Jurnal Teknologi Pertanian Vol. 12 No. 1 (April 211) 49-57

Ukuran: px
Mulai penontonan dengan halaman:

Download "Jurnal Teknologi Pertanian Vol. 12 No. 1 (April 211) 49-57"

Transkripsi

1 APLIKASI OPTIMAL PREVENTIVE REPLACEMENT AGE MODEL UNTUK MENENTUKAN JADWAL PENGGANTIAN KOMPONEN DUMPING GRATE PADA MESIN KETEL UAP (Studi Kasus di PG Rejo Agung Baru Madiun) Application of Optimal Preventive Replacement Age Model to Determine Replacement Schedule For Dumping Grate Component on Boiler Machine (Case Study at Rejo Agung Baru Sugar Factory Madiun) Wike Agustin Prima Dania, Isti Purwaningsih, dan Fajar Andy Aristiono Jurusan Teknologi Industri Pertanian-Fak. Teknologi Pertanian-Universitas Brawijaya Jl. Veteran Malang ABSTRACT Rejo Agung Baru Madiun is one of big sugar companies in East Java. One of the problems in this factory is delayed of production process caused by machine damaged. Based on preliminary survey, it showed that boiler machine is regularly damage and has the highest downtime. Moreover, component that influences the damage of boiler machine is dumping grate component. The main purpose of this research is to determine optimal replacement schedule that has minimum downtime and maximum availability of dumping grate component. Method that is used to solve the problem is optimal preventive replacement age model. Furthermore, it also determines and compares replacement cost before and after scheduling. From the result, it shows that the replacement interval for dumping grate is 555 hours or days with the minimum downtime value is and the availability value is Total cost of optimal replacement scheduling is Rp 3,341,078, The cost comparison before replacement scheduling and after replacement scheduling is Rp 3,517,399, and Rp 3,341,078, respectively or saving about 5.013%. Keywords: dumping grate, minimum downtime, maximum availability, optimal preventive replacement age model PENDAHULUAN Pabrik Gula Rejo Agung Baru Madiun merupakan salah satu pabrik gula milik swasta yang cukup besar di Jawa Timur. Pabrik Gula ini memiliki rata-rata kapasitas giling sebesar TCD dan dengan rata-rata produksi gula sebesar ton per tahun (Anonymous, 2010). Dalam mempertahankan produktivitas dan mencapai target produksi, mesin dan peralatan merupakan salah satu faktor utama. Oleh karena itu kehandalan mesin dan peralatan harus terjaga dengan baik. Mesin yang mempunyai pengaruh pada keberlangsungan proses produksi salah satunya adalah mesin ketel uap. Jika mesin ketel uap mengalami gangguan maka akan berpengaruh terhadap mesin dan peralatan lain. Kondisi seperti ini akan menghambat proses produksi gula sehingga dapat merugikan perusahaan. Berdasarkan survei pendahuluan, komponen pada mesin ketel uap yang sering mengalami kerusakan adalah komponen dumping grate. Hal ini menyebabkan downtime mesin ketel uap mencapai 50,5 jam atau sekitar 55.6% dari total downtime mesin ketel uap. Laggoune et al. (2009) menyatakan bahwa pada sistem yang berjalan secara kontinyu, berhentinya mesin menyebabkan biaya yang lebih besar dibandingkan biaya pembelian komponen untuk penggantian. Oleh karena itu penjadwalan penggantian secara berkala diperlukan untuk meminimumkan biaya. 49

2 Aplikasi Optimal Preventive Replacement Age Model (Dania dkk) Selama ini perusahaan tidak melakukan perawatan preventif tetapi hanya melakukan perawatan korektif. Komponen dumping grate perlu dilakukan perawatan preventif berupa penggantian karena komponen ini tidak dapat diperbaiki ketika rusak, selain itu kerusakan yang terjadi dapat dilakukan pemodelan. Menurut Nakagawa dan Mizutani (2009), terdapat dua model penentuan jadwal optimal penggantian berdasarkan minimasi downtime yaitu Optimal Preventive Replacement Interval (Block Replacement) dan Optimal Preventive Replacement Age (Age Replacement). Model penggantian yang digunakan di dalam penelitian ini adalah dengan menggunakan Optimal Preventive Replacement Age. Pada age replacement policy, komponen akan diganti pada saat usia sistem mencapai T. Wang (2002) menyatakan bahwa age replacement policy lebih efisien dibandingkan dengan block replacement karena dalam block replacement ada kemungkinan komponen diganti sebelum mencapai umur maksimal sehingga terjadi pemborosan. Dengan menentukan jadwal penggantian yang optimum diharapkan dapat meminimasi downtime dan meminimasi biaya penggantian komponen dumping grate pada mesin ketel uap. Tujuan penelitian adalah menentukan jadwal optimal dengan kriteria minimasi downtime dan maksimasi availability penggantian komponen dumping grate pada mesin ketel uap berdasarkan Model Optimal Preventive Replacement Age. Hasil dari penjadwalan tersebut kemudian dihitung biayanya serta dibandingkan dengan kebijakan perusahaan sebelum adanya penjadwalan. BAHAN DAN METODE Penelitian dilaksanakan di PG Rejo Agung Baru Madiun. Batasan masalah dalam penelitian adalah: 1. Penelitian hanya dibatasi pada penentuan jadwal optimal penggantian komponen dumping grate pada mesin ketel uap. 2. Perhitungan biaya penggantian komponen hanya dibatasi pada biaya teknisi, biaya pengadaan komponen, biaya operator menganggur dan biaya kehilangan kesempatan untuk mendapatkan keuntungan. 3. Tidak dibahas aspek teknis pada penggantian komponen dumping grate pada mesin ketel uap. Asumsi yang digunakan di dalam penelitian adalah: 1. Kondisi komponen pengganti adalah komponen yang benar-benar baru, kondisi sesuai dengan spesifikasi alat. 2. Komponen pengganti tersedia pada saat dibutuhkan. 3. Harga komponen tidak berubah selama periode penelitian. 4. Jam kerja produksi dan kapasitas mesin dalam keadaan normal dan tetap. 5. Perencanaan dalam penggantian komponen ini adalah satu musim giling. Penentuan Variabel Variabel yang terkait dengan penelitian ini adalah: 1. Variabel interval waktu antar kerusakan komponen dumping grate. 2. Variabel waktu kegagalan komponen (downtime) yang memerlukan penggantian komponen (penggantian karena kerusakan dan penggantian secara preventif). 3. Variabel biaya seperti biaya teknisi, biaya pengadaan komponen, biaya operator menganggur dan biaya kehilangan kesempatan untuk mendapatkan keuntungan. Analisis Data Tahapan analisis data penelitian ini adalah menentukan rata-rata waktu ketika alat tidak dapat digunakan (downtime), menentukan distribusi kerusakan yang ditinjau dari data interval kerusakan komponen. Selanjutnya adalah menentukan probabilitas kumulatif (F(tp)) dan kehandalan (R(tp)). Kemudian menentukan jadwal optimal dengan melihat nilai mi-

3 nimasi downtime dengan formulasi matematika sebagai berikut: Tahapan selanjutnya adalah menetukan nilai availability. Penentuan nilai availability terbaik ditinjau dari nilai yang paling maksimum. Perhitungan biaya penggantian dilakukan setelah mengetahui jadwal optimal penggantian komponen dumping grate dan kemudian dilakukan perbandingan biaya sebelum dan sesudah penjadwalan. Berdasarkan perbandingan tersebut dapat dilihat perubahan biaya yang terjadi pada penggantian dumping grate. HASIL DAN PEMBAHASAN Kondisi Perawatan Komponen Dumping Grate Komponen terpenting di dalam mesin ketel uap adalah dumping grate. Dumping grate berfungsi sebagai proses pembakaran ampas tebu. Panas yang berasal dari pembakaran ampas tersebut digunakan sebagai energi pada ketel uap, sedangkan sisa pembakaran ampas tebu tersebut akan dibuang melalui cerobong asap dalam bentuk debu. Jika ampas tersebut tidak dapat terbuang dalam bentuk debu, akan dibuang menuju conveyor dengan cara rotasi plat yang dilakukan oleh komponen dumping grate. Komponen dumping grate tersebut bersifat panas, sehingga dalam prosesnya akan ter-jadi pemuaian komponen. Pemuaian komponen ini disebabkan oleh pengaruh suhu yang menyebabkan komponen tersebut rusak dan patah sehingga tidak dapat digunakan lagi. Perawatan berupa penggantian komponen dumping grate dilakukan jika komponen ini mengalami kerusakan. Kegiatan penggantian komponen dumping grate memerlukan waktu rata-rata kurang lebih selama 5,52 jam. Selain itu, penggantian komponen ini melibatkan teknisi perbaikan sebanyak 4 (empat) orang yang bertugas membongkar komponen, memasang komponen dan melakukan instalasi komponen. Menurut Pascual et al. (2008), kegiatan korektif dilakukan tepat pada saat komponen mengalami kerusakan dan diganti dengan yang baru, dan hal ini menyebabkan terjadinya downtime. Data mengenai downtime dan interval kerusakan pada komponen dumping grate tercantum pada Tabel 1. Analisis Distribusi Kerusakan Komponen Dumping Grate Hasil analisis kerusakan komponen dapat dilihat pada Tabel 2. Berdasarkan Tabel 2 diketahui bahwa distribusi kerusakan pada komponen dumping grate yang paling sesuai adalah distribusi lognormal. Hal ini dapat diketahui dari nilai Uji Anderson-Darling sebesar 1,943 pada Software Minitab 14. Usman (2009) menyatakan bahwa Uji Anderson-Darling digunakan sebagai parameter pemilihan Tabel 1 Data kerusakan, downtime dan interval kerusakan komponen dumping grate pada mesin ketel uap No. Tanggal Kerusakan Interval Waktu Downtime Interval Kerusakan Downtime (jam) (jam) 1. 1 Juni ,8 600, Juni ,8 667, Juli ,9 577, Agustus ,3 586, September ,1 626, Oktober , November ,

4 Aplikasi Optimal Preventive Replacement Age Model (Dania dkk) Tabel 2. Hasil analisis distribusi kerusakan Distribusi Uji Anderson-Darling Parameter MTTF (jam) Lognormal 1,943 s= 0, ,752 Weibull 2, ,838 Normal 1, ,757 Eksponensial 4,099 ℷ 612,757 distribusi yang sesuai jika analisis data tersebut menggunakan Software Minitab. Pemilihan distribusi kerusakan yang sesuai adalah yang paling rendah nilai Uji Anderson-Darling. Analisis pemilihan distribusi kerusakan komponen juga dengan menggunakan Software Easy Fit. Hasil yang sama juga ditunjukkan pada grafik pada hasil analisis yang menyebutkan bahwa distribusi kerusakan komponen adalah distribusi lognormal. Penentuan Probabilitas Kumulatif (F(t)) dan Kehandalan (R(t)) F(tp) adalah nilai probabilitas kumulatif pada saat tp. Parameter lognormal berupa m -rata) dan s (standar deviasi) yang ada pada analisa sebelumnya digunakan sebagai perhitungan nilai probabilitas. Rentang nilai probabilitas adalah diawali dengan nilai 0 dan diakhiri dengan nilai 1. Nilai probabilitas dari kerusakan komponen dumping grate dapat dilihat pada Tabel 3. Berdasarkan analisis yang dilakukan, diketahui bahwa nilai probabilitas kerusakan komponen semakin lama semakin meningkat. Nilai probabilitas kerusakan komponen dumping grate terus naik dari waktu ke waktu. Nilai probabilitas mencapai nilai 1 pada jam ke-744. Hal ini berarti peluang kejadian kerusakan komponen dumping grate pasti terjadi pada jam ke-744. Hartono (2003) dalam penelitiannya mengenai penentuan jadwal optimal penggantian komponen hidrolik pada mesin injeksi juga menyatakan bahwa nilai probabilitas komponen semakin lama semakin naik sehingga dapat dipastikan peluang kerusakan komponen akan semakin besar. Tabel 3. Nilai probabilitas kumulatif F(tp) kerusakan komponen dumping grate No tp (jam) F(tp) , , , , , , , , , , Analisis yang dilakukan selanjutnya adalah mengukur nilai kehandalan komponen dumping grate. Nilai kehandalan komponen dumping grate dapat dilihat pada Tabel 4. Tabel 4. Nilai Kehandalan/Reliability (R(tp)) Komponen Dumping Grate No tp (jam) R(tp) , , , , , , , , , , Berdasarkan Tabel 4 diketahui bahwa nilai kehandalan/reliability komponen dumping grate semakin lama semakin menurun. Turunnya nilai kehan-

5 dalan sebuah komponen dapat terjadi dikarenakan komponen tersebut beroperasi secara terus menerus sehingga menyebabkan komponen tersebut rusak. Makin rendah nilai kehandalan menunjukkan bahwa kerusakan dari komponen makin akan sering terjadi yang akan mengakibatkan terganggunya proses pr duksi (Grosh, 1999). Penentuan Jadwal Optimal Penggantian Komponen Dumping Grate Berdasarkan Model Optimal Preventive Replacement Age Penentuan jadwal optimal penggantian pencegahan komponen ini dilakukan perhitungan yang sifatnya trial and error hingga diperoleh nilai downtime yang optimal. Nilai downtime yang optimal disini adalah menggunakan nilai yang paling rendah diantara nilai downtime yang lain pada saat tp (Djunaidi, 2007). Berdasarkan formulasi matematika untuk penggantian maka diperoleh solusi optimal penggantian pencegahan komponen dumping grate dengan kriteria minimasi downtime. Hasil optimal jadwal penggantian pencegahan komponen dumping grate dapat dilihat pada Tabel 5. Tabel 5. Jadwal penggantian komponen dumping grate No tp (jam) D(tp) , , , , , , , , , , , , , , , , , Berdasarkan perhitungan yang telah dilakukan, dapat diketahui bahwa jadwal optimal penggantian pencegahan komponen dumping grate dilakukan setiap interval waktu 555 jam atau setiap 23,125 hari dengan nilai minimasi downtime sebesar Hal ini sesuai dengan pendapat Jung et al. (2008) yang menyatakan bahwa tujuan model optimal preventive replacement age adalah menentukan umur optimal komponen sehingga penggantian pencegahan harus dilakukan untuk meminimasi downtime. Berdasarkan nilai D(tp) pada tabel penentuan jadwal optimal dapat dihitung nilai availability komponen dumping grate setelah dilakukan penjadwalan. Availability merupakan probabilitas suatu komponen dapat beroperasi sesuai fungsinya dalam suatu waktu tertentu. Angka probabilitas availability menunjukkan kemampuan komponen untuk berfungsi setelah dilakukan tindakan perawatan terhadapnya. Semakin tinggi nilai availability maka kemampuan komponen semakin bagus. Nilai availability secara lengkap dilihat dapat ditinjau pada Tabel 6. Tabel 6. Nilai availability komponen dumping grate No tp (jam) Availability , , , , , , , , , , , , , , , , ,27414E-08 53

6 Aplikasi Optimal Preventive Replacement Age Model (Dania dkk) Dari Tabel 6 dapat diketahui bahwa nilai yang paling besar yaitu pada interval ke 555 jam dengan nilai 0, Semakin besar nilai availability maka kemampuan komponen untuk dapat berfungsi setelah mendapatkan tindakan perawatan adalah semakin baik. Hal ini sesuai dengan yang dikemukakan Jiang dan Ji (2002) bahwa tujuan dari perawatan preventif adalah untuk meningkatkan availability dari mesin. Djunaidi (2007) juga menyatakan bahwa semakin besar nilai availability menunjukkan semakin tinggi kemampuan komponen tersebut, atau dapat dikatakan semakin nilai availability mendekati nilai satu, maka semakin baik keadaan komponen tersebut untuk dapat beroperasi sesuai fungsinya. Nilai downtime dan availability komponen dumping grate dapat diketahui pada saat perusahaan menerapkan sistem perawatan korektif. Hal ini dapat diketahui pada Tabel 7. Setelah dilakukan penjadwalan penggantian optimal maka downtime dapat diminimasi sedangkan availability dapat ditingkatkan. Untuk mengetahui nilai downtime dan availability setelah dilakukan penjadwalan optimal dapat dilihat pada Tabel 8. Berdasarkan nilai downtime dan availability di atas dapat diketahui bahwa penjadwalan penggantian optimal komponen dumping grate dapat meminimasi downtime kerusakan dan secara langsung dapat meningkatkan nilai availability dari komponen. Hal ini dapat terjadi dikarenakan penggantian dilakukan berdasarkan umur komponen tersebut. Penggantian ini dilakukan sebelum komponen tersebut mencapai umur kerusakannya. Hal ini sesuai dengan pendapat Jiang dan Ji (2002), bahwa idealnya perawatan preventif dilakukan tepat sebelum kerusakan terjadi. Setelah dilakukan penjadwalan optimal komponen dumping grate, maka dapat dilakukan agenda penggantian komponen selama 1 musim giling pada tahun Asumsi jumlah hari dalam musim giling pada tahun 2010 sama dengan jumlah hari musim giling pada tahun 2009 yaitu selama 192 hari. Untuk mengetahui kalender penjadwalan penggantian komponen dapat dilihat pada Tabel 9. Berdasarkan Tabel 9 dapat diketahui bahwa penggantian komponen dumping grate pada musim giling 2010 adalah sebanyak 8 kali. Penggantian komponen hanya dilakukan 8 kali dikarenakan musim giling berakhir pada tanggal 26 November 2010 sedangkan rata-rata selang waktu penggantian komponen dumping grate adalah selama 555 jam atau 23,125 hari. Tabel 7. Nilai downtime dan availability pada perawatan korektif Penggantian Interval Waktu D(tp) Availability Ke- Kerusakan (jam) 1 600,8 0, , ,4 0, , ,5 0, , ,4 0, , ,2 0, , , , , , Tabel 8. Nilai downtime dan availability sesuai penjadwalan optimal Interval D(tp) Availability Penggantian (jam) 555 0, ,

7 Tabel 9. Jadwal penggantian komponen dumping grate tahun 2010 Penggantian ke- Tanggal Penggantian Waktu Penggantian 1 10 Juni Juli Juli Agustus September Oktober Oktober November Perhitungan Biaya Penggantian Sebelum dan Sesudah Penjadwalan Penentuan biaya total penggantian komponen dilakukan dengan mengumpulkan data biaya teknisi penggantian, biaya pengadaan komponen, biaya operator menganggur dan biaya kehilangan kesempatan untuk mendapatkan keuntungan. Perbandingan biaya-biaya penggantian sebelum dan sesudah penjadwalan dapat dilihat pada Tabel 10. Tenaga kerja teknisi ini berasal dari bengkel tempat pembelian komponen dumping grate. Biaya teknisi dianggap sama antar teknisi karena keahlian yang diperlukan untuk melakukan penggantian sama. Jumlah teknisi yang diperlukan untuk melakukan penggantian adalah sebanyak 4 orang teknisi. Biaya pengadaan komponen hanya terdiri dari tiga macam biaya yakni biaya pembelian komponen dumping grate, biaya penyimpanan, dan biaya pemesanan. Biaya pembelian komponen adalah sebesar Rp ,00 per sekali pembelian. Biaya penyimpanan adalah sebesar 5% dari biaya keseluruhan penyimpanan barang di gudang. Biaya pemesanan sebesar Rp ,00 per sekali pesan. Biaya tersebut digunakan untuk memesan komponen melalui telepon. Biaya operator menganggur dihitung berdasarkan lama penggantian komponen. Operator tersebut menganggur dikarenakan adanya proses penggantian komponen yang dilakukan oleh teknisi sehingga biaya keluar tanpa adanya kinerja dari seorang operator yang mengakibatkan kerugian biaya. Biaya kehilangan kesempatan untuk mendapatkan keuntungan pada saat penggantian dihitung berdasarkan kapasitas giling selama waktu produksi yang terhenti karena penggantian. Kapasitas giling yang digunakan di PG Rejo Agung Baru selalu sama. Kapasitas giling PG Rejo Agung Baru Madiun selama 1 Tabel 10. Total Biaya Penggantian Komponen Sebelum dan Sesudah Penjadwalan Biaya Sebelum Penjadwalan (Rp) Sesudah Penjadwalan (Rp) Biaya Teknisi Biaya Pengadaan Komponen Biaya Operator Menganggur Biaya Kehilangan Kesempatan Untuk Mendapatkan Keuntungan Total Biaya Penggantian Selama 1 Musim Giling

8 Aplikasi Optimal Preventive Replacement Age Model (Dania dkk) jam sebesar ,67 kg. Besarnya rendemen sebesar 6,89% dengan keuntungan gula per kg sebesar Rp 3.000,00. Berdasarkan Tabel 10 dapat diketahui bahwa biaya teknisi, biaya operator menganggur dan biaya kehilangan kesempatan untuk mendapatkan keuntungan sebelum dan sesudah penjadwalan terdapat perbedaan. Ketiga biaya tersebut menurun setelah dilakukan penjadwalan optimal karena waktu yang digunakan dalam proses penggantian lebih cepat. Biaya pengadaan komponen setelah penjadwalan lebih tinggi karena jumlah penggantian komponen yang bertambah banyak sehingga menyebabkan pembelian komponen ikut bertambah. Hal ini sesuai dengan penelitian Pascual et al. (2008) yang menyatakan bahwa dengan penetapan penjadwalan penggantian yang tepat, biaya perawatan akan mencapai titik minimum. Perbandingan Biaya Penggantian Sebelum dan Sesudah Penjadwalan Berdasarkan perhitungan biaya penggantian sebelum penjadwalan dan sesudah penjadwalan dapat dilakukan perbandingan biaya tersebut, sehingga dapat diketahui selisih total biaya penggantian tersebut. Perbandingan total biaya dan selisihnya dapat dilihat pada Tabel 11. Tabel 11. Perbandingan biaya sebelum dan sesudah penjadwalan penggantian Penggantian Komponen Total Biaya Penggantian per Musim Giling Sebelum Rp ,00 Penjadwalan Sesudah Rp ,00 Penjadwalan Selisih Biaya Penggantian Rp ,00 % Penghematan 5,013 Berdasarkan Tabel 11 dapat diketahui bahwa waktu penggantian sebelum penjadwalan adalah penggantian korektif yang dilakukan PG Rejo Agung Baru Madiun pada tahun 2009, sedangkan penggantian komponen sesudah adanya penjadwalan optimal dianjurkan diterapkan pada musim giling 2010 dengan interval waktu penggantian komponen setiap 555 jam. Biaya total yang dikeluarkan oleh perusahaan sebelum penjadwalan adalah sebesar Rp ,00. Adapun biaya yang dikeluarkan perusahaan sesuai dengan usulan yang dapat diterapkan pada musim giling berikutnya adalah sebesar Rp ,00 Biaya total penggantian apabila dibandingkan antara sesudah penjadwalan dengan sebelum penjadwalan (perawatan korektif) memiliki selisih sebesar Rp ,00. Dari selisih biaya penggantian ini perusahaan dapat menghemat biaya sekitar 5,013%. Berdasarkan perbandingan biaya pada Tabel 11 diketahui bahwa total biaya penggantian komponen setelah penjadwalan lebih rendah dibandingkan dengan sebelum penjadwalan walaupun jumlah penggantian komponen lebih banyak. Hal ini dapat terjadi karena adanya penggantian yang terjadwal di tengah proses produksi gula. Jika perusahaan menerapkan sistem penggantian secara terjadwal maka saat proses penggantian terjadi, persiapan yang berhubungan dengan proses penggantian akan lebih matang seperti persiapan komponen ataupun dalam kedatangan teknisi perbaikan. Berbeda dengan kondisi perusahaan yang hanya melakukan penggantian pada saat komponen tersebut telah mengalami kerusakan, maka persiapan yang berhubungan dengan proses penggantian akan mengalami hambatan. Kondisi seperti ini akan berdampak terhadap downtime mesin. Penggantian secara terjadwal dapat meminimasi downtime mesin daripada yang tidak terjadwal. Downtime mesin yang lama akan mengakibatkan proses produksi terhambat. Hal ini sesuai dengan pernyataan Wang (2002) bahwa biaya yang dikeluarkan jika terjadi downtime yang tidak terduga

9 jumlahnya lebih besar dibandingkan biaya penyediaan komponen untuk penggantian. SIMPULAN Penjadwalan penggantian komponen dapat dioptimalkan dengan menerapkan metode preventive replacement age model, untuk meminimasi downtime dan biaya penggantian. Solusi optimal penjadwalan penggantian komponen dumping grate diperoleh pada interval waktu 555 jam atau 23,125 hari dengan nilai minimasi downtime sebesar 0, dan nilai availability sebesar 0, pada satu musim giling. Besarnya biaya total penggantian komponen berdasarkan hasil penjadwalan optimal adalah sebesar Rp ,00. Perbandingan biaya penggantian komponen sesudah dilakukan penjadwalan optimal penggantian dengan penggantian komponen secara korektif yang dilakukan perusahaan pada musim giling 2009 adalah sebesar Rp ,00 atau terjadi penghematan sebesar 5,013%. DAFTAR PUSTAKA Jung, K.M., S.S. Han, and D.H. Park Optimization of cost and downtime for replacement model following the expiration of warranty. J. Reliability Engineering and Safety System 93: Laggoune, R., A. Chateauneuf, and D. Aissani Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units. J. Computers and Chemical Engineering 33: Nakagawa, T. and S.A. Mizutani A summary of maintenance policies for a finite interval. J. Reliability Engineering and Safety System 94:89-96 Pascual, R., V. Meruane, and P.A. Rey On the effect of downtime costs and budget constraint on preventive and replacement policies. J. Reliability Engineering and Safety System 93: Usman, H. dan N. Sobari Teknik Analisis Data Life Time Dalam Riset Marketing. Salemba Empat, Jakarta Wang, H A survey of maintenance policies of deteriorating systems. European Journal of Operational Research 139: Anonymous PT. PG Rajawali I. ( Tanggal akses 5 April 2010 Djunaidi, M. dan M.F. Sufa Usulan interval perawatan komponen kritis pada mesin pencetak botol (mould gear) berdasarkan kriteria minimasi downtime. J. Teknik Gelagar 18(01): Grosh, D.L A Primer of Reliability Theory. John Willeys & Sons Inc., New York Hartono, G. dan S. Dewi Analisis penerapan total preventive maintenance untuk meningkatkan availability dan reliability pada mesin injeksi melalui minimasi downtime. J. INESIA 04(01):1-11 Jiang R. and P. Ji Age replacement policy: a multi-attribute value model. J. Reliability Engineering and Safety System 76:

USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME

USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME USULAN INTERVAL PERAWATAN KOMPONEN KRITIS PADA MESIN PENCETAK BOTOL (MOULD GEAR) BERDASARKAN KRITERIA MINIMASI DOWNTIME Much. Djunaidi dan Mila Faila Sufa Laboratorium Sistem Produksi, Jurusan Teknik Industri

Lebih terperinci

Analisis Kebijakan Maintenance pada Transformator di PT. PLN (Persero) Area Semarang

Analisis Kebijakan Maintenance pada Transformator di PT. PLN (Persero) Area Semarang Petunjuk Sitasi: Mustikasari, A., & Pangestuti, D. E. (2017). Analisis Kebijakan Maintenance pada Transformator di PT. PLN (Persero) Area Semarang. Prosiding SNTI dan SATELIt 2017 (pp. C8-13). Malang:

Lebih terperinci

PERENCANAAN PREVENTIVE MAINTENANCE KOMPONEN CANE CUTTER I DENGAN PENDEKATAN AGE REPLACEMENT (Studi Kasus di PG Kebon Agung Malang)

PERENCANAAN PREVENTIVE MAINTENANCE KOMPONEN CANE CUTTER I DENGAN PENDEKATAN AGE REPLACEMENT (Studi Kasus di PG Kebon Agung Malang) PERENCANAAN PREVENTIVE MAINTENANCE KOMPONEN CANE CUTTER I DENGAN PENDEKATAN AGE REPLACEMENT (Studi Kasus di PG Kebon Agung Malang) PREVENTIVE MAINTENANCE IMPLEMENTATION OF CANE CUTTER I COMPONENT USING

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Rumusan Masalah dan Pengambilan Keputusan Pada metodologi pemecahan masalah mempunyai peranan penting untuk dapat membantu menyelesaikan masalah dengan mudah, sehingga

Lebih terperinci

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW

PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW PENJADWALAN PREVENTIVE MAINTENANCE MESIN B.FLUTE PADA PT AMW Bahtiar S. Abbas 1 ; Edi Steven 2 ; Harry Christian 3 ; Tedy Sumanto 4 1,2,3,4 Jurusan Teknik Industri, Fakultas Teknik, Universitas Bina Nusantara,

Lebih terperinci

Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan)

Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan) 60 A Perhitungan Interval Waktu Kerusakan (TTF) dan Downtime (TTR) Perhitungan Index of Fit Data TTF dan TTR Pemilihan Distribusi Data TTF dan TTR Uji Kesesuaian Distribusi Data Kerusakan Tidak Distribusi

Lebih terperinci

BAB III METODOLOGI PEMECAHAN MASALAH

BAB III METODOLOGI PEMECAHAN MASALAH BAB III METODOLOGI PEMECAHAN MASALAH Metodologi Pemecahan masalah adalah suatu proses berpikir yang mencakup tahapan-tahapan yang dimulai dari menentukan masalah, melakukan pengumpulan data melalui studi

Lebih terperinci

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PEMECAHAN MASALAH BAB 3 METODOLOGI PEMECAHAN MASALAH 3.1 Flowchart Diagram 3.1 Flowchart Metodologi Pemecahan Masalah Diagram 3.1 Flowchart Metodologi Pemecahan Masalah (Lanjutan) 62 63 3.2 Observasi Lapangan Observasi

Lebih terperinci

PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR

PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR PENENTUAN JADWAL PERAWATAN MESIN POMPA MELALUI ANALISIS KEANDALAN PADA PDAM GUNUNG LIPAN, SAMARINDA SEBERANG, KALIMANTAN TIMUR Fathiruddin Ilwan, Fatkhul Hani Rumawan, Lina Dianati Fathimahhayati Program

Lebih terperinci

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN KRITIS PADA MESIN VOLPACK MENGGUNAKAN METODE AGE REPLACEMENT

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN KRITIS PADA MESIN VOLPACK MENGGUNAKAN METODE AGE REPLACEMENT PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN KRITIS PADA MESIN VOLPACK MENGGUNAKAN METODE AGE REPLACEMENT ( Studi Kasus di CV. COOL CLEAN) Skripsi Diajukan Kepada Universitas Muhammadiyah Malang Untuk

Lebih terperinci

BAB I PENDAHULUAN 1.1. Latar Belakang

BAB I PENDAHULUAN 1.1. Latar Belakang BAB I PENDAHULUAN 1.1. Latar Belakang Pada era ini, industri menggunakan mesin-mesin untuk melakukan proses produksi. Namun, setiap mesin memiliki umur masing-masing. Mesin-mesin tersebut tidak selamanya

Lebih terperinci

BAB III METODOLOGI PENELITIAN. Langkah perancangan yang akan dilakukan adalah sebagai berikut: produksi pada departemen plastik

BAB III METODOLOGI PENELITIAN. Langkah perancangan yang akan dilakukan adalah sebagai berikut: produksi pada departemen plastik BAB III METODOLOGI PENELITIAN 3.1 Langkah Perancangan Langkah perancangan yang akan dilakukan adalah sebagai berikut: a. Melakukan studi literatur sejumlah buku yang berkaitan dengan preventive maintenance.

Lebih terperinci

Sumbu X (horizontal) memiliki range (rentang) dari minus takhingga. ( ) hingga positif takhingga (+ ). Kurva normal memiliki puncak pada X

Sumbu X (horizontal) memiliki range (rentang) dari minus takhingga. ( ) hingga positif takhingga (+ ). Kurva normal memiliki puncak pada X Sumbu X (horizontal) memiliki range (rentang) dari minus takhingga ( ) hingga positif takhingga (+ ). Kurva normal memiliki puncak pada X = 0. Perlu diketahui bahwa luas kurva normal adalah satu (sebagaimana

Lebih terperinci

JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT. NOBEL INDUSTRIES*

JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT. NOBEL INDUSTRIES* Reka Integra ISSN: Jurusan Teknik Industri Itenas No.02 Vol.4 Jurnal Online Institut Teknologi Nasional April 2016 JADWAL PERAWATAN PREVENTIVE PADA MESIN DYEING MENGGUNAKAN METODE AGE REPLACEMENT DI PT.

Lebih terperinci

ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING

ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING ANALISIS PREVENTIVE MAINTENANCE DAN RANCANGAN SISTEM INFORMASI PADA MESIN DIE CASTING Sutandani Suriono, Bernardus Bandriyana, Tri Pudjadi Binus University, Jl. K. H. Syahdan No. 9, Kemanggisan / Palmerah

Lebih terperinci

OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN METODA AGE REPLACEMENT DI PT. KERETA API INDONESIA *

OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN METODA AGE REPLACEMENT DI PT. KERETA API INDONESIA * ]Reka Integra ISSN: 2338-5081 [ Teknik Industri Itenas No.04 Vol. 01] Jurnal Online Institut Teknologi Nasional [April 2014] OPTIMISASI WAKTU PENGGANTIAN KOMPONEN PADA LOKOMOTIF DE CC 201 SERI 99 MENGGUNAKAN

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Diagram Alir Gambar 3.1 Diagram Alir Metodologi Penelitian 11 12 Gambar 3.1 Diagram Alir Metodologi Penelitian (Lanjutan) 3.2 Langkah-Langkah Pelaksanaan Penelitian Untuk

Lebih terperinci

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PEMECAHAN MASALAH BAB 3 METODOLOGI PEMECAHAN MASALAH START Studi Pendahuluan Identifikasi Masalah Studi Pustaka Perumusan Masalah Pengumpulan Data Pengolahan Data A Taguchi Identifikasi faktorfaktor yang berpengaruh Penentuan

Lebih terperinci

INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA API PARAHYANGAN * (STUDI KASUS DI PT. KERETA API INDONESIA)

INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA API PARAHYANGAN * (STUDI KASUS DI PT. KERETA API INDONESIA) Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.02 Vol.4 Jurnal Online Institut Teknologi Nasional April 2016 INTERVAL PENGGANTIAN PENCEGAHAN SUKU CADANG BAGIAN DIESEL PADA LOKOMOTIF KERETA

Lebih terperinci

PENENTUAN INTERVAL PERAWATAN DENGAN MENGGUNAKAN MODEL AGE REPLACEMENT DI PT. X

PENENTUAN INTERVAL PERAWATAN DENGAN MENGGUNAKAN MODEL AGE REPLACEMENT DI PT. X PENENTUAN INTERVAL PERAWATAN DENGAN MENGGUNAKAN MODEL AGE REPLACEMENT DI PT. X Rizki Wahyuniardi, Arumsari H., Rizki Triana Teknik Industri Fakultas Teknik Universitas Pasundan Bandung Jl. Dr. Setiabudi

Lebih terperinci

PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM

PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM PENERAPAN METODE RELIABILITYENGINEERING DALAM PERENCANAAN PERAWATAN MESIN DI PERUSAHAAN PRODUKSI AIR MINUM Khawarita Siregar, Ukurta Tarigan, dan Syahrul Fauzi Siregar Departemen Teknik Industri, Fakultas

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN 68 BAB 3 METODOLOGI PENELITIAN 3.1 Model Flowchart Rumusan Masalah dan Pengambilan Keputusan Berikut ini flowchart diagaram alir metodologi penelitian untuk menganalisa terjadinya breakdown dan cara meminimasinya

Lebih terperinci

Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang

Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang JATI UNIK, 07, Vol., No., Hal. 4-9 ISSN : 597-657 (Print) ISSN : 597-7946 (Online) Analisa Preventive Maintenance System Dengan Modularity Design Pada PT. Surya Pamenang Hariyanto *, Sri Rahayuningsih,

Lebih terperinci

PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER CD DI PT. DHARMA ANUGERAH INDAH (DAI)

PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER CD DI PT. DHARMA ANUGERAH INDAH (DAI) Mulyono: PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER D DI PT. DHARMA... 9 PENETAPAN JADWAL PERAWATAN MESIN SPEED MASTER D DI PT. DHARMA ANUGERAH INDAH (DAI) Julius Mulyono ), Dini Endah Setyo Rahaju

Lebih terperinci

BAB II LANDASAN TEORI

BAB II LANDASAN TEORI BAB II LANDASAN TEORI 2.1 Definisi Kerusakan dan Pemeliharaan Suatu barang atau produk dikatakan rusak ketika produk tersebut tidak dapat menjalankan fungsinya dengan baik lagi (Stephens, 2004). Hal yang

Lebih terperinci

OPTIMASI JADWAL PERAWATAN PENCEGAHAN PADA MESIN TENUN UNIT SATU DI PT KSM, YOGYAKARTA

OPTIMASI JADWAL PERAWATAN PENCEGAHAN PADA MESIN TENUN UNIT SATU DI PT KSM, YOGYAKARTA OPTIMASI JADWAL PERAWATAN PENCEGAHAN PADA MESIN TENUN UNIT SATU DI PT KSM, YOGYAKARTA Fransiskus Tatas Dwi Atmaji Program Studi Teknik Industri, Fakultas Rekayasa Industri, Telkom University franstatas@telkomuniversity.ac.id

Lebih terperinci

Universitas Bina Nusantara

Universitas Bina Nusantara Universitas Bina Nusantara Jurusan Teknik Industri Skripsi Sarjana Semester Genap tahun 2006/2007 ANALISA PREVENTIVE MAINTENANCE UNTUK MENINGKATKAN RELIABILITY DAN AVAILABILITY PADA MESIN PRESS DI PT INTIRUB

Lebih terperinci

BAB 4 HASIL DAN PEMBAHASAN. merupakan mesin paling kritis dalam industri pengolahan minyak sawit. Pabrik

BAB 4 HASIL DAN PEMBAHASAN. merupakan mesin paling kritis dalam industri pengolahan minyak sawit. Pabrik BAB 4 HASIL DAN PEMBAHASAN 4.1.Pengumpulan Data Kerusakan Mesin Dalam penelitian ini, penulis meneliti kerusakan pada mesin kempa yang merupakan mesin paling kritis dalam industri pengolahan minyak sawit.

Lebih terperinci

PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR

PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR Yugowati Praharsi 1, Iphov Kumala Sriwana 2, Dewi Maya Sari 3 Abstract: PT. Artha Prima Sukses Makmur memiliki lima mesin

Lebih terperinci

T U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi

T U G A S A K H I R. Diajukan guna melengkapi sebagai syarat. Dalam mencapai gelar Sarjana Strata Satu (S1) DISUSUN OLEH : : Puguh Mursito adi T U G A S A K H I R P e n e n t u a n I n t e r v a l P e r a w a t a n G u n a M e n u r u n k a n D o w n t i m e M e s i n P e n g e r i n g O v e n B o t o l D i PT. P h a r o s I n d o n e s i a Diajukan

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Maintenance 2.1.1 Arti dan Peranan Maintenance Maintenance adalah adalah semua tindakan yang diperlukan untuk mempertahankan barang atau peralatan untuk kembali pada kondisi tertentu

Lebih terperinci

Evaluasi Deviasi dari Aproksimasi Frekuensi Kejadian Perawatan Korektif dan Preventif

Evaluasi Deviasi dari Aproksimasi Frekuensi Kejadian Perawatan Korektif dan Preventif Petunjuk Sitasi: Rahman, A. (2017). Evaluasi Deviasi Dari Aproksimasi Frekuensi Kejadian Perawatan Korektif Dan Preventif. Prosiding SNTI dan SATELIT 2017 (pp. C181-186). Malang: Jurusan Teknik Industri

Lebih terperinci

BAB 4 METODOLOGI PENELITIAN

BAB 4 METODOLOGI PENELITIAN BAB 4 METODOLOGI PENELITIAN 4.1 Peneltian Pendahuluan Penelitian pendahuluan dilakukan untuk mengetahui kondisi pabrik sebenarnya dan melakukan pengamatan langsung untuk mengetahui permasalahan yang dihadapi

Lebih terperinci

PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI TEKNIK *

PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI TEKNIK * Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.04 Vol.03 Jurnal Online Institut Teknologi Nasional Oktober 2015 PENJADWALAN PERAWATAN PREVENTIVE PADA MESIN SLOTTING DI CV. CAHAYA ABADI

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Perumusan masalah dan Pengambilan Keputusan Model perumusan masalah dan pengambilan keputusan yanag digunakan dalam skripsi ini dimulai dengan melakukan observasi

Lebih terperinci

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PEMECAHAN MASALAH BAB 3 METODOLOGI PEMECAHAN MASALAH Diagram 3.1 Flowchart Metodologi Pemecahan Masalah 67 3.1 Penelitian Pendahuluan Sebagai langkah awal penelitian, maka dilakukan penelitian pendahuluan untuk mempelajari

Lebih terperinci

ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM

ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM ANALISIS KEANDALAN KOMPONEN KRITIS LIFT NPX-36000 UNTUK MENENTUKAN JADWAL PERAWATAN PENCEGAHAN YANG OPTIMUM Sachbudi Abbas Ras 1 ; Andy Setiawan 2 ABSTRACT Maintenance system, surely takes important role

Lebih terperinci

Nelson Manurung 1* 1 Jurusan Teknik Mesin, Politeknik Negeri Medan *

Nelson Manurung 1* 1 Jurusan Teknik Mesin, Politeknik Negeri Medan * OPTIMASI JADWAL PEMELIHARAAN SCREW PRESS PEMERAS DAGING BUAH KELAPA SAWIT DENGAN METODE TIME BASED MAINTENANCE (Studi Kasus di Pabrik Kelapa Sawit PTPN III Aek Nabara Selatan) Nelson Manurung 1* 1 Jurusan

Lebih terperinci

PENENTUAN INTERVAL WAKTU PERAWATAN PENCEGAHAN PADA PERALATAN SUB UNIT SINTESA UNIT UREA DI PT X MENGGUNAKAN SIMULASI MONTE CARLO

PENENTUAN INTERVAL WAKTU PERAWATAN PENCEGAHAN PADA PERALATAN SUB UNIT SINTESA UNIT UREA DI PT X MENGGUNAKAN SIMULASI MONTE CARLO PENENTUAN INTERVAL WAKTU PERAWATAN PENCEGAHAN PADA PERALATAN SUB UNIT SINTESA UNIT UREA DI PT X MENGGUNAKAN SIMULASI MONTE CARLO Winy Febrianti 1) dan Bobby Oedy P. Soepangkat 2) Program Studi Magister

Lebih terperinci

Jurnal PASTI Volume IX No 2,

Jurnal PASTI Volume IX No 2, PERENCANAAN PERAWATAN AIR COMPRESSOR UNIT UNTUK KOMPONEN AIR QUICK COUPLINGS DENGAN METODE RELIABILITY CENTERED MAINTENANCE DI PT ASTRA INTERNATIONAL TBK TSO CABANG SALEMBA Renty Anugerah Mahaji Puteri

Lebih terperinci

Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya Minimum Menggunakan Metode Smith dan Dekker (Studi Kasus di PT.

Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya Minimum Menggunakan Metode Smith dan Dekker (Studi Kasus di PT. Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.02 Vol. 02 Jurnal Online Institut Teknologi Nasional Juli 2014 Usulan Selang Waktu Perawatan dan Jumlah Komponen Cadangan Optimal dengan Biaya

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 DIAGRAM ALIR METODOLOGI PENELITIAN Dalam proses penyusunan laporan tugas akhir mengenai penerapan sistem Preventive Maintenance di departemen 440/441 men summer shoes pada

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Pengertian Pemeliharaan (Maintenance) Pemeliharaan (maintenance) dapat didefinisikan sebagai (Ariani, 2008): suatu kombinasi dari berbagai tindakan untuk menjaga, memperbaiki dan

Lebih terperinci

BAB I PENDAHULUAN. antara perusahaan manufaktur menjadi semakin ketat. Setiap perusahaan berusaha

BAB I PENDAHULUAN. antara perusahaan manufaktur menjadi semakin ketat. Setiap perusahaan berusaha BAB I PENDAHULUAN 1.1. Latar Belakang Permasalahan Industri manufaktur dewasa ini mengalami perkembangan yang sangat pesat, hal ini disebabkan adanya perubahan yang dinamis sehingga kompetisi antara perusahaan

Lebih terperinci

Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN:

Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN: Jurnal Telematika, vol. 10 no. 2, Institut Teknologi Harapan Bangsa, Bandung ISSN: 1858-2516 Penentuan Jadwal Pemeliharaan Pencegahan dan Perhitungan Kebutuhan Komponen Kritis pada Mesin Tuber 645M dan

Lebih terperinci

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II)

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II) SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II) (STUDI KASUS PADA PT. BRIDGESTONE TIRE INDONESIA) Disusun oleh : RIAN JANUARSYAH 2012.10.215.130

Lebih terperinci

BAB 3 METODOLOGI PEMECAHAN MASALAH

BAB 3 METODOLOGI PEMECAHAN MASALAH BAB 3 METODOLOGI PEMECAHAN MASALAH 3.1 Flow Chart Pemecahan Masalah dan Penjelasannya Metodologi Penelitian adalah langkah-langkah yang dibuat untuk memudahkan Pemecahkan suatu masalah dalam sebuah Penelitian.

Lebih terperinci

PENENTUAN JADWAL PENGGERINDAAN PADA MATA PAHAT MESIN GILING DAN PENGGANTIAN MATA GERINDA DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE

PENENTUAN JADWAL PENGGERINDAAN PADA MATA PAHAT MESIN GILING DAN PENGGANTIAN MATA GERINDA DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE PENENTUAN JADWAL PENGGERINDAAN PADA MATA PAHAT MESIN GILING DAN PENGGANTIAN MATA GERINDA DENGAN MENGGUNAKAN METODE PREVENTIVE MAINTENANCE Ahmad [1] ; Wilson Kosasih [1] ; Budi Wijoyo [2] 1 Staf Pengajar

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Model Rumusan Masalah dan Pengambilan Keputusan Metodologi pemecahan masalah mempunyai peranan penting untuk membantu menyelesaikan masalah dengan mudah. Oleh karena itu

Lebih terperinci

ANALISIS DAN PERANCANGAN SISTEM INFORMASI PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. STARMAS INTI ALUMINIUM INDUSTRY (SIAI)

ANALISIS DAN PERANCANGAN SISTEM INFORMASI PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. STARMAS INTI ALUMINIUM INDUSTRY (SIAI) ANALISIS DAN PERANCANGAN SISTEM INFORMASI PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. STARMAS INTI ALUMINIUM INDUSTRY (SIAI) Ranggadika Nurtrianto Binus University, Jakarta, DKI Jakarta, Indonesia Abstrak

Lebih terperinci

Jurnal Ilmiah Widya Teknik Vol No ISSN

Jurnal Ilmiah Widya Teknik Vol No ISSN Jurnal Ilmiah Widya Teknik Vol. 13 --- No. 1 --- 2014 ISSN 1412-7350 PERANCANGAN PREVENTIVE MAINTENANCE PADA MESIN CORRUGATING dan MESIN FLEXO di PT. SURINDO TEGUH GEMILANG Sandy Dwiseputra Pandi, Hadi

Lebih terperinci

KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING

KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING KEBIJAKAN OPTIMAL PENGGANTIAN KOMPONEN BERBASIS UMUR UNTUK PREVENTIVE MAINTENANCE PADA CNC PLATE CUTTING M. Imron Mustajib 1, Ulin Nuha 2, dan Nahnul Ansori 3 1,2,3 Program Studi Teknik Industri, University

Lebih terperinci

BAB III METODOLOGI PENELITIAN

BAB III METODOLOGI PENELITIAN BAB III METODOLOGI PENELITIAN 3.1 Waktu dan tempat Waktu pada penelitian ini dilaksanakan pada bulan Agustus, September dan Oktober 2016 yang bertempat di Pabrik Kelapa Sawit 3.2 Rancangan penelitian Adapun

Lebih terperinci

JADWAL PERAWATAN PENCEGAHAN KERUSAKAN KOMPONEN OIL SEAL PADA MESIN BALL MILL DENGAN KRITERIA MINIMISASI TOTAL ONGKOS *

JADWAL PERAWATAN PENCEGAHAN KERUSAKAN KOMPONEN OIL SEAL PADA MESIN BALL MILL DENGAN KRITERIA MINIMISASI TOTAL ONGKOS * Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.01 Vol.03 Jurnal Online Institut Teknologi Nasional Januari 2015 JADWAL PERAWATAN PENCEGAHAN KERUSAKAN KOMPONEN OIL SEAL PADA MESIN BALL MILL

Lebih terperinci

BAB 5 KESIMPULAN DAN SARAN

BAB 5 KESIMPULAN DAN SARAN BAB 5 KESIMPULAN DAN SARAN 5.1 Kesimpulan Berdasarkan hasil penelitian ini, maka didapatkan kesimpulan sebagai berikut: 1. RPM Extruder, Speed Cartepillar, Suhu Air, dan Pressure merupakan faktor - faktor

Lebih terperinci

BAB IV ANALISIS DATA DAN PEMBAHASAN

BAB IV ANALISIS DATA DAN PEMBAHASAN BAB IV ANALISIS DATA DAN PEMBAHASAN 4.1. Pengambilan Data Pada penelitian ini penulis mengambil data di PT. Perkebunan Nusantara Pabrik Gula Pangka di Jalan Raya Pangka Slawi, Kecamatan Pangkah, Kabupaten

Lebih terperinci

OPTIMALISASI INTERVAL WAKTU PENGGANTIAN KOMPONEN MESIN PACKER TEPUNG TERIGU KEMASAN 25 KG DI PT X

OPTIMALISASI INTERVAL WAKTU PENGGANTIAN KOMPONEN MESIN PACKER TEPUNG TERIGU KEMASAN 25 KG DI PT X OPTIMALISASI INTERVAL WAKTU PENGGANTIAN KOMPONEN MESIN PACKER TEPUNG TERIGU KEMASAN 25 KG DI PT X Sutanto 1) dan Abdullah Shahab 2) 1,2) Program Studi Magister Manajemen Teknologi, Institut Teknologi Sepuluh

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN BAB 3 METODOLOGI PENELITIAN 3.1 Diagram Alir Penelitian akan dilakukan dengan langkah-langkah berikut Gambar 3.1: Gambar 3.1 Diagram Alir 11 12 Gambar 3.2 Diagram Alir (Lanjutan) 3.2 Langkah-Langkah Penelitian

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN

BAB 3 METODOLOGI PENELITIAN 30 BAB 3 METODOLOGI PENELITIAN 3.1 Peneltian Pendahuluan Penelitian pendahuluan dilakukan untuk mengetahui kondisi pabrik sebenarnya dan melakukan pengamatan langsung untuk mengetahui permasalahan yang

Lebih terperinci

OPTIMASI PERSEDIAAN SUKU CADANG UNTUK PROGRAM PEMELIHARAAN PREVENTIP BERDASARKAN ANALISIS RELIABILITAS

OPTIMASI PERSEDIAAN SUKU CADANG UNTUK PROGRAM PEMELIHARAAN PREVENTIP BERDASARKAN ANALISIS RELIABILITAS Program Studi MMT-ITS, Surabaya 4 Agustus 27 OPTIMASI PERSEDIAAN SUKU CADANG UNTUK PROGRAM PEMELIHARAAN PREVENTIP BERDASARKAN ANALISIS RELIABILITAS (Studi Kasus di PT. Terminal Peti Kemas Surabaya) Agus

Lebih terperinci

(Studi Kasus :PT.Suri Tani Pemuka Banyuwangi)

(Studi Kasus :PT.Suri Tani Pemuka Banyuwangi) PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN MESIN PELLETING MENGGUNAKAN METODE AGE REPLACEMENT (Studi Kasus :PT.Suri Tani Pemuka Banyuwangi) Skripsi Diajukan Kepada Universitas Muhammadiyah Malang Untuk

Lebih terperinci

PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI

PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI PENENTUAN INTERVAL WAKTU PENGGANTIAN OPTIMUM KOMPONEN KRITIS MESIN HAMMER MILL DENGAN MODEL AGE REPLACEMENT DI PT. SEJATI COCONUT INDUSTRI TUGAS SARJANA Diajukan untuk Memenuhi Sebagian dari Syarat-syarat

Lebih terperinci

BAB 1 PENDAHULUAN. bergerak dalam dunia industri khususnya sebagai supplier bahan baku

BAB 1 PENDAHULUAN. bergerak dalam dunia industri khususnya sebagai supplier bahan baku BAB 1 PENDAHULUAN 1.1 Latar Belakang Penelitian PT. Cisangkan yang terletak di Bandung merupakan perusahaan manufaktur yang bergerak dalam dunia industri khususnya sebagai supplier bahan baku bangunan.

Lebih terperinci

4.1.7 Data Biaya Data Harga Jual Produk Pengolahan Data Penentuan Komponen Kritis Penjadualan Perawatan

4.1.7 Data Biaya Data Harga Jual Produk Pengolahan Data Penentuan Komponen Kritis Penjadualan Perawatan DAFTAR ISI HALAMAN JUDUL... i HALAMAN PENGAKUAN... ii SURAT KETERANGAN DARI PERUSAHAAN... iii HALAMAN PENGESAHAN PEMBIMBING... iv HALAMAN PENGESAHAAN PENGUJI... v HALAMAN PERSEMBAHAN... vi HALAMAN MOTTO...

Lebih terperinci

Usulan Jadwal Perawatan Preventif Mesin HGF di Stasiun Puteran Pabrik Gula

Usulan Jadwal Perawatan Preventif Mesin HGF di Stasiun Puteran Pabrik Gula Performa (8) Vol.7, No.:9- Usulan Jadwal Perawatan Preventif Mesin HGF di Stasiun Puteran Pabrik Gula Wahyudi Sutopo, Ari Nugroho, Yuniaristanto Laboratorium Sistem Logistik dan Bisnis, Jurusan Teknik

Lebih terperinci

3 BAB III LANDASAN TEORI

3 BAB III LANDASAN TEORI 3 BAB III LANDASAN TEORI 3.1 Pemeliharaan (Maintenance) 3.1.1 Pengertian Pemeliharaan Pemeliharaan (maintenance) adalah suatu kombinasi dari setiap tindakan yang dilakukan untuk menjaga suatu barang dalam,

Lebih terperinci

UNIVERSITAS BINA NUSANTARA

UNIVERSITAS BINA NUSANTARA UNIVERSITAS BINA NUSANTARA Program Ganda Teknik Informatika - Matematika Skripsi Sarjana Program Ganda Semester Ganjil 2005/2006 PERANCANGAN PROGRAM APLIKASI PENGHITUNGAN WAKTU PENGGANTIAN DAN PEMERIKSAAN

Lebih terperinci

Imam Sodikin Jurusan Teknik Industri, Fakultas Teknologi Industri, IST AKPRIND Yogyakarta amdiki@yahoo.com

Imam Sodikin Jurusan Teknik Industri, Fakultas Teknologi Industri, IST AKPRIND Yogyakarta amdiki@yahoo.com PENENTUAN INTERVAL PERAWATAN PREVENTIF KOMPONEN ELEKTRIK DAN KOMPONEN MEKANIK YANG OPTIMAL PADA MESIN EXCAVATOR SERI PC 200-6 DENGAN PENDEKATAN MODEL JARDINE Imam Sodikin Jurusan Teknik Industri, Fakultas

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI 28 BAB 2 LANDASAN TEORI 2.1 Pemeliharaan (Maintenance) 2.1.1 Pengertian Pemeliharaan (Maintenance) Beberapa definisi pemeliharaan (maintenance) menurut para ahli: Menurut Patrick (2001, p407), maintenance

Lebih terperinci

ANALISA KEANDALAN PADA PERALATAN UNIT PENGGILINGAN AKHIR SEMEN UNTUK MENENTUKAN JADWAL PERAWATAN MESIN (STUDI KASUS PT. SEMEN INDONESIA PERSERO TBK.

ANALISA KEANDALAN PADA PERALATAN UNIT PENGGILINGAN AKHIR SEMEN UNTUK MENENTUKAN JADWAL PERAWATAN MESIN (STUDI KASUS PT. SEMEN INDONESIA PERSERO TBK. ANALISA KEANDALAN PADA PERALATAN UNIT PENGGILINGAN AKHIR SEMEN UNTUK MENENTUKAN JADWAL PERAWATAN MESIN (STUDI KASUS PT. SEMEN INDONESIA PERSERO TBK.) I Gusti Ngr. Rai Usadha 1), Valeriana Lukitosari 2),

Lebih terperinci

INTERVAL WAKTU PENGGANTIAN PENCEGAHAN OPTIMAL KOMPONEN SISTEM PRINTING UNIT U41 MENGGUNAKAN METODE AGE REPLACEMENT DI PT.

INTERVAL WAKTU PENGGANTIAN PENCEGAHAN OPTIMAL KOMPONEN SISTEM PRINTING UNIT U41 MENGGUNAKAN METODE AGE REPLACEMENT DI PT. Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No.01 Vol.03 Jurnal Online Institut Teknologi Nasional Januari 2015 INTERVAL WAKTU PENGGANTIAN PENCEGAHAN OPTIMAL KOMPONEN SISTEM PRINTING UNIT

Lebih terperinci

BAB I PENDAHULUAN. operasi pada suatu perusahaan adalah kesiapan mesin mesin produksi dalam. diperlukan adanya suatu sistem perawatan yang baik.

BAB I PENDAHULUAN. operasi pada suatu perusahaan adalah kesiapan mesin mesin produksi dalam. diperlukan adanya suatu sistem perawatan yang baik. 1 BAB I PENDAHULUAN 1.1 Latar Belakang Masalah Ketidakstabilan perekonomian dan semakin tajamnya persaingan di dunia industri mengharuskan suatu perusahaan untuk lebih meningkatkan kelancaran kegiatan

Lebih terperinci

ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT.

ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT. ANALISIS PENYEBAB KEGAGALAN (BREAKDOWN) UNTUK PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA SEMI GANTRY CRANE 32 TON DI PT. RST TUGAS AKHIR Diajukan sebagai salah satu syarat untuk memperoleh gelar

Lebih terperinci

BAB I PENDAHULUAN. Gula pasir merupakan kebutuhan pokok strategis yang memegang peran

BAB I PENDAHULUAN. Gula pasir merupakan kebutuhan pokok strategis yang memegang peran BAB I PENDAHULUAN 1.1 Latar Belakang Gula pasir merupakan kebutuhan pokok strategis yang memegang peran penting di sektor pertanian, khususnya sub sektor perkebunan dalam perekonomian nasional, yaitu sebagai

Lebih terperinci

IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA

IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA JURNAL TEKNIK INDUSTRI VOL. 3, NO. 1, JUNI 001: 18-5 IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE DI DEPARTEMEN NON JAHIT PT. KERTA RAJASA RAYA Tanti Octavia Ronald E. Stok Dosen Fakultas Teknologi Industri,

Lebih terperinci

DAFTAR ISI. HALAMAN JUDUL... i. NASKAH SOAL TUGAS AKHIR... iv. HALAMAN PERSEMBAHAN... v. ABSTRACT... vii. KATA PENGANTAR... viii. DAFTAR ISI...

DAFTAR ISI. HALAMAN JUDUL... i. NASKAH SOAL TUGAS AKHIR... iv. HALAMAN PERSEMBAHAN... v. ABSTRACT... vii. KATA PENGANTAR... viii. DAFTAR ISI... DAFTAR ISI HALAMAN JUDUL... i PENGESAHAN... ii PERNYATAAN... iii NASKAH SOAL TUGAS AKHIR... iv HALAMAN PERSEMBAHAN... v INTISARI... vi ABSTRACT... vii KATA PENGANTAR... viii DAFTAR ISI... x DAFTAR GAMBAR...

Lebih terperinci

BAB 3 METODOLOGI PENELITIAN. menggunakan data stagnasi mesin yang dicatat oleh perusahaan. Penelitian

BAB 3 METODOLOGI PENELITIAN. menggunakan data stagnasi mesin yang dicatat oleh perusahaan. Penelitian BAB 3 METODOLOGI PENELITIAN 3.1. Populasi dan Sampel Penelitian Penelitian mengenai preventive maintenance mesin pada PTPTN XIII menggunakan data stagnasi mesin yang dicatat oleh perusahaan. Penelitian

Lebih terperinci

Prosiding Seminar Nasional Manajemen Teknologi XXIV Program Studi MMT-ITS, Surabaya 23 Januari 2016

Prosiding Seminar Nasional Manajemen Teknologi XXIV Program Studi MMT-ITS, Surabaya 23 Januari 2016 PENENTUAN INTERVAL WAKTU PERAWATAN PENCEGAHAN PADA PERALATAN DI MEDIUM PRESSURE GAS COMPRESSION AREA (MPGCA) DI PT TEXI DENGAN MENGGUNAKAN SIMULASI MONTE CARLO Arief Witjaksono 1) dan Bobby Oedy P. Soepangkat

Lebih terperinci

BAB II TINJAUAN PUSTAKA. besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam

BAB II TINJAUAN PUSTAKA. besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam BAB II TINJAUAN PUSTAKA 2.1 Tinjauan Pustaka Manajemen operasi merupakan salah satu bidang yang berpengaruh sangat besar terhadap produktivitas pada bidang manufaktur maupun jasa. Dalam menjalankan operasionalnya,

Lebih terperinci

BAB II LANDASAN TEORI Pengertian perawatan Jenis-Jenis Perawatan Metode Reliability Centered Maintenance (RCM)...

BAB II LANDASAN TEORI Pengertian perawatan Jenis-Jenis Perawatan Metode Reliability Centered Maintenance (RCM)... DAFTAR ISI HALAMAN JUDUL... i LEMBAR PENGESAHAN PEMBIMBING... ii LEMBAR PENGESAHAN PENGUJI... iii HALAMAN PENGAKUAN... iv HALAMAN PERSEMBAHAN... v HALAMAN MOTTO... vi KATA PENGANTAR... vii DAFTAR ISI...

Lebih terperinci

JADWAL PERAWATAN OVERHEAD CRANE DENGAN MENGGUNAKAN PROPORTIONAL HAZARDS MODEL DAN TOTAL TIME ON TEST PLOTTING DI PT. BUKAKA TEKNIK UTAMA *

JADWAL PERAWATAN OVERHEAD CRANE DENGAN MENGGUNAKAN PROPORTIONAL HAZARDS MODEL DAN TOTAL TIME ON TEST PLOTTING DI PT. BUKAKA TEKNIK UTAMA * Reka Integra ISSN: 2338-5081 Jurusan Teknik Industri Itenas No. 01 Vol. 02 Jurnal Online Institut Teknologi Nasional Juli 2014 JADWAL PERAWATAN OVERHEAD CRANE DENGAN MENGGUNAKAN PROPORTIONAL HAZARDS MODEL

Lebih terperinci

Penjadwalan Predictive Maintenance dan Biaya Perawatan Mesin Pellet di PT Charoen Pokphand Indonesia - Sepanjang

Penjadwalan Predictive Maintenance dan Biaya Perawatan Mesin Pellet di PT Charoen Pokphand Indonesia - Sepanjang Soesetyo, et al. / Penjadwalan Predictive Maintenance dan Biaya Perawatan Mesin di PT Charoen Pokphand Indonesia - Sepanjang / Jurnal Titra, Vol. 2, No.2, Juni 24, pp. 47-54 Penjadwalan Predictive Maintenance

Lebih terperinci

Minimalisasi Kegagalan Sirkulasi Pengembalian Feed pada Mesin Pellet di PT Charoen Pokphand Indonesia Feedmill

Minimalisasi Kegagalan Sirkulasi Pengembalian Feed pada Mesin Pellet di PT Charoen Pokphand Indonesia Feedmill Minimalisasi Kegagalan Sirkulasi Pengembalian Feed pada Mesin Pellet di PT Charoen Pokphand Indonesia Feedmill Stefanie Mariana Linardi 1, Tanti Octavia 2 Abstract: One of the most common problem happened

Lebih terperinci

RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN

RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN Jurnal Riset dan Teknologi Kelautan (JRTK) Volume 14, Nomor 1, Januari - Juni 2016 RELIABILITY CENTERED MAINTENANCE DALAM PERAWATAN F.O. SERVICE PUMP SISTEM BAHAN BAKAR KAPAL IKAN M. Rusydi Alwi Dosen

Lebih terperinci

ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS

ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS INFO TEKNIK Volume 17 No. 2 Desember 2016 (253-262) ANALISIS INTERVAL PERAWATAN KOMPONEN KRITIS UNIT MESIN STITCHING UNTUK MEMINIMUMKAN BIAYA PERAWATAN DAN MENINGKATKAN PRODUKTIVITAS Fina Andika Frida

Lebih terperinci

PERAWATAN MESIN SECARA PREVENTIVE MAINTENANCE DENGAN MODULARITY DESIGN PADA PT. RXZ

PERAWATAN MESIN SECARA PREVENTIVE MAINTENANCE DENGAN MODULARITY DESIGN PADA PT. RXZ PERAWATAN MESIN SECARA PREVENTIVE MAINTENANCE DENGAN MODULARITY DESIGN PADA PT. RXZ Paulus Tarigan 1, Elisabeth Ginting 2, Ikhsan Siregar 2 Departemen Teknik Industri, Fakultas Teknik, Universitas Sumatera

Lebih terperinci

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT

PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT PENENTUAN INTERVAL WAKTU PENGGANTIAN KOMPONEN PADA MESIN MULTI BLOCKDENGAN MENGGUNAKAN METODE AGE REPLACEMENT (PT. Malang Indah) Skripsi DiajukanKepadaUniversitasMuhammadiyah Malang UntukMemenuhi Salah

Lebih terperinci

Kata Kunci Life Cycle Cost (LCC), Overall Equipment Effectiveness (OEE), Six Big Losses

Kata Kunci Life Cycle Cost (LCC), Overall Equipment Effectiveness (OEE), Six Big Losses PERANCANGAN KEBIJAKAN MAINTENANCE PADA MESIN KOMORI LS440 DENGAN MENGGUNAKAN METODE LIFE CYCLE COST (LCC) DAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) (Studi Kasus : PT ABC) Chairun Nisa 1, Judi Alhilman

Lebih terperinci

Perancangan Aktivitas Pemeliharaan Dengan Reliability Centered Maintenance II (Studi Kasus : Unit 4 PLTU PT. PJB Gresik)

Perancangan Aktivitas Pemeliharaan Dengan Reliability Centered Maintenance II (Studi Kasus : Unit 4 PLTU PT. PJB Gresik) JURNAL TEKNIK, (2014) 1-6 1 Perancangan Aktivitas Pemeliharaan Dengan Reliability Centered Maintenance II (Studi Kasus : Unit 4 PLTU PT. PJB Gresik) Ahmad Nizar Pratama, Yudha Prasetyawan Teknik Industri,

Lebih terperinci

Penentuan Interval Waktu Optimum Penggantian Pisau Cane Cutter

Penentuan Interval Waktu Optimum Penggantian Pisau Cane Cutter ` Penentuan Interval Waktu Optimum Penggantian Pisau Cane Cutter PENENTUAN INTERVAL WAKTU OPTIMUM PENGGANTIAN PISAU CANE CUTTER PADA MESIN CANE CUTTER DENGAN PENDEKATAN RELIABILITY DI PT. PERKEBUNAN NUSANTARA

Lebih terperinci

BAB 4 METODOLOGI PENELITIAN

BAB 4 METODOLOGI PENELITIAN BAB 4 METODOLOGI PENELITIAN 4.1 Model Rumusan Masalah dan Pengambilan Keputusan Metodologi pemecahan masalah mempunyai peranan penting untuk membantu menyelesaikan masalah dengan mudah. Oleh karena itu

Lebih terperinci

PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT DI PT. MOUNT DREAM INDONESIA

PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT DI PT. MOUNT DREAM INDONESIA Penentuan Interval Waktu Optimal Penggantian Komponen Dengan Metode Age Replacement PENENTUAN INTERVAL WAKTU OPTIMAL PENGGANTIAN KOMPONEN WIRE SCREEN PADA MESIN WIRE PART DENGAN METODE AGE REPLACEMENT

Lebih terperinci

Analisis Pemeliharaan Mesin Raw Mill Pabrik Indarung IV PT Semen Padang

Analisis Pemeliharaan Mesin Raw Mill Pabrik Indarung IV PT Semen Padang Petunjuk Sitasi: Taufik, Fithri, P., & Arsita, R. (2017). Analisis Pemeliharaan Mesin Raw Mill Pabrik Indarung IV PT Semen Padang. Prosiding SNTI dan SATELIT 2017 (pp. C75-84). Malang: Jurusan Teknik Industri

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB 2 LANDASAN TEORI 2.1 Pengertian Maintenance Dalam buku Maintenance Engineering Handbook (Hinggins, Mobley, & Smith, 2002) Mobley mengatakan bahwa perawatan tidak hanya tentang pencegahan, pemberian

Lebih terperinci

BAB I PENDAHULUAN 1.1. Latar Belakang

BAB I PENDAHULUAN 1.1. Latar Belakang BAB I PENDAHULUAN 1.1. Latar Belakang Era globalisasi mendorong peningkatan kebutuhan manusia agar dapat memenuhi keinginannya. Perawatan komponen pada mesin industri penting untuk mendukung kegiatan pengoperasian

Lebih terperinci

BAB III METODOLOGI PENELITIAN. Adapun penjelasan yang lebih lengkap dari tiap langkah adalah sebagaiberikut :

BAB III METODOLOGI PENELITIAN. Adapun penjelasan yang lebih lengkap dari tiap langkah adalah sebagaiberikut : BAB III METODOLOGI PENELITIAN 3.1 Identifikasi Masalah Tahap identifikasi masalah terdiri dari empat langkah yaitu : latarbelakang masalah, perumusan masalah, tujuan dan manfaat penelitian serta studiliteratur.

Lebih terperinci

PENGUSULAN ALTERNATIF UNTUK ALAT TRANSPORTASI BUCKET ELEVATOR YANG DAPAT MENGURANGI DOWN TIME

PENGUSULAN ALTERNATIF UNTUK ALAT TRANSPORTASI BUCKET ELEVATOR YANG DAPAT MENGURANGI DOWN TIME PENGUSULAN ALTERNATIF UNTUK ALAT TRANSPORTASI BUCKET ELEVATOR YANG DAPAT MENGURANGI DOWN TIME Rahmat Azis,Andi Pawennari, Taufik Nur Program Studi Teknik Industri, Fakultas Teknologi Industri, Universitas

Lebih terperinci

Perancangan Sistem Planned Maintenance dan Man Power Planning

Perancangan Sistem Planned Maintenance dan Man Power Planning Perancangan Sistem Planned Maintenance dan Man Power Planning di PT X David Soebiantoro 1, Siana Halim 2 Abstract: The purposes of this thesis are designing a planned maintenance and man power planning

Lebih terperinci

PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI.

PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI. PENERAPAN RELIABILITY CENTERED MAINTENANCE II (RCM II) DALAM PERENCANAAN KEGIATAN PADA MESIN BOILER DI PT PG CANDI BARU SIDOARJO SKRIPSI Oleh : NURAHADIN ZAKI ROMADHON NPM. 0632010165 JURUSAN TEKNIK INDUSTRI

Lebih terperinci

BAB I PENDAHULUAN. persaingan dengan perusahaan manufaktur lainnya, maka diperlukan kebijakan

BAB I PENDAHULUAN. persaingan dengan perusahaan manufaktur lainnya, maka diperlukan kebijakan BAB I PENDAHULUAN 1.1. Latar Belakang Permasalahan Di era globalisasi saat ini perusahaan manufaktur akan menghadapi persaingan dengan perusahaan manufaktur lainnya, maka diperlukan kebijakan untuk bersaing

Lebih terperinci