ANALISIS STABILITAS TIMBUNAN MENGGUNAKAN TURAP BETON PADA TAMBANG SITE TELEN ORBIT PRIMA ABSTRAK

dokumen-dokumen yang mirip
ANALISIS KESTABILAN LERENG DENGAN ATAU TANPA PERKUATAN GEOTEXTILE DENGAN PERANGKAT LUNAK PLAXIS ABSTRAK

Denny Nugraha NRP : Pembimbing : Ir. Asriwiyanti Desiani, MT. ABSTRAK

ANALISIS STABILITAS LERENG PADA JALAN REL SEPANCAR - GILAS STA 217 MENGGUNAKAN METODE IRISAN BISHOP DAN PERANGKAT LUNAK PLAXIS ABSTRAK

LAMPIRAN 1 LANGKAH PEMODELAN ANALISA STABILITAS TIMBUNAN PADA PROGRAM PLAXIS 8.6

ANALISIS STABILITAS DAN PERKUATAN LERENG PLTM SABILAMBO KABUPATEN KOLAKA SULAWESI TENGGARA ABSTRAK

LAMPIRAN 1. Langkah Program PLAXIS V.8.2

ANALISIS ANGKA KEAMANAN (SF) LERENG SUNGAI CIGEMBOL KARAWANG DENGAN PERKUATAN PILE DAN SHEET PILE SKRIPSI

PENGARUH KEDALAMAN PEMANCANGAN TURAP BAJA PADA BERBAGAI KEPADATAN TANAH NON-KOHESIF TERHADAP FAKTOR KEAMANAN PEMANCANGAN ABSTRAK

ANALISIS OPTIMASI JUMLAH JANGKAR PADA KONSTRUKSI TURAP BERJANGKAR MENGGUNAKAN PLAXIS 2D ABSTRAK

PENGARUH TINGGI GALIAN TERHADAP STABILITAS LERENG TANAH LUNAK ABSTRAK

DAFTAR ISI. Halaman Judul Pengesahan ABSTRAK ABSTRACT KATA PENGANTAR

TUGAS AKHIR. Diajukan sebagai syarat untuk meraih gelar Sarjana Teknik Strata 1 (S-1) Disusun Oleh : Maulana Abidin ( )

ANALISIS DEFLEKSI TURAP KANTILEVER BAJA DAN BETON MENGGUNAKAN PLAXIS 2D ABSTRAK

PENGARUH JENIS TANAH TIMBUNAN TERHADAP STABILITAS DINDING PENAHAN TANAH SEGMENTAL ABSTRAK

BAB III PROSEDUR ANALISIS

ANALISIS KESTABILAN LERENG GALIAN DALAM SEGMEN C PADA PROYEK JALAN SOROWAKO BAHODOPI SULAWESI Andri Hermawan NRP:

DAFTAR ISI HALAMAN JUDUL...

LEMBAR PENGESAHAN TUGAS AKHIR

PENGARUH VARIASI LEBAR GALIAN TERHADAP FAKTOR KEAMANAN DAN PENENTUAN JENIS TURAP PADA KONSTRUKSI GALIAN BASEMENT ABSTRAK

DAFTAR ISI ABSTRACT KATA PENGANTAR DAFTAR TABEL DAFTAR GAMBAR DAFTAR LAMPIRAN DAFTAR NOTASI DAN SINGKATAN BAB I PENDAHULUAN 1 1.

HALAMAN PENGESAHAN BERITA ACARA BIMBINGAN TUGAS AKHIR MOTTO PERSEMBAHAN

BAB II DASAR TEORI...

BAB II TINJAUAN PUSTAKA

EVALUASI KESTABILAN LERENG PADA TAMBANG TERBUKA DI TAMBANG BATUBARA ABSTRAK

LANGKAH-LANGKAH PEMODELAN MENGGUNAKAN PLAXIS V8.2. Pada bagian ini dijelaskan tentang cara-cara yang dilakukan untuk memodelkan proyek

Pemodelan 3D Pada Stabilitas Lereng Dengan Perkuatan Tiang Menggunakan Metode Elemen Hingga

LANGKAH PEMODELAN ANALISA KAPASITAS LATERAL KELOMPOK TIANG PADA PROGRAM PLAXIS 3D FOUNDSTION

DAFTAR ISI HALAMAN JUDUL

PENGARUH BENTUK, KEDALAMAN, DAN RASIO KELANGSINGAN TERHADAP KAPASITAS BEBAN LATERAL TIANG PANCANG BETON ABSTRAK

BAB II TINJAUAN PUSTAKA

PENGARUH KONSISTENSI TANAH DAN MODULUS PENAMPANG TURAP BAJA TERHADAP KEDALAMAN GALIAN TURAP BAJA

ANALISIS ANGKA KEAMANAN (SF) LERENG SUNGAI CIGEMBOL KARAWANG DENGAN PERKUATAN SHEET PILE

DAFTAR ISI PERNYATAAN ABSTRAK. KATA PENGANTAR... DAFTAR ISI... DAFTAR TABEL.. DAFTAR GAMBAR. DAFTAR NOTASI

PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS SEBELAS MARET SURAKARTA 2016

Angel Refanie NRP : Pembimbing: Andrias Suhendra Nugraha, S.T., M.T. ABSTRAK

Laporan Tugas Akhir Analisis Pondasi Jembatan dengan Permodelan Metoda Elemen Hingga dan Beda Hingga BAB III METODOLOGI

BAB III METODE PENELITIAN

ANALISIS STABILITAS KONSTRUKSI SHEET PILE AKIBAT PEKERJAAN GALIAN DENGAN METODE ELEMEN HINGGA. (Studi Kasus : Normalisasi Kali Item Jakarta)

PENGARUH DIAMETER TERHADAP KAPASITAS DUKUNG LATERAL TIANG TUNGGAL ABSTRAK

PENGARUH PEMBEBANAN PADA DINDING PENAHAN TANAH SEGMENTAL ABSTRAK

PERENCANAAN STABILITAS LERENG DENGAN SHEET PILE DAN PERKUATAN GEOGRID MENGGUNAKAN METODE ELEMEN HINGGA. Erin Sebayang 1 dan Rudi Iskandar 2

Analysis Slope Stability dengan Plaxis 8.x. ANALYSIS SLOPE STABILITY Site ID : Site Name : I. Data Boring LOG. By: dedy trianda Hal.

Mahasiswa, Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Nasional 2

PENGARUH KONSISTENSI TANAH LEMPUNG TERHADAP STABILITAS FONDASI MENERUS BERDASARKAN METODE LOAD AND RESISTANCE FACTOR DESIGN ABSTRAK

PERHITUNGAN STABILITAS LERENG DENGAN PERKUATAN GEOGRID MENGGUNAKAN PROGRAM PLAXIS 2D

REKAYASA GEOTEKNIK DALAM DISAIN DAM TIMBUNAN TANAH

Bab 3 METODOLOGI. penyelidikan tanah di lapangan dan pengujian tanah di laboratorium. Untuk memperoleh

STUDI PERBANDINGAN PERANCANGAN DINDING TURAP DENGAN MENGGUNAKAN METODE MANUAL DAN PROGRAM OASYS GEO 18.1

FAKULTAS TEKNIK JURUSAN TEKNIK SIPIL UNIVERSITAS KRISTEN MARANATHA BANDUNG

DAFTAR ISI. KATA PENGANTAR.. i. DAFTAR ISI.ii. DAFTAR TABEL v. DAFTAR GAMBAR ix. DAFTAR LAMPIRAN xv BAB I PENDAHULUAN Latar Belakang...

UNIVERSITAS BINA NUSANTARA Jurusan Teknik Sipil Skripsi Sarjana Semester Genap Tahun 2007/2008

PENGARUH DIMENSI, KEDALAMAN, DAN RASIO KELANGSINGAN TERHADAP KAPASITAS DUKUNG LATERAL DAN DEFLEKSI PADA TIANG PANCANG SPUN PILE ABSTRAK

ANALISIS LERENG DENGAN PERKUATAN PONDASI TIANG

BAB I PENDAHULUAN 1. 1 LATAR BELAKANG MASALAH

DAFTAR ISI. i ii iii. ix xii xiv xvii xviii

JUDUL HALAMAN PENGESAHAN BERITA ACARA MOTTO DAN PERSEMBAHAN KATA PENGANTAR ABSTRAK DAFTAR ISI DAFTAR GAMBAR DAFTAR TABEL DAFTAR NOTASI DAFTAR LAMPIRAN

PENGARUH BENTUK, KEDALAMAN, DAN RASIO KELANGSINGAN TERHADAP KAPASITAS DUKUNG LATERAL DAN DEFLEKSI PADA TIANG PANCANG BAJA ABSTRAK

BAB III LANDASAN TEORI

PERBANDINGAN HASIL ANALISIS DAYA DUKUNG PONDASI TIANG BOR MENGGUNAKAN METODE REESE, PILE DRIVING ANALYZER TEST, DAN PERANGKAT LUNAK NPILE

BAB III METODE PENELITIAN. Mulai. Studi literatur. Pemodelan numerik Plaxis 2D. Input data 1. Geometri model 2. Parameter material

STUDI PERBANDINGAN ANALISIS PELAT KONVENSIONAL DAN PELAT PRACETAK ABSTRAK

DAFTAR ISI. HALAMAN JUDUL ABSTRAK... i ABSTRACT... iii KATA PENGANTAR... v DAFTAR ISI... vii DAFTAR TABEL... xi DAFTAR GAMBAR...

PENGARUH KEKAKUAN LENTUR PADA DEFLEKSI TIANG PONDASI YANG DIBEBANI LATERAL ABSTRAK

TESIS MAGISTER. Oleh Giyoko Surahmat

STUDI PENGARUH DIAMETER TERHADAP STABILITAS SOLDIER PILE PADA GEDUNG SERBA GUNA UNIVERSITAS KRISTEN MARANATHA BANDUNG ABSTRAK

PENGGUNAAN BORED PILE SEBAGAI DINDING PENAHAN TANAH

D3 JURUSAN TEKNIK SIPIL POLBAN BAB II DASAR TEORI

BAB 1 PENDAHULUAN. Perkembangan ilmu pengetahuan dan teknologi yang semakin pesat

ANALISIS DAYA DUKUNG KELOMPOK TIANG BOR PADA PEMBANGUNAN GEDUNG SERBA GUNA UNIVERSITAS KRISTEN MARANATHA ABSTRAK

TUGAS AKHIR. Diajukan sebagai syarat untuk meraih gelar Sarjana Teknik Strata 1 (S-1) Disusun oleh : TITIK ERNAWATI

BAB I PENDAHULUAN LatarBelakang Tujuan Kajian Sistematika Penyusunan Laporan...3

UNIVERSITAS BINA NUSANTARA

Jurusan Teknik Sipil Itenas No.x Vol. Xx Jurnal Online Institut Teknologi Nasional Januari 2016

BAB IV KRITERIA DESAIN

STABILITAS DERMAGA AKIBAT PEMANASAN GLOBAL PADA PELABUHAN IKAN PEMANGKAT KALIMANTAN BARAT

Pengaruh Tension Crack (Tegangan Retak) pada Analisis Stabilitas Lereng menggunakan Metode Elemen Hingga

HAND OUT KOMPUTASI GEOTEKNIK

PEMODELAN BANGUNAN PEMECAH GELOMBANG SISI MIRING DENGAN VARIASI PELINDUNG LAPISAN INTI PADA UJI LABORATORIUM DUA DIMENSI ABSTRAK

MEKANIKA TANAH 2 KESTABILAN LERENG. UNIVERSITAS PEMBANGUNAN JAYA Jl. Boulevard Bintaro Sektor 7, Bintaro Jaya Tangerang Selatan 15224

ANALISIS PERUBAHAN TEGANGAN DI DALAM TANAH AKIBAT TIMBUNAN MENGGUNAKAN METODE ELEMEN HINGGA

STUDI PERBANDINGAN PERHITUNGAN STABILITAS DINDING PENAHAN TANAH ANTARA METODE KONVENSIONAL DAN METODE ELEMEN HINGGA

BAB IV HASIL DAN PEMBAHASAN

ANALISIS STABILITAS TANAH TIMBUNAN DENGAN PERKUATAN SABUT KELAPA

ANALISA KESTABILAN LERENG GALIAN AKIBAT GETARAN DINAMIS PADA DAERAH PERTAMBANGAN KAPUR TERBUKA DENGAN BERBAGAI VARIASI PEMBASAHAN PENGERINGAN

Setyanto1) Ahmad Zakaria2) Giwa Wibawa Permana3)

MEKANIKA TANAH (CIV -205)

DAFTAR ISI. DAFTAR ISI... viii. DAFTAR TABEL... xi. DAFTAR GAMBAR... xiii BAB I PENDAHULUAN Latar Belakang Penelitian...

Analisis Stabilitas Lereng Bertingkat Dengan Perkuatan Geotekstil Menggunakan Metode Elemen Hingga

BAB 4 PEMBAHASAN. memiliki tampilan input seperti pada gambar 4.1 berikut.

PENGARUH PENINGKATAN KAPASITAS AIR TERHADAP KEKUATAN STRUKTUR BAK SEDIMENTASI PADA INSTALASI PENGOLAHAN AIR

BAB 4 HASIL DAN PEMBAHASAN. penambangan batu bara dengan luas tanah sebesar hektar. Penelitian ini

DAFTAR ISI HALAMAN JUDUL... LEMBAR PENGESAHAN... BERITA ACARA TUGAS AKHIR... MOTO DAN LEMBAR PERSEMBAHAN... KATA PENGANTAR... DAFTAR ISI...

BAB III METODE PENELITIAN

BAB IX PERENCANAAN TUBUH EMBUNG

JURNAL TEKNIK ITS Vol. 6, No. 1, (2017) ISSN: ( Print D-44

STUDI PENGARUH KONSTANTA PEGAS TANAH TERHADAP RESPON TEGANGAN DAN PENURUNAN PADA PONDASI PELAT (MAT FOUNDATION) ABSTRAK

PERENCANAAN STRUKTUR TANGGUL KOLAM RETENSI KACANG PEDANG PANGKAL PINANG DENGAN MENGGUNAKAN SOFTWARE OASYS GEO 18.1 DAN 18.2

BAB I PENDAHULUAN. lereng, hidrologi dan hidrogeologi perlu dilakukan untuk mendapatkan desain

BAB IV. METODE PENELITIAN 4.1. TINJAUAN UMUM TAHAPAN PENELITIAN BERBASIS STUDI NUMERIK... 73

Analisis Stabilitas dan Penurunan pada Timbunan Mortar Busa Ringan Menggunakan Metode Elemen Hingga

Transkripsi:

ANALISIS STABILITAS TIMBUNAN MENGGUNAKAN TURAP BETON PADA TAMBANG SITE TELEN ORBIT PRIMA Nesa Nurhadi Sunarya NRP : 1121029 Pembimbing : Ir. Asriwiyanti Desiani, MT. ABSTRAK Turap beton berfungsi sebagai perkuatan lereng, seringkali digunakan terutama di daerah yang berbatasan dengan air, seperti tepi sungai dan pelabuhan. Hal ini terjadi karena turap tersebut memiliki sifat tahan terhadap korosi dan dapat dibuat kedap terhadap air melalui proses pelapisan anti air (coating). Corrugated Prestressed Concrete (CPC) sheet piles merupakan salah jenis turap beton yang memiliki bentuk penampang bergelombang. Penampang tersebut berfungsi sebagai pengunci agar tanah tidak bergerak ke arah samping. Studi ini bertujuan untuk menganalisis kestabilan lereng pada tanah timbunan di site PT. Telen Orbit Prima (TOP). Analisis terhadap nilai faktor keamanan (ΣMsf) lereng dilakukan dengan menggunakan perangkat lunak Plaxis. Kondisi lereng yang ditinjau yaitu, kestabilan pada kondisi aktual (kondisi 1), kestabilan pada saat terjadi rembesan air di badan timbunan (kondisi 2), kestabilan pada saat terjadi penurunan permukaan air ke elevasi +2.00 (kondisi 3), kestabilan pada saat pemadatan tanah tidak optimal (kondisi 4), serta kestabilan menggunakan perkuatan turap beton CPC dengan variasi jenis dan kedalaman pemancangan (kondisi 5). Berdasarkan hasil analisis yang telah dilakukan, nilai ΣMsf lereng pada kondisi 2 adalah sebesar 1,0734 < 1,2, dapat disimpulkan bahwa lereng berada dalam kondisi tidak aman. Pada kondisi 3, nilai ΣMsf adalah sebesar 1,0482 < 1,2, lereng juga berada dalam kondisi tidak aman. Pada kondisi 4, didapatkan hasil bahwa lereng mengalami keruntuhan. Melalui kurva hubungan ΣMsf terhadap kedalaman pemancangan, didapatkan kesimpulan bahwa penggunaan jenis turap beton yang paling efisien adalah CPC 325_8 meter dengan kedalaman pemancangan 4 meter. Nilai ΣMsf yang didapat sebesar 1,2228 > 1,2 untuk kondisi terjadi rembesan air di badan timbunan. Kata kunci: Corrugated Prestressed Concrete, Plaxis, ΣMsf vii

THE EMBANKMENT STABILITY ANALYSIS WITH CONCRETE SHEET PILE REINFORCEMENT IN TELEN ORBIT PRIMA MINE SITE Nesa Nurhadi Sunarya NRP : 1121029 Pembimbing : Ir. Asriwiyanti Desiani, MT. ABSTRACT Concrete sheet piles serve as a slope reinforcement, they are often used primarily in an area which close to the water, such as river and harbour. Concrete sheet piles are stainless and can be made as waterproof through coating process. Corrugated Prestressed Concrete (CPC) is a type of sheet piles which has a wavy shape of cross-section. The cross-section shape has a function as a lock to the soil, so that there will be a less movement on horizontal direction. This study aims to analyze the slope stability of embankment in Telen Orbit Prima jobsite. The anlysis on slope safety factor (ΣMsf) is calculated using Plaxis software. The slope is reviewed based on four conditions. They are, the slope stability in the actual condition (1 st condition), the slope stability when there is a leak of water inside the embankment (2 nd condition), the slope stability when the water surface decrease to level +2.00 (3 rd condition), the slope stability when the soil is not perfectly compacted (4 th condition), and the slope stability using the variety CPC sheet piles on type and depth (5 th condition). Based on the result of the analysis, the ΣMsf value of slope in the second condition is 1,0734 < 1,2, it means that the slope is not safe. In the third condition, the ΣMsf value is 1,0482 < 1,2, the slope is also not safe. In the fourth condition, the result shows that the slope is failed. From curves of ΣMsf and piling depth, it results that CPC 325_8 meters with a 4 meters depth is the most effecient sheet piles. In the second condition which the water is leaking, its ΣMsf value is 1,2228 > 1,2. Kata kunci: Corrugated Prestressed Concrete, Plaxis, ΣMsf viii

DAFTAR ISI Halaman HALAMAN JUDUL... i LEMBAR PENGESAHAN... ii PERNYATAAN ORISINALITAS LAPORAN PENELITIAN... iii PERNYATAAN PUBLIKASI LAPORAN PENELITIAN... iv SURAT KETERANGAN TUGAS AKHIR... v SURAT KETERANGAN SELESAI TUGAS AKHIR... vi ABSTRAK... vii ABSTRACT... viii KATA PENGANTAR... ix DAFTAR ISI... xi DAFTAR GAMBAR... xiii DAFTAR TABEL... xviii DAFTAR NOTASI... xix DAFTAR LAMPIRAN... xx BAB I PENDAHULUAN... 1 1.1 Latar Belakang... 1 1.2 Tujuan Penulisan... 2 1.3 Batasan Masalah... 2 1.4 Sistematika Penulisan... 3 1.5 Lisensi Perangkat Lunak... 3 BAB II TINJAUAN PUSTAKA... 4 2.1 Lereng... 4 2.1.1 Pengertian Lereng... 4 2.1.2 Gangguan Stabilitas Lereng... 5 2.1.3 Gerakan Tanah... 7 2.1.4 Jenis Jenis Longsoran... 10 2.2 Analisa Stabilitas Lereng... 11 2.2.1. Kekuatan Geser Tanah... 11 2.2.2. Parameter Tanah... 14 xi

2.3 Perkuatan Lereng dengan Turap (Sheet Piles)... 18 2.3.1. Turap... 18 2.3.2. Corrugated Prestressed Concrete (CPC) Sheet Piles... 20 2.4 Geomembrane... 26 2.5 Perangkat Lunak Plaxis... 28 BAB III DATA TANAH DAN CARA PENGGUNAAN PERANGKAT LUNAK... 31 3.1 Data Tanah... 31 3.1.1. Data Hasil Pengujian Pada Tanah... 31 3.1.2. Data Teknis Lereng... 33 3.2 Perangkat Lunak Plaxis... 34 3.2.1. Input Data... 34 3.2.2. Calculation... 39 3.2.3. Output Data... 45 BAB IV ANALISIS DATA DENGAN MENGGUNAKAN PERANGKAT LUNAK 4.1 Desain Parameter... 46 4.2 Data Teknis Lereng... 49 4.3 Analisis Lereng Dengan Menggunakan Perangkat Lunak... 49 4.3.1. Kondisi 1 : Kestabilan Lereng Pada Kondisi Aktual... 49 4.3.2. Kondisi 2 : Kestabilan Lereng Pada Saat Terjadi Rembesan Air... 55 4.3.3. Kondisi 3 : Kestabilan Lereng Pada Saat Permukaan Air Turun ke Elevasi +2.00... 60 4.3.4. Kondisi 4 : Kestabilan Lereng Pada Saat Pemadatan Tanah Tidak Optimal... 64 4.3.5. Kondisi 5 : Kestabilan Lereng dengan Perkuatan Turap Beton (Sheet Piles)... 66 BAB V KESIMPULAN DAN SARAN... 85 5.1 Kesimpulan... 85 5.2 Saran... 86 DAFTAR PUSTAKA... 87 DAFTAR LAMPIRAN... 88 xii

DAFTAR GAMBAR Gambar 2.1 Faktor Geologi Terhadap Gangguan Stabilitas Lereng... 6 Gambar 2.2 Faktor Morfologi Terhadap Gangguan Stabilitas Lereng... 6 Gambar 2.3 Faktor Perbuatan Manusia Terhadap Gangguan Stabilitas Lereng.. 7 Gambar 2.4 Gerakan Tanah Jenis Runtuhan (Falls)... 8 Gambar 2.5 Gerakan Tanah Jenis Pengelupasan (Topples)... 8 Gambar 2.6 Gerakan Tanah Jenis Aliran Tanah (Earth Flow/Debris Flow)... 9 Gambar 2.7 Gerakan Tanah Jenis Rayapan (Creep)... 9 Gambar 2.8 Gerakan Tanah Jenis Longsoran (Slides)... 10 Gambar 2.9 Kecepatan Gerakan Longsoran (TRB, 1978)... 10 Gambar 2.10 Longsoran Rotasi... 11 Gambar 2.11 Longsoran Translasi... 11 Gambar 2.12 Garis Keruntuhan Mohr Coulomb... 12 Gambar 2.13 Alat Uji Direct Shear... 17 Gambar 2.14 Alat Uji Triaxial... 17 Gambar 2.15 Turap Jenis 1... 18 Gambar 2.16 Turap Jenis 2... 19 Gambar 2.17 Turap Jenis 3 (a)... 19 Gambar 2.18 Turap Jenis 3 (b)... 19 Gambar 2.19 Corrugated Prestressed Concrete Sheet Pile... 22 Gambar 2.20 Langkah 1 Metode Panel Driving... 23 Gambar 2.21 Langkah 2 Metode Panel Driving... 23 Gambar 2.22 Langkah 3 Metode Panel Driving... 24 Gambar 2.23 Langkah 4 Metode Panel Driving... 24 Gambar 2.24 Langkah 5 Metode Panel Driving... 24 Gambar 2.25 Langkah 6 Metode Panel Driving... 25 Gambar 2.26 Langkah 7 Metode Panel Driving... 25 Gambar 2.27 Langkah 8 Metode Panel Driving... 25 Gambar 2.28 Persiapan Lapisan Permukaan... 26 Gambar 2.29 Pekerjaan Parit Angkur... 27 Gambar 2.30 Penggelaran Geomembrane... 27 xiii

Gambar 2.31 Pengelasan Geomembrane... 28 Gambar 3.1 Lokasi Titik Bor Tangan... 31 Gambar 3.2 Timbunan Tanah Yang Ditinjau... 33 Gambar 3.3 Dimensi Timbunan Tanah... 34 Gambar 3.4 General Settings Project... 35 Gambar 3.5 General Settings Dimensions... 35 Gambar 3.6 Geometry Input... 36 Gambar 3.7 Material Sets Soil & Interfaces General... 37 Gambar 3.8 Material Sets Soil & Interfaces Parameters... 37 Gambar 3.9 Material Sets Geogrid... 37 Gambar 3.10 Material Sets Plates... 38 Gambar 3.11 Standard Fixities... 38 Gambar 3.12 Generate Mesh... 39 Gambar 3.13 Calculation - General... 40 Gambar 3.14 Calculation - Parameters... 40 Gambar 3.15 Staged Construction... 41 Gambar 3.16 Water Condition... 41 Gambar 3.17 Generate Water Pressure... 42 Gambar 3.18 Loading Input Define Staged Construction... 42 Gambar 3.19 Loading Input Define Phreatic Level... 43 Gambar 3.20 Generate Water Pressures... 43 Gambar 3.21 Calculation Point for Curves... 44 Gambar 3.22 Plastic Calculation... 44 Gambar 3.23 Calculation - Multipliers... 44 Gambar 3.24 Output Data Deformed Mesh... 45 Gambar 3.25 Output Data Total Displacement - Contours... 45 Gambar 4.1 Dimensi Lereng Pada Pemodelan Plaxis... 49 Gambar 4.2 Initial Phase Staged Construction (Kondisi 1)... 50 Gambar 4.3 Timbunan 1 Staged Construction (Kondisi 1)... 50 Gambar 4.4 Beban 1 Staged Construction (Kondisi 1)... 51 Gambar 4.5 Tekanan Air Staged Construction (Kondisi 1)... 52 Gambar 4.6 Tekanan Air Water Conditions (Kondisi 1)... 52 Gambar 4.7 Timbunan 12 Staged Construction (Kondisi 1)... 52 Gambar 4.8 Timbunan 12 Water Conditions (Kondisi 1)... 53 xiv

Gambar 4.9 Beban 12 Staged Construction (Kondisi 1)... 53 Gambar 4.10 SF Struktur Plastic Calculation (Kondisi 1)... 54 Gambar 4.11 SF Struktur ΣMsf (Kondisi 1)... 54 Gambar 4.12 Output Data Deformed Mesh (Kondisi 1)... 55 Gambar 4.13 Output Data Total Displacements (Kondisi 1)... 55 Gambar 4.14 Initial Phase Staged Construction (Kondisi 2)... 56 Gambar 4.15 Timbunan 1 Staged Construction (Kondisi 2)... 56 Gambar 4.16 Beban 1 Staged Construction (Kondisi 2)... 57 Gambar 4.17 Tekanan Air Water Conditions (Kondisi 2)... 57 Gambar 4.18 Rembesan Air Water Conditions (Kondisi 2)... 58 Gambar 4.19 SF Struktur Plastic Calculation (Kondisi 2)... 58 Gambar 4.20 SF Struktur ΣMsf (Kondisi 2)... 59 Gambar 4.21 Output Data Deformed Mesh (Kondisi 2)... 59 Gambar 4.22 Output Data Total Displacement (Kondisi 2)... 60 Gambar 4.23 Initial Phase Staged Construction (Kondisi 3)... 60 Gambar 4.24 Timbunan 1 Staged Construction (Kondisi 3)... 61 Gambar 4.25 Beban 1 Staged Construction (Kondisi 3)... 61 Gambar 4.26 Tekanan Air Water Conditions (Kondisi 3)... 62 Gambar 4.27 Penurunan Elevasi Air Water Conditions (Kondisi 3)... 62 Gambar 4.28 Penurunan Elevasi Air General (Kondisi 3)... 63 Gambar 4.29 Output Data Deformed Mesh (Kondisi 3)... 63 Gambar 4.30 Output Data Total Displacements (Kondisi 3)... 64 Gambar 4.31 Timbunan 10 Staged Construction (Kondisi 4)... 65 Gambar 4.32 Timbunan 10 General (Kondisi 4)... 65 Gambar 4.33 Output Data Deformed Mesh (Kondisi 4)... 66 Gambar 4.34 Output Data Total Displacement (Kondisi 4)... 66 Gambar 4.35 Initial Phase Staged Construction (Kondisi 5)... 67 Gambar 4.36 Initial Phase Water Conditions (Kondisi 5)... 67 Gambar 4.37 CPC 325_8m Staged Construction... 68 Gambar 4.38 CPC 325_8m Water Conditions... 68 Gambar 4.39 Timbunan 6 Staged Construction (CPC 325_8 m)... 68 Gambar 4.40 Beban 6 Staged Construction (CPC 325_8 m)... 69 Gambar 4.41 Tekanan Air Water Conditions (CPC 325_8 m)... 69 Gambar 4.42 Galian Luar Staged Construction (CPC 325_8 m)... 70 xv

Gambar 4.43 Rembesan Air Water Conditions (CPC 325_8 m)... 70 Gambar 4.44 SF Struktur ΣMsf Tekanan Air (CPC 325_8 m)... 71 Gambar 4.45 SF Struktur - ΣMsf Rembesan Air (CPC 325_8 m)... 71 Gambar 4.46 SF Struktur ΣMsf Tekanan Air (CPC 325_9 m)... 72 Gambar 4.47 SF Struktur - ΣMsf Rembesan Air (CPC 325_9 m)... 72 Gambar 4.48 SF Struktur ΣMsf Tekanan Air (CPC 325_10 m)... 73 Gambar 4.49 SF Struktur - ΣMsf Rembesan Air (CPC 325_10 m)... 73 Gambar 4.50 SF Struktur ΣMsf Tekanan Air (CPC 350_9 m)... 74 Gambar 4.51 SF Struktur - ΣMsf Rembesan Air (CPC 350_9 m)... 74 Gambar 4.52 SF Struktur ΣMsf Tekanan Air (CPC 350_10 m)... 75 Gambar 4.53 SF Struktur - ΣMsf Rembesan Air (CPC 350_10 m)... 75 Gambar 4.54 Output Data Tekanan Air Deformed Mesh (CPC 325_8 m)... 76 Gambar 4.55 Output Data Tekanan Air Total Displacements (CPC 325_8 m)... 77 Gambar 4.56 Output Data Rembesan Air Deformed Mesh (CPC 325_8 m)... 77 Gambar 4.57 Output Data Rembesan Air Total Displacements (CPC 325_8 m)... 77 Gambar 4.58 Output Data Tekanan Air Deformed Mesh (CPC 325_9 m)... 78 Gambar 4.59 Output Data Tekanan Air Total Displacements (CPC 325_9 m)... 78 Gambar 4.60 Output Data Rembesan Air Deformed Mesh (CPC 325_9 m)... 78 Gambar 4.61 Output Data Rembesan Air Total Displacements (CPC 325_9 m)... 79 Gambar 4.62 Output Data Tekanan Air Deformed Mesh (CPC 325_10 m)... 79 Gambar 4.63 Output Data Tekanan Air Total Displacements (CPC 325_10 m)... 79 Gambar 4.64 Output Data Rembesan Air Deformed Mesh (CPC 325_10 m)... 80 Gambar 4.65 Output Data Rembesan Air Total Displacements (CPC 325_10 m)... 80 Gambar 4.66 Output Data Tekanan Air Deformed Mesh (CPC 350_9 m)... 80 Gambar 4.67 Output Data Tekanan Air Total Displacements (CPC 350_9 m)... 81 Gambar 4.68 Output Data Rembesan Air Deformed Mesh (CPC 350_9 m)... 81 xvi

Gambar 4.69 Output Data Rembesan Air Total Displacements (CPC 350_9 m)... 81 Gambar 4.70 Output Data Tekanan Air Deformed Mesh (CPC 350_10 m)... 81 Gambar 4.71 Output Data Tekanan Air Total Displacements (CPC 350_10 m)... 81 Gambar 4.72 Output Data Rembesan Air Deformed Mesh (CPC 350_10 m)... 82 Gambar 4.73 Output Data Rembesan Air Total Displacements (CPC 350_10 m)... 82 Gambar 4.74 Kurva ΣMsf Tekanan Air Terhadap Kedalaman Turap... 84 Gambar 4.75 Kurva ΣMsf Rembesan Air Terhadap Kedalaman Turap... 84 xvii

DAFTAR TABEL Tabel 2.1 Faktor faktor yang Mempengaruhi Stabilitas Lereng... 5 Tabel 2.2 Faktor Keamanan Minimum Kemantapan Lereng... 13 Tabel 2.3 Harga harga Koefisien Rembesan... 15 Tabel 2.4 Harga harga Modulus Young... 16 Tabel 2.5 Harga harga Angka Poisson... 16 Tabel 2.6 Klasifikasi CPC Sheet Pile... 20 Tabel 2.7 Panjang Sheet Pile Berdasarkan Momen Retak... 21 Tabel 3.1 Deskripsi Tanah Hasil Pengujian Bor Tangan... 32 Tabel 3.2 Deskripsi Tanah Hasil Pengujian Laboratorium... 32 Tabel 3.3 Spesifikasi Timbunan Tanah... 34 Tabel 4.1 Spesifikasi Data Tanah Pada Pemodelan Mohr Coloumb... 47 Tabel 4.2 Spesifikasi Turap Beton dan Geomembrane Pada Pemodelan Mohr Coloumb... 48 Tabel 4.3 ΣMsf Berdasarkan Kedalaman Turap (CPC 325_8 m)... 71 Tabel 4.4 ΣMsf Berdasarkan Kedalaman Turap (CPC 325_9 m)... 72 Tabel 4.5 ΣMsf Berdasarkan Kedalaman Turap (CPC 325_10 m)... 73 Tabel 4.6 ΣMsf Berdasarkan Kedalaman Turap (CPC 350_9 m)... 74 Tabel 4.7 ΣMsf Berdasarkan Kedalaman Turap (CPC 350_10 m)... 75 Tabel 4.8 Data ΣMsf dan Perpindahan Maksimum Berdasarkan Jenis Turap Beton... 83 xviii

DAFTAR NOTASI c : Kohesi dalam keadaan tegangan efektif. E : Modulus Young. F s H w t A I K L u W W s W w : Faktor keamanan. : Tinggi. : Lebar. : Tebal. : Luas. : Momen Inersia. : Koefisien rembesan. : Panjang. : Tekanan air pori pada bidang geser. : Berat tanah (kg). : Berat butiran padat (kg). : Berat air (kg). V : Volume tanah (m 3 ). τ f σ : Kuat geser maksimum. : Tegangan normal total pada bidang geser. σ : Tegangan normal efektif pada bidang geser. ф : Sudut ketahanan geser dalam keadaan tegangan efektif. τ f τ d : Kekuatan geser tanah yang tersedia. : Kekuatan geser tanah yang bekerja sepanjang bidang longsor. γ : Berat volume tanah (kg/m 3 ). γ d : Berat volume kering tanah (kg/m 3 ). μ : Angka Poisson. ΣMsf : Faktor pengali total keamanan. ϕ masukan ϕ tereduksi c masukan c tereduksi : nilai ϕ yang dimasukkan dalam set data material. : nilai ϕ tereduksi yang digunakan dalam analisis. : nilai c yang dimasukkan dalam set data material. : nilai c tereduksi yang digunakan dalam analisis. xix

DAFTAR LAMPIRAN L.1 DATA PENYELIDIKAN TANAH DI LUBANG BOR 1... 87 L.2 LAY OUT PROYEK BENDUNGAN DI SITE PT. TOP... 90 L.3 KATALOG PRODUK RETAINING WALL CONCRETE PRODUCTS PT. WIKA BETON... 92 L.4 KATALOG PRODUK PADFOOT DRUM SOIL COMPACTOR PT. TRAKINDO UTAMA... 93 L.5 KATALOG PRODUK HUITEX GEOMEMBRANE... 95 xx