DAFTAR ACUAN [1]. Irizarry. J., Karan, E. P. 2012. Optimizing Location Of Tower Cranes [2]. Irizarry. J., Karan, E. P. 2012. Optimizing Location Of Tower Cranes [3]. Al-Hussein, M., Niaz, M., A., Yu, H., & Kim, H. 2006. Integrating 3D visualization and simulation for tower crane operations on construction sites. Automation in Construction, 15(5), 554-562. [4]. Irizarry. J., Karan, E. P. 2012. Optimizing Location Of Tower Cranes [5]. Rostiyanti, S. F. 2002. Alat Berat untuk Proyek Konstruksi, Rineka Cipta, [6]. Gray, C., and Little, J. (1985). A systematic approach to the selection of an appropriate crane for a construction site, Construction Management and Economics, 3, pp. 121-144. [7]. Kholil, Ahmad. 2012. Alat Berat. Penerbit : PT. Remaja Rosdakarya. [8]. Kholil, Ahmad. 2012. Alat Berat. Penerbit : PT. Remaja Rosdakarya. [9]. Kholil, Ahmad. 2012. Alat Berat. Penerbit : PT. Remaja Rosdakarya. [10]. Kholil, Ahmad. 2012. Alat Berat. Penerbit : PT. Remaja Rosdakarya. x
[11]. Rostiyanti, S. F. 2002. Alat Berat untuk Proyek Konstruksi, Rineka Cipta, [12]. Sebt, M. H, Karan, E. P, Delavar. M. R. 2008. Potential Application of GIS to Layout of Construction Temporary Facilities. International Journal of Civil Engineering, Vol. 6, No. 4, December 2008. [13]. Sebt, M. H, Karan, E. P, Delavar. M. R. 2008. Potential Application of GIS to Layout of Construction Temporary Facilities. International Journal of Civil Engineering, Vol. 6, No. 4, December 2008. [14]. Tam and Arthur W T Leung. 2008. Genetic Algorithm Modeling Aided with 3D Visualization in Optimizing Construction Site Facility Layout. International Department of Building & Construction and Division of Building Science and Technology, City University of Hong Kong. [15]. Kang, S.,C., & Miranda, E. 2004. Automated Simulation of the Erection Activities in Virtual Construction. Proceedings of The International Conference on Computing in Civil and Building Engineering (ICCCBE). xi
DAFTAR PUSTAKA Al-Hussein, M., Niaz, M., A., Yu, H., & Kim, H. 2006. Integrating 3D visualization and simulation for tower crane operations on construction sites. Automation in Construction, 15(5), 554-562. Gray, C., and Little, J. 1985. A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3, pp. 121-144. Irizarry. J., Karan, E. P. 2012. Optimizing Location Of Tower Cranes On Construction Kang, S.,C., & Miranda, E. 2004. Automated Simulation of the Erection Activities in Virtual Construction. Proceedings of The International Conference on Computing in Civil and Building Engineering (ICCCBE). Kholi, Ahmad. 2012. Alat Berat. Penerbit : PT. Remaja Rosdakarya. Lee, D., Son, K., & Kim, S. 2011. Analysis Of Operation Efficiency Of Tower Crane In FormWork Construction For Multi-Family Housing. Proceedings of the 28th ISARC, 1225-1227. Lien, L., C. & Cheng, M., Y. 2013. Particle Bee Algorithm For Tower Cranes Layout With Materials Quantity Supply And Demand Optimization. Automation in Construction, 45, 25-32. xii
Pranata, A., H., Adi, T., J., W., & Putri, Y., E. 2012. Perbandingan Produktivitas Static Tower Crane dan Mobile Crane dengan Modifikasi Posisi Titik Supply. Jurnal Teknik Pomits 1(1), 1-6. Rahman, Sofyan. 2011. Optimasi Lokai Untuk Group Tower Crane Pada Proyek Apartement Guna Wangsa Surabaya. Tugas Akhir, Institut Teknologi Sepuluh November. Rostiyanti, S. F. 2002. Alat Berat untuk Proyek Konstruksi, Rineka Cipta, Sebt, M. H, Karan, E. P, Delavar. M. R. 2008. Potential Application of GIS to Layout of Construction Temporary Facilities. International Journal of Civil Engineering, Vol. 6, No. 4, December 2008 Tam and Arthur W T Leung. 2008. Genetic Algorithm Modeling Aided with 3D Visualization in Optimizing Construction Site Facility Layout. International Department of Building & Construction and Division of Building Science and Technology, City University of Hong Kong. Yudha, B.A. Bhirawa. 2015. Evaluasi Penempatan Tower Crane pada Proyek Pembangunan Jember Icon. Tugas Akhir, Universitas Jember. xiii
DAFTAR LAMPIRAN Lampiran A : Spesifikasi Tower Crane Lampiran B : Waktu Angkut Skenario Original Lampiran C : Waktu Angkut Skenario 1 Lampiran D : Waktu Angkut Skenario 2 Lampiran E : Waktu Angkut Skenario 3 Lampiran F : Rangkuman Waktu Angkut Skenario Original Sampai Skenario 3 xiv