PERENCANAAN LINE BALANCING DENGAN METODE RANK (RA) GUNA MENINGKATKAN OUTPUT PRODUKSI SKRIPSI

dokumen-dokumen yang mirip
PERENCANAAN KESEIMBANGAN LINTASAN GUNA MENINGKATKAN EFISIENSI KERJA TUGAS AKHIR

RESTU SYAIFUL MUHARROM

MENINGKATKAN EFISIENSI LINTASAN KERJA MENGGUNAKAN METODE RPW DAN KILLBRIDGE-WESTERN

ABSTRAK. i Universitas Kristen Maranatha

LAPORAN KERJA PRAKTEK ANALISA LINE BALANCING PADA PROSES PRODUKSI GENTENG TILUX DI PT. BAKRIE BUILDING INDUSTRIES

Analisis Kebutuhan Man Power dan Line Balancing Jalur Supply Body 3 D01N PT. Astra Daihatsu Motor Karawang Assembly Plant (KAP)

ABSTRAK. Universitas Kristen Maranatha

Jakarta, 30 Maret Penulis

PERANCANGAN SISTEM KESEIMBANGAN LINTASAN PRODUKSI UNTUK MENGURANGI BALANCE DELAY GUNA MENINGKATKAN OUTPUT PRODUKSI

ABSTRAK. iii. Universitas Kristen Maranatha

BAB 3 METODOLOGI PENELITIAN

ABSTRAK. Universitas Kristen Maranatha

PERANCANGAN MEJA ERGONOMIS BAGI PEKERJA PEMBUATAN ROTI

ABSTRAK. Universitas Kristen Maranatha

ABSTRAK. Universitas Kristen Maranatha

BAB 3 METODE PENELITIAN. Berikut ini adalah diagram alir yang digunakan dalam penyelesaian studi kasus ini: Mulai

PERANCANGAN ULANG TATA LETAK PABRIK UNTUK MENURUNKAN TOTAL BIAYA PERPINDAHAN MATERIAL DENGAN MENGGUNAKAN METODE PAIRWISE EXCHANGE

Universitas Bina Nusantara. Jurusan Teknik Industri Skripsi Sarjana Teknik Industri Semester Genap tahun 2006/2007

PENENTUAN JUMLAH OPERATOR PADA PROSES PRODUKSI FURNITURE UNTUK MEMINIMALISASI WIP DENGAN MENGGUNAKAN SIMULASI

TUGAS AKHIR ANALISA KESEIMBANGAN LINI UNTUK TARGET PRODUKSI AIR FILTER. (STUDI KASUS PT. SELAMAT SEMPURNA Tbk)

USULAN KESEIMBANGAN LINI PRODUKSI PADA PEMBUATAN SEPATU TIPE SAMBA PADA PT.POONG WON INDONESIA. Muhammad Kastalani

MINIMALISASI BOTTLENECK PROSES PRODUKSI DENGAN MENGGUNAKAN METODE LINE BALANCING

BAB V ANALISIS HASIL

PERANCANGAN KESEIMBANGAN LINTASAN PRODUKSI MENGGUNAKAN METODE RANKED POSITIONAL WEIGHTS DAN PENDEKATAN SIMULASI

ANALISIS KESEIMBANGAN LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE RANKED POSITION WEIGHT (RPW) (STUDI KASUS: PT. KRAKATAU STEEL, Tbk.

TUGAS AKHIR ANALISIS PENINGKATAN EFISIENSI LINTASAN PADA LINE PRODUKSI SHORT SIZE V-BELT TIPE A-JGG-B SIZE 60 DI PT.

BAB I PENDAHULUAN. dan juga hasil sampingannya, seperti limbah, informasi, dan sebagainya.

2.10 Pengertian Efisiensi Pengertian Lintasan Produksi(Line Balancing) Keseimbangan Kapasitas Lintasan Produksi 25 2.

Daftar Isi. Lembar Pengesahan... Kata Pengantar... Abstrak...

PERBAIKAN LINI FINISHING DRIVE CHAIN AHM OEM PADA PT FEDERAL SUPERIOR CHAIN MANUFACTURING DENGAN METODE KESEIMBANGAN LINI DAN METHODS TIME MEASUREMENT

BAB III METODOLOGI PENELITIAN

ABSTRAK. iv Universitas Kristen Maranatha

BAB 2 LANDASAN TEORI

Analisis Line Balancing dengan RPW pada Departemen Sewing Assembly Line Style F1625W404 di PT. Pan Brothers, Boyolali

KATA PENGANTAR. ialah line balancing dengan judul Analisa Line Balancing dengan Membandingkan

SKRIPSI PERBAIKAN SISTEM PRODUKSI DI PT. X DENGAN MEMPERHATIKAN LINTASAN PERAKITAN DAN TATA LETAK FASILITAS. Disusun Oleh :

KESEIMBANGAN LINI PRODUKSI PADA PT PAI

UNIVERSITAS BINA NUSANTARA. Jurusan Teknik Industri Tugas Akhir Sarjana Semester Ganjil tahun 2007 / 2008

UNIVERSITAS BINA NUSANTARA

ANALISA DAN PERANCANGAN ULANG PROSEDUR KERJA PENCETAKAN PAVING YANG ERGONOMIS DENGAN MENGGUNAKAN METODE RULA

BAB 2 TINJAUAN PUSTAKA

UNIVERSITAS BINA NUSANTARA PENGUKURAN EFISIENSI PROSES PEMBUATAN HANGER TIPE TAC 6212 PADA PT. BIGGY CEMERLANG DENGAN ANALISIS LINE BALANCING

PENYEIMBANGAN LINTASAN PRODUKSI DENGAN METODE HEURISTIK (STUDI KASUS PT XYZ MAKASSAR)

BAB 2 LANDASAN TEORI

UNIVERSITAS BINA NUSANTARA. Jurusan Teknik Industri Skripsi Sarjana Semester Genap tahun 2006/2007

ANALISA LINE BALANCING PRODUK SANDAL DENGAN METODA HEURISTIK

ANALISIS KESEIMBANGAN LINI PADA LINTASAN TRANSMISI MF06 DENGAN PENERAPAN METODE RANKED POSITIONAL WEIGHT

Perancangan Keseimbangan Lintasan Produksi untuk Mengurangi Balance Delay dan Meningkatkan Efisiensi Kerja

PERENCANAAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN MENGGUNAKAN METODE ALGORITMA CRAFT. (Studi Kasus Di PT Kasin Malang) TUGAS AKHIR

BAB V ANALISA HASIL Kondisi Keseimbangan Lintasan Produksi Aktual

PENGARUH TINGKAT INFLASI DAN PERTUMBUHAN EKONOMI TERHADAP TINGKAT PENGANGGURAN DI KABUPATEN/KOTA PROVINSI JAWA TENGAH TAHUN

PEMILIHAN METODE LOT SIZE

ANALISA PENINGKATAN EFISIENSI ASSEMBLY LINE B PADA BAGIAN MAIN LINE DENGAN METODE RANKED POSITIONAL WEIGHTS DI PT. X

PROGRAM PENDIDIKAN SARJANA EKSTENSI D E P A R T E M E N T E K N I K I N D U S T R I F A K U L T A S T E K N I K UNIVERSITAS SUMATERA UTARA MEDAN 2011

PERANCANGAN DAN PENGUJIAN TURBIN KAPLAN PADA KETINGGIAN (H) 4 M SUDUT SUDU PENGARAH 30 DENGAN VARIABEL PERUBAHAN DEBIT (Q) DAN SUDUT SUDU JALAN

Perbaikan Lintasan CU dengan Metode Line Balancing

PENENTUAN KESEIMBANGAN LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE HELGESON-BIRNIE

ANALISIS PENGARUH IKLAN DAN PENJUALAN PRODUK DI INTERNET TERHADAP MINAT BELI KONSUMEN (SURVEY PELANGGAN TOKO ONLINE AULIA SHOP)

ANALISIS KESEIMBANGAN LINTASAN LINE PRODUKSI DRIVE ASSY DI PT. JIDECO INDONESIA

BAB 4 METODOLOGI PEMECAHAN MASALAH

ANALISIS ASSEMBLY LINE BALANCING PRODUK HEAD LAMP TYPE K59A DENGAN PENDEKATAN METODE HELGESON-BIRNIE Studi Kasus PT. Indonesia Stanley electric

PENENTUAN JUMLAH TENAGA KERJA DENGAN METODE KESEIMBANGAN LINI PADA DIVISI PLASTIC PAINTING PT. XYZ

Seminar Nasional IENACO ISSN PENGELOMPOKAN STASIUN KERJA UNTUK MENYEIMBANGKAN BEBAN KERJA DENGAN METODE LINE BALANCING

(Studi Kasus :PT.Suri Tani Pemuka Banyuwangi)

PERBAIKAN PROSES PRODUKSI DALAM SISTEM PRODUKSI PADA CV. GRAFFITY COLLECTION SKRIPSI

DAFTAR ISI ABSTRAK... ABSTRACT... KATA PENGANTAR. DAFTAR ISI... DAFTAR TABEL... DAFTAR GAMBAR DAFTAR LAMPIRAN Latar Belakang Penelitian..

Analisis Efisiensi Operator Pemanis CTP dengan Westing House System s Rating

D E P A R T E M E N T E K N I K I N D U S T R I F A K U L T A S T E K N I K UNIVERSITAS SUMATERA UTARA M E D A N

PERANCANGAN SISTEM PENGUKURAN. METODE BALANCED SCORECARD (Studi kasus : PT. Miwon Indonesia) TUGAS AKHIR

SKRIPSI. Diajukan Kepada Universitas Muhammadiyah Malang. Untuk Memenuhi Salah Satu Persyaratan Akademik

ABSTRAK. Universitas Kristen Maranatha

BAB VI LINE BALANCING

SKRIPSI Diajukan Untuk Memenuhi Salah Satu Syarat. Guna Memperoleh Gelar Sarjana Strata Satu (S.1) Dalam Ilmu Tarbiyah. Oleh :

BAB 2 LANDASAN TEORI

ANALISIS HARMONIK DAN PERANCANGAN SINGLE TUNED FILTER PADA SISTEM DISTRIBUSI STANDAR IEEE 18 BUS DENGAN MENGGUNAKAN SOFTWARE ETAP POWER STATION 4.

ANALISIS PENGENDALIAN INTERNAL POLA KERJASAMA PERMODALAN KPRI BERINGIN DENGAN PIHAK BANK KESEJAHTERAAN EKONOMI

TUGAS AKHIR. Disusun oleh : D

Improvement Proses Screwing pada Lini Kaleng Kopi di PT Sinar Djaja Can

ANALISIS STRATEGI BERSAING PADA LPK JENGGALA COURSE JEPARA SKRIPSI

ABSTRAK. di bawah bimbingan Dr. H. Amir Machmud, SE, M.Si. Oleh Imas Maesyaroh

ANALISA PENYEIMBANGAN LINTASAN PRODUKSI MENGGUNAKAN THEORY OF CONSTRAINTS DAN TABU SEARCH

Oleh : Fitri Arif Kholidah A

UPAYA PENINGKATAN KAPASITAS PRODUKSI PADA PLONG MANUAL DAN GLUEING MANUAL DI PT. X

BAB I PENDAHULUAN. massal. Sejumlah pekerjaan perakitan dikelompokkan kedalam beberapa pusatpusat

PERANCANGAN STANDAR WAKTU KERJA DAN PERHITUNGAN JUMLAH TENAGA KERJA OPTIMAL PADA BAGIAN MEDICAL EQUIPMENT I PT OTSUKA INDONESIA-LAWANG

ANALISIS PERTUMBUHAN EKONOMI DAN DISPARITAS PENDAPATAN KABUPATEN / KOTA DI PROVINSI JAWA TIMUR

BAB II TINJAUAN PUSTAKA Studi Gerak dan Waktu Studi gerak dan waktu terdiri atas dua elemen penting, yaitu studi waktu dan studi gerakan.

ANALISIS METODE MOODIE YOUNG DALAM MENENTUKAN KESEIMBANGAN LINTASAN PRODUKSI

ANALISA BEBAN KERJA DAN JUMLAH TENAGA KERJA YANG OPTIMAL PADA BAGIAN PRODUKSI DENGAN PENDEKATAN

BAB I PENDAHULUAN. tetap menjaga mutu dan produktivitasnya untuk dapat bersaing di pasar dunia, maka PT

BAB V PENUTUP. penelitian seperti yang telah dikemukakan pada bab sebelumnya, dapat ditarik

PENGARUH KAPASITOR BANK TERHADAP OUTPUT DARI GENERATOR INDUKSI 1 FASA

USULAN PERBAIKAN TATA LETAK GUDANG MATERIAL DENGAN MENGGUNAKAN METODE DEDICATED STORAGE

PENINGKATAN EFISIENSI STASIUN KERJA DENGAN PENDEKATAN REGION LINE BALANCING ( STUDI KASUS DI PT. TRIANGLE MOTORINDO )

ANALISIS PENGARUH PDRB DAN INVESTASI TERHADAP PENYERAPAN TENAGA KERJA DI KABUPATEN/ KOTA PROVINSI JAWA TIMUR SKRIPSI

DAFTAR LAMPIRAN. viii

PENYEIMBANGAN LINTASAN PADA PERAKITAN TRANSFORMATOR DENGAN METODE MOODIE YOUNG DAN COMSOAL PADA PT. MORAWA ELECTRIC TRANSBUANA

BAB 2 LANDASAN TEORI

BAB II TINJAUAN PUSTAKA

ANALISIS TINGKAT EFISIENSI PERUSAHAAN FURNITURE DENGAN PENDEKATAN METODE DATA ENVELOPMENT ANALYSIS (DEA)

Transkripsi:

PERENCANAAN LINE BALANCING DENGAN METODE RANK POSITION WEIGHT (RPW) DAN METODE REGION APPROACH (RA) GUNA MENINGKATKAN OUTPUT PRODUKSI SKRIPSI Diajukan Kepada : Fakultas Teknik Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Persyaratan Akademik Dalam Menyelesaikan Program Sarjana Teknik Disusun Oleh : ABDUL ARIJAL TAUFIQ ( 02540018 ) JURUSAN INDUSTRI FAKULTAS TEKNIK UNIVERSITAS MUHAMMADIYAH MALANG 2008

ABSTRAKSI ABDUL ARIJAL TAUFIQ, 2008, NIM.02540018, PERENCANAAN LINE BALANCING DENGAN METODE RANK POSITION WEIGHT ( RPW ) DAN METODE REGION APPROACH ( RA ) GUNA MENINGKATKAN OUTPUT PRODUKSI DI KOPERASI INTAKO TANGGULANGIN SIDOARJO, Skripsi Jurusan Teknik Industri Fakultas Teknik Universitas Muhammadiyah Malang. Pembimbing I : Ir. H. M. LUKMAN, MT. Pembimbing II : ANNISA KESSY, G. ST. MT. Permasalahan line balancing dalam aliran produksi terkadang masih diabaikan oleh perusahaan, meskipun pada kenyataannya masalah line balancing merupakan salah satu yang memegang peranan penting dalam pemenuhan target produksi yang telah direncanakan. Koperasi INTAKO pada divisi pabrik yang terletak di tanggulangin sidoarjo merupakan koprasi yang menghasilkan beraneka ragam jenis tas perempuan. Permasalahan yang dihadapi koperasi INTAKO adalah sering kali adanya penambahan jam kerja (lembur) hal ini diakibatkan tidak dapat memenuhi permintaan pasar yang disebabkan karena rendahnya jumlah produksi akibat kurang seimbangnya lintasan produksi. Dalam upaya menyelesaikan masalah tersebut digunakan metode rank position weight dan region approach yang merupakan metode heuristic dengan pendekatan trial and error untuk membandingkan kondisi awal dengan kondisi setelah perencanaan metode line balancing pada koperasi INTAKO. Yang meliputi balance delay, efisiensi lintasan, dan output produksi. Berdasarkan hasil analisa ternyata dari kedua metode didapatkan hasil perhitungan balance delay awal 23% berkurang menjadi 21% dengan metode rank position weight. Dan 17% dengan metode region approach. Sedangkan efisiensi lintasan dari kondisi awal sebesar 77% meningkat menjadi 79% dengan metode rank position wight, dan 83% dengan metode region approach. Output produksi tas perempuan meningkat dari kondisi awal 1848 unit/bulan menjadi 2662 unit/bulan dengan metode rank position weight, dan 2464 unit/bulan dengan metode region approach. Karena pada kasus ini yang lebih ditekankan adalah output produksinya maka perencanaan line balancing dengan metode rank positional weight dapat digunakan dalam pemecahan masalah pada koperasi INTAKO Tanggulangin Sidoarjo. Kata Kunci : Line Balancing, Efisiensi Lintasan, Balance Delay, Output Produksi, RPW, RA.

ABSTRACT ABDUL ARIJAL TAUFIQ, 2008, NIM.02540018, PLANNING OF LINE of BALANCING WITH METHOD of RANK POSITION WEIGHT (RPW) AND METHOD of REGION APPROACH (RA) UTILIZE TO IMPROVE OUTPUT PRODUCE IN CO-OPERATION of INTAKO TANGGULANGIN SIDOARJO, Industrial Skripsi Majors Technique [of] Faculty Of Technique University of Muhammadiyah Unlucky. Counsellor Of I : Ir. H. M. LUKMAN, MT. Counsellor Of II : ANNISA KESSY, G. ST. MT. Problems of line of balancing in stream of productions sometimes still disregarded by company, though practically the problem of line of balancing represent one other playing a part important in accomplishment of goals produce which have been planned. Co-operation of INTAKO at factory division which located in sidoarjo tanggulangin represent co-operation yielding is multifarious of woman bag type manner. Problems faced by co-operation of INTAKO is frequently the existence of addition of office hours this matter overtime is resulted cannot fulfill request of caused by market to lower him is amount of production effect of less as well-balanced as production trajectory. In the effort finishing the problem used by method of rank weight position and of region approach representing method of heuristic with approach of error and trial for comparing is condition of early with condition of after planning of line method of balancing at co-operation of INTAKO. covering delay balance, trajectory efficiency, and production output. Pursuant to result of analysis in the reality from both method got by result of calculation of delay balance early 23% decreasing to become 21% with method of rank weight position. And 17% with method of region approach. While trajectory efficiency from condition of early equal to 77% mounting to become 79% with method of rank wight position, and 83% with method of region approach. Output produce woman bag mount from condition of early 1848 unit / month become 2662 unit / month with method of rank weight position, and 2464 unit / month with method of region approach. Because [at] this case which more emphasized its production output hence planning of line of balancing with method of rank weight positional can be used in trouble-shooting at co-operation of INTAKO Tanggulangin Sidoarjo. Keyword : Line of Balancing, Efficiency Trajectory, Balance Delay, Output Production, RPW, RA.

KATA PENGANTAR Syukur Alhamdulillah penulis ucapkan kehadirat Allah SWT yang maha dari segala maha sehingga laporan tugas akhir dengan judul PERENCANAAN LINE BALANCING DENGAN METODE RANK POSITION WEIGHT (RPW) DAN METODE REGION APPROACH (RA) GUNA MENINGKATKAN OUTPUT PRODUKSI ini dapat terselesaikan lewat pada waktu yang telah penulis rencanakan. Teriring do a sholawat serta salam semoga senantiasa melimpah kehariban nabi besar MUHAMMAD SAW rosul akhir zaman, penutup para nabi yang membawa kesempurnaan ajaran tauhid dan keutamaan budi pekerti. Dan semoga ditumpahkan do a sholawat menetes segenap keluarga sahabat dan seluruh ummatnya yang dengan tulus mencintai dan menjunjung sunnahnya. Skripsi ini merupakan salah satu persyaratan untuk menyelesaikan pendidikan di Fakultas Teknik Jurusan Industri Universitas Muhammadiyah Malang. Skripsi ini dapat terselesaikan karena banyak pihak yang telah membantu baik doa, maupun dengan tenaga. Oleh karena itu pada kesempatan ini penulis ingin mengucapkan banyak terima kasih kepada : 1 Keluargaku (emmak, bapak, alek anis, dan alek vera). Terutama emmakku bapak kedua yang tidak akan pernah kering akan do a do anya yang tulus yang slalu mendukung lahir maupun batin. Dan keluarga besar H.SATIMAN. 2. Ibu Dyah Retno P, MT, selaku Ketua Jurusan Teknik Industri. 3. Ir.M.Lukman, MT selaku dosen pembimbing I, yang telah meluangkan waktunya untuk memberikan bimbingan hingga terselesaikannya Skripsi ini.

4. Annisa Kesy, G. ST. MT selaku dosen pembimbing II terima kasih atas kesabaran, arahan dan bimbingannya hingga terselesaikannya Skripsi ini. 5. TU jurusan, terima kasih atas bantuannya. 6. Seluruh staf dan karyawan Koperasi INTAKO Tanggulangin Sidoarjo, yang telah membantu selama penelitian. 7. Yang kusayangi dan aku hargai hanunah. 8. Seluruh teman jurusan industri yang sudah maupun yang tertunda. Penulis hanya bisa memberi ungkapan terima kasih dan doa tulus yang dapat dipersembahkan, semoga segala yang mereka berikan kepada saya tercatat diperjalanan hidup saya dan tercatat dalam catatan sang Roqib sebagai sebuah ibadah yang tiada ternilai, amiiiin. Ya Allah terima kasih atas segalanya, terutama nikmat hidup yang engkau berikan, dan ampuni hambamu ini yang sering melupakanmu dalam keseharianku. Hamba mohon padamu untuk engkau, bawa hambamu kemanapun engkau ridhoi agar hambamu kelak bisa menemukan kedamaian hidup dan hati yang sebenarnya dalam pelukan cinta sesungguhnya darimu. Akhirnya penulis berharap semoga Skripsi ini dapat bermanfaat. Terima kasih. Billahittaufiq wal hidayah Malang, 29 November 2008 Penulis

DAFTAR ISI Halaman Judul Berita Acara Ujian Tugas Akhir Lembar Pengesahan Lembar Asistensi Abstaraksi Kata Pengantar Daftar Isi Daftar Tabel Lampiran HALAMAN BAB I : PENDAHULUAN 1.1. Latar Belakang...1 1.2. Rumusan Masalah...2 1.3. Tujuan Penelitian...2 1.4. Manfaat Penelitian...3 1.5. Batasan Masalah...3 1.6. Asumsi-Asumsi...4 1.7. Sistematika Penulisan...4 BAB II : LANTASAN TEORI 2.1. Line Balancing...6 2.1.1 Faktor Faktor Yang Mempengarihi Line Balancing...7 2.1.2 Tipe Tipe Line Balancing...8 2.1.3 Tujuan Line Balancing.... 9 2.1.4 Metode Dalam Penyeimbangan Lintasan Perakitan...9 2.1.5 Metode Rank Position Weight.....10 2.1.6 Metode Region Approach...11 2.2. Peta Proses Operasi...12 2.3 Precedence Diagram...14 2.4. Menentukan Waktu Siklus...27 2.5 Menentukan Jumlah Stasiun Kerja..16 2.6 Menghitung Balance Delay.. 17 2.7 Menghitung Efisiensi Lintasan.... 18

2.8 Menentukan Output Produksi.. 18 2.9 Pengukuran Waktu Kerja Dengan Jam Henti..19 2.9.1 Uji Kecukupan Dan Keseragaman Data....22 2.9.2 Performance Rating...23 2.9.3 Menentukan Allowance Time....32 2.9.4 Waktu Normal....37 2.9.5 Waktu Baku...38 BAB III : METODOLOGI PENELITIAN 3.1 Diagram Alir Penelitian...39 3.2 Diskripsi Diagram Alir Penelitian...40 3.2.1. Survey Perusahaan...40 3.2.2. Identifikasi Masalah...40 3.2.3. Study Literatur...41 3.2.4. Pengumpulan Data... 41 3.2.5. Tes Keseragaman Data 42 3.2.6 Tes Kecukupan Data...43 3.2.7. Menghitung Waktu Normal...44 3.2.8. Menghitung Waktu Baku...44 3.2.9. Pembuatan Precedence Diagram...45 3.2.10. Perencanaan Keseimbangan Lintasan...45 3.2.11. Analisa Hasil...49 3.2.12 Kesimpulan Dan Saran...49 BAB IV : PENGUMPULAN DAN PENGOLAHAN DATA 4.1. Sejarah Umum Perusahaan...50 4.2. Produk Koperasi Intako...51 4.3. Outlet Intako...52 4.4. Layout Produksi...53 4.5. Pengumpulan Data...53 4.5.1. Cara Mendapatkan Data...53 4.5.2. Bahan Baku Yang Digunakan...54 4.5.3. Mesin Dan Alat Yang Digunakan...54 4.5.4. Proses Pembuatan Tas Perempuan...56 4.5.5. Peta Proses Operasi...59 4.5.6. Waktu Operasi Tiap Proses...62

4.5.7. Jam Kerja Efektif...65 4.6. Pengolahan Data...65 4.6.1. Uji Keseragaman Data..65 4.6.2. Uji Kecukupan Data. 70 4.6.3. Menghitung Waktu Baku Tiap Proses..73 4.6.4. Pengelompokan Elemen Kerja Kedalam Stasiun Kerja Awal...85 4.6.5. Perhitungan Tenaga Kerja Dan Output Sebelum Perencanaan.....87 4.7. Perencanaan Keseimbangan Lintasan Dengan Metode RPW...92 4.7.1. Precedence Diagram...93 4.7.2. Penentuan Bobot Posisi Masing-masing Operasi...95 4.7.3. Penyusunan Ranking Bobot Posisi...96 4.7.4. Penentuan Rank Waktu Siklus...98 4.7.5.Pengelompokan Operasi Kedalam Stasiun Kerja...99 4.7.5.1. Perencanaan I Dengan Waktu Siklus 226.42 detik...99 4.7.5.2. Perencanaan II Dengan Waktu Siklus 244.81 detik...103 4.7.5.3. Perencanaan III Dengan Waktu Siklus 263.21 detik...106 4.7.5.4. Perencanaan IV Dengan Waktu Siklus 281.60 detik...109 4.8. Perencanaan Keseimbangan Lintasan Dengan Metode RA...112 4.8.1. Precedence Diagram...112 4.8.2 Pembagian Operasi Kedalam Beberapa Region...112 4.8.3 Pengelompokan Operasi Kedalam Stasiun Kerja...114 4.8.3.1. Perencanaan I Dengan Waktu Siklus 226.42 detik...114 4.8.3.2. Perencanaan II Dengan Waktu Siklus 244.81 detik...118 4.8.3.3. Perencanaan III Dengan Waktu Siklus 263.21 detik...121 4.8.3.4. Perencanaan IV Dengan Waktu Siklus 281.60 detik...124 4.9. Analisa Perencanaan Line Balancing Dengan Metode RPW Dan RA...127 4.10. Perhitungan Biaya Tenaga Kerja Sesudah Perencanaan...128 4.10.1. Perhitungan Biaya Tenaga Kerja Dengan Metode RPW...128 4.10.2. Perhitungan Biaya Tenaga Kerja Dengan Metode RA...131 4.12. Pemilihan Perencanaan Line Balancing Terbaik Berdasarkan Output Maksimal Dengan Metode RPW dan RA...133 BAB V : ANALISA PEMBAHASAN 5.1. Perbandingan Output Produksi Dan Biaya Tenaga Kerja, Sebelum Dan Sesudah Perencanaan...139

5.1.1. Sebelum Perencanaan...139 5.1.2. Sesudah Perencanaan Keseimbangan Lintasan Dengan Menggunakan Metode RPW dan RA...141 5.2. Perbandingan Perubahan Elemen Kerja Antara Stasiun Kerja Awal Dengan Stasiun Kerja Usulan...143 BAB VI : KESIMPULAN 6.1. Kesimpulan...149 6.2. Saran...151

DAFTAR TABEL Tabel 2.1 Westing House Performance Rating...24 Tabel 2.2 Beasarnya Kelonggaran Faktortenaga yang dikeluarkan... 33 Tabel 2.3 Besarnya Kelonggaran Berdasarkan Faktor Sikap Kerja...33 Tabel 2.4 Besarnya Kelonggaran Berdasarkan Faktor Gerakan Kerja...34 Tabel 2.5 Besarnya Kelonggaran Berdasarkan Faktor Kelelahan Mata...34 Tabel 2.6 Besarnya Kelonggaran Berdasarkan Faktor Keadaan Tempratur.....35 Tabel 2.7 Besarnya Kelonggaran Berdasarkan Faktor Kadaan Atmosfer.. 36 Tabel 2.8 Besarnya Kelonggaran Berdasarkan Faktor Kadaan Lingkungan...36 Tabel 3.1 Tes Keseragaman Data...42 Tabel 3.2 Tes Kecukupan Data...43 Tabel 3.3 Perhitungan Waktu Normal...44 Tabel 3.4 Perhitungan Waktu Baku...44 Tabel 3.5 Pengelompokan Elemen Kerja Kedalam Stasiun Kerja...47 Tabel 4.1 Proses Pembuatan Tas Perempuan...56 Tabel 4.2 Data Waktu Pengamatan Pembuatan Tas Perempuan...63 Tabel 4.3 Data Pengamatan Untuk Proses Operasi 1 (0-01)...66 Tabel 4.4 Uji Keseragaman Data...68 Tabel 4.5 Uji Kecukupan Data...72 Tabel 4.6 Waktu Siklus Tiap Operasi...74 Tabel 4.7 Westinghause Performance Rating...75 Tabel 4.8 Performance Rating Operasi 1(0-01)...76 Tabel 4.9 Penentuan Performace Rating...77 Tabel 4.10 Waktu Normal Tiap Proses...79 Tabel 4.11 Allowance Time Tiap Operasi...81 Tabel 4.12 Waktu Normal Tiap Proses...83 Tabel 4.13 Stasiun Kerja Awal.85 Tabel 4.14 Data Permintaan..........88 Tabel 4.15 Keterangan Stasiun Kerja Kondisi Awal.........91 Tabel 4.16 Penentuan Bobot Posisi Pada Tiap Opersi...95 Tabel 4.17 Penyusunan Ranking Bobot Opersi...97 Tabel 4.18 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 226.42 detik...99 Tabel 4.19 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 244.81 detik...103

Tabel 4.20 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 263.21 detik...106 Tabel 4.21 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 281.60 detik...109 Tabel 4.22 Pembagian Operasi Kedalam Beberapa Region...113 Tabel 4.23 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 226.42 detik...115 Tabel 4.24 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 244.81 detik...118 Tabel 4.25 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 263.21 detik...121 Tabel 4.26 Pengelompokan Stasiun Kerja Dengan Waktu Siklus 281.60 detik...124 Tabel 4.27 Hasil Perencanaan Line Balancing Dengan Metode RPW dan RA...127 Tabel 4.28 Perbandingan Hasil Line Balancing Dengan Metode RPW dan RA...134 Tabel 4.29 Keterangan Pengelompokan Elemen Kerja Waktu Siklus 207.46 Detik...136 Tabel 5.1 Data Historis Permintaan Tas Perempuan Perbulan...119 Tabel 5.2 Perbandingan Metode RPW dan RA...141 Tabel 5.3 Perbandingan Kriteria Sebelum Dan Sesudah Perencanaan...143 Tabel 5.4 Perbandingan Elemen Kerja Sebelum Dan Sesudah Perencanaan...144 Tabel 6.1 Perbandingan Sebelum dan Sesudah Perencanaan...149 Tabel 6.2 Pengelompokan Elemen Kerja Dengan Metode RPW Dan RA Dengan Waktu Siklus 207.46 Detik...150

DAFTAR GAMBAR Gambar 2.1 Sketsa Pembuatan Peta Proses Operasi...14 Gambar 2.2 Precedence Diagram...15 Gambar 2.3 Langkah Langkah Sistematis Dalam Kegiatan Pengukuran Kerja Dengan Jam Henti...21 Gambar 2.4 Precedence Diagram...34 Gambar 3.1 Diagram Alir Penelitian...39 Gambar 3.2 Precedence Diagram...45 Gambar 4.1 Layout Lantai Produksi...53 Gambar 4.2 Peta Proses Operasi...61 Gambar 4.3 Pengelompokan Stasiun Kerja Kondisi Awal...90 Gambar 4.4 Precedence Diagram Pembuatan Tas Perempuan...94 Gambar 4.5 Pengelompokan Stasiun Kerja Menggunakan metode RPW Dengan Waktu Siklus 207.46 detik...135 Gambar 5.1 Pembagian Stasiun Kerja Sebelum Perencanaan...147 Gambar 5.2 Pembagian Stasiun Kerja Setelah Perencanaan...148

DAFTAR PUSTAKA Baroto, Teguh, 2002, Pengantar Teknik Industri, Cetakan Pertama, UMM Press, Malang. Sutalaksana, Iftikar Z. dkk, 1979, Teknik Tata Cara Kerja, Departemen Teknik Industri, ITB, Bandung. Purnomo, Hari Pengantar Teknik Industri, Graha Ilmu, Yogyakarta. Wignjosoebroto, Sritomo, 2003, Ergonomi Studi Gerak dan Waktu, Edisi Pertama, Cetakan Ketiga, PT. Guna Widya, Jakarta. Wignjosoebroto, Sritomo, 1992, Teknik Tata Cara dan pengukuran Kerja, Edisi Kedua, PT. Guna Widya, Jakarta.