TINJAUAN DAN PERENCANAAN PLTA KEDUNGOMBO PURWODADI JAWA TENGAH. Arika Iranawati, Dwi Putri W Joetata Hadihardjada, Sri Sangkawati

dokumen-dokumen yang mirip
BAB III METODOLOGI III UMUM

PERENCANAAN PLTA UNDIP II, SEMARANG (Design of The UNDIP Hydropower Plant II, in Semarang)

KAJI ANALITIK POTENSI DAYA LISTRIK PLTMH DI AIR TERJUN MUARA JAYA DESA ARGAMUKTI KABUPATEN MAJALENGKA PROVINSI JAWA BARAT

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI BENDUNGAN SEMANTOK, NGANJUK, JAWA TIMUR

SIMULASI POLA OPERASI PEMBANGKIT LISTRIK TENAGA AIR DI WADUK KEDUNGOMBO

LAMPIRAN A DESKRIPSI PROYEK

BAB IV HASIL YANG DICAPAI DAN POTENSI KHUSUS 1.1 KETERSEDIAAN DEBIT AIR PLTM CILEUNCA

BAB I PENDAHULUAN. 1.1 Latar Belakang Masalah. Air merupakan unsur yang sangat penting di bumi dan dibutuhkan

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) PALUMBUNGAN, PURBALINGGA Design of Mini Hydro Power Plant at Palumbungan, Purbalingga

BAB V STUDI POTENSI. h : ketinggian efektif yang diperoleh ( m ) maka daya listrik yang dapat dihasilkan ialah :

HYDRO POWER PLANT. Prepared by: anonymous

DAFTAR ISI. BAB III METODE PENELITIAN Lokasi Penelitian Desain Penelitian Partisipan... 35

STUDI PENGARUH PENAMBAHAN UNIT PLTA IV & V TERHADAP POLA OPERASI WADUK KARANGKATES KABUPATEN MALANG

BAB II TINJAUAN PUSTAKA

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) SUMBER MARON DUA DESA KARANGSUKO KECAMATAN PAGELARAN KABUPATEN MALANG TUGAS AKHIR

II. TINJAUAN PUSTAKA

PERENCANAAN BENDUNGAN BENER KABUPATEN PURWOREJO. Claudia Ratna KD, Dwiarta A Lubis Sutarto Edhisono, Hary Budieni

KARAKTERISTIK TURBIN KAPLAN PADA SUB UNIT PEMBANGKIT LISTRIK TENAGA AIR KEDUNGOMBO

Listrik Mikro Hidro Berdasarkan Potensi Debit Andalan Sungai

Scheduling Energi Pembangkitan di PT. PJB Unit Pembangkitan Brantas PLTA Siman

BAB I PENDAHULUAN BAB I PENDAHULUAN

LAMPIRAN B BATASAN TEKNIS

LAPORAN INVESTIGASI PLTM WALESI 5

PERENCANAAN EMBUNG SEMAR KABUPATEN REMBANG. Muchammad Chusni Irfany, Satriyo Pandu Wicaksono, Suripin *), Sri Eko Wahyuni *)

DAFTAR ISI. Halaman Judul... i. Lembar Pengesahan Dosen Pembimbing... ii. Lembar Pernyataan Keaslian... iii. Lembar Pengesahan Penguji...

STUDI PERENCANAAN POLA OPERASI WADUK LOMPATAN HARIMAU DI KABUPATEN ROKAN HULU PROVINSI RIAU

SESSION 8 HYDRO POWER PLANT. 1. Potensi PLTA 2. Jenis PLTA 3. Prinsip Kerja 4. Komponen PLTA 5. Perencanaan PLTA

BAB 2 LANDASAN TEORI. 1. Pembangkit Listrik Tenaga Surya (PLTS), 2. Pembangkit Listrik Tenaga Diesel (PLTD), 3. Pembangkit Listrik Tenaga Angin,

GALIH EKO PUTRA Dosen Pembimbing Ir. Abdullah Hidayat SA, MT

PENENTUAN KAPASITAS DAN TINGGI MERCU EMBUNG WONOBOYO UNTUK MEMENUHI KEBUTUHAN AIR DI DESA CEMORO

LAPORAN PERJALANAN EKSKURSI WADUK CIRATA DAN JATILUHUR

STUDI PERENCANAAN OPERASI WADUK BUDONG-BUDONG KABUPATEN MAMUJU TENGAH PROVINSI SULAWESI BARAT

BAB I PENDAHULUAN 1.1 LATAR BELAKANG

Analisis Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Studi Kasus : Sungai Air Anak (Hulu Sungai Way Besai)

BAB I PENDAHULUAN. A. Latar Belakang. Berdasarkan penelitian dari Nippon Koei (2007), Bendungan Serbaguna

PENGEMBANGAN SUMBER DAYA AIR (PSDA) Dosen : Fani Yayuk Supomo, ST., MT ATA 2011/2012

BAB II TINJAUAN PUSTAKA

Studi Optimasi Operasional Waduk Sengguruh untuk Pembangkit Listrik Tenaga Air

PERENCANAAN SALURAN BYPASS SUNGAI KEDUANG UNTUK MEMINIMALISASI SEDIMENTASI DI WADUK WONOGIRI

STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI DESA GUNUNG RINTIH KECAMATAN STM HILIR KABUPATEN DELI SERDANG

REKAYASA SUMBERDAYA AIR (WATER RESOURCES ENGINEERING ) OPERASI WADUK

Makalah Seminar Kerja Praktek ANALISIS SISTEM OPERASI DAN PRODUKSI PADA PT. INDONESIA POWER UBP MRICA SUB UNIT PLTA JELOK - SALATIGA

HASIL DAN PEMBAHASAN

BAB I PENDAHULUAN. Undang-Undang Republik Indonesia Nomor 7 Tahun 2004 tentang

BAB II PENGEMBANGAN POTENSI SUMBERDAYA AIR PERMUKAAN DANAU, WADUK DAN BENDUNG

LAPORAN TUGAS SARJANA

1. PENDAHULUAN 2. TUJUAN

PRA - STUDI KELAYAKAN RENCANA PEMBANGUNAN PLTMH SUBANG

1 BAB I PENDAHULUAN 1.1 TINJAUAN UMUM 1.2 LATAR BELAKANG

PERENCANAAN BENDUNGAN BENDO PONOROGO

PERENCANAAN BENDUNGAN MATENGGENG DI KABUPATEN CILACAP. Frangky A Pangaribuan, Bernard Septian, Sri Sangkawati *), Sutarto Edhisono *)

BAB III METODE PEMBAHASAN

PEMERINTAH PROVINSI JAWA TENGAH KERANGKA ACUAN KERJA ( TERM OF REFERENCE TOR ) KEGIATAN KEGIATAN PEMBANGUNAN SUMUR BOR DI DAERAH RAWAN KERING

PERENCANAAN BENDUNGAN BENDO PONOROGO

58. Pada tail race masih terdapat kecelakaan air 1m/det serta besarnya K = 0,1. Hitung : 1) Hidrolik Losses!

ANALISA PERFORMANSI TURBIN AIR UNIT 1 KAPASITAS 41 MW DI PLTA RENUN LAPORAN TUGAS AKHIR

EVALUASI KINERJA WADUK WADAS LINTANG

Kata Kunci : Waduk Diponegoro, Rekayasa Nilai.

BAB I PENDAHULUAN BAB I PENDAHULUAN I TINJAUAN UMUM

BAB 3 STUDI LOKASI DAN SIMULASI

STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI SUNGAI JUJU DESA MUWUN KABUPATEN MURUNG RAYA PROVINSI KALIMANTAN TENGAH

BAB III STUDI KASUS. Bab III Studi Kasus 3.1. SEKILAS SUNGAI CITARUM

BAB I PENDAHULUAN I-1. Laporan Tugas Akhir Kinerja Pengoperasian Waduk Sempor Jawa Tengah dan Perbaikan Jaringan Irigasinya

BAB II PEMBANGKIT LISTRIK TENAGA AIR

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI SALURAN IRIGASI MATARAM

PERENCANAAN PUSAT LISTRIK TENAGA MINI HIDRO PERKEBUNAN ZEELANDIA PTPN XII JEMBER DENGAN MEMANFAATKAN ALIRAN KALI SUKO

PENERAPAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO DI DESA HUKURILA KOTA AMBON UNTUK MENDUKUNG KETAHANAN ENERGI

BAB II KAJIAN PUSTAKA

OPTIMASI DIAMETER PIPA PESAT PADA MODEL PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH)

Proses Pembuatan Waduk

BAB I PENDAHULUAN 1.1. Latar Belakang

PERENCANAAN EMBUNG TAMANREJO KECAMATAN SUKOREJO, KABUPATEN KENDAL. Bachtiar Khoironi Wibowo, Arvie Narayana, Abdul Kadir *), Dwi Kurniani *)

PEMBANGKIT LISTRIK TENAGA AIR (PLTA)

KAJIAN DISTRIBUSI SEDIMENTASI WADUK BENING KABUPATEN MADIUN (EMPERICAL AREA REDUCTION METHOD

DAFTAR ISI LEMBAR PENGESAHAN... KATA PENGANTAR...

BAB 4 PERENCANAAN ALTERNATIF SOLUSI

STUDI PERENCANAAN TEKNIS BANGUNAN PENANGKAP SEDIMEN PADA BENDUNG INGGE KABUATEN SARMI PAPUA ABSTRAK

Tahapan Perencanaan Pembangkit Listrik Tenaga Mikrohidro

BAB I PENDAHULUAN. juga untuk melakukan aktivitas kehidupan sehari-hari yang berhubungan dengan

9. Dari gambar berikut, turunkan suatu rumus yang dikenal dengan rumus Darcy.

STUDI POLA OPERASI WADUK WAY SEKAMPUNG MENGGUNAKAN HEC-RESSIM

BAB II LANDASAN TEORI...

BAB II LANDASAN TEORI

STUDI PERENCANAAN PEMBANGKIT LISTRIK TENAGA AIR DI KABUPATEN ROKAN HULU PROVINSI RIAU JURNAL

Kata kunci: debit andalan, diameter pipa, tinggi jatuh efektif, kelayakan ekonomi.

BAB IV DESAIN STRUKTUR MEKANIKAL ELEKTRIKAL PLTMH JORONG AIA ANGEK

ANALISA CFD DAN AKTUAL PERFORMA TURBINE BULB DENGAN HEAD 0,6 METER Gatot Eka Pramono 1

KAJIAN HIDROLIK PADA BENDUNG SUMUR WATU, DAERAH IRIGASI SUMUR WATU INDRAMAYU

PERENCANAAN EMBUNG BLORONG KABUPATEN KENDAL, JAWA TENGAH. Muhammad Erri Kurniawan, Yudha Satria, Sugiyanto *), Hari Budieny *)

REDESAIN WADUK KLAMPIS KECAMATAN KEDUNGDUNG KABUPATEN SAMPANG SEBAGAI BANGUNAN PEMBANGKIT TENAGA AIR

4.6 Perhitungan Debit Perhitungan hidrograf debit banjir periode ulang 100 tahun dengan metode Nakayasu, ditabelkan dalam tabel 4.

RENCANA PEMBELAJARAN SEMESTER

Ekspansi Tenaga Air Untuk Ketahanan Energi Melalui Pengoperasian Waduk Tunggal

BAB II TINJAUAN PUSTAKA. 2.1 Dasar Teori Pembangkit Listrik Tenaga Mikro Hidro

Bab III Metodologi Analisis Kajian

LAPORAN TUGAS AKHIR. PERENCANAAN PEMENUHAN AIR BAKU DI KECAMATAN GUNEM KABUPATEN REMBANG ( Design Of Raw Water Supply In Gunem District, Rembang )

Survei, Investigasi dan Disain Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) di Kabupaten Sumba Tengah, Provinsi NusaTenggara Timur

STUDI AWAL PERENCANAAN SISTEM MEKANIKAL DAN KELISTRIKAN PEMBANGKIT LISTRIK TENAGA MINI-HIDRO

PENYELIDIKAN OPERASI PINTU INTAKE EMBUNG SAMIRAN DENGAN UJI MODEL HIDROLIK. Dwi Kurniani *) Kirno **)

ANALISIS UNJUK KERJA TURBIN AIR KAPASITAS 81,1 MW UNIT 1 PADA BEBAN NORMAL DAN BEBAN PUNCAK DI PT INDONESIA ASAHAN ALUMINIUM POWER PLANT

Transkripsi:

TINJAUAN DAN PERENCANAAN PLTA KEDUNGOMBO PURWODADI JAWA TENGAH Arika Iranawati, Dwi Putri W Joetata Hadihardjada, Sri Sangkawati Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro Jl. Prof Soedarto, Tembalang, Semarang. 50239, Telp.: (024)7474770, Fax.: (024)7460060 ABSTRAK Waduk Kedungombo selain difungsikan untuk pemenuhan kebutuhan irigasi dan air baku juga dimanfaatkan untuk pembangkitan. PLTA Kedungombo direncanakan dengan debit maksimal 61,8 m 3 /dtk dan debit minimal 45 m 3 /dtk. Daya yang direncanakan sebesar 22,5 MW. Namun, pada kenyataannya daya yang dihasilkan PLTA Kedungombo lebih kecil dari daya yang direncanakan. Volume sedimentasi Waduk Kedungombo sampai tahun 2012 sebesar 34,47 juta m 3 dan sudah mencapai elevasi +56,80 m. Sedangkan intake yang terpasang terdapat pada elevasi +55,60 m, sehingga elevasi intake perlu dinaikan. Selain itu, untuk meningkatkan produksi listrik, maka power house dipindahkan ke elevasi yang lebih rendah. Debit desain PLTA dari hasil evaluasi debit dengan menggunakan mass curve inflow selama 5 tahun (tahun 2007 s/d 2012) adalah 34,77 m 3 /dtk. Q release turbin selama 5 tahun (tahun 2007 s/d 2012) didapatkan Q rata-rata sebesar 33,91 m 3 /dtk, Q maksimum 61,8 m 3 /dtk sedangkan Q minimumnya adalah 49,02 m 3 /dtk. Jika meninjau kebutuhan irigasi dan air baku, maka Waduk Kedungombo harus memenuhi kebutuhan air sebesar 1530,704 juta m 3 dengan debit yang harus dialirkan minimum 55 m 3 /dtk. Debit pada perencanaan awal sebesar maksimum 61,8 m3/dtk dan minimum 45 m3/dtk, sehingga debit desain PLTA diambil maksimum yaitu 61,8 m 3 /dtk. Desain struktur PLTA yang direncanakan untuk menunjang operasional PLTA agar dapat berfungsi dengan baik adalah bangunan pengambilan (Intake), pipa pesat, pintu pengaturan, turbin, saluran pembuangan, dan draft tube. Hasil detail perencanaan adalah sebagai berikut, (1) intake menggunakan tipe menara dengan diameter 3,8 m pada elevasi +60,00. (2) Penstock dengan diameter 3,8 m dan panjang total 287 m dan tersambung dengan lubang intake pada elevasi +60,00. (3) Tinggi terjun bersih 60,00 m. (4) Daya yang dihasilkan sebesar 32.374 kw.(5) Pintu pengatur menggunakan profil Canal 500x250x10. (6) Turbin yang digunakan yaitu tipe Turbin Francis. (7) Saluran pembuangan pasangan batu kali penampang trapesium dengan ukuran b = 5,5 m, h = 2,6 m. Dari perhitungan operasional PLTA, maka hasil produksi PLTA Kedungombo dapat meningkat sebesar 78,87% dari produksi semula. Rata rata produksi PLTA Kedungombo sebesar 16,81 MW menjadi 29,57 MW. Konstruksi PLTA Kedungombo memerlukan biaya sebesar Rp 38.958.723.000,00 (tiga puluh delapan milyar sembilan ratus lima puluh delapan juta tujuh ratus dua puluh tiga ribu rupiah) dengan lama waktu pelaksanaan 17 minggu. Kata Kunci : Debit PLTA, Produksi PLTA, Bangunan PLTA. 1

ABSTRACT Kedungombo Dam besides enabled for the fulfillment of the irrigation demands and raw water is also used for power plant. Kedungombo Hydro Electric Power Plant Kedungombo planned with the maximum discharge 61.8 m3/sec and minimum discharge 45.00 m3/sec. Power designed by 22.50 MW. However, in reality the power generated is less than the designed power. The volume of the sediment in Kedungombo Dam to 2012 amounted to 34.47 million m 3 and has reached the elevation of 56.80 m. While intakes are mounted at an elevation of 55.60 m, so the elevation of the intake should be increased. In addition, to increase the production of electricity, the power house was moved to a lower elevation. Design discharge for hydropower obtained from the discharge evaluation by using mass curve inflow over the last 5 years (from 2007 until 2012) obtained design discharge of 34.77 m3/sec. Discharge release for 5 years (from 2007 until 2012) obtained an average discharge of 33.91 m3/sec, maximum discharge 61.8 m3/sec, and the minimum discharge of 49.02 m3/sec. When reviewing the irrigation demands and raw water,kedungombo Dam must meet the requirements of 1,530.70 million m 3 of water and discharge must flow with minimum 55.00 m 3 /sec. Kedungombo Hydro Electric Power Plant designed with the maximum discharge 61.80 m3/sec and minimum discharge 45.00 m3/sec, so the development of hydropower has taken maximum design discharge of 61.80 m3/sec. Hydro electric power plant structure that designed for operational support in order to function properly such as intake, penstock, control gate, turbines, tail race, and the draft tube. Results of the detailed design, are (1) intake using a tower with diameter 3,8 m on elevation +60.00. (2) Penstock (steel pipe) with diameter 3.8 m and the total length 287 m connected with intake on elevation +60.00. (3) Nett Head 60.00 m. (4) The power generated 32.37 kw. (5) Control gate using Canal 500x250x10 profile. (6) Turbine type used is Franciss Turbine. (7)Tail race stone masonry type in trapezium shape with b = 5.5 m, h = 2.6 m. From calculations of power plant operations, the results of Kedungombo power plant production can be increased by 78.87% from the original production. Average production of the Kedungombo Hydro Electric Power Plant 16.81 MW to 29.57 MW. Cost of constuction Kedungombo Hydro Electric Power Plant is estimated Rp 38.958.723.000.- (Thirty Eight Billion Nine Hundred and Fifty Eight Million Seven Hundred Twenty Three Thousand Rupiahs ) and durations for execution is 17 weeks. Keywords: Hydro Electric Power Plant Discharge, Hydro Electric Power Plant Productions, Hydro Electric Power Plant Building. PENDAHULUAN Waduk Kedungombo terletak di desa Kedungombo, tepatnya pada pertemuan tiga kabupaten, yaitu Kabupaten Boyolali, Sragen dan Grobogan merupakan salah satu waduk yang berfungsi sebagai bendungan serbaguna yaitu untuk pelayanan irigasi dan air baku, PLTA, pengendalian banjir, perikanan dan pariwisata. Potensi air Waduk Kedungombo berasal dari sungai utama yaitu Sungai Serang. Daerah genangan Waduk Kedungombo meliputi sebagian wilayah Kabupaten Grobogan, Boyolali, dan Sragen, serta daerah layanan Waduk Kedungombo, meliputi wilayah Kabupaten Grobogan, Demak, Kudus, dan Pati.PLTA Kedungombo merupakan salah satu Sub Unit Pembangkitan milik PT. Indonesia Power yang berada di bawah naungan Unit Bisnis Pembangkitan Mrica. PLTA Kedungombo memiliki 1 (satu) turbin yang bisa digunakan untuk menghasilkan daya listrik sebesar 22,5 MW dan dalam keadaan normal dapat menghasilkan listrik sebesar 2

68.000 MWh/tahun. Namun, berdasarkan data yang diperoleh PLTA Kedungombo menghasilkan daya kurang dari yang telah direncanakan. Dalam operasinya rata-rata daya yang dihasilkan PLTA Kedungombo sebesar 16,814 MW dan PLTA Kedungombo sewaktu-waktu berhenti beroperasi. Oleh karena itu, perlu diadakan tinjauan ulang serta pegembangan terhadap PLTA Kedungombo. Gambar 1. Peta Lokasi PLTA Waduk Kedungombo (Sumber : BBWS Pemali - Juana) ANALISA HIDROLOGI WADUK KEDUNGOMBO Kapasitas Tampungan Waduk Kedungombo Laju sedimentasi waduk dapat ditentukan dengan cara membandingkan hasil pengukuran terbaru dengan hasil pengukuran periode sebelumnya atau pada saat dibangunnya waduk. Berdasarkan hasil pengukuran tampungan waduk yang telah dilakukan dari beberapa pengukuran terdahulu dapat dikaji laju pengendapan pada waduk sampai saat ini. Berdasarkan hasil pengukuran tersebut terlihat bahwa sejak mulai beroperasi sampai dengan saat ini telah terjadi perubahan volume Waduk Kedungombo. Dari pengumpulan data terlihat adanya perubahan volume tampungan. Pada periode 1989 s/d 1994 (5 tahun) terjadi perubahan volume sebesar 11,93 juta m 3, atau laju sedimentasi rerata tahunan sebesar 2,39 juta m 3 /tahun. Periode 1994 s/d 2003 (9 tahun) terjadi perubahan volume sebesar 7,81 juta m 3, dengan laju sedimentasi rerata tahunan sebesar 0,87 juta m 3 /tahun. Berdasarkan pengukuran terakhir yaitu pada periode 2003 s/d 2012 (9 tahun) telah terjadi perubahan volume sebesar 688,414 juta m 3, atau laju sedimentasi rerata tahunan sebesar 1,62 juta m 3 /tahun. Jika dibandingkan pengukuran Tahun 2012 dibandingkan dengan pengukuran Tahun 1989 terjadi perubahan volume sebesar 34,47 juta m 3, atau laju sedimentasi rerata tahunan sebesar 1,48 juta m 3 /tahun. Laju Sedimentasi tersebut dapat dilihat pada Tabel 1 berikut. Tabel 1. Laju Sedimentasi Waduk Kedungombo Antara Tahun 1989 s/d 2012 Tahun 1989 1994 2003 2012 Volume Waduk 723,16 711,23 703,42 688,414 Besar sedimentasi (juta m 3 ) - 11,93 7,81 14,59 Laju sedimentasi (juta m 3 /tahun) - 2,39 0,87 1,62 (Sumber : Laporan Antara Inspeksi Besar Waduk Kedungombo, 2012) 3

Dengan adanya laju sedimentasi, maka distribusi volume tampungan Waduk Kedungombo mengalami perubahan dari desain awal. Berikut merupakan distribusi tampungan Waduk Kedungombo serta kurva grafik hubungan elevasi muka air, luas genangan waduk dan volume tampungan pada tahun 2012. (Sumber : Unit OP Waduk Kedungombo, BBWS Pemali Juana) Gambar 2. Distribusi Volume Tampungan Waduk Kedungombo (Tahun 2012) (Sumber : Laporan Antara Inspeksi Besar Waduk Kedungombo, 2012) Gambar 3. Grafik Hubungan antara Elevasi, Luas Genangan dan Volume Tampungan Waduk Kedungombo Tahun 2012 4

Debit Desain PLTA Kedungombo Debit desain merupakan debit yang digunakan untuk perencanaan bangunan air, dalam hal ini perencanaan PLTA. Dalam pengembangan PLTA Kedungombo ini, debit desain didapat dari hasil evaluasi debit yaitu berdasarkan inflow yang tersedia, outflow, debit untuk kebutuhan irigasi serta debit desain pada perencanaan awal PLTA Kedungombo. Dengan menggunakan mass curve inflow selama 5 tahun (tahun 2007 s/d 2012) didapatkan Q desain sebesar 34,77 m 3 /dtk. Rata rata outflow turbin (Q release) selama 5 tahun (tahun 2007s/d 2012) sebesar 33,91 m 3 /detik, Q maksimum 61,8 m 3 /dtk, sedangkan Q minimumnya sebesar 49,02 m 3 /dtk. Ditinjau dari kebutuhan irigasi dan air baku maka Waduk Kedungombo harus memenuhi kebutuhan air sebesar 1530,704 juta m 3. Dengan kebutuhan tersebut maka debit yang harus dialirkan sebesar 53,68 m 3 /detik. Sedangkan debit yang direncanakan untuk pembangkitan PLTA sebesar maksimum 61,8 m 3 /detik dan minimumnya sebesar 45 m 3/ detik. Tinjauan Hasil Analisa Hidrologi Volume sedimentasi Waduk Kedungombo sampai tahun 2012 sebesar 34,47 juta m 3 (Sumber : Laporan Antara Inspeksi Besar Waduk Kedungombo) dan sudah mencapai elevasi +56,80 m. Sedangkan intake yang terpasang terdapat pada elevasi +55,60 m sehingga elevasi lubang intake perlu dinaikan yaitu pada elevasi +60,00 m. Namun, syarat elevasi Muka Air Rendah (MAR) harus dinaikkan untuk mencegah udara yang masuk pipa bersama dengan aliran air. Elevasi MAR berada ± 2 m di atas intake, sehingga MAR disyaratkan pada elevasi +66,00 m. Selain adanya peninggian intake, hal yang perlu dilakukan adalah dengan memindahkan power house ke elevasi yang lebih rendah, sehingga produksi yang dihasilkan dapat meningkat. Rata rata debit yang mampu dikeluarkan (Qrelease) Waduk Kedungombo untuk pembangkitan selama 5 (lima) tahun sebesar 33,91 m 3 /detik. Sedangkan debit desain berdasarkan inflow (menggunakan mass curve) sebesar 34,77 m 3 /detik. Jika meninjau kebutuhan irigasi dan air baku maka Waduk Kedungombo harus memenuhi kebutuhan air sebesar 1530,704 juta m 3, sehingga debit yang dialirkan sebesar 53,68 m 3 /detik. Debit yang direncanakan sebesar maksimum 61,8 m 3 /detik dan nilai minimumnya sebesar 45 m 3 /detik, sehingga untuk pengembangan PLTA digunakan debit sebesar 61,8 m 3 /detik. Dengan debit 61,8 m 3 /detik diharapkan pipa pesat mampu mengalirkan aliran air pada saat maksimum. PERENCANAAN PLTA KEDUNGOMBO Bangunan PLTA yang direncanakan adalah bangunan pengambilan (intake), pipa pesat (penstock), power house, turbin, tail race, dan draft tube. Bangunan Pengambilan (Intake) Bangunan intake Waduk Kedungombo terletak pada elevasi +55,60 namun untuk mencegah kerusakan akibat sedimentasi maka bangunan intake dinaikkan menjadi +60,00 m. Pada perencanaan PLTA Kedungombo ini tetap mempertahankan bangunan intake yang sudah ada, dengan tinggi (termasuk tower) 63,40 m. Sedangkan dimensi pintu pengambilan yaitu tinggi 3,80 m dan lebar 3,00 m. Dengan mempertimbangkan kemudahan pemasangan dan perawatan serta agar tidak terjadi kehilangan energi akibat perbedaan diameter dengan pipa pesat maka lubang intake direncanakan sebesar 3,8 m. Perencanaan Pintu Pengatur Pintu pengatur dengan ukuran plat pintu 5,2 m x 5,2,m terbuat dari baja dengan diameter stang ulir 2,5 cm. Profil horizontal dan vertical menggunakan baja canal 500x250x10. 5

Tinggi Terjun (Head) Tinggi jatuh efektif dapat diperoleh dengan mengurangi tinggi jatuh total (dari permukaan air pada pengambilan sampai permukaan air pada saluran bawah) dengan kehilangan tinggi pada saluran air. Dengan adanya penyaluran air dari waduk (reservoir) ke saluran pembuangan akan terjadi kehilangan energi (Head Loss) yang diakibatkan oleh trash rack, inlet penstock, gesekan dinding penstock, belokan dan akibat reducer pada draft tube. Kehilangan Energi pada pengembangan PLTA ini sebesar 2,158 m, sehingga didapat tinggi terjun bersih (Nett Head) yaitu: Hnett = Hbruto He tot = 62,00 2,158 = 59,842 m 60 m Pipa Pesat (Penstock) Diameter pipa yang sudah terpasang terletak di badan waduk. Oleh karena itu,diameter pipa tetap yaitu 3,8 m, sehingga tidak mengalami pembongkaran. Agar mudah dalam pemasangan maka dimeter pipa pesat sambungan disamakan yaitu 3,8 m. Tebal plat pipa pesat : Daya yang Dihasilkan Turbin P = 9,81 x Qr x Hnett x η t (kw) = 9,81x 61,8 x 60 x 0,89 = 32.374 kw Pemilihan Jenis Turbin Ns = 3763/Hnett 0.854 = 3763/60 0,854 = 114,023 rpm Dari perhitungan Ns = 40 s/d 400, dan dikarenakan head 10 < H < 350 maka dipergunakan turbin dengan tipe Francis. N = Ns*(Hnett 5/4 / P 1/2 ) = 103,56*(46,5 5/4 / 32.374 1/2 ) = 69,889 rpm 70 rpm Karena harga N = 70 rpm maka digunakan kisaran angka runaway speed sebesar 2. Power House Untuk mendapatkan head yang lebih besar maka letak power house dipindahkan pada elevasi yang lebih rendah. Pada perencanaan power house PLTA Kedungombo tidak dihitung secara detail, hanya mengambil contoh bangunan yang sudah ada. Saluran Pembuangan (Tail Race) Saluran pembuangan direncanakan terbuat dari pasangan batu kali dengan penampang trapesium berukuran b = 5,5 m, h = 2,6 m dan kecepatan aliran = 2,71 m/detik. Pipa Hisap (Draft Tube) Dr = diameter pipa pesat = 3800 mm = 3,8 m Dt = diameter reducer (35 %) = 0,35*3,8 =1,33 m A = (3,8 2 1,33 2 ) π /4 = 9,95 m 2 V = Operasional PLTA Kedungombo Berdasarkan data yang ada rata rata produksi yang dihasilkan PLTA Kedungombo selama 5 (lima) tahun (2007 s/d 2012) sebesar 16,814 MW. Jika dilakukan pengembangan terhadap bangunan PLTA maka rata rata produksi sebesar 29,57 MW dengan asumsi pelayanan selama 24 jam. Hal ini menunjukkan bahwa setelah adanya pengembangan maka produksi yang dihasilkan PLTA Kedungombo mengalami peningkatan sebesar 78.87%. RENCANA ANGGARAN BIAYA DAN JADWAL PELAKSANAAN PROYEK Rencana anggaran biaya konstruksi PLTA Kedungombo direncanakan sebesar Rp. 38.958.723.000,00. Jadual pelaksanaan menggunakan metode NWP dengan rencana waktu pelaksanaan selama 17 minggu. 6

Gambar 4. Layout PLTA Kedungombo 7

Gambar 5. Potongan Memanjang PLTA Kedungombo 8

KESIMPULAN Dari tinjauan dan perencanaan PLTA Kedungombo dapat disimpulkan: 1. Elevasi sedimen sudah mencapai elevasi intake. Laju sedimentasi rerata 1,48 juta m 3 /tahun. Volume sedimentasi (sampai tahun 2012) sebesar 34,47 m 3, volume tersebut sudah mencapai elevasi +56,80. 2. Penanganan yang dipilih adalah peninggian intake pada elevasi +60,00 dan pemindahan power house ke elevasi yang lebih rendah yaitu pada elevasi +28,00. 3. Hasil perencanaan PLTA adalah sebagai berikut : Bangunan pengambilan (intake) elevasi +60,00 Diameter = 3,8 m Pipa pesat (penstock) elevasi +60,00 Tipe = pipa baja Diameter = 3,8 m Panjang = 287 m Tinggi terjun bersih sebesar 60 m Daya yang dihasilkan sebesar 32.374 kw Pintu pengatur elevasi +26,00 Profil horizontal dan vertikal = Canal 500x250x100 Ukuran plat pintu = 5,2 m x 5,2m Diameter stang ulir = 35 mm Turbin tipe Francis Saluran pembuangan (tail race) elevasi permukaan air +28,00 Lebar (b) = 5,5 m Tinggi (h) = 2,6 m 4. Rencana anggaran biaya konstruksi PLTA Kedungombo direncanakan sebesar Rp 38.958.723.000,00 (tiga puluh delapan milyar sembilan ratus lima puluh delapan juta tujuh ratus dua puluh tiga ribu rupiah) dengan lama waktu pelaksanaan 17 minggu. SARAN 1. Jika inflow yang masuk Waduk Kedungombo tidak dapat mencukupi kebutuhan debit rencana, maka sebaiknya perlu pengaturan pada pintu pengatur agar debit yang keluar dapat memaksimalkan fungsi PLTA secara kontinyu. 2. Kelebihan air selama musim penghujan, selain dimanfaatkan untuk kebutuhan irigasi dan air baku dapat juga untuk memaksimalkan produksi PLTA Waduk Kedungombo. 3. Pengaturan pintu pada musim penghujan perlu diperhatikan, agar tidak terjadi kelebihan air pada bagian hilir yang dapat menyebabkan banjir. DAFTAR PUSTAKA Hadihardaja, J., Sri Sangkawati, Bangunan Tenaga Air, Universitas Diponegoro. Harvey, Adams, 1993, Micro Hydro Design Manual, London : IT Publication. Mosonyi, Emil, 1991, High-Head Power Plant (Volume A&B), Budapest : Akademia Kiado. Patty, OF, 1995, Bangunan Tenaga Air, Jakarta : Erlangga. Laporan Akhir Sementara PT Indra Karya, 1993. Laporan Antara Inspeksi Besar Waduk Kedungombo, 2012. 9