DETAIL ENGINEERING DESIGN PALEMBANG SHELTER INDONESIA INFRASTRUCTURE INITIATIVE
HALTE JAKABARING TAMPAK DEPAN SKALA 1:0
TAMPAK SAMPING SKALA 1:0
213 69, 3 39 43 42 43 43 3 7 9, D DET. H 8 JALUZI BANGKIRE 2/ cm RANGKA JALUZI HOLLOW / cm D TAMPAK SAMPING - RENCANA JALUZI SKALA 1:2
180 4 127, 82, 0 0 82, 370 17, 0 PARKIR SEPEDA +2,00 +2,00 +2,00 1 70 360 90 +2,00 HALTE +80,00 160 70 TEMPAT SAMPAH FIBERGLASS KAP.0 Lt 0 ±00,00 LAJUR KHUSUS BUS 0 90 363, 4 2, 160 2, 370 17, 43, 1239 17, JALAN RAYA SITE PLAN SKALA 1:0
124 111, 76 377, 44 67, 3 47, 0 0 82, 377, C 137, +2,00 137, 32, A A 47, 80 32, 13 B HALTE +80,00 B 13 C 86 1, 0 0 160 0 0 1, 117 118 117 1 406, 160 3, 32 1 139 DENAH HALTE SKALA 1:0
A DIREK JASA K 1 : 76 82, 0 0 82, PEKER PEREN HALTE TRANS KONSU 3 47, 10 10 90 60 60 90 47, 3 PENAN 211 211 JALUZI BANGKIRE 2/ cm 211 211 600 29 80 181, 3 42, 3 +2,00 TIANG PIPA GALVANIS Ø 8" KURSI PIPA GALVANIS Ø 1," FIN. STAINLESS STEEL URUGAN PASIR t. cm DIPADATKAN +80,00 LT. KERAMIK / cm PIPA GALVANIS Ø 1," TIANG PIPA GALVANIS Ø 8" SANSEVIERIA sp. t=0 cm RINGBALK 1/1 cm PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL 77, 84 97, 29 80 74 JASA K CATATA NO 14 0 14 ±00,00 2 8 42 63 82 SLOOF BETON 1/2 cm URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN PONDASI BETON SETEMPAT PONDASI BATU KALI 1:4 AANSTAMPING 2 113 82 19 JUDUL SKAL 4 4 37, 60 90 90 60 60 180 60 60 22, 4 90 97, 180 1 180 1 67, 8 POTONGAN A - A SKALA 1:0
PENANGGUNG PEMER DINA Jl. Pangeran Si 186, 600 42, 86 3 47, 10 10 10 10 47, 3 32 1239 SUMBER DANA APBD T PEKERJAAN : PERENCANA HALTE BUS R TRANS MUSI KONSULTAN P 211 JALUZI BANGKIRE 2/ cm 288, DIREKTUR ASISTEN BUS RAP 480 70 113 184 8 4 2 113 DET. C TIANG PIPA GALVANIS Ø 8" KURSI PIPA GALVANIS Ø 1," FIN. STAINLESS STEEL +80,00 LT. KERAMIK DET. B / cm DET. D +2,00 +2,00 URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN PONDASI BETON SETEMPAT DET. A URUGAN PASIR t. cm DIPADATKAN PAS. TRANSRAM SLOOF BETON 1/2 cm PONDASI BATU KALI 1:4 AANSTAMPING PIPA GALVANIS Ø 1," RAILING FIN. STAINLEES STEEL 7 RINGBALK 1/1 cm URUGAN PASIR t. cm DIPADATKAN URUGAN PASIR t. cm DIPADATKAN PIPA GALVANIS Ø 1," FIN. STAINLEES STEEL LT. KERAMIK TEKSTUR / cm 84 1 8 2 2 22, 138 NO DA PEJA JASA KONSULT BUS RAP ME P JASA KONSULT BUS RAP DINAS CATATAN : U JUDUL GAMBA 4 4 14 4 4 37, 10 10 0 37, 4 4 90 9 9 72 4 4 SKALA 4 4 82, 0 0 82, 370 4 1 : 0 149 76 41 POTONGAN B - B SKALA 1:0
TIANG PIPA GALVANIS Ø 8" 2 X ACRYLIC SHEET BENING t=0,8 cm STANDOFF Ø 3/4" FIN. CHROME 7, 99 84 84 7, PIPA GALVANIS Ø 1," 80 7, 2, 2, 7, 80 0 1 0 DETAIL A POTONGAN B - B SKALA 1:40
137, 137, 4 3 4 3 40 1 KURSI PIPA GALVANIS Ø 1," FIN. STAINLESS STEEL 3 37, 12, 1 7, 1 12, 7, DETAIL B POTONGAN B - B SKALA 1:40
12 10 90 66 140 4 6 16 RAILING FIN. STAINLEES STEEL 172 6 13 NOOSING STAIR +80,00 +2,00 4 6 LT. KERAMIK TEKSTUR / cm 2 4 4 40 6 6 6 82 60 60 6 DETAIL C POTONGAN B - B SKALA 1:2 1 117 118 117 140 66 0
RAILING FIN. STAINLEES STEEL 746 140 173 +80,00 PIPA GALVANIS Ø 1," FIN. STAINLEES STEEL PLESTERAN t = 4 cm 170 LT. KERAMIK TEKSTUR / cm RINGBALK 1/1 cm 170 10 0 66 7 16 0 70 36 234 118 118 234 70 740 DETAIL D POTONGAN B - B SKALA 1:2
7 7 211 269 70 18 80 180 7, 9 98 143 211 ATAP ONDULINE WARNA BIRU 97, 490 97, 82 42 79 112, 7, 9 82 10 121 112 8 70 190 DET. F TIANG PIPA GALVANIS Ø 8" KURSI PIPA GALVANIS Ø 1," FIN. STAINLESS STEEL RAILING PIPA GALVANIS Ø 2" FIN. STAINLEES STEEL 2 40 1 3 42, DET. E RINGBALK 1/1 cm +80,00 PAS. TRANSRAM 70 4 2 8 +2,00 SLOOF BETON 1/2 cm ±00,00 8 17 8 80 1 AANSTAMPING URUGAN PASIR t. cm DIPADATKAN 72 72 1 77, 4 4 124, 4, 137, 21 32, POTONGAN C - C SKALA 1:40 0 18 99
CATA 90 66 4 6 16 +2,00 4 6 LT. KERAMIK TEKSTUR / cm 66 0 66 0 7 0 16 JAS 2 6 4 6 4 6 40 70 36 234 118 118 234 82 60 60 6 DETAIL C POTONGAN B - B SKALA 1:2 70 740 DETAIL D POTONGAN B - B SKALA 1:2 JAS NO 1 117 118 117 1, 0 0 160 0 0 1, 86 RAILING FIN. STAINLEES STEEL 373 31 10 33 6 2 +2,00 0 8 8 7 RINGBALK 1/1 cm LT. KERAMIK TEKSTUR / cm PLESTERAN t = 4 cm 173 SLOOF BETON 1/2 cm PONDASI BATU KALI 1:4 13 7 8 9 8 1 +80,00 PIPA GALVANIS Ø 1," FIN. STAINLEES STEEL LT. KERAMIK / cm 80 0 78 7 1 33 2 80 1 JUDU SKA 1 1 176 194 82, 0 360,8 10 82, 4 3 139 DETAIL E POTONGAN C - C SKALA 1:0
SWIVEL HOIST RINGS LOAD RATING 00 Lbs 7 WIRE ROPE 8 X 2 F (FC) Ø 12 mm OPEN SPELTER WIRE ROPE SOCKETS SIZE /16-3/8 7, 9 TURNBUCKLE EYE AND EYE COMBINATION - END STOCK DIAMETER 1/4" (SWL 00 Lb) 97, 98 4 192, 97, 490 ATAP ONDULINE WARNA BIRU 82 DET. G 3,96 SWIVEL HOIST RINGS LOAD RATING 00 Lbs 82 2 7, 9 10 90, 8 70 112 PIPA GALVANIS Ø 8" TIANG PIPA GALVANIS Ø 8" 40 40 HURUF TIMBUL FIN. STAINLEES STEEL BESI PLAT L= cm JALUZI BANGKIRE 2/ cm 121 RANGKA JALUZI HOLLOW / cm 170 DETAIL F POTONGAN C - C SKALA 1: DETAIL SKALA 1:
POTONGAN D - D SKALA 1:
4 0 0 ATAP ONDULINE WARNA BIRU 2,79 PIPA GALVANIS Ø 2 1 2" PIPA GALVANIS PIPA GALVANIS 17,79 1 80 Ø 1 Ø 2 1 2" Ø 1 1 4" Ø 2 2 Ø 8 13 7 PONDASI BETON TUMBUK 1 : 3 : ANGKUR BESI Ø mm URUGAN PASIR t. cm DIPADATKAN 0 7 0 4 2 0 0 4 1 1 4 POTONGAN E - E RENCANA PARKIR SEPEDA SKALA 1: RE
ATAP ONDULINE WARNA BIRU 172,1 90 90 ALVANIS Ø 4" N. CAT DUCO PA GALVANIS N. CAT DUCO 7 7 0 1 PIPA GALVANIS Ø 4" 80 PIPA GALVANIS Ø 1," PIPA GALVANIS Ø 2," 2,79 80 2 PIPA GALVANIS Ø 1 1 4" PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL ASIR AN 70 8 0 PONDASI BETON TUMBUK 1 : 3 : ANGKUR BESI Ø mm 8 7 URUGAN PASIR t. cm DIPADATKAN KANSTEIN 13 12 3 1 1 127,1 2,8 1 A 60 0 POTONGAN F - F RENCANA PARKIR SEPEDA SKALA 1:
DETAIL G SKALA 1:
12 0 1 1 DETAIL KERBS SKALA 1:
RANGKA JALUZI HOLLOW / cm JALUZI BANGKIRE 2/ cm RANGKA HURUF BESI PLAT L= cm HURUF TIMBUL TYPE ARIAL BOLD FIN. STAINLEES STEEL 2,96 2,96 28 93 HALTE JAKABARING 3 22, 14 14 14 14 22, 2 0 0 10 10 0 0 2 60 RENCANA JALUZI SKALA 1:2 D
DETAIL H SKALA 1:
4 14 1 1 170 170 82, 127, 0 0 127, 370 97, 1 60 92, 0 90 70 140 1 7 1 PONDASI BETON TUMBUK PONDASI ROLAGH PONDASI BATU KALI 1:4 KANSTEIN 80 44, 23 172, 187, 1 90 1 3, 337, 337, 280 90 14 1 3, 99 370 90 RENCANA PONDASI MENERUS SKALA 1:7 4 82, 67, 1 180 1 180 1 67, 32 17, 137, PONDASI BETON SETEMPAT 137, 80 1 32, 47, 13 13 90 363, 4 82, 0 0 82, 370 RENCANA SLOOF DAN
60 92, 0 140 PONDASI BETON TUMBUK PONDASI ROLAGH 80 172, 90 70 7 1 PONDASI BATU KALI 1:4 KANSTEIN 44, 23 187, 1 90 1 3, 337, 337, 280 90 14 1 3, 99 370 90 RENCANA PONDASI MENERUS SKALA 1:7 4 82, 67, 1 180 1 180 1 67, 32 17, 137, PONDASI BETON SETEMPAT 137, 80 1 32, 47, 13 13 90 363, 4 82, 0 0 82, 370 RENCANA SLOOF DAN PONDASI SETEMPAT SKALA 1:7 4 127, 3 142, 142, 7, 3 194 KP KP KP KP KG KG KG KP KP 7, 3 47, 10 KP RENCANA RINGBALK DAN KOLOM
PONDASI BETON SETEMPAT 47, 4 127, 3 142, 142, 7, 3 194 176 17, 137, 137, KP KP KP 21 KP KG KG KG KP 80 13 KP KP 7, 3 47, 10 10 0 47, 3 194 176 RENCANA RINGBALK DAN KOLOM SKALA 1:7
7, 1 1 0 2 1 2 8 7 8 PAS. TRANSRAM URUGAN PASIR t. cm DIPADATKAN + 0.00 RB SL RB LT. KERAMIK / PLESTERAN t = 4 cm URUGAN PASIR t. cm DIPADATKAN URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN 70 + 0.00 4 1 38 17 8 Ø 6-10 mm 42 80 2 Ø mm 113 SLOOF BETON 1/2 1 PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL PONDASI BATU KALI 1:4 180 DETAIL PONDASI MENERUS SKALA 1: AANSTAMPING URUGAN PASIR t. cm DIPADATKAN 1
Ø 6-10 mm 4 Ø mm Ø6mm-10 4Ømm 4Ø12mm 2Ø16mm TIANG PIPA GALVANIS Ø 8" Ø8mm-10 DETAIL SLOOF (SL) SKALA 1: DETAIL KOLOM PRAKTIS (KP) DAN RINGBALK (RB) SKALA 1: DETAIL KOLOM PIPA GALVANIS (KG) SKALA 1:
A 4 1 70 38 + 0.00 17 8 42 180 1 TIANG PIPA GALVANIS Ø 8" Ø 12-10 mm 4 4 RB SL 4 4 KG 1 DETAIL PONDASI BETON SETEMPAT SKALA 1: LT. KERAMIK / PLESTERAN t = 4 cm URUGAN PASIR t. cm DIPADATKAN URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN Ø 6-10 mm 2 Ø mm SLOOF BETON 1/2 TIANG PIPA GALVANIS Ø 8" URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN 3 Ø 12 mm Ø 8-10 mm Ø 12-10 mm LANTAI KERJA BETON t = cm URUGAN PASIR t. cm DIPADATKAN 4 Ø 12 mm 4 4 U S P PE H TR K P C NO JU
180 0 780 370 10 2 +2,00 1 +2,00 11 1 2 PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL LT. KERAMIK / 1 +2,00 3 2 +70,00 3 9 1 3 LT. KERAMIK TEKSTUR / 490 60 680 370 10 0 0 RENCANA POLA LANTAI SKALA 1:7 PIPA GALVANIS Ø 1," ATAP ONDULINE WARNA BIRU ATAP ONDULINE WARNA BIRU PIPA GALVANIS Ø 1,"
IKAN ATURAL +2,00 3 2 1 1 +70,00 3 UR 490 60 680 370 10 0 0 RENCANA POLA LANTAI SKALA 1:7 180 1 0 0 22 10 10 10 10 6 PIPA GALVANIS Ø 1," ATAP ONDULINE WARNA BIRU ATAP ONDULINE WARNA BIRU PIPA GALVANIS Ø 1," 31 9 PIPA GALVANIS Ø 8" 9 8 RENCANA RANGKA ATAP SKALA 1:7
RENCANA RANGKA ATAP SKALA 1:7
180 1 372, 60 90 62, 70 240 1 10 0 47, 37, 60 1 1 60 1 40 +2,00 +2,00 1 1 2 +70,00 3 1 +2,00 60 1 60 60 90 237, 60 60 60 10 90 1 90 10 60 360 7, 1 12, 1 PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL UBIN PENGARAH BERMOTIF GARIS-GARIS / cm RENCANA POLA LANTAI SKALA 1:7 2 3 LT. KERAMIK / cm LT. KERAMIK TEKSTUR / UBIN PERINGATAN BERMOTIF BULAT / cm PIPA GALVANIS Ø 1," ATAP ONDULINE WARNA BIRU ATAP ONDULINE WARNA BIRU PIPA GALVANIS Ø 1,"
90 237, 60 60 12, 10 90 1 90 10 1 1 PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL UBIN PENGARAH BERMOTIF GARIS-GARIS / cm RENCANA POLA LANTAI SKALA 1:7 2 LT. KERAMIK / cm UBIN PERINGATAN BERMOTIF BULAT / cm 3 LT. KERAMIK TEKSTUR / 180 1 0 0 22 10 10 10 10 6 PIPA GALVANIS Ø 1," ATAP ONDULINE WARNA BIRU ATAP ONDULINE WARNA BIRU PIPA GALVANIS Ø 1," 31 9 PIPA GALVANIS Ø 8" 9 8 RENCANA RANGKA ATAP SKALA 1:7
1 90 0 0 0 0 0 0 2 1 1 49 17 9 24 17 9 24 17 9 24 17 9 24 17 9 24 17 9 24 17 9 1 F 1 E 60 E 1 RENCANA PARKIR SEPEDA SKALA 1: F 1 1 49 0 0 21 1 1 49 0 0 21 1 1 ATAP ONDULINE WARNA BIRU PIPA GALVANIS Ø 2 1 2" 1 80 PIPA GALVANIS Ø 4" PIPA GALVANIS