LAMPIRAN
Lampiran 1. Data Hotel/ Villa di Kawasan Puncak Bogor No Nama Hotel Lokasi Kapasitas Harga Kamar (Rp/ (Kamar) Kamar) 1 Megamendung Permai Megamendung 254 190.000-505.000 2 Hotel Permata Alam Cisarua 40 280.000-390.000 3 Alfa Resort Cisarua 81 470.000-1.790.000 4 Hotel Puri Avia Megamendung 113 272.600-2.547.600 5 Hotel Grand USSU Cisarua 52 400.000-1.250.000 6 Resort Permata Hati Ciburial 34 200.000-1.500.000 7 Hotel Mars 91 Megamendung 150 200.000-500.000 8 Terrace Villa Golf Cisarua 153 280.000-440.000 9 Hotel Pramesthi Ciawi 100 75.000-1.100.000 10 Lembah Pasir Angin Megamendung 110 400.000-2.500.000 11 Wisma Cisarua Cisarua 52 240.000-1.000.000 12 Villa Graha Kasih Cisarua 30 80.000-125.000 13 Villa Puri Asri Cisarua 22 300.000-700.000 14 Cibulan River Cottage Cisarua 14 400.000-850.000 15 Hotel Safari Garden Cisarua 215 475.000-1.155.000 16 Hotel Ever Green Cisarua 167 175.000-2.750.000 17 Hotel Cipayung Asri Megamendung 70 195.000-665.000 18 Villa Erema Cisarua 40 1.000.000-1.250.000 19 Hotel Indra Jaya Megamendung 26 145.000-165.000 20 Hotel Cibulan Indah Cisarua 19 150.000 21 Hotel New Ayuda Megamendung 20 150.000-250.000 22 Hotel Fitria Cisarua 15 100.000-125.000 23 Hotel Cipayung Megamendung 63 125.000-300.000 24 Hotel Andalus Megamendung 20 165.000-242.000 25 Hotel Gardena Resort Megamendung 35 150.000-250.000 26 Dwima Convention Megamendung 31 117.000-180.000 27 Hotel Taman Indah Cisarua 24 110.000-280.000 28 Hotel Dirga Cibulan Cisarua 32 55.000-500.000 29 Hotel Pardede Cisarua 26 200.000-1.100.000 30 Villa Aldita Cisarua 43 150.000-400.000 31 Hotel Aries Biru Cisarua 37 250.000-900.000 32 Hotel Gemala Cisarua 22 1.500.000-2.500.000 33 Pondok Arjuna Jaya Cisarua 36 200.000-500.000 34 Hotel Aquarius Cisarua 40 600.000-3.000.000 35 Hotel Graha Dinar Cisarua 127 235.000-700.000 36 Hotel Ria Diani Megamendung 47 210.000-235.000 37 Hotel Lembah Nyiur Cisarua 65 130.000-635.000 38 Hotel Purnama Putera Megamendung 89 125.000-150.000 39 Villa Back To Nature Megamendung 36 400.000-625.000 40 Villa Gubug Jaya Megamendung 28 100.000-600.000 41 Hotel Rudian Cisarua 33 100.000-150.000 42 Villa Anggrek Cisarua 24 610.000-1.260.000 43 Hotel Santo Jaya Cisarua 92 150.000-350.000 44 Hotel Purnama I Megamendung 44 125.000-150.000 45 Hotel Bonita Cisarua 20 215.000-300.000 Sumber : dari berbagai sumber 100
Lampiran 2. Hasil Estimasi Model Regresi Linear Berganda dengan Program SPSS 13.0 for Windows 1. Koefisien Determinasi dan Uji Autokorelasi Model Summary(b) Model R R Square Adjusted R Square Std. Error of the Estimate Durbin-Watson 1,933(a),870,850 3,38536 2,004 a Predictors: (Constant), UMR, HH, PND, JRK, HT, KA, CH, INC b Dependent Variable: JK 2. Uji Statistik F (Uji Model) ANOVA(b) Model Sum of Squares df Mean Square F Sig. 1 Regression 3916,86 8 489,607 42,722,000(a) Residual 584,474 51 11,46 Total 4501,333 59 a Predictors: (Constant), UMR, HH, PND, JRK, HT, KA, CH, INC b Dependent Variable: JK 3. Uji Statistik t (Uji Parsial) dan Uji Multikolinearitas Coefficients(a) Model Unstandardized Standardized Coefficients Coefficients Collinearity Statistics Std. t Sig. B Error Beta Tolerance VIF 1 (Constant) 40,770 4,496 8,845 0,000 BP -0,019 0,007-0,214-2,628 0,011 0,382 2,615 KA -1,288 0,733-0,138-1,757 0,085 0,415 2,410 CH -2,213 0,78-0,227-2,838 0,006 0,398 2,512 HH -3,84 0,968-0,333-3,969 0,000 0,361 2,772 INC 1,548 0,456 0,284 3,392 0,001 0,364 2,749 PND -0,751 0,717-0,064-1,047 0,300 0,681 1,469 JRK -39,77 0,663-0,233-3,457 0,001 0,558 1,791 UMR -0,019 0,061-0,044-0,766 0,447 0,781 1,280 a Dependent Variable: JK 101
4. Uji Normalitas Histogram Dependent Variable: JK 10 8 Frequency 6 4 2 0-2 -1 0 1 2 Regression Standardized Residual 3 Mean = -1.6E-15 Std. Dev. = 0.93 N = 60 Normal P-P Plot of Regression Standardized Residual 1.0 Dependent Variable: JK 0.8 Expected Cum Prob 0.6 0.4 0.2 0.0 0.0 0.2 0.4 0.6 Observed Cum Prob 0.8 1.0 102
One-Sample Kolmogorov-Smirnov Test Unstandardize d Residual N 60 Normal Parameters a Mean.0000000 Std. Deviation 2.92998668 Most Extreme Differences Absolute.059 Positive.059 Negative -.051 Kolmogorov-Smirnov Z.454 Asymp. Sig. (2-tailed) 0.986 a. Test distribution is Normal. 5. Uji Heteroskedastisitas Scatterplot Dependent Variable: JK 3 Regression Studentized Residual 2 1 0-1 -2-1 0 1 Regression Standardized Predicted Value 2 103
Model Coefficients(a) Unstandardized Coefficients Standardized Coefficients t Sig. B Std. Error Beta 1 (Constant) -2,49 3,472-0,717 0,476 BP 0,01 0,006 0,369 1,826 0,174 KA 0,725 0,566 0,248 1,281 0,206 CH 0,102 0,602 0,033 0,169 0,866 HH -1,132 0,747-0,315-1,515 0,136 INC 0,391 0,352 0,23 1,11 0,272 PND 0,051 0,554 0,014 0,093 0,926 JRK 0,111 0,512 0,036 0,216 0,830 UMR 0,005 0,047 0,015 0,108 0,914 a Dependent Variable: LnResid 2 6. Uji Multikolinearitas Coefficient Correlations(a) Model 1 Correlat ions Covaria nces UMR HH PND JRK BP CH KA INC UMR 1,000 -,081 -,200 -,020 -,135 -,231 -,082 -,252 HH -,081 1,000 -,011 -,313,105,453 -,394,017 PND -,200 -,011 1,000 -,021,155,089 -,176 -,350 JRK -,020 -,313 -,021 1,000 -,277 -,045,038,122 BP -,135,105,155 -,277 1,000,310 -,230,330 CH -,231,453,089 -,045,310 1,000,062,028 KA -,082 -,394 -,176,038 -,230,062 1,000,307 INC -,252,017 -,350,122,330,028,307 1,000 UMR,003 -,004 -,008 -,001 -,006 -,010 -,004 -,007 HH -,004,882 -,007 -,189,075,299 -,285,007 PND -,008 -,007,476 -,010,082,043 -,093 -,106 JRK -,001 -,189 -,010,414 -,137 -,021,019,035 BP -,006,075,082 -,137,587,167 -,136,111 CH -,010,299,043 -,021,167,493,034,009 KA -,004 -,285 -,093,019 -,136,034,592,104 INC -,007,007 -,106,035,111,009,104,194 a Dependent Variable: JK 104
Lampiran 3. Gambar Sebaran Titik Normal dan Titik Minimum Jumlah Pengunjung Beberapa Obyek Wisata Akibat Perubahan Iklim Gambar 1. Titik Normal dan Minimum Jumlah Pengunjung Wisata Paralayang yang Dipengaruhi oleh Kecepatan Angin Gambar 2. Titik Normal dan Minimum Jumlah Pengunjung Wisata Paralayang yang Dipengaruhi oleh Curah Hujan Gambar 3. Titik Normal dan Minimum Jumlah Pengunjung Wisata Paralayang yang Dipengaruhi oleh Hari Hujan 105
Gambar 4. Titik Normal dan Minimum Jumlah Pengunjung Wisata Arung Jeram yang Dipengaruhi oleh Kecepatan Angin Pada Tahun 2009 Gambar 5. Titik Normal dan Minimum Jumlah Pengunjung Wisata Arung Jeram yang Dipengaruhi oleh Curah Hujan Pada Tahun 2009 Gambar 6. Titik Normal dan Minimum Jumlah Pengunjung Wisata Arung Jeram yang Dipengaruhi oleh Hari Hujan Pada Tahun 2009 106
Gambar 7. Titik Normal dan Minimum Jumlah Pengunjung Wisata Flying Fox yang Dipengaruhi oleh Kecepatan Angin Pada Tahun 2009 Gambar 8. Titik Normal dan Minimum Jumlah Pengunjung Wisata Flying Fox yang Dipengaruhi oleh Curah Hujan Pada Tahun 2009 Gambar 9. Titik Normal dan Minimum Jumlah Pengunjung Wisata Flying Fox yang Dipengaruhi oleh Hari Hujan Pada Tahun 2009 107
Gambar 10. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Kecepatan Angin Pada Tahun 2008 Gambar 11. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Curah Hujan Pada Tahun 2008 Gambar 12. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Hari Hujan Pada Tahun 2008 108
Gambar 13. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Kecepatan Angin Pada Tahun 2009 Gambar 14. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Curah Hujan Pada Tahun 2009 Gambar 15. Titik Normal dan Minimum Jumlah Pengunjung Agrowisata Gunung Mas yang Dipengaruhi oleh Hari Hujan Pada Tahun 2009 109
Lampiran 4. Hasil Estimasi Kerugian Obyek Wisata No 1 Obyek Wisata Harga Tiket (Rp) Wisata paralayang 300.000 Waktu Desember 2010 April 2011 Dampak Iklim Jumlah Pengunjung Normal Pendapatan Normal (I 1 ) Jumlah Pengunjung Minimum Pendapatan Minimum (I 2 ) Nilai Kerugian (I 2 I 1 ) Kecepatan Angin 156 Rp 46.800.000 134 Rp 40.200.000 Rp 6.600.000 Curah Hujan 150 Rp 45.000.000 134 Rp 40.200.000 Rp 4.800.000 2 Wisata outbound flying fox TWM 15.000 Selama tahun 2009 Hari Hujan 149 Rp 44.700.000 134 Rp 40.200.000 Rp 4.500.000 Kecepatan Angin 1.000 Rp 15.000.000 753 Rp 11.295.000 Rp 3.705.000 Curah Hujan 918 Rp 13.770.000 753 Rp 11.295.000 Rp 2.475.000 3 Wisata outbound arung jeram SOAR 25.000 Selama tahun 2009 Hari Hujan 926 Rp 13.890.000 753 Rp 11.295.000 Rp 2.595.000 Kecepatan Angin 1.680 Rp 42.000.000 396 Rp 9.900.000 Rp 32.100.000 Curah Hujan 1.367 Rp 34.175.000 396 Rp 9.900.000 Rp 24.275.000 4 Wisata kebun teh Gunung Mas 6.000 Selama tahun 2008 Hari Hujan 1.505 Rp 37.625.000 396 Rp 9.900.000 Rp 27.725.000 Kecepatan Angin 22.505 Rp 135.030.000 20.810 Rp 124.860.000 Rp 10.170.000 Curah Hujan 22.240 Rp 133.440.000 20.810 Rp 124.860.000 Rp 8.580.000 5 Wisata kebun teh Gunung Mas 6.000 Selama tahun 2008 Hari Hujan 22.823 Rp 136.938.000 20.810 Rp 124.860.000 Rp 12.078.000 Kecepatan Angin 28.616 Rp 171.696.000 28.289 Rp 169.734.000 Rp 1.962.000 Curah Hujan 28.531 Rp 171.186.000 28.289 Rp 169.734.000 Rp1.452.000 110 Hari Hujan 28.659 Rp 171.954.000 28.289 Rp 169.734.000 Rp 2.220.000
Lampiran 5. Gambar Obyek Wisata Lokasi Penelitian 1. Gunung Mas 2. Wisata arung jeram 3. Wisata paralayang dan wisata flying fox 111
Lampiran 6. Peta Wisata Kawasan Puncak 112