PENGARUH FAKTOR DESAIN, OPERASI DAN PIHAK KETIGA TERHADAP KATEGORI RESIKO PIPELINE. Dodi Novianus Kurniawan

dokumen-dokumen yang mirip
QUANTITATIVE RISK ASSESSMENT UNTUK EQUIPMENT DALAM GAS PROCESSING UNIT DI TOPSIDE OFFSHORE PLATFORM

BAB IV Pengaruh Parameter Desain, Kondisi Operasi dan Pihak Ketiga

STUDI ANALISIS RESIKO PADA PIPELINE OIL DAN GAS DENGAN METODE RISK ASSESMENT KENT MUHLBAUER DAN RISK BASED INSPECTION API REKOMENDASI 581

Gambar 3.1. Diagram Alir Penelitian

Gambar 5. 1 Sistem Pipeline milik Vico Indonesia

SIDANG P3 JULI 2010 ANALISA RESIKO PADA ELBOW PIPE AKIBAT INTERNAL CORROSION DENGAN METODE RBI. Arif Rahman H ( )

Analisis Remaining Life dan Penjadwalan Program Inspeksi pada Pressure Vessel dengan Menggunakan Metode Risk Based Inspection (RBI)

Tugas Akhir (MO )

ANALISIS KONSEKUENSI KEGAGALAN SECARA KUANTITATIF PADA ONSHORE PIPELINE BERDASARKAN API 581 BRD. I Wayan Diptagama

STUDI ANALISIS RESIKO PADA PIPELINE OIL DAN GAS DENGAN METODE RISK ASSESMENT KENT MUHLBAUER DAN RISK BASED INSPECTION API REKOMENDASI 581.

BAB I PENDAHULUAN. 1.1 Latar Belakang

Muhammad

Gambar 4.1. Diagram Alir Proses Stasiun Pengolahan Gas (PFD)

UNIVERSITAS INDONESIA ANALISA PERBANDINGAN METODE ASSESSMENT BERBASIS RESIKO DENGAN METODE ASSESSMENT BERBASIS WAKTU PADA STASIUN PENGOLAHAN GAS

Studi Aplikasi Metode Risk Based Inspection (RBI) Semi-Kuantitatif API 581 pada Production Separator

SIDANG P3 TUGAS AKHIR JURUSAN TEKNIK KELAUTAN 28 JANUARI 2010

4.1 INDENTIFIKASI SISTEM

INSPEKSI BERBASIS RISIKO DAN PENENTUAN UMUR SISA JALUR PIPA KURAU DAN SEPARATOR V-201 EMP MALACCA STRAIT. Oleh : ALRIZAL DIYATNO NIM

DAFTAR TABEL. 1. Tabel 3.1. Metoda penentuan tingkat kerawanan akibat thinning... 23

Non Destructive Testing

Muhammad (NRP )

ANALISA OVER STRESS PADA PIPA COOLING WATER SYSTEM MILIK PT. XXX DENGAN BANTUAN SOFTWARE CAESAR II

UNIVERSITAS DIPONEGORO

Metode Seleksi Material pada Pengilangan Minyak dan Gas Menggunakan Neraca Massa dan Energi dan Diagram Alir Proses

BAB IV PEMBAHASAN 2 1 A B C D E CONSEQUENCE CATEGORY. Keterangan : = HIGH = MEDIUM = MEDIUM HIGH = LOW

ABSTRAK. Optimisasi Proses Freis dengan Nicholas Baskoro. Program Studi Teknik Mesin Fakultas Teknologi Industri Institut Teknologi Bandung

Bab 2 Tinjauan Pustaka

INSTITUT TEKNOLOGI BANDUNG

1 BAB 1 PENDAHULUAN. 1.1 Latar Belakang

SKRIPSI PERANCANGAN BURNER KETEL UAP PIPA API BERBAHAN BAKAR OLI BEKAS. Oleh : Maramad Saputra Nara

Bab 3 Data Operasi Sistem Perpipaan pada Topside Platform

PERANCANGAN STANDARD OPERATING PROCEDURE SIKLUS PENJUALAN KAMAR SECARA KREDIT PADA HOTEL BINTANG EMPAT (STUDI PRAKTIK KERJA PADA HOTEL MGMS)

SKRIPSI USULAN PERENCANAAN PERAWATAN PADA MESIN CURING MENGGUNAKAN METODE RCM II (RELIABILITY CENTERED MAINTENANCE II)

INSTITUT TEKNOLOGI BANDUNG

Abstrak Kata Kunci :

ANALISIS PENILAIAN RISIKO PADA FLOWLINE JALUR PIPA GAS DARI WELLHEAD MENUJU CENTRAL PROCESSING PLANT. (Studi Kasus : Industri Pengolahan Gas Alam)

Penilaian Risiko Dan Perencanaan Inspeksi Pipa Transmisi Gas Alam Cepu-Semarang Menggunakan Metode Risk Based Inspection Semi-Kuantitatif Api 581

TUGAS AKHIR PERANCANGAN SISTEM PENDETEKSI SUHU PADA BODY TRAFO DISTRIBUSI GARDU PLN BERBASIS SMS GATEWAY

PEMANFAATAN WEB SERVICE MOODLE BERBASIS REST- JSON UNTUK MEMBANGUN MOODLE ONLINE LEARNING EXTENSION BERBASIS ANDROID

Manajemen Risiko Proyek Perangkat Lunak Menggunakan Pendekatan Just In Time Pada Perusahaan IT (Studi Kasus PT.Cerise Yogyakarta)

ANALISIS KARAKTERISTIK TEGANGAN TEMBUS PADA MINYAK TRAFO NYNNAS DAN APPAR TERHADAP SUHU

ALOKASI PEMBEBANAN UNIT PEMBANGKIT TERMAL DENGAN MEMPERHITUNGKAN RUGI-RUGI SALURAN TRANSMISI DENGAN ALGORITMA GENETIKA PADA SISTEM KELISTRIKAN BALI

TUGAS AKHIR PIPELINE STRESS ANALYSIS TERHADAP TEGANGAN IJIN PADA PIPA GAS ONSHORE DARI TIE-IN SUBAN#13 KE SUBAN#2 DENGAN PENDEKATAN CAESAR II

ABSTRAK. Kata Kunci: manajemen risiko, analisis risiko, kuantitatif, probabilitas, dampak, severity index, skala likert. Universitas Kristen Maranatha

PERANCANGAN DAN ANALISA SISTEM PERPIPAAN PROCESS PLANT DENGAN METODE ELEMEN HINGGA

APLIKASI PERANGKAT AJAR PENGELOLAAN DAN PERHITUNGAN EKSPRESI MATEMATIKA DARYANTO

KAJIAN PENYUMBATAN (BOTTLENECK) ALIRAN MULTIFASA PADA JARINGAN PIPA

ANALISA RESIKO PADA REDUCER PIPELINE AKIBAT INTERNAL CORROSION DENGAN METODE RBI (RISK BASED INSPECTION)

UNIVERSITAS DIPONEGORO

PENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa?

Analisa Laju Erosi dan Perhitungan Lifetime Terhadap Material Stainless Steel 304, 310, dan 321

ANALISIS FAKTOR GESEKAN PADA PIPA HALUS ABSTRAK

ANALISIS KUALITAS PROSES COATING TERHADAP KETAHANAN PIPA API 5L DENGAN MENGGUNAKAN PENDEKATAN SIX SIGMA (STUDI KASUS PLANT COATING PT.

Bab 4 Pemodelan Sistem Perpipaan dan Analisis Tegangan

LAPORAN TUGAS AKHIR ANALISA TEGANGAN SISTEM PIPA PROCESS LIQUID DARI VESSEL FLASH SEPARATOR KE CRUDE OIL PUMP MENGGUNAKAN PROGRAM CAESAR II

(Badan Geologi Kementrian ESDM, 2010)

RANCANG BANGUN ALAT PENGERING TIPE TRAY DENGAN MEDIA UDARA PANAS DITINJAU DARI LAMA WAKTU PENGERINGAN TERHADAP EXERGI PADA ALAT HEAT EXCHANGER

INSTITUT TEKNOLOGI BANDUNG

PROTOTYPE PENGOLAHAN AIR LAUT MENJADI AIR MINUM Studi Mekanika Fluida (Analisis Aliran Fluida dalam Pipa dan Nilai Head Loss Pipa dan Sambungan Pipa)

KAJIAN PENDAHULUAN PEMBUATAN PADUAN Fe-Ni-Al DARI BAHAN BAKU FERRONIKEL PT. ANTAM Tbk. TUGAS AKHIR. Fiksi Sastrakencana NIM :

OPTIMALISASI DESAIN TURBIN PLTA PICO- HYDRO UNTUK MENINGKATKAN EFISIENSI DAYA DENGAN BANTUAN SOFTWARE CFD DAN KONSEP REVERSE ENGINEERING

BAB I PENDAHULUAN 1.1 Latar Belakang

HUBUNGAN ZONA SERPENTINISASI DENGAN PENYEBARAN NIKEL LATERIT DAERAH LOJI, KABUPATEN HALMAHERA SELATAN, PROVINSI MALUKU UTARA

SKRIPSI FAKTOR JUMLAH LILITAN PIPA BURNER TERHADAP POLA NYALA DAN WAKTU PEMBAKARAN PADA ALAT PEMBAKAR JENAZAH KONVENSIONAL

BAB II INSPEKSI BERBASIS RISIKO

Oleh: NUGROHO E RAHARJO L2E

Pipeline Risk Assessment

KAJIAN MODEL PERKIRAAN AWAL BIAYA PADA-PROYEK PENINGKATAN JALAN KABUPATEN DI KABUPATEN SUMEDANG TESIS MAGISTER. Oleh: AGUS SUTOPO NIM :

INSTITUT TEKNOLOGI BANDUNG

ANALISIS KEGAGALAN AKIBAT KOROSI DAN KERETAKAN PADA PIPA ALIRAN GAS ALAM DI NEB#12 PETROCHINA INTERNATIONAL JABUNG LTD

BAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk

Penilaian Risiko dan Penjadwalan Inspeksi pada Pressure Vessel Gas Separation Unit dengan Metode Risk Based Inspection pada CPPG

POLITEKNIK NEGERI SRIWIJAYA PALEMBANG 2016

ANALISA PERAWATAN BERBASIS RESIKO PADA SISTEM PELUMAS KM. LAMBELU

BAB IV DATA DAN ANALISIS

NAJA HIMAWAN

KARAKTERISTIK PENGGUNA MOBILE BANKING DI INDONESIA

UNIVERSITAS INDONESIA ANALISA PENGEMBANGAN DAN DAMPAK INDUSTRI BIOETANOL DI JAWA TIMUR DENGAN METODE INPUT OUTPUT TESIS KULSUM

PERSOALAN OPTIMASI FAKTOR KEAMANAN MINIMUM DALAM ANALISIS KESTABILAN LERENG DAN PENYELESAIANNYA MENGGUNAKAN MATLAB

TUGAS AKHIR. Analisa Pengendalian Kualitas Produk Jumbo Roll. Dengan Menggunakan Metode FTA (Fault Tree Analysis)

PENERAPAN DIAGRAM KONTROL IMPROVED GENERALIZED VARIANCE PADA PROSES PRODUKSI HIGH DENSITY POLYETHYLENE (HDPE)

JURNAL TEKNIK POMITS Vol. 1, No. 1, (2013) 1-6 1

ANALISA PENINGKATAN KUALITAS PADA PUPUK PHONSKA DENGAN PENDEKATAN QUALITY RISK MANAGEMENT DI PT. PETROKIMIA GRESIK

PERENCANAAN PERSEDIAAN KNIFE TC 63 mm BERDASARKAN ANALISIS RELIABILITAS (Studi Kasus di PT. FILTRONA INDONESIA)

ANALISIS DAN PERANCANGAN SISTEM INFORMASI AKUNTANSI PEMBELIAN DALAM RANGKA MENINGKATKAN PENGENDALIAN INTERNAL (STUDI KASUS PADA CV ACP)

THESIS. OPTIMASI PEMILIHAN KOMBINASI ALAT BERAT DENGAN APLIKASI REKURSIF DYNAMIC PROGRAMMING Studi Kasus : PT. VICO INDONESIA

Bab III Data Perancangan GRP Pipeline

PEMODELAN DESAIN PARAMETER UNTUK ESTIMASI BIAYA PEMBANGUNAN RUMAH

Analisa Konsekuensi. Pada kasus ini tergolong dalam C6-H8 (Gasoline, Naphta, Light Straight, Heptane), memiliki sifat :

EVALUASI TEKNIS DAN EKONOMIS PROSES PRODUKSI TEH HITAM CTC PTPN XII WONOSARI DENGAN KAPASITAS PRODUKSI 4500 KG/HARI

Diajukan Sebagai Syarat Memperoleh Gelar Sarjana Teknik Jurusan Teknik Industri Fakultas Teknik Universitas Muhammadiyah Surakarta

PERANCANGAN SISTEM PENDUKUNG KEPUTUSAN PENENTUAN JUMLAH PRODUKSI DENGAN METODE TSUKAMOTO (Studi Kasus pada PT Tanindo Subur Prima) SKRIPSI

EVALUASI PENGENDALIAN INTERNAL SIKLUS PENDAPATAN PELAYANAN KAPAL PADA PT. PELABUHAN INDONESIA III CABANG TANJUNG PERAK

OLEH: SALLY SANADA

PENGEMBANGAN PERANGKAT LUNAK UNTUK SIMULASI ESTIMASI VOLUME KEBOCORAN MINYAK

STUDI PENGARUH MUTUAL INDUCTANCE TERHADAP SETTING RELE JARAK PADA SALURAN TRANSMISI DOUBLE CIRCUIT 150 kv ANTARA GI KAPAL GI PEMECUTAN KELOD

PENGEMBANGAN SISTEM BERBASIS SMS GATEWAY SEBAGAI MEDIA INFORMASI KEGIATAN DI KELURAHAN PURWOKERTO WETAN SKRIPSI

KECINTAAN TERHADAP UANG (THE LOVE OF MONEY) MAHASISWA PASCA SARJANA UNIVERSITAS ATMA JAYA YOGYAKARTA

UNIVERSITAS BINA NUSANTARA

ABSTRAK. Kata kunci: chatbot, information state, mixture-language model. v Universitas Kristen Maranatha

Transkripsi:

PENGARUH FAKTOR DESAIN, OPERASI DAN PIHAK KETIGA TERHADAP KATEGORI RESIKO PIPELINE Diajukan sebagai salah satu syarat dalam memperoleh gelar Magister Teknik Mesin Oleh: Dodi Novianus Kurniawan 231 06 022 PROGRAM STUDI TEKNIK MESIN FAKULTAS TEKNOLOGI INDUSTRI INSTITUT TEKNOLOGI BANDUNG 2007

LEMBAR PENGESAHAN Tugas Pasca Sarjana PENGARUH FAKTOR DESAIN, OPERASI DAN PIHAK KETIGA TERHADAP KATEGORY RESIKO PIPELINE Telah diperiksa dan dinyatakan sah sebagai salah satu syarat kelulusan program strata dua di Departemen Teknik Mesin, Fakultas Teknologi Industri, Institut Teknologi Bandung Oleh : Dosen Pembimbing Dr. Ir. IGN Wiratmaja Puja N I P. 131 835 240

ABSTRAK Pipeline merupakan fasilitas yang penting dalam dunia perminyakan. Fasilitas ini perlu sekali untuk diperhatikan karena banyak sekali kegagalan yang terjadi. Kegagalan yang terjadi dapat mengakibatkan resiko kerugian yang cukup besar. Kategori resiko dipengaruhi oleh beberapa faktor antara lain faktor desain, operasi dan pihak ketiga. Perlu mengetahui bagaimana pengaruh masing masing faktor terhadap kategori resikonya. Kategori resiko ditunjukkan dalam penilaian Probability of Failure (PoF) dan Consequence of Failure (CoF). Pada tugas akhir ini dilakukan analisis pengaruh parameter desain, operasi dan pihak ketiga terhadap kategori resiko sebuah pipeline. Perhitungan kategori resiko dilakukan berdasarkan metodologi Muhlbauer dan API 581. Studi kasus yang diambil adalah sambungan pipeline milik Vico Indonesia. Dengan melakukan segmentasi sepanjang pipeline tersebut, diambil sebuah segmen pada bagian pipa yang melewati jalan raya pada titik zona PK 30+350. Kemudian untuk mempermudah melakukan perhitungan, maka dilakukan pembuatan alat bantu perangkat lunak perhitungan kategori resiko pipeline. Consequence area dan economic berbanding lurus dengan diameter pipa dan kepadatan penduduk. Terhadap temperatur operasi tidak akan berubah, namun akan terjadi discontinuity ketika fluida menjadi auto ignition. Consequence area memilki hubungan fungsi parabolik terhadap panjang pipa dan tekanan operasi. Economic consequence cenderung tetap meskipun panjang pipa bertambah. Demikian juga ketika tekanan operasi bertambah, namun akan terjadi discontinuity ketika mencapai tekanan tertentu. PoF berbanding terbalik terhadap diameter pipa dan kedalaman penguburan yang mendekati fungsi parabolik dan berbading lurus terhadap jumlah sambungan dalam pipa dan waktu (umur) operasi. PoF akan tetap nilainya sampai panjang sebuah pipa tertentu, kemudian meningkat secara hiperbolik. PoF cenderung tetap dengan bertambahnya tekanan operasi, namun akan akan terjadi discontinuity ketika melewati 0,9 dari design pressure dan semakin meningkat ketika melewati desain pressure. Demikian juga terhadap temperatur operasi, discontinuity terjadi ketika melewati angka 0,82 dan 0,9 dari batasan temperatur material. Road crossing pada pipeline milik VICO Indonesia pada PK+350 adalah Medium - high

ABSTRACT Pipeline is important facility in oil and gas industry. There are several failures on this facility, so special maintenance is required. The failure on this facility can make another risk, especially on product lost. Risk category of pipeline is effected by several factor especially are design, operation and third-party factor. The effects from each factor to this risk category need to be cleared. Risk category is shown in Probability of Failure (PoF) and Consequence of Failure (CoF). The effect of design, operation and third-party factor to pipeline risk category is conducted on this thesis. Pipeline risk category is conducted based on Muhlbauer and API 581 methodology. Vico Indonesia has a pipeline that has been chosen to conduct special case study. Segmentation has been conducted to divide this pipeline, where zone PK 30+350 is chosen to calculate risk category. Software has been developed to conduct this calculation. Based on this study, consequence area and economic are equivalent with pipe diameter and number of population. Operating temperature does not make several changes to this, but the discontinuity is happen when fluid type change to be auto ignition. The corelation of consequence area to pipe length and opreting pressure is parabolic fungtion. Economic consequence will not change when change is occure on pipe length and operating pressure, but the discontinuity is occure when operating pressure state on one value. PoF is equivalent with number of connection on pipeline and it age. PoF will not change until one value of pipe length, then will higher with parabolic function. PoF will not change when operating pressure change, but there will be discontinuity when it pressure higher than 0.9 of design pressure then the acceleration will be higher when it is higher then design pressure. PoF will be higher when operating temperature change to be higher, discontinuity will be happen when this value more than 0.82 and 0.9 from allowable tempertature. Risk category of VICO road crossing pipeline on PK+#%) is medium high.

KATA PENGANTAR Puji syukur penulis panjatkan kepada Tuhan Yang Maha Esa atas anugrah dan penyertaannya, sehingga laporan thesis ini dapat penulis selesaikan dengan baik. Thesis dengan judul Pengaruh Faktor Desain, Operasi dan Pihak Ketiga Terhadap Kategory Resiko Pipeline ini membahas tentang pengaruh beberapa parameter desain, operasi dan pihak ketiga terhadap kategori resiko sebuah pipeline. Dimana perhitungan tersebut dilakukan berdasarkan API 581 dan metode Muhlbauer. Dalam menyelesaikan tugas akhir ini penulis banyak dibantu oleh beberapa pihak. Oleh karena itu, penulis ingin menyampaikan rasa terima kasih yang sedalam-dalamnya kepada: 1. Tuhan Yang Maha Esa atas anugrah dan penyertaannya hingga laporan tugas pasca sarjana ini dapat diselesaikan. 2. Bapak, Ibu, Mas Eko, Mas Wawik, Kak Ana dan seluruh keluarga yang selalu memberikan perhatian, dukungan dan doa. 3. Dr. Ir. IGN Wiratmaja Puja yang telah memberikan arahan dan bimbingan dalam proses pembuatan dan penyelesaian tugas ini. 4. Dr. Ir. I Wayan Suweca, Dr. Rachman Setiawan, ST sebagai staf pengajar Laboratorium Perancangan Mesin ITB. 5. Ridho, Suka, Kariem, Sigit, Alvian, Fernanda, Risky, Id, Davis, Arnold dan rekan-rekan di Laboratorium Perancangan Mesin ITB yang telah memberikan kerjasamanya selama penulis melaksanakan tugas pasca sarjana ini. 6. Bang Tongam, Bang Jeriko, Bang Meang, Anton, Jhon, Felis, Made, Edu, Haga, Indra dan rekan-rekan Wisma Sejahtera lainnya atas dukungan dan doanya. 7. Mas Nova, Bang Toni, Nickal, David, Erick, Jimmy, Dianta, Hizkia, Roland, Herbert dan teman temanku di LPMI yang selalu memberikan dorongan dan dukungannya dalam doa. 8. Okto, Jaja, Seto, Nova dan Iman sebagai teman sekerja di Dago Engineering yang memberikan bantuan kepada penulis. 9. Teh Rini, Mas Dadang, Mas Jajang, dan Iin sebagai staf Laboratorium yang memberikan bantuan kepada penulis. v

10. Pihak-pihak lain yang tidak dapat disebutkan satu per satu, yang telah membantu penyelesaian tugas sarjana ini. Semoga banyak manfaat yang bisa diperoleh dari tugas pasca sarjana ini terutama bagi penulis pribadi. Bandung, Juni 2007 Penulis vi

DAFTAR ISI Lembar Pengesahan Abstrak Kata Pengantar Daftar Isi Daftar Gambar Daftar Tabel v vii ix xii Bab I Pendahuluan... 1 1.1. Latar Belakang... 1 1.2. Tujuan... 3 1.3. Ruang Lingkup Pembahasan... 3 1.4. Sistematika Pembahasan... 3 Bab II Teori Dasar... 5 2.1 Sistem Pipeline... 5 2.1 Sistem Pipeline... 5 2.2 Risk Based Inspection... 7 2.3 Pengkategorian Resiko Berdasarkan Metode Muhlbauer... 11 2.3.1 Probability of Failure (PoF)... 11 2.3.2 Consequence of Failure (CoF)... 12 2.3.3 Third-party Damage Factor... 13 2.3.4 Corrosion Factor... 19 2.3.5 Design Factor... 25 2.3.6 Incorrect Operation Factor... 29 2.3.7 Leak Impact Factor (CoF)... 33 2.4 Pengkategorian Resiko Berdasarkan API 581... 40 2.4.1 Perhitungan secaral kuantitatif... 41 2.4.2 Probability of Failure (PoF)... 42 2.4.3 Consequence of Failure (CoF)... 53 2.4.4 Metode Penampilan Hasil Analisis Resiko... 60 vii

Bab III Pengembangan Perangkat Lunak... 62 3.1 Pengembangan Perangkat Lunak Metode Muhlbauer... 62 3.1.1 Diagram Alir Perancangan Perangkat Lunak Metode Muhlbauer... 63 3.1.2 Tampilan Perangkat Lunak Metode Muhlbauer... 69 3.2 Pengembangan Perangkat Lunak Metode API 581... 86 3.2.1 Diagram Alir Perancangan Perangkat Lunak Metode API 581 86 3.2.2 Tampilan Perangkat Lunak Metode API 581... 110 Bab IV Pengaruh Parameter Desain, Kondisi Operasi dan Pihak Ketiga... 116 4.1 Parameter Desain... 116 4.2 Parameter Operasi... 122 4.3 Pihak Ketiga... 130 Bab V Studi Kasus... 133 4. 1 Data Perhitungan... 135 4. 2 Metode Muhlbaeur... 137 4. 3 Metode API 581... 145 Bab V Kesimpulan dan Saran... 150 5. 1 Kesimpulan... 150 5. 2 Saran... 151 Daftar Pusataka... 152 viii

DAFTAR GAMBAR Gambar 1. 1 Contoh Kerusakan Pada Pipeline [3]... 2 Gambar 2. 1 Contoh Sistem Perpipaan... 7 Gambar 2. 2 Diagram RBI [4]... 8 Gambar 2. 3 Risk Assessment Model... 8 Gambar 2. 4 Risk Matrix [1]... 9 Gambar 2. 5 Pembagian Pipeline Menjadi Beberapa Segmen [2]... 10 Gambar 2. 6 Flowchart Pengkategorian Resiko Metode Muhlbauer [2]... 11 Gambar 2. 7 Leak Impact Factor (CoF) Flowchart [2]... 12 Gambar 2. 8 Third-party Damage Factor Flowchart [2]... 13 Gambar 2. 9 Corrosion Factor Flowchart [2]... 21 Gambar 2. 10 Design Factor Flowchart [2]... 27 Gambar 2. 11 Incorrect Operation Factor Flowchart [2]... 32 Gambar 2. 12 Leak Impact Factor (CoF) Flowchart [2]... 37 Gambar 2. 13 Chronic Hazard Flowchart [2]... 39 Gambar 2. 14 Metode Perhitungan Secara Kuantitatif [1]... 45 Gambar 2. 15 Metode Perhitungan Probability of Failure (PoF) [1]... 47 Gambar 2. 16 Management Evaluation Score vs PSM Modification Factor [1]... 48 Gambar 2. 17 Perhitungan Technical Module Subfactor (TMSF) [1]... 50 Gambar 2. 18 Perhitungan Thinning TMSF [1]... 52 Gambar 2. 19 Faktor koreksi untuk pipa/pipeline [1]... 55 Gambar 2. 20 Perhitungan SCC TMSF... 57 Gambar 2. 21 Perhitungan HTHA TMSF [1]... 59 Gambar 2. 22 Penentuan Furnace Tube Technical Module [1]... 60 Gambar 2. 23 Penentuan Long Term TMSF [1]... 61 Gambar 2. 24 Penentuan Short Term TMSF... 61 Gambar 2. 25 Penentuan Piping Mechanical Fatigue TMSF [1]... 63 Gambar 2. 26 Penentuan Low Temperature/Low Toughness Failure TMSF [1]... 64 Gambar 2. 27 Penentuan Temper Embritlement TMSF [1]... 65 Gambar 2. 28 Penentuan 8850F Embritlement TMSF [1]... 65 ix

Gambar 2. 29 Penentuan Sigma Phase Embritlement TMSF [1]... 66 Gambar 2. 30 Penentuan Lining TMSF [1]... 67 Gambar 2. 31 Flowchart untuk external damage [1]... 68 Gambar 2. 32 Flowchart external corrosion untuk Carbon & Low Alloy Steels [1]... 68 Gambar 2. 33 Flowchart CUI untuk Carbon & Low Alloy Steels [1]... 69 Gambar 2. 34 Flowchart External SCC untuk Austenitic Stainless Steels [1]... 69 Gambar 2. 35 Flowchart External CUI SCC untuk Austenitic Stainless Steels [1]... 70 Gambar 2. 36 Perhitungan Process Subfactor [1]... 71 Gambar 2. 37 Perhitungan Mechanical Sub Factor [1]... 72 Gambar 2. 38 Perhitungan PoF [1]... 73 Gambar 2. 39 Perhitungan release rate [1]... 75 Gambar 2. 40 Penentuan Release Type [1]... 78 Gambar 2. 41 Penentuan Fasa Final Liquid [1]... 79 Gambar 2. 42 Flowchart Perhitungan Flammable Consequence [1]... 80 Gambar 2. 43 Perhitungan Toxic Consequence [1]... 81 Gambar 2. 44 Perhitungan Environmental Consequence [1]... 82 Gambar 2. 45 Perhitungan Bussiness interuption Consequence [1]... 83 Gambar 2. 46 Perhitungan Kategori Consequence of Failure [1]... 84 Gambar 2. 47 Risk Matriks [1]... 85 Gambar 3. 1 Pengaruh Diameter Pipa Terhadap Consequence area... 87 Gambar 3. 2 Pengaruh Diameter Pipa Terhadap Economic consequence... 88 Gambar 3. 3 Pengaruh Diameter Pipa Terhadap Probability of failure... 88 Gambar 3. 4 Pengaruh Panjang Pipa Terhadap Consequence area... 89 Gambar 3. 5 Pengaruh Panjang Pipa Terhadap Economic consequence... 90 Gambar 3. 6 Pengaruh Panjang Pipa Terhadap Asset Damage Consequence... 91 Gambar 3. 7 Pengaruh Panjang Pipa Terhadap Probability of failure... 91 Gambar 3. 8 Pengaruh Jumlah Sambungan Terhadap Probability of failure... 92 Gambar 3. 9 Pengaruh Tekanan Operasi Terhadap Consequence area... 93 Gambar 3. 10 Pengaruh Panjang Pipa Terhadap Economic consequence... 94 Gambar 3. 11 Pengaruh Tekanan Operasi Terhadap Asset Damage Consequence dan Business Interuption... 94 Gambar 3. 12 Pengaruh Tekanan Operasi Terhadap Probability of failure... 95 x

Gambar 3. 13 Pengaruh Temperatur Operasi Terhadap Consequence area... 96 Gambar 3. 14 Pengaruh Temperatur Operasi Terhadap Economic consequence... 97 Gambar 3. 15 Pengaruh Temperatur Operasi Terhadap Probability of failure... 97 Gambar 3. 16 Pengaruh Debit Aliran Fluida Terhadap Consequence area... 98 Gambar 3. 17 Pengaruh Debit Aliran Fluida Terhadap Economic consequence... 99 Gambar 3. 18 Pengaruh Debit Aliran Fluida Terhadap Probability of failure... 99 Gambar 3. 19 Pengaruh Waktu (Umur) Operasi Terhadap Probability of failure... 100 Gambar 3. 20 Pengaruh Kedalam Penguburan Pipa Terhadap Probability of failure... 101 Gambar 3. 21 Pengaruh Kepadatan Penduduk Terhadap Consequence of Failure.. 102 Gambar 4. 1 Sistem Pipeline milik Vico Indonesia... 104 Gambar 4. 2 Pipeline yang melintasi jalan... 105 xi

DAFTAR GAMBAR Gambar 1. 1 Contoh Kerusakan Pada Pipeline [3]... 2 Gambar 2. 1 Contoh Sistem Perpipaan... 7 Gambar 2. 2 Diagram RBI [4]... 8 Gambar 2. 3 Risk Assessment Model... 8 Gambar 2. 4 Risk Matrix [1]... 9 Gambar 2. 5 Pembagian Pipeline Menjadi Beberapa Segmen [2]... 10 Gambar 2. 6 Flowchart Pengkategorian Resiko Metode Muhlbauer [2]... 11 Gambar 2. 7 Leak Impact Factor (CoF) Flowchart [2]... 12 Gambar 2. 8 Third-party Damage Factor Flowchart [2]... 13 Gambar 2. 9 Corrosion Factor Flowchart [2]... 21 Gambar 2. 10 Design Factor Flowchart [2]... 27 Gambar 2. 11 Incorrect Operation Factor Flowchart [2]... 32 Gambar 2. 12 Leak Impact Factor (CoF) Flowchart [2]... 37 Gambar 2. 13 Chronic Hazard Flowchart [2]... 39 Gambar 2. 14 Metode Perhitungan Secara Kuantitatif [1]... 45 Gambar 2. 15 Metode Perhitungan Probability of Failure (PoF) [1]... 47 Gambar 2. 16 Management Evaluation Score vs PSM Modification Factor [1]... 48 Gambar 2. 17 Perhitungan Technical Module Subfactor (TMSF) [1]... 50 Gambar 2. 18 Perhitungan Thinning TMSF [1]... 52 Gambar 2. 19 Faktor koreksi untuk pipa/pipeline [1]... 55 Gambar 2. 20 Perhitungan SCC TMSF... 57 Gambar 2. 21 Perhitungan HTHA TMSF [1]... 59 Gambar 2. 22 Penentuan Furnace Tube Technical Module [1]... 60 Gambar 2. 23 Penentuan Long Term TMSF [1]... 61 Gambar 2. 24 Penentuan Short Term TMSF... 61 Gambar 2. 25 Penentuan Piping Mechanical Fatigue TMSF [1]... 63 Gambar 2. 26 Penentuan Low Temperature/Low Toughness Failure TMSF [1]... 64 Gambar 2. 27 Penentuan Temper Embritlement TMSF [1]... 65 Gambar 2. 28 Penentuan 8850F Embritlement TMSF [1]... 65 ix

Gambar 2. 29 Penentuan Sigma Phase Embritlement TMSF [1]... 66 Gambar 2. 30 Penentuan Lining TMSF [1]... 67 Gambar 2. 31 Flowchart untuk external damage [1]... 68 Gambar 2. 32 Flowchart external corrosion untuk Carbon & Low Alloy Steels [1]... 68 Gambar 2. 33 Flowchart CUI untuk Carbon & Low Alloy Steels [1]... 69 Gambar 2. 34 Flowchart External SCC untuk Austenitic Stainless Steels [1]... 69 Gambar 2. 35 Flowchart External CUI SCC untuk Austenitic Stainless Steels [1]... 70 Gambar 2. 36 Perhitungan Process Subfactor [1]... 71 Gambar 2. 37 Perhitungan Mechanical Sub Factor [1]... 72 Gambar 2. 38 Perhitungan PoF [1]... 73 Gambar 2. 39 Perhitungan release rate [1]... 75 Gambar 2. 40 Penentuan Release Type [1]... 78 Gambar 2. 41 Penentuan Fasa Final Liquid [1]... 79 Gambar 2. 42 Flowchart Perhitungan Flammable Consequence [1]... 80 Gambar 2. 43 Perhitungan Toxic Consequence [1]... 81 Gambar 2. 44 Perhitungan Environmental Consequence [1]... 82 Gambar 2. 45 Perhitungan Bussiness interuption Consequence [1]... 83 Gambar 2. 46 Perhitungan Kategori Consequence of Failure [1]... 84 Gambar 2. 47 Risk Matriks [1]... 85 Gambar 3. 1 Pengaruh Diameter Pipa Terhadap Consequence area... 87 Gambar 3. 2 Pengaruh Diameter Pipa Terhadap Economic consequence... 88 Gambar 3. 3 Pengaruh Diameter Pipa Terhadap Probability of failure... 88 Gambar 3. 4 Pengaruh Panjang Pipa Terhadap Consequence area... 89 Gambar 3. 5 Pengaruh Panjang Pipa Terhadap Economic consequence... 90 Gambar 3. 6 Pengaruh Panjang Pipa Terhadap Asset Damage Consequence... 91 Gambar 3. 7 Pengaruh Panjang Pipa Terhadap Probability of failure... 91 Gambar 3. 8 Pengaruh Jumlah Sambungan Terhadap Probability of failure... 92 Gambar 3. 9 Pengaruh Tekanan Operasi Terhadap Consequence area... 93 Gambar 3. 10 Pengaruh Panjang Pipa Terhadap Economic consequence... 94 Gambar 3. 11 Pengaruh Tekanan Operasi Terhadap Asset Damage Consequence dan Business Interuption... 94 Gambar 3. 12 Pengaruh Tekanan Operasi Terhadap Probability of failure... 95 x

Gambar 3. 13 Pengaruh Temperatur Operasi Terhadap Consequence area... 96 Gambar 3. 14 Pengaruh Temperatur Operasi Terhadap Economic consequence... 97 Gambar 3. 15 Pengaruh Temperatur Operasi Terhadap Probability of failure... 97 Gambar 3. 16 Pengaruh Debit Aliran Fluida Terhadap Consequence area... 98 Gambar 3. 17 Pengaruh Debit Aliran Fluida Terhadap Economic consequence... 99 Gambar 3. 18 Pengaruh Debit Aliran Fluida Terhadap Probability of failure... 99 Gambar 3. 19 Pengaruh Waktu (Umur) Operasi Terhadap Probability of failure... 100 Gambar 3. 20 Pengaruh Kedalam Penguburan Pipa Terhadap Probability of failure... 101 Gambar 3. 21 Pengaruh Kepadatan Penduduk Terhadap Consequence of Failure.. 102 Gambar 4. 1 Sistem Pipeline milik Vico Indonesia... 104 Gambar 4. 2 Pipeline yang melintasi jalan... 105 xi