DIRECT REIMBURSABLE COST FOR BOP TIM KOORDINATOR KOTA #REF!

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Total Remuneration (I.1 + I.2 + Fee)

REMUNERATION I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.2])

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF II.1 TRAVEL COST II.2 OFFICE EXPENSES

REMUNERATION I.1 INDIVIDUAL CONSULTANT SUB PROFF & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.

SURAT EDARAN Nomor: 63/SE/DC/2016 TENTANG PETUNJUK TEKNIS PENYALURAN BANTUAN PEMERINTAH DI DIREKTORAT PENGEMBANGAN KAWASAN PERMUKIMAN

CONTRACT AMENDMENT NO. 7

: OVERSIGHT SERVICE PROVIDER 10 (OSP IN ACEH) Periode Kontrak : 16 September 2013 sd 31 Desember 2014 NO KOMPOSISI BIAYA CONTRACT AMANDEMENT 1

: Integrated Community Driven Development (ICDD) Project IDB ICDD Phase II & III Nama Konsultan DESCRIPTION I REMUNERATION

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

CONTRACT AMANDEMENT 8 I REMUNERATION ( SUB TOTAL I ) 12,007,950,000 11,073,250, ,900,000 11,375,150, ,800,000

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

CONTRACT AMANDEMENT 4

RAPAT KOORDINASI PELAKSANAAN PROGRAM SLUM ALLEVIATION

: Integrated Community Driven Development (ICDD) Project Phase II & III Nama Konsultan NO COST COMPONENT AMANDMENT CONTRAC NO.2

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

PT. KOGAS DRIYAP KONSULTAN in JV with PT. PERENTJANA DJAJA

CONTRACT AMENDMENT NO. 7 I REMUNERATION ( SUB TOTAL I ) 4,397,025,000

I REMUNERATION ( SUB TOTAL I ) PROFESSIONAL STAFF SUPPORTING STAFF

PANDUAN PROSES PEMBAYARAN PEKERJAAN LAYANAN JASA NON KONSULTAN PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT (PNPM) MANDIRI PERKOTAAN

RENCANA & REALISASI PENANAMAN MODAL DALAM NEGERI (PMDN) MENURUT SEKTOR TAHUN 2010 DI KALIMANTAN TIMUR

REALISASI INVESTASI PROVINSI KALIMANTAN TIMUR PADA TRIWULAN III TAHUN 2016

TEPRA KALIMANTAN TIMUR TIM EVALUASI DAN PENGAWASAN REALISASI ANGGARAN TIM EVALUASI DAN PENGAWASAN REALISASI ANGGARAN (TEPRA) SAMARINDA, JULI

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Kementerian Pekerjaan Umum

REALISASI INVESTASI PROVINSI KALIMANTAN TIMUR PADA TRIWULAN II TAHUN 2016

Sumber Pendanaan Nama Konsultan

SURAT EDARAN DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTUR JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

AMENDMENT CONTRACT NO. 8 I REMUNERATION ( SUB TOTAL I ) 17,371,247, PROFESSIONAL STAFF 12,790,500, SUPPORTING STAFF 3,368,800,000

PANDUAN PENGAJUAN PENAGIHAN PEMBAYARAN PEKERJAAN LAYANAN JASA NON KONSULTAN PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN

BPS PROVINSI KALIMANTAN TIMUR

NO DESCRIPTION CONTRACT AMANDEMENT 8

Profil PROGRAM KOTA TANPA KUMUH (KOTAKU) Provinsi Jawa Timur. Kelurahan Gading Kasri - Kota Malang

Penanggulangan Kemiskinan Di Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

: IBRD Loan No. (Four PNPM) ID Nama Konsultan. Sumber Pendanaan. : PT Kogas Driyap Konsultan JV PT Artistika Prasetia Alamat konsultan

Penanggulangan Kemiskinan Di Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

BERITA RESMI STATISTIK

AMENDMENT CONTRACT NO. 6 I REMUNERATION ( SUB TOTAL I ) 14,902,295, PROFESSIONAL STAFF 10,978,750, SUPPORTING STAFF 2,883,850,000

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Kementerian Pekerjaan Umum

NO COST COMPONENT AMANDMENT CONTRACT No. 7

Arah Kebijakan Percepatan Penanganan Kumuh dan Gambaran Umum Program KOTAKU

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

MEKANISME PENCAIRAN DAN PEMANFAATAN ANGGARAN BANTUAN DANA INVESTASI (BDI) NATIONAL SLUM UPGRADING PROGRAM (NSUP)

SURAT EDARAN DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

BAB I PENDAHULUAN 1.1 Latar Belakang Kota Bontang terletak 150 km di utara Samarinda. Dengan wilayah yang relatif kecil dibandingkan kabupaten

Program Peningkatan Kualitas Permukiman di Perkotaan (P2KP)

TOTAL PRICE (IDR) NO. DESCRIPTION. Annex 2A-Recapitulation

BPS PROVINSI KALIMANTAN TIMUR

PETA INFORMASI DAN ANALISIS LIFTING DBH MIGAS PROVINSI KALIMANTAN TIMUR

AUDIT ATAS PROGRAM TAHUN 2017 KOTA TANPA KUMUH (KOTAKU) / NATIONAL SLUM UPGRADING PROGRAM (NSUP) Jakarta, 23 Mei 2017 RAKORNAS PROGRAM NSUP

Penanggulangan Kemiskinan Di Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

BPS PROVINSI KALIMANTAN TIMUR

Nomor & Periode Invoice : No. 26 Periode (September 2016) Realisasi Invoice : November 2016 : IBRD Loan No ID, Ln ID & No.

REALISASI PENANAMAN MODAL (INVESTASI) PROVINSI KALIMANTAN TIMUR TRIWULAN IV TAHUN 2013

Kredit. Kredit. + Promo Umroh Mandiri Travel Center Diskon Hingga Rp 1 Jt dengan Mandiri Kartu

RUMUSAN RAPAT KERJA TEKNIS KELAUTAN DAN PERIKANAN TAHUN 2014

KERANGKA ACUAN KEGIATAN TRAINING OF TRAINER (TOT) STBM BAGI KOORDINATOR STBM PROVINSI DAN FASILITATOR STBM KABUPATEN/KOTA PROGRAM PAMSIMAS II TA 2014

Buy 3 Get 1 Free Umroh Awal Tahun 9 hari dengan Etihad Airways

BERITA NEGARA REPUBLIK INDONESIA

Nomor & Periode Invoice : No. 24 Periode (Juli 2016) Realisasi Invoice : September 2016 : IBRD Loan No ID, Ln ID & No.

I. Pendahuluan. I.1. Latar Belakang

+ Umroh Tahun Baru Plus Madain Salih 11 Hari dengan Emirates

KEBIJAKAN PENANGANAN PERMUKIMAN KUMUH SEBAGAI JALAN MENUJU KOTA LAYAK HUNI DAN BERKELANJUTAN

PEMERINTAH PROVINSI KALIMANTAN TIMUR BADAN PENDAPATAN DAERAH

TENTANG SINERGITAS PENANGANAN PERMUKIMAN KUMUH YANG BERKELANJUTAN BERBASIS TEKNOLOGI INFORMASI DENGAN RAHMAT TUHAN YANG MAHA ESA WALIKOTA YOGYAKARTA,

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

INDEKS PEMBANGUNAN MANUSIA (IPM) KALIMANTAN TIMUR TAHUN 2016

REALISASI INVESTASI PROVINSI KALIMANTAN TIMUR TRIWULAN I TAHUN 2018

REALISASI INVESTASI PROVINSI KALIMANTAN TIMUR TRIWULAN I TAHUN 2017

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

HASIL PENGOLAHAN DAN ANALISISDATA AKREDITASI SEKOLAH/MADRASAH PROVINSI KALIMANTANTIMUR TAHUN 2016

LAPORAN KEMAJUAN USK FMR

Oleh : Direktur Penataan Bangunan dan Lingkungan Disampaikan dalam rangka Sosialisasi Nasional APBNP 2013 Jakarta, 21 Agustus 2013

PENGAWALAN INTEGRASI JAGUNG DI LAHAN PERKEBUNAN PROVINSI KALIMANTAN TIMUR TAHUN 2017

ANALISIS SURVEY PILIHAN STUDI DAN BIDANG KERJA LULUSAN SMA/SMK DI KALIMANTAN TIMUR

PROGRAM KOTA TANPA KUMUH (KOTAKU)

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

L AP O R A N PENYELENGGARAAN MUSRENBANG DAN PENYAMPAIAN RANCANGAN RKPD PROVINSI KALIMANTAN TIMUR TAHUN 2017

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

Oleh : Kepala PMU P2KP. Disampaikan dalam rangka Sosialisasi Nasional P4IP Tahun 2013 Denpasar, Agustus 2013

SIAP BERKOLABORASI... MENUJU KOTA LAYAK HUNI & BERKELANJUTAN

BADAN PUSAT STATISTIK KOTA BONTANG

I REMUNERATION ( SUB TOTAL I ) 31,516,725, PROFESSIONAL STAFF 23,117,650, SUPPORTING STAFF 8,399,075,000

REALISASI INVESTASI PENANAMAN MODAL DI PROVINSI KALIMANTAN TIMUR PADA TRIWULAN I TAHUN 2014

PENGUMUMAN LELANG PENGADAAN PERUSAHAAN PENYEDIA JASA TENAGA ALIH DAYA BPJS KESEHATAN WILAYAH KERJA DIVISI REGIONAL VIII. Nomor : 01/PLTAD/0117

PT. KOGAS DRIYAP KONSULTAN REKAPITULASI INVOICE NO. 6 Periode : Agustus 2010 s/d September 2010

BAB I PENDAHULUAN. pemukiman, kependudukan, sarana dan prasarana serta transportasi. Adanya

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM

Analisis Ekonomi Proyek Jalan Tol Penajam Samarinda

I REMUNERATION ( SUB TOTAL I ) 27,691,025, PROFESSIONAL STAFF 21,013,350, SUPPORTING STAFF 6,677,675,000

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

REALISASI INVESTASI DAN REALISASI PENERBITAN IZIN PENANAMAN MODAL DI PROVINSI KALIMANTAN TIMUR PADA TRIWULAN II TAHUN 2013

PENGUMUMAN LELANG ULANG PASCAKUALIFIKASI Nomor : 02/PLTAD2/1215

KEMENTERIAN PENDIDIKAN DAN KEBUDA Y AAN

L A P O R A N REALISASI PENANAMAN MODAL (INVESTASI) DI PROVINSI KALIMANTAN TIMUR PADA TRIWULAN II TAHUN 2014

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM

BAB I PENDAHULUAN. mempengaruhi pelaksanaan otonomi daerah adalah sebagai berikut.

Transkripsi:

NATIONAL SLUM UPGRADING PROGRAM - FY. 2018-2021 KOTA TANPA KUMUH "KOTAKU" SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT BOP - TIM KOORDINATOR KOTA & ASKOT MANDIRI Nomor Loan : Loan NCEP-Urban No. 8213-ID, NSUP IBRD No. 8636-ID, NSUP Asian Infrastructure Investment Bank (AIIB) Loan No. 0004-IDN Nama Konsultan : PT. Arkonin Engineering Manggala Pratama (KSO) PT. Trans Intra Asia Paket : Coverage Area : PROPINSI KALIMANTAN TIMUR Nomor & Tanggal Kontrak : HK.02.03/OSP-7/IBRD & AIIB/ SATKER-PKPBM/18/2018, Tanggal 29 Oktober 2018 Periode Kontrak : 29 Oktober 2018 sd 28 Oktober 2021 NO DESKRIPSI TOTAL KONTRAK (IDR) BOP - TIM KOORDINATOR KOTA & ASKOT MANDIRI I DUTY TRAVEL EXPENSES KALTIM 68.250.000 II OFFICE OPERATIONAL EXPENSES 1.512.000.000 III OFFICE EQUIPMENT EXPENSES 198.660.000 IV RENTAL EXPENSES 1.210.896.000 GRAND TOTAL ( I sd IV ) 2.989.806.000

2.1. DUTY TRAVEL EXPENSES PROVINCE KALTIM No Deskripsi Vol Unit Harga Satuan Kontrak (IDR) Keterangan 1 Monitoring Tim Korkot Ke Lokasi Dampingan Askot Mandiri Frekuensi Orang Hari 60.900.000 Dari Kota Balikpapan ke Kabupaten (1) Paser Transportasi 11 2 1 21 Perjalanan PP 1.500.000 31.500.000 Akomodasi 11 2 1 21 O/H 250.000 5.250.000 Uang Harian 11 2 2 42 O/H 100.000 4.200.000 Dari Kota Bontang ke Kabupaten (1) Kutai Kertanegara Transportasi 11 2 1 21,00 Perjalanan PP 500.000 10.500.000 Akomodasi 11 2 1 21,00 O/H 250.000 5.250.000 Uang Harian 11 2 2 42,00 O/H 100.000 4.200.000 Ceiling Rate akomodasi. Transportasi dan uang harian fixed rate 2 Korkot dan Askot Mandiri ke Ibukota Provinsi untuk Pertemuan Koordinasi Frekuensi Orang Hari 7.350.000 Dari Kabupaten Berau ke Kota Samarinda Transportasi 3 1 1 3 Perjalanan PP 900.000 2.700.000 Dari Kota Balikpapan ke Kota Samarinda Transportasi 3 1 1 3 Perjalanan PP 250.000 750.000 Dari Kota Bontang ke Kota Samarinda Transportasi 3 1 1 3 Perjalanan PP 300.000 900.000 Fixed Rate Dari Kabupaten Kutai Kartanegara ke Kota Samarinda Transportasi 3 1 1 3 Perjalanan PP 300.000 900.000 Dari Kabupaten Paser ke Kota Samarinda Transportasi 3 1 1 3 Perjalanan PP 700.000 2.100.000 TOTAL DUTY TRAVEL 68.250.000

2.2. OFFICE OPERATIONAL EXPENSES No DESKRIPSI Unit Vol Harga Satuan Kontrak Keterangan A OFFICE RUNNING COST 540.000.000 1 City Coordinator Office 378.000.000 ( 3 Kota/Kab) mth 108 3.500.000 378.000.000 B OFFICE SUPPLY & CONSUMABLE 540.000.000 1 City Coordinator Office 378.000.000 (3 Kota/Kab) mth 108 3.500.000 378.000.000 C COMMUNICATION COST (TELP, FAX & INTERNET) 432.000.000 1 City Coordinator Office 270.000.000 (3 Kota/Kab) mth 108 2.500.000 270.000.000 TOTAL OF OFFICE OPERATIONAL EXPENSES 1.512.000.000

2.3. OFFICE EQUIPMENT EXPENSES No DESKRIPSI Unit Vol Harga Satuan Kontrak (IDR) Keterangan A CITY COORDINATOR OFFICE 1 (3 Korkot) 142.440.000 a Laptop/Notebook (Purchase) Unit 3 10.000.000 30.000.000 b Desktop Computer (Purchase) Unit 9 9.000.000 81.000.000 c Printer Ink Jet (Purchase) Unit 3 2.500.000 7.500.000 Fixed Rate d GPS (Purchase) Unit 3 4.500.000 13.500.000 e Equipment Maintenance (Include existing equipment) Unit 90 116.000 10.440.000 Ceiling rate B ASSISTAN CD MANDIRI OFFICE 1 (3 Askot Mandiri) 56.220.000 a Laptop/Notebook (Purchase) Unit 3 10.000.000 30.000.000 b Printer Ink Jet (Purchase) Unit 3 2.500.000 7.500.000 Fixed Rate c GPS (Purchase) Unit 3 4.500.000 13.500.000 d Equipment Maintenance (Include existing equipment) Unit 45 116.000 5.220.000 Ceiling rate TOTAL OF OFFICE EQUIPMENT EXPENSES 198.660.000

2.4. RENTAL EXPENSES No DESKRIPSI Unit Vol Harga Satuan Kontrak (IDR) Remark I OSP OFFICE SPACE (including furniture, AC etc) 309.096.000 space/m2 mth a City Coordinator (3 City Coordinator @70m2) 210 36 m2/mth 7.560 27.000 204.120.000 b Ass. City Coordinator (3 Askot Mandiri @36m2) 108 36 m2/mth 3.888 27.000 104.976.000 VEHICLES (Minimun Year 2015 - Included driver, O & M, II 826.200.000 Insurance etc) for City Coordinator Office unit mth (3 Kota/Kab) 3 36 unit/mth 108 7.650.000 826.200.000 Fixed Rate MOTORCYCLE (Minimun Year 2015- Included O & M, Insurance etc) III 75.600.000 For Assistant CD Mandiri of City Coordinators unit mth (3 Kota/Kab) 3 36 unit/mth 108 700.000 75.600.000 Fixed Rate TOTAL OF RENTAL EXPENSES 1.210.896.000