Procurement List 2015
Komoditas Pengadaan Sesuai Permen ESDM No.13 Tahun 2013 No. Nama Paket Pengadaan Kategori 1. Pipa Pemboran-OCTG (High Grade, Low Grade) Barang 2. Pipa Penyalur (Spiral/SAW, ERW, Seamless Pipe) Barang 3. Lumpur Pemboran, Semen, dan Bahan Kimia Pemboran Barang 4. Electrical Submersible Pump Barang 5. Pumping Unit Barang 6. Machinery & Equipment Barang 7. Wellhead & Xmas Tree (Onshore & Offshore) Barang 8. Bahan Bakar Minyak Barang 9. Pelumas Barang 10. Barang Lain-lain Barang 11. Jasa Survei, Seismik dan Studi Geologi (Onshore & Offshore) Jasa 12. Jasa Pemboran (Onshore & Offshore) Jasa 13. Jasa FEED (Onshore & Offshore) Jasa 14. Jasa EPCI (Onshore & Offshore) Jasa 15. Jasa Perkapalan Jasa 16. Jasa Pesawat Udara Jasa 17. Jasa Lain-lain Jasa
NILAI PROCUREMENT LIST 2015 Procurement List 2015 (Perkiraan Nilai Yang Akan Datang) > USD 5 Juta < USD 5 Juta Proc List > USD 5 Juta Ac?ve On Going Future 1,555.85 3% 5,461.95 10% 19,750.15 39% 29,766.26 58% Proc List < USD 5 Juta 51,072.27 90% Ac?ve On Going Future 421.30 8% 2,826.42 52% 2,214.23 40%
Nilai Komoditas Permen ESDM Procurement List 2 Nilai Procrement List Barang Bahan Bakar Minyak (BBM) Machinery & Equipment Pipa Pemboran (OCTG) Pemboran (OCTG) High Grade Pemboran (OCTG) Low Grade Wellhead dan Xmas tree ellhead dan Xmas tree Darat ellhead dan Xmas tree Laut ran, semen, dan bahan kimia Pipa Penyalur (linepipe) enyalur (linepipe) Spiral/SAW Pipa Penyalur (linepipe) ERW yalur (linepipe) Seamless Pipe Electrical Submersible Pump Pumping Unit Pelumas Barang lainlain 0.00 9,043,500.00 0.00 0.00 127,560,857.82 191,349,245.00 111,946,161.00 79,403,084.00 185,965,282.10 146,161,468.94 137,117,968.94 67,982,277.00 283,468,852.40 373,488,947.72 403,575,894.00 411,029,710.22 637,479, Nilai Procrement List Jasa Jasa Pemboran Jasa Pemboran Darat Jasa Pemboran Laut Jasa EPCI Jasa EPCI Darat Jasa EPCI Laut Jasa Perkapalan rvei, Seismik, dan Studi Geologi eismik, dan Studi Geologi Darat Seismik, dan Studi Geologi Laut Jasa Pesawat Udara Jasa FEED Jasa FEED Darat Jasa FEED Laut Jasa lainlain 397,196,759.00 283,404,259.00 113,792,500.00 45,095,764.00 30,000,000.00 15,095,764.00 311,276,348.24 981,156,474.00 1,866,428,760.60 2,232,303,320.52 3,006,033,971.44 3,082,483,778.75 3,213,459,794.52 5,411,146,263.66 6,088,517,750.1 Total Nilai Proc List 2015 Future Contract : US$ 19,750.15 Juta
NILAI ONSHORE VS OFFSHO Proc List 2015 Future Contract 10,926.48 55% Onshore Offshore 8,823.67 45% Nilai Future Contract US$ 19.750,15 Juta Komoditas 12.b. Jasa Pemboran Laut 12.a. Jasa Pemboran Darat 14.b. Jasa EPCI Laut 15. Jasa Perkapalan 14.a. Jasa EPCI Darat 8. Bahan Bakar Minyak (BBM) 6. Machinery & Equipment 10. Barang lainlain 16. Jasa Pesawat Udara 1.a. Pipa Pemboran (OCTG) High Grade 11.a. Jasa Survei, Seismik, dan Studi Geologi Darat 7.a. Wellhead dan Xmas tree Darat 3. Lumpur pemboran, semen, dan bahan kimia 2.b. Pipa Penyalur (linepipe) ERW 1.b. Pipa Pemboran (OCTG) Low Grade 11.b. Jasa Survei, Seismik, dan Studi Geologi Laut 4. Electrical Submersible Pump 13.a. Jasa FEED Darat 13.b. Jasa FEED Laut 2.c. Pipa Penyalur (linepipe) Seamless Pipe 9. Pelumas 7.b. Wellhead dan Xmas tree Laut 5. Pumping Unit 2.a. Pipa Penyalur (linepipe) Spiral/SAW 17. Jasa lainlain Onshore vs Offshore Komoditas Permen ESDM 15/2013 251.10 405.86 59.49 561.64 75.84 135.57 253.74 180.19 205.94 207.56 105.33 153.72 129.75 283.40 79.40 111.95 116.42 69.55 24.97 112.14 10.45 117.11 113.79 67.98 15.00 15.00 14.20 15.10 9.04 928.45 1,460.57 1,981.20 Offshore Onshore 2,457.22 3,082.48 3,006.03 2,932.94 500 1,000 1,500 2,000 2,500 3,000 3, Juta US$
15 BESAR KK BERDASARKAN NILAI PROCUREMENT LIST 2 15 Besar Kelompok KKKS Nilai Proc List 2015 Future Contract Chevron Pacific Indonesia 2,928.30 PEP 2,858.42 Chevron Indonesia Company 2,731.72 Santos Pty. Ltd. 2,402.56 ConocoPhillips Indonesia Inc. 2,139.60 PHE 1,994.02 KKKS BP Indonesia ExxonMobil Indonesia PetroChina Interna?onal 392.49 866.58 1,577.16 PremierOil 389.88 CNOOC SES Ltd. 296.67 Star Energy (Kakap) Ltd. 207.32 HuskyCNOOC Madura Ltd. 187.06 Total E& P Indonesie 154.31 JOB Pertamina Medco Tomori 134.70 500 1,000 1,500 2,000 2,500 3,000 3,500 Juta US$ al Nilai Rencana Pengadaan 2015 15 Besar Kelompok KKKS : US$ 19,260.78 Juta (97,52% dari Nilai Proc List 2015 Future tract)
PROCUREMENT LIST 2015 BERDASARKAN REGION DAN WKP Proc List 2015 Future Contract KS 3,596.58 18% NS 633.44 PALU 3% 2,115.22 11% CS 4,926.34 25% Nilai Proc List Future Eksplorasi Contract 236.66 1% Produksi 19,513.50 99% EJNT 2,235.73 11% JVSWJ 1,760.99 9% NA SS 3,758.55 723.31 19% 4% Nilai Proc List 2015Future Contract US$ 19.750.15 Juta Northern Sumatera; NA: NatunaAnambas; CS: Central Sumatera; Southern Sumatera; JVSWJ: Java SeaWest Java; EJNT: East JavaNusa ggara; KS: KalimantanSulawesi; PALU: PapuaMaluku
PAKET PENGADAAN PROCUREMENT LIST 2015 Paket Pengadaan Proc List 2015 Future Contract Nilai Pengadaan Proc List 2015Future Contract US$ 5 M s.d < US$ 20M US$ 20M US$ 5 M s.d < US$ 20M US$ 20M 235 42% 327 58% 3,484.93 18% 16,265.23 82% Proc List 2015Future Contract 562 Paket Pengadan Nilai Proc List 2015Future Contract US$ 19.750.15 Juta