RENCANA PENGEMBANGAN GRI PULAU KECIL OLAR PV AN PV IEEL I PROVINI NUA TENGGARA TIMUR
PETA PROVINI NUA TENGGARA TIMUR Kotamadya 1 Kabupaten 21 Kecamatan 306 esa/kelurahan 3268 Jumlah Jiwa 5.356.567 GEOGRAFI : KEPULAUAN
NAMA PULAU TEREPAN I PROPINI NUA TENGGARA TIMUR (Perbatasan T.leste & Australia) Pulau Batek (Kab. Kupang) Pulau Manggudu (Kab. umba Timur) Pulau ana abu ( Kab. abu Raijua) Pulau ana Rote (Kab. Rote Ndao)
Ikonik PROVINI NUA TENGGARA TIMUR
AREA FBB AREA FBT PT. PLN (Persero) Wil. NTT Pembangkit Tarif AREA UMBA EKTOR NTT AREA KUPANG PELANGGAN Unit Area 2008 2009 2010 2011 2012 2013 Kupang 120.595 122.331 130.331 176.808 243.029 269.821 Growth (%) 8,9% 1,4% 6,5% 35,7% 37,5% 11,0% Flores Bagian Barat 58.807 60.539 65.729 89.881 127.962 145.835 Growth (%) 9,8% 2,9% 8,6% 36,7% 42,4% 14,0% umba 21.037 21.581 24.341 31.866 57.449 48.348 Growth (%) 11,8% 2,6% 12,8% 30,9% 80,3% -15,8% Flores Bagian Timur 45.917 49.104 54.041 77.471 95.603 99.842 Growth (%) 12,7% 6,9% 10,1% 43,4% 23,4% 4,4% Wilayah NTT 246.356 253.555 274.442 376.026 524.043 563.846 Growth (%) 10,0% 2,9% 8,2% 37,0% 39,4% 7,6%
Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016 ITEM RUTENG ITEM AEEA ITEM LARANTUKA ITEM AONARA ITEM LEMBATA ITEM KALABAHI. MAMPU : 7,28 MW. MAMPU : 2,55 MW. MAMPU : 3,70 MW. MAMPU : 2,70 MW. MAMPU : 3,10 MW. MAMPU : 4,92 MW B. MALAM : 8,47 MW B. MALAM : 2,29 MW B. MALAM : 4,17 MW B. MALAM : 3,39 MW B. MALAM : 2,91 MW B. MALAM : 4,16 MW EFIIT : -1,19 MW CA. : 0,26 MW EFIIT : -0,47 MW EFIIT : -0,69 MW CA. : 0,19 MW CA. : 0,76 MW ITEM LABUAN BAJO. MAMPU : 4,40 MW B. MALAM : 4,20 MW CA. : 0,20 MW AREA FBB AREA FBT ITEM ATAMBUA. MAMPU : 7,60 MW B. MALAM : 7,90 MW EFIIT : - 0,30 MW ITEM BETUN. MAMPU : 2,59 MW ITEM BAJAWA B. MALAM : 2,39 MW. MAMPU : 5,00 MW B. MALAM : 5,60 MW EFIIT : -0,60 MW AREA KUPANG CA. : 0,20 MW ITEM KEFAMENANU. MAMPU : 4,77 MW B. MALAM : 4,41 MW ITEM WAIKABUBAK + WAITABULA. MAMPU : 5,32 MW B. MALAM : 6,52 MW AREA UMBA CA. : 0,36 MW ITEM O E. MAMPU : 5,12 MW B. MALAM : 5,00 MW EFIIT : -1,20 MW CA. : 0,12 MW ITEM WAINGAPU ITEM ENE ITEM MAUMERE ITEM ABU ITEM ROTE ITEM KUPANG. MAMPU : 6,35 MW. MAMPU : 7,35 MW. MAMPU : 11,50 MW. MAMPU : 1,28 MW. MAMPU : 3,50 MW. MAMPU : 49,23 MW B. MALAM : 5,64 MW B. MALAM : 9,49 MW B. MALAM : 10,95 MW B. MALAM : 1,16 MW B. MALAM : 3,28 MW B. MALAM : 53,40 MW CA. : 0,71 MW EFIIT : -2,14 MW CA. : 0,55 MW CA. : 0,12 MW CA. : 0,22 MW EFIIT : -4,17 MW
tatus Komposisi Pembangkit PLN NTT ( esember 2015) 1. Berdasarkan Pembangkit 2. Berdasarkan Area Kerja Pasokan energi primer didominasi bahan bakar fosil : 59,12 % dari BBM PLT ewa, 20,49 % dari BBM PLT sendiri, 13,98 % dari PLTU, 3,53 % dari PLTP, 2,80 % dari PLTM/PLTMH, 0,07 % dari PLT Pasokan Energi Listrik Berdasarkan Area Kerja yang didominasi oleh : 1. Area Kupang : 58,28 % 2. Area FBB : 20,07 % 3. Area FBT : 14,44 % 4. Area umba : 7,21 %
2010 26,40% 2011 41,55% 2012 53,22% 2013 54,77% 2014 58,53% Okt 2015 58,44% 2016 63,2% 2017 65,7% 2018 68,7% 2019 70,9% 2020 73,2%
PEMETAAN PER KABUPATEN Manggarai Barat 45,706 KK 2,990 plg RT 96 esa Manggarai&Ma nggarai Timur 112,225 KK 14,865 plg RT 175 esa Nagekeo 27,730 KK 5,299 plg RT 42 esa ikka 60,583 KK 22,400 plg RT 65 esa Flores Timur 51,560 KK 22,490 plg RT 117 esa Alor 39,549 KK 10,354 plg RT 112 esa Belu umba Barat aya 57,051 KK 5,254 plg RT 66 esa Ngada 29,172 KK 15,172 plg RT Ende 51,716 KK 27,154 plg RT Lembata 23,210 KK 8,642 plg RT 67 esa TTU 47,212 KK 10,210 plg RT 72 esa 95,954 KK 11,782 plg RT 123 esa ~ 36 esa 97 esa Kupang&abu 85,509 KK umba Timur 14,625 plg RT umba Barat&Tengah 37,361 KK 5,107 plg RT 53 esa 49,549 KK 12,259 plg RT 86 esa 72 esa Rote Ndao 25,812 KK 7,604 plg RT ~ Kota Kupang 63,518 KK 56,532 plg RT - TT 90,712 KK 15,071 plg RT 125 esa Proyeksi KK 2011 menurut BP esa Belum Berlistrik Jml plg Rumah Tangga (III-09 Juni 2011) 36 esa
Rasio Elektrifikasi s/d OKTOBER 2015 PROPINI KABUPATEN TARGET REALIAI 2015 Oct-15 RE (%) JUMLAH RUMAH JUML. PEL. JUML. PEL. JUML. PEL. RE (%) RE (%) TOTAL TANGGA RT PLN RT NON PLN RT TOTAL PLN TOTAL 1 2 8=6/3 9 10 11 12=10+11 13=10/9 14=12/9 Kota Kupang 99.32 93,090 90,137 447 90,584 96.83 97.31 NUA TENGGARA TIMUR Kupang 55.90 69,217 33,299 2,592 35,891 48.11 51.85 abu Raijua 23.97 25,028 4,946 916 5,862 19.76 23.42 Timor Tengah elatan 49.16 109,322 43,705 4,670 48,375 39.98 44.25 Timor Tengah Utara 69.25 57,132 30,309 6,600 36,909 53.05 64.60 Belu & Malaka 45.43 81,484 33,945 3,510 37,455 41.66 45.97 Alor 68.30 46,063 27,670 3,160 30,830 60.07 66.93 Rote Ndao 81.42 32,184 22,974 2,309 25,283 71.38 78.56 Ende 79.28 56,436 39,986 3,119 43,105 70.85 76.38 Ngada 97.87 33,247 26,068 2,015 28,083 78.41 84.47 Nagekeo 57.37 27,122 14,445 1,613 16,058 53.26 59.21 Manggarai 59.49 68,790 27,576 4,312 31,888 40.09 46.36 Manggarai Timur 39.94 57,311 19,116 6,892 26,008 33.36 45.38 Manggarai Barat 46.28 53,982 14,928 6,568 21,496 27.65 39.82 ikka 66.38 68,902 39,658 3,246 42,904 57.56 62.27 Flores Timur 92.20 56,477 43,977 7,543 51,520 77.87 91.22 Lembata 75.17 30,984 17,018 4,842 21,860 54.92 70.55 umba Timur 50.99 51,599 21,712 3,305 25,017 42.08 48.48 umba Barat 42.83 21,876 7,670 692 8,362 35.06 38.22 umba tengah 29.75 12,859 3,302 653 3,955 25.68 30.76 umba Barat aya 29.63 51,734 13,225 953 14,178 25.56 27.41 TOTAL 61.81 1,104,837 575,666 69,957 645,623 52.10 58.44 1 2 3 4 5 6 1 2 KENALA : Banyaknya KK tidak sebanding dengan banyaknya rumah, misalnya : 2-3 KK dalam 1 rumah Pelanggan Tersambung untuk 1 kms UTM sebanyak : 105 pelanggan (investasi = ± Rp. 300 jt) Pelanggan Tersambung untuk 1 kms UTR sebanyak : 104 pelanggan (investasi = ± Rp. 200 jt) Pelanggan Tersambung untuk 1 Transformator sebanyak : 174 pelanggan (investasi = ± Rp. 125 jt) umber daya ekomomi masyarakat (Pertanian, pedangan tenun ikat, pabriakan es batu) Banyak daerah yang harus melintasi atau melewati kawasan hutan yang membutuhkan proses perijinan UKUNGAN : Penguatan / Penambahan Alokasi Anggaran Kemudahan dan percepatan perijinan 3 Komunikasi politik anggaran
RENCANA PENGEMBANGAN ITEM KELITRIKAN PLN NTT 2016-2025 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= ========= Calendar Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= ========= Total Population (10^3) 5,037 5,120 5,204 5,287 5,372 5,456 5,541 5,627 5,713 5,799 5,885 5,971 Jumlah KK (10^3) 1,104.51 1,131.61 1,158.70 1,185.52 1,212.34 1,238.60 1,264.87 1,291 1,317 1,343 1,369 1,394 - Growth Rate (%) 1.3 1.7 1.6 1.6 1.6 1.6 1.6 1.5 1.5 1.5 1.5 1.5 Growth of Total GP (%) 5.0 5.8 6.6 7.1 7.5 8.0 6.4 6.4 6.4 6.4 6.4 6.4 Electrification Ratio (% ) 55.5 57.8 63.2 65.7 68.7 70.9 73.2 76.3 79.3 82.4 85.5 88.6 Energy ales (GWh) 702.3 772.1 851.0 941.4 1,044.2 1,156.9 1,259.3 1,369.0 1,485.2 1,608.3 1,738.6 1,876.7 - Growth Rate (%) 9.8 9.9 10.2 10.6 10.9 10.8 8.8 8.7 8.5 8.3 8.1 7.9 -- Residential 424.6 466.9 511.4 560.7 617.1 676.5 730.2 790.1 853.1 919.4 989.3 1,062.9 -- Commercial 178.9 196.8 217.6 240.8 266.5 295.5 321.2 348.3 377.0 407.3 439.2 473.0 -- Public 73.4 80.3 89.3 100.1 112.7 127.6 140.3 154.0 168.9 185.1 202.6 221.4 -- Industrial 25.4 28.0 32.7 39.8 47.9 57.3 67.6 76.5 86.2 96.5 107.6 119.4 Power Contracted (MVA) 613.6 683.6 754.1 831.6 921.3 1,012.3 1,095.9 1,191.9 1,292.7 1,398.5 1,509.8 1,626.8 -- Residential PLN 437.1 492.7 545.5 603.3 671.0 737.2 798.8 871.6 947.9 1,027.7 1,111.5 1,199.4 -- Commercial 107.5 116.1 125.6 136.0 147.2 159.4 170.7 182.4 194.6 207.3 220.6 234.5 -- Public 54.1 57.8 62.3 67.6 73.7 80.8 86.9 93.5 100.5 108.1 116.3 125.0 -- Industrial 15.0 17.1 20.6 24.6 29.4 34.9 39.5 44.4 49.6 55.3 61.4 67.9 - Growth Rate (%) 16.6 11.4 10.3 10.3 10.8 9.9 8.3 8.8 8.5 8.2 8.0 7.8 Number of Customer 730,287 778,656 864,864 919,568 982,097 1,035,550 1,090,571 1,157,658 1,226,200 1,296,153 1,367,729 1,440,939 -- Total Residential 613,354 653,818 732,100 778,839 833,364 878,767 925,688 984,649 1,045,035 1,106,822 1,170,224 1,235,241 -- Commercial 30,104 31,616 33,132 34,655 36,186 37,725 39,274 40,828 42,388 43,949 45,512 47,079 -- Public 86,692 93,084 99,492 105,931 112,400 118,907 125,453 132,022 138,615 145,214 151,822 158,445 -- Industrial 137 137 140 143 147 151 156 159 163 167 171 175 - Growth Rate (%) 15.2 6.6 11.1 6.3 6.8 5.4 5.3 6.2 5.9 5.7 5.5 5.4 Total Production (GWh) 783.8 873.6 975.4 1,088.1 1,215.0 1,346.9 1,453.0 1,566.8 1,701.9 1,844.4 1,980.1 2,132.6 Energy Requirement (GWh) 749.5 820.6 903.6 998.6 1,106.7 1,224.9 1,332.0 1,446.7 1,568.1 1,697.1 1,833.7 1,979.4 tation Use (%) 3.3 6.1 7.4 8.2 8.9 9.1 8.3 7.7 7.9 8.0 7.4 7.2 T & Losses (%) +) 6.30 5.91 5.82 5.73 5.65 5.55 5.46 5.37 5.29 5.24 5.19 5.19 Load Factor (%) 55.4 55.1 55.2 55.3 55.3 55.4 55.5 55.5 55.6 55.7 55.7 55.8 Peak Load (MW) 161.4 180.8 201.7 224.71 250.6 277.5 299.0 322.02 349.4 378.2 405.5 436.21 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
PERKEMBANGAN AN TARGET ENERGY MIX PEMBANGKIT TENAGA LITRIK PLN WILAYAH NTT TAHUN 2015 2020 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2013 2014 2015 2016 2017 2018 2019 2020 URAIAN 2013 2014 2015 2016 2017 2018 2019 2020 BBM 96% 83% 80% 72% 54% 27% 16% 17% Batubara 0% 10% 14% 16% 24% 42% 42% 38% PLTMG 0% 0% 0% 0% 6% 11% 21% 22% Panas Bumi 2% 4% 4% 5% 6% 7% 8% 10% PLTA / PLTMH 2% 3% 3% 7% 8% 12% 12% 11% PLT 0.02% 0.05% 0.07% 0.5% 1.0% 1.3% 1.5% 1.8%
PERENCANAAN AN PENGEMBANGAN PLT 5 PLT IPP On grid 6 PLT Off grid 94 1 PLT smart grid (Bilacenge) PLT Off 1 PLT on grid (Lembata) 2 PLT hybrid (BPPT& PEMA) s/d 2008 s/d 2009 s/d 2011 s/d 2013 s/d 2015 grid
PENGEMBANGAN PLT I PLN WILAYAH NTT PLT IPP ON GRI ENE KAP. 1 MWp PLT IPP ON GRI MAUMERE KAP. 1 MWp PLT OFF GRI OLOR BARAT KAP. 275 KWp PLT ON GRI LEMBATA KAP. 200 KWp PLT OFF GRI NULE - ALOR KAP. 250 KWp PLT IPP ON GRI LABUAN BAJO KAP. 1 MWp PLT OFF GRI PURA - ALOR KAP. 175 KWp PLT ON GRI BILACENGE KAP. 500 KWp BEROPERAI RENCANA PLT IPP ON GRI ATAMBUA KAP. 1 MWp PLT IPP ON GRI UMBA TIMUR KAP. 1 MWp PLT OFF GRI WINI KAP. 60 KWp PLT ON GRI ALURA KAP. 150 KWp PLT OFF GRI RAIJUA KAP. 150 KWp PLT OFF GRI NEMBERALA KAP. 50 KWp PLT OFF GRI EMAU KAP. 450 KWp PLT IPP ON GRI KUPANG KAP. 5 MWp
L/O/G/O EVALUAI PENGOPERAIAN PLT IPP KUPANG 5 MWp PT PLN (PERERO) WILAYAH NTT
LATAR BELAKANG 1 PROE PEMBANGUNAN PLT IPP KUPANG 5 MWP 2 HAL-HAL YANG IPERHATIKAN PENGOPERAIAN PLT 3 EVALUAI PEMBEBANAN PLT IPP KUPANG 4 HAIL PROUKI PLT IPP KUPANG 5 6 KEIMPULAN AN ARAN IMPLEMENTAI P2M www.themegallery.com
Proses Pembangunan PLT IPP Kupang 5 MWp No Kegiatan Pelaksana Aktual Ket 1 Penetapan pemenang EBTKE 24-Jan-14 2 Penugasan Pembelian Tenaga Listrik Kepada PT PLN (Persero) MEM 20-Okt-14 3 Pengurusan Izin-izin yang dibutuhkan (tatus Tanah, Izin Lokasi, Izin Lingkungan, dll) PT LEN 4 tudi Interkoneksi PLT IPP Kupang 5 MWp PT LEN 5 Rekomendasi tudi Interkoneksi PLT IPP Kupang 5 MWp PT PLN Wil NTT 21-Nov-14 6 Izin Usaha Penyedian Tenaga Listrik ementara untuk PT Len JK 03-es-14 7 Izin Prinsip Pembelian Tenaga Listrik PLT IPP Kupang 5 MWp IREKI PLN 22-es-14 8 Penyerahan Jaminan Pelaksanaan Tahap I PT LEN 22-es-14 9 TT Perjanjian Pembelian Energi Listrik PT PLN NTT PT LEN 09-Jan-15 10 Ujicoba Operasi dengan istem Kupang PT PLN NTT PT LEN 08-es-15 11 Peresmian PLT IPP Kupang 5 MWp Presiden RI 27-es-15 www.themegallery.com
Hal-hal yang harus diperhatikan Pada Pengoperasian PLT IPP Kupang 5 MWp 1. Asumsi Interpolasi ari 20 kw Menjadi 5 MW 2. Pembahasan tandard Operating Procedure (OP) Perbedaan output daya selama 1 menit dapat mencapai 44.4% Pada sistem 5 MW, perbedaan ini setara dengan fluktuasi sebesar 2,22 MW dalam waktu 1 menit imungkinkan adanya perubahan yang lebih besar www.themegallery.com
BEBAN ITEM KUPANG pada TANGGAL 19 EEMBER 2015 M : 46,1 MW BP iang : 43,9 MW BT iang : 37,2 MW PLT EWA Beban PLTU PLT Waktu 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 PLTU BOLOK 13,410 13,400 13,500 13,700 13,420 13,520 13,340 13,500 13,550 13,650 13,500 13,240 13,500 13,500 13,200 13,200 13,100 13,050 13,200 13,380 13,500 13,300 13,000 13,420 PLT KUANINO - - - - - - - - - - - - - - 1,200 1,200 - - 2,200 2,200 2,200 2,200 2,200 - PLT TENAU 2,000 2,300 2,300 2,500 2,300 2,300 2,300 2,500 2,300 2,500 2,100 3,300 2,100 3,200 2,200 2,000 2,300 4,400 4,500 4,500 4,500 4,500 4,100 4,300 PLT EWA 25,823 25,289 22,401 21,262 21,285 20,085 20,048 20,425 23,030 23,176 23,150 23,090 23,663 23,591 24,650 25,900 27,110 28,565 30,750 30,750 30,750 30,750 26,647 26,359 PLT IPP KUPANG - - - - - - 1,000 1,200 900 1,800 2,600 2,300 4,300 3,400 2,900 1,200 700 - - - - - - - TOTAL BEBAN 41,233 40,989 38,201 37,462 37,005 35,905 36,688 37,625 39,780 41,126 41,350 41,930 43,563 43,691 44,150 43,500 43,210 46,015 50,650 50,830 50,950 50,750 45,947 44,079 FREKUENI (HZ) 50.07 50.13 50.11 50.03 50.03 50.10 50.18 50.22 50.11 50.00 50.23 50.31 50.11 50.17 50.21 49.81 50.22 49.99 49.81 50.00 49.88 50.01 50.01 49.83 www.themegallery.com
Evaluasi Pembebanan PLT IPP KUPANG 5 MWp Tanggal, 19 esember 2015 Waktu P ( KW ) F ( Hz ) KET 6:00 278 50.10 5 MWp 6:15 352 50.10 5 MWp 6:30 690 50.10 5 MWp 6:45 1,003 50.10 5 MWp 7:00 1,300 50.20 5 MWp 7:15 914 50.20 5 MWp 7:30 2,210 50.20 5 MWp 7:45 1,800 50.20 5 MWp 8:00 1,300 50.20 5 MWp 8:15 1,200 50.20 5 MWp 8:30 900 50.10 5 MWp 8:45 635 50.10 5 MWp 9:00 937 50.10 5 MWp 9:15 1,700 50.10 5 MWp 9:30 2,100 50.10 5 MWp 9:45 2,100 50.10 5 MWp 10:00 2,600 50.10 5 MWp 10:15 2,600 50.20 5 MWp 10:30 2,600 50.00 5 MWp 10:45 4,000 50.00 5 MWp 11:00 4,200 50.20 5 MWp 11:15 4,600 50.20 5 MWp 11:30 4,200 50.30 5 MWp 11:45 4,200 50.10 5 MWp 12:00 3,500 50.20 5 MWp 12:15 4,100 50.10 5 MWp 12:30 4,100 50.20 5 MWp 12:45 4,200 50.20 5 MWp 13:00 4,200 50.20 5 MWp 13:15 3,900 50.10 5 MWp 13:30 3,900 50.10 5 MWp 13:45 3,800 50.20 5 MWp 14:00 3,400 50.30 5 MWp 14:15 2,000 50.10 5 MWp 14:30 1,500 49.80 5 MWp 14:45 2,520 50.20 5 MWp 15:00 3,300 50.30 5 MWp 15:15 2,130 50.20 5 MWp 15:30 1,850 50.10 5 MWp 15:45 1,210 50.20 5 MWp 16:00 1,820 50.30 5 MWp 16:15 936 49.90 5 MWp 16:30 916 50.00 5 MWp 16:45 880 50.00 5 MWp 17:00 705 50.10 5 MWp 17:15 418 50.20 5 MWp 17:30 278 50.10 5 MWp www.themegallery.com Catatan : - M : 46,1 MW - BP iang : 43,9 MW - BT iang : 37,2 MW Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 19 es. 2015 - Total Produksi : 27.540 kwh - Radiasi Matahari : 5,5 kwh/m 2 /hari - Jadi dalam setahun : 9,914 MWh
Evaluasi Pembebanan PLT IPP KUPANG 2 MWp Tanggal, 20 Januari 2016 Waktu P ( KW ) F ( Hz ) KET 6:00 2 MWp 6:15 2 MWp 6:30 2 MWp 6:45 150 50.20 2 MWp 7:00 232 50.30 2 MWp 7:15 350 50.30 2 MWp 7:30 450 50.20 2 MWp 7:45 572 50.00 2 MWp 8:00 789 50.10 2 MWp 8:15 907 50.10 2 MWp 8:30 988 49.90 2 MWp 8:45 1,079 50.20 2 MWp 9:00 1,167 50.00 2 MWp 9:15 1,234 50.10 2 MWp 9:30 1,337 50.10 2 MWp 9:45 1,339 50.10 2 MWp 10:00 1,371 50.00 2 MWp 10:15 1,448 50.20 2 MWp 10:30 1,482 50.10 2 MWp 10:45 1,529 50.10 2 MWp 11:00 1,584 50.10 2 MWp 11:15 1,590 50.10 2 MWp 11:30 1,604 50.00 2 MWp 11:45 1,620 50.00 2 MWp 12:00 1,648 50.00 2 MWp 12:15 1,629 50.20 2 MWp 12:30 1,653 50.20 2 MWp 12:45 1,653 50.10 2 MWp 13:00 1,576 50.10 2 MWp 13:15 1,595 50.10 2 MWp 13:30 1,546 50.10 2 MWp 13:45 1,512 50.10 2 MWp 14:00 1,449 50.00 2 MWp 14:15 1,393 50.00 2 MWp 14:30 1,313 50.00 2 MWp 14:45 1,308 50.00 2 MWp 15:00 1,256 49.90 2 MWp 15:15 1,220 50.00 2 MWp www.themegallery.com Catatan : - M : 52,25 MW - BP iang : 50,60 MW - BT iang : 40,11 MW Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 20 Jan. 2016 - Total Produksi : 10.261 kwh - Radiasi Matahari : 5,12 kwh/m 2 /hari - Jadi dalam setahun : 3,687 MWh
Evaluasi Pembebanan PLT IPP KUPANG 2 MWp Tanggal, 21 Januari 2016 Waktu P ( KW ) F ( Hz ) KET 6:00 2 MWp 6:15 2 MWp 6:30 2 MWp 6:45 164 50.40 2 MWp 7:00 229 50.30 2 MWp 7:15 317 50.20 2 MWp 7:30 450 50.00 2 MWp 7:45 583 49.90 2 MWp 8:00 688 50.10 2 MWp 8:15 800 50.00 2 MWp 8:30 900 50.10 2 MWp 8:45 1,010 50.00 2 MWp 9:00 1,100 50.00 2 MWp 9:15 1,176 50.00 2 MWp 9:30 1,258 50.00 2 MWp 9:45 1,336 50.10 2 MWp 10:00 1,423 50.20 2 MWp 10:15 1,486 50.10 2 MWp 10:30 1,806 50.30 2 MWp 10:45 1,853 50.20 2 MWp 11:00 1,827 50.00 2 MWp 11:15 1,750 50.10 2 MWp 11:30 596 50.10 2 MWp 11:45 1,820 50.30 2 MWp 12:00 1,010 50.20 2 MWp 12:15 1,902 50.10 2 MWp 12:30 1,823 50.00 2 MWp 12:45 1,822 50.00 2 MWp 13:00 1,829 50.20 2 MWp 13:15 649 50.20 2 MWp 13:30 450 50.00 2 MWp 13:45 1,543 50.10 2 MWp 14:00 640 49.80 2 MWp 14:15 1,553 50.00 2 MWp 14:30 1,470 49.90 2 MWp 14:45 1,796 50.00 2 MWp 15:00 1,495 49.90 2 MWp www.themegallery.com Catatan : - M : 52,25 MW - BP iang : 50,60 MW - BT iang : 40,11 MW Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 21 Jan. 2016 - Total Produksi : 10.261 kwh - Radiasi Matahari : 5,12 kwh/m 2 /hari - Jadi dalam setahun : 3,687 MWh
Proyeksi Produksi PLT KUPANG 5 MWp Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 19 es. 2015 - Total Produksi : 27.540 kwh - Radiasi Matahari : 5,5 kwh/m 2 /hari - Jadi dalam setahun : 9,914 MWh Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 20 Jan. 2016 - Total Produksi : 11.027 kwh - Radiasi Matahari : 5,54 kwh/m 2 /hari - Jadi dalam setahun : 3,986 MWh Evaluasi Produksi kwh dalam 1 Tahun esuai ata Tgl 21 Jan. 2016 - Total Produksi : 10.261 kwh - Radiasi Matahari : 5,12 kwh/m 2 /hari - Jadi dalam setahun : 3,687 MWh www.themegallery.com
Hasil Produksi PLT KUPANG 5 MWp untuk Operasi 2 MWp 20000 PROUKI 18000 16000 14000 12000 10000 8000 6000 4000 2000 0 Total Produksi Bulan Januari 2016 : 231,834 KWH www.themegallery.com
Kesimpulan dan aran PLT IPP Kupang 5 MWp Pengoperasian PLT IPP Kupang 5 MWp tercapai apa bila sistem Kupang pada siang hari tidak mengalami pemadaman bergilir. Pembangkit pada sistem Kupang harus memenuhi N-1, sehingga PLT 5 MWp dapat dioperasikan secara optimal. iusulkan untuk menjaga keandalan sistem Kupang pada saat cuaca mendung harus mempunyai back up daya (batere) www.themegallery.com
IMPLEMENTAI P2M www.themegallery.com
TERIMA KAIH