Data Lingkungan -Mapping Sector DATA NON LAPANGAN : -Data Dimensi Anode -Data Harga Anode DESAIN MATERIAL ANODE DESAIN TIPE ANODE Perhitungan

Lebih terperinci

LAPORAN TUGAS AKHIR (KL-40Z0) Perancangan Dermaga dan Trestle Tipe Deck On Pile di Pelabuhan Garongkong, Propinsi Sulawesi Selatan. Bab 6.

LAPORAN TUGAS AKHIR (KL-40Z0) Perancangan Dermaga dan Trestle Tipe Deck On Pile di Pelabuhan Garongkong, Propinsi Sulawesi Selatan. Bab 6. LAPORAN TUGAS AKHIR (KL-40Z0) Perancangan Dermaga dan Trestle Tipe Deck On Pile di Pelabuhan Garongkong, Propinsi Sulawesi Selatan Bab 6 Penulangan Bab 6 Penulangan Perancangan Dermaga dan Trestle Tipe

Lebih terperinci

CREEP. Contoh komponen-komponen yang potensial mengalami creep adalah.

CREEP. Contoh komponen-komponen yang potensial mengalami creep adalah. CREEP Def. Deformasi Plastis yang terjadi sebagai akibat dari lingkungan yang bertemperatur tinggi dan tegangan static yang tetap dalam kurun waktu yang lama. Contoh komponen-komponen yang potensial mengalami

Lebih terperinci

BAB I PENDAHULUAN. digunakan di Indonesia dalam pembangunan fisik. Karena sifat nya yang unik. pembuatan, cara evaluasi dan variasi penambahan bahan.

BAB I PENDAHULUAN. digunakan di Indonesia dalam pembangunan fisik. Karena sifat nya yang unik. pembuatan, cara evaluasi dan variasi penambahan bahan. BAB I PENDAHULUAN I.1 Latar Belakang Masalah Beton merupakan salah satu bahan bangunan yang pada saat ini banyak digunakan di Indonesia dalam pembangunan fisik. Karena sifat nya yang unik diperlukan pengetahuan

Lebih terperinci

PERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK

PERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK TUGAS AKHIR KONVERSI ENERGI PERENCANAAN ULANG INSTALASI POMPA PENYALUR BASE OIL DI PT PERTAMINA PRODUCTION UNIT GRESIK Putra Aditiawan 2108030043 Dosen pembinmbing: Dr.Ir.Heru Mirmanto,MT GAMBAR INSTALASI

Lebih terperinci

KEBIJAKAN ALOKASI GAS BUMI UNTUK DALAM NEGERI

KEBIJAKAN ALOKASI GAS BUMI UNTUK DALAM NEGERI KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEBIJAKAN ALOKASI GAS BUMI UNTUK DALAM NEGERI Jakarta, 6 Februari 2014 I KONDISI HULU MIGAS 2 CADANGAN GAS BUMI (Status

Lebih terperinci

Disampaikan Dalam Rangka Diskusi Meja Bundar Tinjauan Persiapan Penerapan Standard EURO II Kendaraan Type Baru 2005

Disampaikan Dalam Rangka Diskusi Meja Bundar Tinjauan Persiapan Penerapan Standard EURO II Kendaraan Type Baru 2005 Disampaikan Dalam Rangka Diskusi Meja Bundar Tinjauan Persiapan Penerapan Standard EURO II Kendaraan Type Baru 2005 Direktorat Pengolahan dan Niaga Migas Direktorat Jenderal Minyak dan Gas Bumi Jakarta

Lebih terperinci

COMPANY PROFILE PT. CIDAS SUPRA METALINDO

COMPANY PROFILE PT. CIDAS SUPRA METALINDO COMPANY PROFILE PT. CIDAS SUPRA METALINDO COMPANY PROFILE Name : PT. CIDAS SUPRA METALINDO Established : February 1998 Bussines Line : Precision Metal Works Share Holders : PT. Banten Java Persada President

Lebih terperinci

Baja profil I-beam proses canai panas (Bj.P I-beam)

Baja profil I-beam proses canai panas (Bj.P I-beam) Standar Nasional Indonesia Baja profil I-beam proses canai panas (Bj.P I-beam) ICS 77.140.10 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii Pendahuluan... iii 1 Ruang lingkup...

Lebih terperinci

PENGARUH AIR LIMBAH PADA ADUKAN BETON TERHADAP KUAT TEKAN BETON NORMAL

PENGARUH AIR LIMBAH PADA ADUKAN BETON TERHADAP KUAT TEKAN BETON NORMAL PENGARUH AIR LIMBAH PADA ADUKAN BETON TERHADAP KUAT TEKAN BETON NORMAL Oleh : Armeyn Dosen Teknik Sipil Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Padang Abstrak Penggunaan air untuk campuran

Lebih terperinci

LAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II

LAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II LAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II Diajukan Guna Memenuhi Syarat Kelulusan Mata Kuliah Tugas Akhir

Lebih terperinci

MODUL 5. Addendum Perencanaan Lantai Kenderaan Dengan Corrugated Steel Plate STRUKTUR BAJA II. Dosen Pengasuh : Ir.

MODUL 5. Addendum Perencanaan Lantai Kenderaan Dengan Corrugated Steel Plate STRUKTUR BAJA II. Dosen Pengasuh : Ir. STRUKTUR BAJA II MODUL 5 Addendum Perencanaan Lantai Kenderaan Dengan Corrugated Steel Plate Dosen Pengasuh : Materi Pembelajaran : 1. Lantai dengan baja gelombang (Corrugated steel plate, CSP).. Material.

Lebih terperinci

Spesifikasi material baja tahan karat unit instalasi pengolahan air

Spesifikasi material baja tahan karat unit instalasi pengolahan air Standar Nasional Indonesia Spesifikasi material baja tahan karat unit instalasi pengolahan air ICS 91.140.60; 77.140.01 Badan Standardisasi Nasional Daftar isi Daftar isi... i Prakata... ii Pendahuluan...

Lebih terperinci

POTENSI GAS ALAM DI INDONESIA

POTENSI GAS ALAM DI INDONESIA POTENSI GAS ALAM DI INDONESIA M. Hasan Syukur *) ABSTRAK Gas bumi merupakan sumber daya alam dengan cadangan terbesar ketiga di dunia setelah batu bara dan minyak bumi. Gas alam pada awalnya tidak dikonsumsi

Lebih terperinci

BAB I PENDAHULUAN. 1.1 Latar Belakang. Sebagai salah satu komoditi strategis didalam pembangunan tidak dapat

BAB I PENDAHULUAN. 1.1 Latar Belakang. Sebagai salah satu komoditi strategis didalam pembangunan tidak dapat BAB I PENDAHULUAN 1.1 Latar Belakang Sebagai salah satu komoditi strategis didalam pembangunan tidak dapat dipungkiri bahwa ketersediaan bahan bakar minyak didalam negeri merupakan hal yang amat penting

Lebih terperinci

TUGAS PERANCANGAN PABRIK METHANOL DARI GAS ALAM DENGAN PROSES LURGI KAPASITAS TON PER TAHUN

TUGAS PERANCANGAN PABRIK METHANOL DARI GAS ALAM DENGAN PROSES LURGI KAPASITAS TON PER TAHUN EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA TUGAS PERANCANGAN PABRIK METHANOL DARI GAS ALAM DENGAN PROSES LURGI KAPASITAS 230000 TON PER TAHUN Oleh: ISNANI SA DIYAH L2C 008 064 MUHAMAD ZAINUDIN L2C

Lebih terperinci

III. METODE PENELITIAN. Penelitian dilakukan dibeberapa tempat, sebagai berikut:

III. METODE PENELITIAN. Penelitian dilakukan dibeberapa tempat, sebagai berikut: III. METODE PENELITIAN A. Tempat Penelitian Penelitian dilakukan dibeberapa tempat, sebagai berikut: 1. Pembuatan kampuh dan proses pengelasan dilakukan di Politeknik Negeri Lampung, Bandar Lampung, 2.

Lebih terperinci

EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA

EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA TUGAS PERANCANGAN PABRIK AMONIUM NITRAT DENGAN PROSES UHDE Oleh : Tika Pratiwi Lis Pudiastuti NIM NIM Y. Saptiana Oktari NIM L2C0 06 112 Zulfatus Saadah

Lebih terperinci

BAB I PENDAHULUAN. Teknik Material dan Metalurgi FTI-ITS

BAB I PENDAHULUAN. Teknik Material dan Metalurgi FTI-ITS BAB I PENDAHULUAN I.1 Latar Belakang Baja (steel) adalah material yang paling banyak dan umum digunakan di dunia industri, hal ini karena baja memberikan keuntungan keuntungan yang banyak yaitu pembuatannya

Lebih terperinci

PERANCANGAN TEKNIS BAUT BATUAN BERDIAMETER 39 mm DENGAN KEKUATAN PENOPANGAN kn LOGO

PERANCANGAN TEKNIS BAUT BATUAN BERDIAMETER 39 mm DENGAN KEKUATAN PENOPANGAN kn LOGO www.designfreebies.org PERANCANGAN TEKNIS BAUT BATUAN BERDIAMETER 39 mm DENGAN KEKUATAN PENOPANGAN 130-150 kn Latar Belakang Kestabilan batuan Tolok ukur keselamatan kerja di pertambangan bawah tanah Perencanaan

Lebih terperinci

VIRTUAL BURSTING TEST ELBOW 16 LR 90 DENGAN METODE ELEMEN HINGGA MENGGUNAKAN SOFTWARE ANSYS WORKBENCH

VIRTUAL BURSTING TEST ELBOW 16 LR 90 DENGAN METODE ELEMEN HINGGA MENGGUNAKAN SOFTWARE ANSYS WORKBENCH VIRTUAL BURSTING TEST ELBOW 16 LR 90 DENGAN METODE ELEMEN HINGGA MENGGUNAKAN SOFTWARE ANSYS WORKBENCH Muhammad Salem Abdul Ajes Teknik Mesin, Sekolah Tinggi Teknologi Fatahillah Cilegon, Kota Cilegon,

Lebih terperinci

2. PT Kaltim Methanol Industri

2. PT Kaltim Methanol Industri - 7- LAM PI RAN I PERATURAN MENTERI ENERGI DAN SUMBER DAY A MINERAL REPUBLIK INDONESIA NOMOR 40 TAHUN 2016 TENTANG HARGA GAS BUMI UNTUK INDUSTRI TERTENTU PERU BAHAN HARGA GAS BUMI DI PINTU PABRIK PEMBELI

Lebih terperinci

STUDI PARAMETER PENGARUH TEMPERATUR, KEDALAMAN TANAH, DAN TIPE TANAH TERHADAP TERJADINYA UPHEAVAL BUCKLING PADA BURRIED OFFSHORE PIPELINE

STUDI PARAMETER PENGARUH TEMPERATUR, KEDALAMAN TANAH, DAN TIPE TANAH TERHADAP TERJADINYA UPHEAVAL BUCKLING PADA BURRIED OFFSHORE PIPELINE 1 STUDI PARAMETER PENGARUH TEMPERATUR, KEDALAMAN TANAH, DAN TIPE TANAH TERHADAP TERJADINYA UPHEAVAL BUCKLING PADA BURRIED OFFSHORE PIPELINE Saiful Rizal 1), Yoyok S. Hadiwidodo. 2), dan Joswan J. Soedjono

Lebih terperinci

PRARANCANGAN PABRIK UREA FORMALDEHID PROSES FORMOX KAPASITAS TON / TAHUN

PRARANCANGAN PABRIK UREA FORMALDEHID PROSES FORMOX KAPASITAS TON / TAHUN EXECUTIVE SUMMARY TUGAS PERANCANGAN PABRIK KIMIA PRARANCANGAN PABRIK UREA FORMALDEHID PROSES FORMOX KAPASITAS 44.000 TON / TAHUN MURTIHASTUTI Oleh: SHINTA NOOR RAHAYU L2C008084 L2C008104 JURUSAN TEKNIK

Lebih terperinci

PERHITUNGAN SPESIFIKASI PENYAMBUNGAN PIPA GAS DAN INSTALASI PIPELINE GAS PADA PIPELINE PROJECT BOJONEGARA - CIKANDE

PERHITUNGAN SPESIFIKASI PENYAMBUNGAN PIPA GAS DAN INSTALASI PIPELINE GAS PADA PIPELINE PROJECT BOJONEGARA - CIKANDE PERHITUNGAN SPESIFIKASI PENYAMBUNGAN PIPA GAS DAN INSTALASI PIPELINE GAS PADA PIPELINE PROJECT BOJONEGARA - CIKANDE Oleh Nama : Roby Pratomo NPM : 26409806 Fakultas : Teknologi Industri Jurusan : Teknik

Lebih terperinci

PELAKSANAAN PROPER Sekretariat PROPER Kementerian Lingkungan Hidup

PELAKSANAAN PROPER Sekretariat PROPER Kementerian Lingkungan Hidup PELAKSANAAN PROPER 2012-2013 Sekretariat PROPER Kementerian Lingkungan Hidup MEKANISME DAN KRITERIA PROPER X KEUNGGULAN LINGKUNGAN S U B N I L A I Sistem Manajemen Lingkungan Efisiensi Energi Penurunan

Lebih terperinci

BAB V KESIMPULAN DAN SARAN

BAB V KESIMPULAN DAN SARAN 83 BAB V KESIMPULAN DAN SARAN 5.1 Kesimpulan Dari perancangan berdasarkan perhitungan yang telah dilakukan, dapat diambil kesimpulan: 1. Untuk Organic Rankine Cycle alat penukar kalor yang biasa digunakan

Lebih terperinci

Bab IV Analisis Perancangan Struktur GRP Pipeline Berdasarkan ISO 14692

Bab IV Analisis Perancangan Struktur GRP Pipeline Berdasarkan ISO 14692 Bab IV Analisis Perancangan Struktur GRP Pipeline Berdasarkan ISO 14692 4.1 Flowchart Perancangan GRP Pipeline Menurut ISO 14692-3 bagian 7.10 perancangan sistem perpipaan dengan menggunakan material komposit

Lebih terperinci

PERENCANAAN STRUKTUR DERMAGA PETI KEMAS TELUK LAMONG TANJUNG PERAK SURABAYA JAWA TIMUR

PERENCANAAN STRUKTUR DERMAGA PETI KEMAS TELUK LAMONG TANJUNG PERAK SURABAYA JAWA TIMUR PERENCANAAN STRUKTUR DERMAGA PETI KEMAS TELUK LAMONG TANJUNG PERAK SURABAYA JAWA TIMUR Faris Muhammad Abdurrahim 1 Pembimbing : Andojo Wurjanto, Ph.D 2 Program Studi Sarjana Teknik Kelautan Fakultas Teknik

Lebih terperinci

Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer e-issn: X

Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer e-issn: X Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer e-issn: 2548-964X Vol. 2, No. 1, Januari 2018, hlm. 184-189 http://j-ptiik.ub.ac.id Klasifikasi Standar Produk Baja PT. Krakatau Steel (Persero)

Lebih terperinci

BAB IV DATA SISTEM PIPELINE DAERAH PORONG

BAB IV DATA SISTEM PIPELINE DAERAH PORONG BAB IV DATA SISTEM PIPELINE DAERAH PORONG Sistem pipeline yang dipilih sebagai studi kasus adalah sistem pipeline yang terdapat di daerah Porong, Siodarjo, Jawa Timur yang lokasinya berdekatan dengan daerah

Lebih terperinci

PREHEATER ENGINEERING. MANUFACTURING Material According to ASME BPV Code Section II Manufacturing by precision machine (CNC)

PREHEATER ENGINEERING. MANUFACTURING Material According to ASME BPV Code Section II Manufacturing by precision machine (CNC) PREHEATER Heat Exchange: up to 500 kw MAWP: up to 25 bar Design Pressure: 30 bar Test Pressure: 32 bar Hot Fluid: Brine Water Cold Fluid: Hydrocarbon CONDENSOR Heat Exchange: 0.1 up 200 MW MAWP: max 1.5

Lebih terperinci

Analisa Kegagalan U Fire Tube Heater Treater di Santan Terminal Chevron Indonesia Company

Analisa Kegagalan U Fire Tube Heater Treater di Santan Terminal Chevron Indonesia Company JURNAL TEKNIK POMITS Vol. 1, No. 1, (2013) 1-5 1 Analisa Kegagalan U Fire Tube Heater Treater di Santan Terminal Chevron Indonesia Company Dyan Ratna Mayangsari dan Rochman Rochiem Teknik Material dan

Lebih terperinci

RC Evaluasi dan Re-Design Breakwater Untuk Pelabuhan Penyeberangan (Feri) Waikelo, Kabupaten Sumba Barat, Nusa Tenggara Timur.

RC Evaluasi dan Re-Design Breakwater Untuk Pelabuhan Penyeberangan (Feri) Waikelo, Kabupaten Sumba Barat, Nusa Tenggara Timur. RC09-1336 Evaluasi dan Re-Design Breakwater Untuk Pelabuhan Penyeberangan (Feri) Waikelo, Kabupaten Sumba Barat, Nusa Tenggara Timur. Oleh: Gorbachev Partahi Bonar 3110100106 Dosen Pembimbing : Ir. Fuddoly,

Lebih terperinci

PENGARUH TULANGAN CRT DAN TULANGAN BJTD PADA KOMPONEN LENTUR DENGAN MUTU BETON F C 24,52 MPA (182S)

PENGARUH TULANGAN CRT DAN TULANGAN BJTD PADA KOMPONEN LENTUR DENGAN MUTU BETON F C 24,52 MPA (182S) PENGARUH TULANGAN CRT DAN TULANGAN BJTD PADA KOMPONEN LENTUR DENGAN MUTU BETON F C 24,52 MPA (182S) Eri Andrian Yudianto, Sudiman Indra Dosen Program Studi Sipil S-1, Fakultas Teknik Sipil dan Perencanaan,

Lebih terperinci