PT PEMBANGKITAN JAWA-BALI UNIT PEMBANGKITANMUARA TAWAR JI. PLTGU MuaraTawar No.1, DesaSegaraJaya, Kec.TarumaJaya, Bekasi Telp. (021) 88990052 (Hunting)Fax.(021) 88990055 PENGUMUMAN PELELANGAN UMUM No. 0348.Pm/600/PGD-UPMT/2014 Dengan ini diumumkan bahwa PT PJS Unit Pembangkitan Muara Tawar akan melaksanakan Pelelangan Umum untuk pengadaan barang/jasa : REHABILITASI BACKWASH FILTER WASH WATER PUMP a. Jasa: 1. Penggantian filter backwash 2. Penormalan system control automatic 1 LOT 3. Individual test dan commissioning 4. Training operation dan maintenance b. Material: 2. Motor Listrik 1 SET 3. Sistem Kontrol (Negara asal produk : Eropa atau Amerika) REHABILITASI BACKWASH FILTER DESALINATION SEA WATER a. Jasa: 5. Penggantian filter backwash 6. Penormalan system control automatic 1 LOT 7. Individual test dan commissioning 8. Training operation dan maintenance b. Material: 2. Motor Listrik 1 SET 3. Sistem Kontrol (Ne~ara asal produk : Eropa atau Amerika) 1. HPS: RP. 800.000.000,- (delapan ratus juta rupiah) 2. Persyaratan Peserta 1.1. Perseroan Terbatas (PT) dengan bidang keahlian Mekanikal, Elektrikal 1.2. Perusahaan I Rekanan yang pernah mensuply barang I jasa rehabilitasi backwash filter minimal 1 kali dibuktikan dengan dokumen kontrak I PO beserta dokumen SA Penerimaan barang 3. Persyaratan Pendaftaran 3.1. Menunjukan fotocopy Kompetensi Asosiasi (APTEK I ARDIN I sejenis), TDP, NPWP, PKP, Sukti pelunasan pajak 3 bulan terakhir. 3.2. Fotocopy kontrak I PO pekerjaan sejenis dengan disertai fotocopy SA penyerahan barang. 4. Pelaksanaan Pelelangan 4.1. Pendaftaran Peserta Pelelangan dan Pengambilan Dokumen Lelang Tanqqal 30 Juni s.d 8 Juli 2014 Waktu Pukul 10.00 s.d. 15.00 wib Tempat PT PJS Unit Pembangkitan Muara Tawar
4.2. Penjelasan Lelang (Aanwijzing) Tanggal 10 Juli 2014 Waktu Kamis, Pukul 14.00 wib Tempat PT PJB Unit Pembangkitan Muara Tawar Demikian untuk diketahui dan bagi perusahaan yang berminat untuk mengikuti Pelelangan agar segera menyelesaikan persyaratan yang telah ditetapkan. Pengumuman ini bukan merupakan ikatan yang mengakibatkan kewajiban finansial kepada PT PJB. Bekasi, 30 Juni 2014 A~~GADAAN BARANG/JASA t2!l~i&i~' Pembangkitan Muara Tawar 1",..~ {
DEl AIL PERMINl AAN NO NAMA BARANG/JASA A. Supplai barang : 2. Motor Listrik 3. Sistem Kontrol (Negara asal produk : Eropa atau Amerika) B. Data sheet untuk filter wash water adalah sebagai berikut: 1 TAG NO 19PAAOIAT006 2 SERVICE SEAWATERTO LINE SPRAYTRAVELLING WATER SCREEN 3 QUANTITY No. 1 GENERAL 4 RATING: - CONTINUOUS % 100 5 - SHOCK % 2 x 50 6 LOCATION INDOOR 7 MANUFACTURER SPX 8 MODEL BFSS-D400A3-V with bolted acces cover Viton seals 9 DUTY CONTINUOUS 10 FLUID HANDLED SEAWATER 11 SPECIVICGRAVITY Kg/m 3 1025 12 TEMPERATURE Deg C 32.5 (MAX) 13 PRESSURE Barg 3,6 OPERATING 14 FLOWRATE Iiter/min 2060 CONDITIONS 15 BACKWASHING TIME Min 5 16 WATER LOSSDURING BACKWASH M 3 /h 25 17 PRESSUREDROP: 18 CLEAN CONDITION Barg 0,15 19 MAX (BACKWASHING) Barg 0,35 20 MAX (ALARM) Barg 0,5 21 TYPE 4" NB (DN 100) Automatic Self Cleaning "Compact" Backflushing filter 22 SCREENSIZE Mm 1,6 23 DESIGN PRESSURE Barg 10 24 TEST PRESSURE Barg 15 CONSTRUCTION 25 DESIGN TEMPERATURE DegC 45 26 FLANGED Ansi ANSI B16.5-150 RF 27 WEIGHT EMPTY/IN OPERATION Kg - 28 MOTOR RATING Kw 0,25 29 BASEDIMENSIONS (FLANGE - FLANGE) cm 57 30 BODY Fabricated 55316 /316L with SS316L internal parts (valves, shafts) 31 COVER STAINLESSSTEEL316L 32 FILTERELEMENTS 1600 micron SS316l wedge wire element 33 VENT 1" ANSI B16.5-150 RF MATERIAL 34 CONNECTION 2 x 3/8" NPT DPG Connections Automatic / Electrical 1 x IP55 / NEMA4 (0.25 KW) Motor 35 ACTUATOR 1 x IP55 / NEMA4 DP Switch 1 x IP55 / NEMA4 Actuated Drain Valve (SS316 valve) 1 x IP55 / NEMA4 Control Panel- 415V - 3PH - 50HZ Supply /".,.- -
C. Data sheet untuk backwash filter DSWP adalah sebagai berikut: TAG NO 2 SERVICE 3 QUANTITY No. 90GBK03AA003 SEAWATER TO DESALINATION PLANT GENERAL 4 RATING: - CONTINUOUS 5 - SHOCK 6 LOCATION 7 MANUFACTURER 8 MODEL 9 DUTY 10 FLUID HANDLED 11 SPECIVIC GRAVITY 12 TEMPERATURE 13 PRESSURE % 100 % 2x50 INDOOR SPX BFSS-1000A3-V (WITH BOLTED ACCES COVER VITON SEALS) CONTINUOUS SEAWATER Kg/m' 1025 DegC 32.5 (MAX) Barg 5,2 OPERATING 14 FLOWRATE CONDITIONS 15 BACKWASHING TIME 16 WATER LOSS DURING BACKWASH 17 PRESSURE DROP: 18 CLEAN CONDITION 19 MAX (BACKWASHING) 20 MAX (ALARM) 21 TYPE 22 FILTERING SURFACE 23 DESIGN PRESSURE 24 TEST PRESSURE CONSTRUCTION 25 DESIGN TEMPERATURE 26 FLANGE JOINTS 27 WEIGHT EMPTY/IN OPERATION 28 MOTOR RATING 29 BASE DIMENSIONS (FLANGE-FLANGE) 30 BODY 31 COVER 32 FILTER ELEMENTS 33 DRAIN 34 VENTING MATERIAL 35 CONNECTION 36 AUTO BACKWASH VALVE 37 ACTUATOR m'/hour 450 Min 5 M'/h 50 Barg 0,15 Barg 0,35 Barg 0,5 10" NB (DN250)Automatic Self Cleaning "Compact" Backflushing filter Cm' 22624 Barg 10 Barg 15 Deg C 45 Ansi ANSI B16.5-150 RF Kg Kw 0,25 cm 87 Fabricated SS316 / 316L WITH SS316L INTERNAL PARTS (VALVES, SHAFTS) STAINLESS STEEL 316L 500 micron SS316L Wedge wire element 2,5" ANSI B16.5-150 RF 1" ANSI B16.5-150 RF 2 x 3/8" NPT DPG Connections DAROT WITH SOLENOID OPERATED DIAPHRAGM Automatic / Electrical 1 x IP55 / NEMA4 (0.25 KW) Motor 1 x IP55 / NEMA4 DP Switch 1 x IP55 / NEMA4 Actuated Drain Valve (SS316 valve) 1 x IP55 / NEMA4 Control Panel - 415V - 3PH - 50HZ Supply D. Supplai jasa : 1. Penggantian backwash filter 2. Pengaktifan kembali sitem control operasi backwash agar dapat beroperasi secara automatis 3. Individual test dan commissioning 4_ Training operation dan maintenance Dengan detail pekerjaan Rehabilitasi Backwash Filter Wash Water Pump dan Desalination Sea Water Pump sebagai berikut : ~ C{-.I,. f...., flban. '" UNIT -:. '\' "ne1-!bangk)tan I' ~ \ MUARA TAWAR \~*. '\.»: \ r, WA. _ 'D,...\.
(1) Pembongkaran Filter Existing. a. Mempersiapkan peralatan teknis yang dibutuhkan, semua peralatan teknis dalam proses ini disediakan oleh pihak ke-3 pemenang tender. b. Mempresentasikan rencana dan jadwal pekerjaan pelepasan filter existing, mobilisasi filter existing dan instalasi filter baru, peralatan yang akan digunakan beserta resiko yang mungkin terjadi di hadapan direksi pekerjaan. c. Melakukan mekanisme penggantian filter dengan memperhatikan faktor Keselamatan dan Kesehatan Kerja. (2) Mobilisasi Filter Existing ke Gudang UP Muara Tawar. a. Melakukan pengangkatan filter existing untuk dibawa ke gudang UP Muara Tawar dengan peralatan teknis. (3) Pemasangan Backwash Filter Baru. a. Melakukan pemasangan backwash filter baru beserta kelengkapannya. (4) Set up Sistem Mechanical, Electrical, dan Control System ke System Operasi Wash Water. a. Melakukan setting mechanical, electrical, dan intrumentation control ke dalam sistem pengoperasian wash water pump. Koneksi akan dibantu oleh pihak PJB UP Muara Tawar. (5) Individual Test. a. Melakukan pengujian backwash filter. b. Pelaksana pekerjaan akan melakukan perbaikan jika ada kerusakan ataupun kegagalan pada saat dilakukan individual test. (6) Test Commissioning. a. Melakukan commissioning backwash filter. b. Pelaksana pekerjaan akan melakukan perbaikan jika terdapat suatu item commissioning backwash filter mengalami kegagalan, perbaikan dilakukan sampai item pengujian tersebut dinyatakan berhasll. c. Jika masih ada kerang/sampah yang masih tersangkut di pipa drain, maka pihak ke-3 harus bersedia mengganti dimensi pipa drain sarnpai tidak ada kerang/sampah yang tersangkut lagi. (untuk backwash filter DSWP) d. Dokumentasi setiap proses commissioning. (7) Pelaporan a. Membuat report dan dokumentasi terkait proses plug and play dari awal sampai akhir proses yang disetujui oleh direksi pekerjaan. (8) Training Memberikan training kepada personel PT PJB UP Muara Tawar dengan rincian sebagai berikut: a. Training untuk Engineer (2 orang) terkait dengan mekanisme dan system backwash filter b. Training untuk bidang operasi (5 orang) terkait dengan sistem pengoperasian backwash filter c. Training untuk bidang pemeliharaan (3 orang) terkait sistem pemeliharaan backwash filter d. Training dilakukan selama 2 hari (1 hari teori dan 1 hari praktek di lapangan).