PERENCANAAN EMBUNG ROBATAL KABUPATEN SAMPANG

dokumen-dokumen yang mirip
PERENCANAAN EMBUNG MAMBULU BARAT KECAMATAN TAMBELANGAN KABUPATEN SAMPANG MADURA

PERENCANAAN TUBUH EMBUNG ROBATAL, KECAMATAN ROBATAL, KABUPATEN SAMPANG

PERENCANAAN EMBUNG SALAK DIDESA PAKUWESI KAB.BONDOWOSO

I. PENDAHULUAN. Kata kunci : Air Baku, Spillway, Embung.

PERENCANAAN TUBUH EMBUNG BULUNG DI KABUPATEN BANGKALAN TUGAS AKHIR

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang

BAB II TINJAUAN PUSTAKA

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang

PERENCANAAN EMBUNG KEDUNG BUNDER KABUPATEN PROBOLINGGO AHMAD NAUFAL HIDAYAT

Perencanaan Embung Juruan Laok, Kecamatan Batuputih, Kabupaten Sumenep

JURNAL TEKNIK POMITS Vol. 1, No. 1, (2013) ISSN: Perencanaan Embung Bulung Kabupaten Bangkalan

4.6 Perhitungan Debit Perhitungan hidrograf debit banjir periode ulang 100 tahun dengan metode Nakayasu, ditabelkan dalam tabel 4.

PERENCANAAN TUBUH EMBUNG GADDING KECAMATAN MANDING, KABUPATEN SUMENEP TUGAS AKHIR

STUDI PERENCANAAN HIDROLIS PELIMPAH SAMPING DAM SAMPEAN LAMA SITUBONDO LAPORAN PROYEK AKHIR

TUGAS AKHIR PERENCANAAN DIMENSI STRUKTUR BENDUNG PLTM KAREKAN DI BANJARNEGARA

PERENCANAAN EMBUNG GUNUNG RANCAK 2, KECAMATAN ROBATAL, KABUPATEN SAMPANG

PERENCANAAN EMBUNG BLORONG KABUPATEN KENDAL, JAWA TENGAH. Muhammad Erri Kurniawan, Yudha Satria, Sugiyanto *), Hari Budieny *)

PERENCANAAN EMBUNG MANDIRADA KABUPATEN SUMENEP. Oleh : M YUNUS NRP :

PERENCANAAN BANGUNAN PENGENDALI SEDIMEN WADUK SELOREJO KABUPATEN MALANG

PERENCANAAN NORMALISASI KALI TUNTANG DI KABUPATEN DEMAK DAN KABUPATEN GROBOGAN

STUDI PERENCANAAN PELIMPAH EMBUNG KRUENG RAYA KELURAHAN KRUENG RAYA KECAMATAN MESJID RAYA KABUPATEN ACEH BESAR

NORMALISASI KALI KEMUNING DENGAN CARA PENINGGIAN TANGKIS UNTUK MENGURANGI LUAPAN AIR DI KABUPATEN SAMPANG MADURA JAWA TIMUR

PERENCANAAN BENDUNG SIDOREJO DAN BANGUNAN PELENGKAPNYA DAERAH IRIGASI SIDOREJO KECAMATAN PURWODADI KABUPATEN GROBOGAN

PERENCANAAN DETAIL EMBUNG UNDIP SEBAGAI PENGENDALI BANJIR PADA BANJIR KANAL TIMUR

I. PENDAHULUAN. Redesain Bendungan Way Apu Kabpaten Buru Provinsi Maluku

REHABILITASI BENDUNG SINOMAN DI KALI BRANGKAL UNTUK MENGATASI BANJIR DI DESA SOOKO, KOTA MOJOKERTO TESIS

TUGAS AKHIR ANALISIS ROUTING ALIRAN MELALUI RESERVOIR STUDI KASUS WADUK KEDUNG OMBO

ABSTRAK Faris Afif.O,

ANALISIS DEBIT BANJIR SUNGAI CISADANE UNTUK PENENTUAN ELEVASI TANGGUL DI JEMBATAN PASAR ANYAR TANGERANG

DAFTAR ISI. 1.1 Latar Belakang Permasalahan Batasan Masalah Maksud dan Tujuan Sistematika Penyajian Laporan...

Identifikasi Debit Banjir, Desain Teknis dan Kontrol Stabilitas Bendung Pengelak Banjir ABSTRAK

BAB I PENDAHULUAN. Waduk Jatibarang. Peta Das Waduk Jatibarang BAB II TINJAUAN PUSTAKA

BAB VII PENELUSURAN BANJIR (FLOOD ROUTING)

LEMBAR PENGESAHAN LAPORAN TUGAS AKHIR PERENCANAAN SISTEM DRAINASE BANDAR UDARA AHMAD YANI SEMARANG

TINJAUAN DEBIT BANJIR KALA ULANG TERHADAP TINGGI MUKA AIR WADUK KRISAK KABUPATEN WONOGIRI

DAFTAR ISI. HALAMAN JUDUL... i LEMBAR PENGESAHAN... ii KATA PENGANTAR... iii. DAFTAR TABEL... ix DAFTAR GAMBAR... xi

Perencanaan Sistem Drainase Perumahan Grand City Balikpapan

BAB III METODOLOGI. 3.1 Tinjauan Umum

TUGAS AKHIR PERENCANAAN DIMENSI HIDROLIS BANGUNAN AIR BENDUNG PADA SUNGAI MANAU JAMBI

PERENCANAAN SISTEM DRAINASE PERUMAHAN GRAND CITY BALIKPAPAN

KAJIAN HIDROLIS RUNTUHNYA EMBUNG JOHO DI KECAMATAN SEMEN KABUPATEN KEDIRI

PRESENTASI TUGAS AKHIR PERENCANAAN BENDUNG TETAP SEMARANGAN KABUPATEN TRENGGALEK PROPINSI JAWA TIMUR KHAIRUL RAHMAN HARKO DISAMPAIKAN OLEH :

Identifikasi Debit Banjir, Desain Teknis dan Kontrol Stabilitas Bendung Pengelak Banjir ABSTRAK

PERENCANAAN BENDUNG TETAP DI DESA NGETOS KECAMATAN NGETOS KABUPATEN NGANJUK

BAB III METODOLOGI. Gambar 3.1 Diagram Alir Penyusunan Tugas Akhir

KAJIAN LEBAR BANGUNAN PELIMPAH TIPE LENGKUNG TERHADAP ELEVASI MUKA BANJIR (STUDI KASUS WADUK TENAYAN)

PERENCANAAN EMBUNG PARAS KABUPATEN BOYOLALI JAWA TENGAH

PERENCANAAN EMBUNG KERSULO KABUPATEN PATI JAWA TENGAH

TUGAS AKHIR Perencanaan Pengendalian Banjir Kali Kemuning Kota Sampang

PERENCANAAN BENDUNGAN PAMUTIH KECAMATAN KAJEN KABUPATEN PEKALONGAN BAB III METODOLOGI

TUGAS AKHIR EVALUASI DIMENSI SALURAN DI KAWASAN TERMINAL GROGOL JL. DR. SUSILO JAKARTA BARAT

PERENCANAAN BENDUNGAN BENER KABUPATEN PURWOREJO. Claudia Ratna KD, Dwiarta A Lubis Sutarto Edhisono, Hary Budieni

BAB III METODOLOGI. Setiap perencanaan akan membutuhkan data-data pendukung baik data primer maupun data sekunder (Soedibyo, 1993).

STUDI PERENCANAAN BANGUNAN UTAMA EMBUNG GUWOREJO DALAM PEMENUHAN KEBUTUHAN AIR BAKU DI KABUPATEN KEDIRI

TUGAS AKHIR KAJIAN PERENCANAAN EMBUNG UNTUK KEPERLUAN IRIGASI DI DAERAH BATU BETUMPANG KABUPATEN BANGKA SELATAN PROVINSI KEPULAUAN BANGKA BELITUNG

NORMALISASI SUNGAI GUNTING UNTUK PENANGGULANGAN BANJIR DI KECAMATAN MOJOAGUNG KABUPATEN JOMBANG

BAB III METODOLOGI 3.1 URAIAN UMUM

DAFTAR ISI. Halaman Judul Pengesahan Persetujuan Moto dan Persembahan ABSTRAK ABSTRACT KATA PENGANTAR

PROPOSAL TUGAS AKHIR PERENCANAAN TUBUH EMBUNG UMBARAN GUNUNG RANCAK SAMPANG

PERENCANAAN STRUKTUR BENDUNGAN BANDUNGHARJO DESA BANDUNGHARJO - KECAMATAN TOROH KABUPATEN GROBOGAN

PERENCANAAN EMBUNG MEMANJANG DESA NGAWU KECAMATAN PLAYEN KABUPATEN GUNUNG KIDUL YOGYAKARTA. Oleh : USFI ULA KALWA NPM :

BAB I PENDAHULUAN I-1

HALAMAN PENGESAHAN...

TUGAS AKHIR EVALUASI PERENCANAAN HIDROLIS BENDUNG PLTM CIKOPO KABUPATEN GARUT, PROPINSI JAWA BARAT

METODOLOGI BAB III III Tinjauan Umum

PERENCANAAN EMBUNG KAJAR, KECAMATAN SONGGON, KABUPATEN BANYUWANGI UNTUK MEMENUHI KEBUTUHAN AIR BAKU

LEMBAR PENGESAHAN LAPORAN TUGAS AKHIR EVALUASI DAN PERENCANAAN BENDUNG MRICAN KABUPATEN BANTUL DAERAH ISTIMEWA YOGYAKARTA.

EVALUASI DESAIN MASTERPLAN SISTEM DRAINASE KOTA TANJUNG SELOR. The Design Evaluation of Tanjung Selor City Drainage System Masterplan SKRIPSI

GENANGAN DI KABUPATEN SURABAYA

Studi Penanggulangan Banjir Kali Lamong Terhadap Genangan Di Kabupaten Gresik

Rizky Utama Dosen Pembimbing. Ir. Makmur Ginting, M.Sc NIP

BAB III METODOLOGI PENELITIAN. A. Lokasi Penelitian Lokasi penelitian yang akan dilakukan bertempat di kolam retensi taman lansia kota bandung.

PERENCANAAN EMBUNG SEMAR KABUPATEN REMBANG. Muchammad Chusni Irfany, Satriyo Pandu Wicaksono, Suripin *), Sri Eko Wahyuni *)

LEMBAR PENGESAHAN TUGAS AKHIR PERENCANAAN SISTEM DAN JARINGAN DRAINASE DAS KALI SEMARANG. ( Drainage System Design of Kali Semarang Basin)

Studi Penanggulangan Banjir Kali Lamong Terhadap Genangan di Kabupaten Gresik

LEMBAR PENGESAHAN TUGAS AKHIR EVALUASI DAN PERENCANAAN BENDUNGAN KETRO KABUPATEN SRAGEN PROPINSI JAWA TENGAH

ANALISIS KAPASITAS PELIMPAH EMBUNG TETEASA DI KECAMATAN ANGATA KABUPATEN KONAWE SELATAN

PERENCANAAN BANGUNAN PELIMPAH UTAMA BENDUNGAN LAWE-LAWE DI KABUPATEN PENAJAM PASER UTARA TUGAS AKHIR

PENGGUNAAN CHECK DAM DALAM USAHA MENANGGULANGI EROSI ALUR

TUGAS AKHIR ANALISIS PROFIL MUKA AIR BANJIR DENGAN METODE UNSTEADY FLOW MENGGUNAKAN SOFTWARE HEC-RAS 4.1 PADA

PERENCANAAN EMBUNG KENDO KECAMATAN RASANAE TIMUR KABUPATEN BIMA NTB

PERENCANAAN BANGUNAN SUPLESI PEGADIS DAERAH IRIGASI BATANG SAMO RIAU

ANALISA SISTEM DRAINASE DENGAN MENGGUNAKAN POLDER (STUDI KASUS SALURAN PRIMER ASRI KEDUNGSUKO KECAMATAN SUKOMORO KABUPATEN NGANJUK) TUGAS AKHIR

BAB III METODOLOGI 3.1. UMUM

PENELUSURAN BANJIR DI SUNGAI NGUNGGAHAN SUB DAS BENGAWAN SOLO HULU 3

PERENCANAAN BENDUNG GERAK KEPOHBARU UNTUK KEPERLUANAIR BAKU DAN IRIGASI DESA SUMBERHARJO KECAMATAN KEPOHBARU KABUPATEN BOJONEGORO

BAB IV ANALISIS HIDROLOGI

ABSTRAK. Kata kunci : Tukad Unda, Hidrgraf Satuan Sintetik (HSS), HSS Nakayasu, HSS Snyder

EVALUASI KEAMANAN PELIMPAH BENDUNGAN PRIJETAN MENGGUNAKAN APLIKASI PLAXIS 8.2.

BAB VIII PERENCANAAN BANGUNAN PELIMPAH (SPILLWAY)

LEMBAR PENGESAHAN LAPORAN TUGAS AKHIR ANALISA NERACA AIR DAERAH PENGALIRAN SUNGAI LOGUNG. Disusun Oleh : Ir. Bambang Pudjianto, MT NIP.

PERENCANAAN EMBUNG SIDOMULIH KABUPATEN BANYUMAS JAWA TENGAH

TUGAS AKHIR KAJIAN HIDROGRAF BANJIR BENDUNG PASAR BARU, SUNGAI CISADANE. Disusun oleh : Mohamad Rizca S. Yopy

TUGAS AKHIR KAJIAN HIDROGRAF BANJIR WILAYAH SUNGAI CILIWUNG DI PINTU AIR MANGGARAI, PROVINSI DKI JAKARTA

Perencanaan Penanggulangan Banjir Akibat Luapan Sungai Petung, Kota Pasuruan, Jawa Timur

PROYEK AKHIR PERENCANAAN TEKNIK EMBUNG DAWUNG KABUPATEN NGAWI

BAB II METODOLOGI 2.1 Bagan Alir Perencanaan

ANALISIS BANJIR TAHUNAN DAERAH ALIRAN SUNGAI SONGGORUNGGI KABUPATEN KARANGANYAR

1.1 Latar Belakang Tujuan Lokasi proyek Analisis Curali Hujan Rata-rata Rerata Aljabar 12

PERENCANAAN BENDUNGAN SALAK KABUPATEN KULON PROGO, YOGYAKARTA. Aprilia Cheni Hermawati 1, Arinda Puspitaningtyas 1 Suseno Darsono 2, Sugiyanto 3

Transkripsi:

TUGAS AKHIR PS 1380 PERENCANAAN EMBUNG ROBATAL KABUPATEN SAMPANG RATNA SRI SUMARNI Nrp 3106.100.617 Dosen Pembimbing Umboro Lasminto ST. MSc JURUSAN TEKNIK SIPIL Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2009

TUGAS AKHIR PS 1380 PERENCANAAN EMBUNG ROBATAL KABUPATEN SAMPANG RATNA SRI SUMARNI Nrp 3106.100.617 Dosen Pembimbing Umboro Lasminto ST. MSc JURUSAN TEKNIK SIPIL Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2009

FINAL PROJECT PS 1380 THE DESIGN OF RESERVOIR IN KABUPATEN SAMPANG RATNA SRI SUMARNI Nrp 3106.100.617 FINAL PROJECT LECTURE Umboro Lasminto ST.MSc DEPARTMENT OF CIVIL ENGINEERING Faculty of Civil Engineering and Planning Institut Teknologi Sepuluh Nopember Surabaya 2009

PERENCANAAN EMBUNG ROBATAL KABUPATEN SAMPANG TUGAS AKHIR Diajukan Untuk Memenuhi Salah Satu Syarat Memperoleh Gelar Sarjana Teknik Pada Program Studi S -1 Lintas Jalur JurusanTeknik Sipil Fakultas Teknik Sipil Dan Perencanaan Institut Teknologi Sepuluh Nopember Oleh : RATNA SRI SUMARNI Nrp. 3106 100 617 Disetujui Oleh Pembimbing Tugas Akhir : Umboro Lasminto ST.Msc SURABAYA,Juli 2009

PERENCANAAN EMBUNG ROBATAL KABUPATEN SAMPANG Nama Mahasiswa : Ratna Sri Sumarni NRP : 3106.100.617 Jurusan : Teknik Sipil FTSP-ITS Dosen Pembimbing : Umboro Lasminto ST.Msc ABSTRAK Desa Robatal Kabupaten Sampang sering mengalami kekurangan air bersih di musim kemarau dikarenakan tidak tersedianya tempat tampungan. Sehingga air hujan langsung mengalir ke laut. Maka sebagai alternatif pemecahan masalah adalah dengan membangun embung yang dimanfaatkan untuk menyimpan air di musim penghujan dan digunakan di musim kemarau. Dalam tugas akhir ini akan membahas metodemetode untuk perhitungan dari beberapa analisa-analisa perencanaan konstruksi embung tersebut. Analisa-analisa tersebut meliputi : analisa hidrologi, analisa kapasitas tampungan, analisa neraca air dan analisa teknis bendungan. Untuk analisa konstruksi bangunan meliputi : desain dan stabilitas tubuh embung, bangunan pelimpah. Dari hasil analisa diperoleh debit banjir rencana nakayasu periode ulang 100 tahun sebesar 34.089 m3/dt. Elevasi dasar sungai +74.00 m. Dan elevasi puncak tubuh embung +84.90, kemiringan lereng hulu 1:2, kemiringan lereng hilir 1:3. Pada Perencanaan Spillway didapatkan

elevasi mercu pelimpah + 81.80 dengan lebar pelimpah 10 m dan tinggi pelimpah 2 m. Sedangkan untuk perencanaan kolam olak dipakai kolam olak USBR tipe III dengan panjang kolam olak sebesar 7 m. Kata kunci : Embung, Perencanaan Robatal

THE DESIGN OF RESERVOIR IN KABUPATEN SAMPANG Name : Ratna Sri Sumarni Register Number : 3106 100 617 Majoring : Civil Engineering FTSP- ITS Counsellor Lectures :. Umboro Lasminto ST.Msc Abstract Robatal village in Sampang Regency often less of clean water on dry season, it is caused there is no water storage. With the condition as such, the rain water directly flow to the sea. So the alternative to solve this problem is to built reservoir that used for store water on the raining season and to be utilized on the dry season. In this final assignment will discuss the methods to calculate of several construction design analysis of the reservoir. The analysis include : Hydrology analysis, Load capacity analysis, water balance analysis and dam technical analysis. And for the building construction analysis include : design and stability, over lower building. As the result the planned flood Nakayasu discharge is 34,089 m 3 /sec for 100 year return period. The elevation of riverbed are +74.00 m. and the top the elevation of reservoir building are +84,90, with the inclination for upstream are 1:2 and 1:3 for downstream. At the spillway design is got the elevation of crest spillway +81,80 with the overflow width 10 m and height 2 m. Where as for the design of stilling basin uses USBR Type III with 7.0 m in length Keywords : Reservoir Robatal

KATA PENGANTAR Assalamualaikum wr wb, Alhamdulillah, puji syukur ke hadirat Allah SWT atas segala kemudahan, kelancaran, dan petunjuk-nya sehingga penulis bisa menyelesaikan Tugas Akhir ini dengan baik. Sholawat dan salam juga selalu tercurah untuk Rasulullah SAW, keluarga, serta para sahabat. Dari hati yang terdalam saya ucapkan terima kasih kepada : 1) Bapak DR.Ir.Hidayat Sugihardjo, MS selaku ketua jurusan Teknik Sipil ITS Surabaya. 2) Bapak Umboro Lasminto ST.Msc, selaku dosen pembimbing tugas akhir, terimakasih atas arahan, bimbingan dan kesabarannya. 3) Ibu Edijatno DR.Ir selaku dosen wali, terimaksih atas arahan dan nasehatnya. 4) Bapak / Ibu dosen-dosen penguji Tugas Akhir yang banyak memberi saran dan kritik atas penulisan Tugas Akhir ini. 5) Dosen Pengajar di Jurusan Teknik Sipil ITS, terimakasih saran dan arahannya. 6) Bapak / Ibu karyawan serta semua pegawai di Jurusan Teknik Sipil ITS, Pak.So (terimakasih banyak atas bantuannya). 7) Ibu dan Bapak tercinta, ya Allah lindungi mereka, sayangi mereka, ampuni dosa mereka. Mereka telah memberikan doa, kasih sayang dan pengorbanan yang begitu besar pada putra-putranya. 8) Untuk suami ku tercinta, terima kasih atas dorongan semangat dan bantuannya. 9) Teman-teman yang aku sayangi, terimakasih atas dorongan semangat dan bantuannya. i

Saya menyadari sepenuhnya bahwa masih banyak kekurangan baik yang disengaja maupun tidak, untuk itu mohon kritik dan saran untuk kesempurnaan Tugas Akhir ini. Semoga tugas akhir ini bisa bermanfaat untuk kita semua. Wassalamualaikum wr.wb. Surabaya, Juli 2009 Penulis ii

DAFTAR ISI Abstrak Kata pengantar i Daftar isi iii Daftar Tabel vi Daftar Gambar xi Daftar Grafik xiii BAB I PENDAHULUAN 1 1.1 Latar belakang 1 1.2 Rumusan Permasalahan 2 1.3 Tujuan 2 1.4 Batasan Masalah 2 1.5 Manfaat 2 1.6 Lokasi 3 BAB II TINJAUAN PUSTAKA 5 2.1 Studi Sebelumnya 5 2.2 Analisa Frekuensi 6 2.3 Perhitungan Distribusi 7 2.4 Uji Kesesuaian Distribusi Frekuensi 10 2.5 Perhitungan Distrusi Hujan Jam - Jaman 15 2.6 Perhitungan Debit Banjir Rencana 16 2.7 Lengkung Kapasitas Waduk 20 2.8 Evapotranspirasi 20 2.9 Penelusuran Banjir 22 2.10 Perencanaan Bangunan Pelimpah 23 2.11 Perencanaan Kolam Olakan 25 2.12 Analisa Konstruksi Embung 27 2.12.1 Tinggi Puncak Embung 27 2.12.2 Lebar Puncak Embung 28 2.13 Analisa Stabilitas Tubuh Embung 28 2.13.1 Aman Terhadap Geseran 29 2.13.2 Aman Terhadap Bahaya Rembesan 31 2.14 Muatan Gaya Gaya Pada Pelimpah 33 iii

2.15 Stabilitas Pada Pelimpah 34 2.15.1 Tinjauan Terhadap Bahaya Geser 34 2.15.2 Tinjauan Terhadap Bahaya Guling 34 BAB III METODOLOGI 35 BAB IV ANALISA HIDROLOGI 37 4.1 Umum 37 4.2 Pemilihan Metode Perhitungan Curah Hujan Rencana 38 4.2.1 Perhitungan Parameter Dasar Statistik 39 4.2.2 Metode Distribusi Nominal 40 4.2.3 Metode Distribusi Gumbel 40 4.2.2 Metode Distribusi Log Pearson Type III 41 4.3 Pemeriksaan Uji Kesesuaian Distribusi Frekuensi 45 4.3.1 Uji Smirnov Kolmogorof 45 4.3.2 Metode Chi - Kuadrat 46 4.3.2.1 Uji Chi Kuadrat Matode Distribusi Nominal 47 4.3.2.2 Uji Chi Kuadrat Matode Distribusi Gumbel49 4.3.2.3 Uji Chi Kuadrat Matode Distribusi Log Pearson Type III 50 4.4 Distribusi Hujan 52 4.5 Analisa Unit Hidrograf 55 4.5.1 Perhitungan Unit Hidrograf Metode Nakayasu 55 4.5.2 Perhitungan Unit Hidrograf Metode Snyder 69 BAB V ANALISA KAPASITAS EMBUNG 81 5.1 Umum 5.1.1 Menentukan Volume Tampungan 81 5.2 Menentukan Debit Inflow 83 5.3 Kebutuhan Air Baku 85 5.4 Evapotranspirasi 85 5.5 Menentukan Kapasitas Embung 89 5.5.1 Kapasitas Mati 89 5.5.2 Kapasitas Effektif Embung 89 5.5.3 Kapasitas Tampungan Embung 92 5.6 Penelusuran Banjir 92 5.6 Bentuk Penampang Spillway 98 iv

5.8 Perhitungan Panjang Kolam Olak 100 5.8.1 Perencanaan Kolam Olak USBR Type III 103 5.9 Bangunan Utama 107 5.9.1 Tinggi Puncak Tubuh Embung 107 5.9.2 Lebar Mercu Tubuh Embung 110 BAB VI ANALISA STABILITAS 111 6.1 Stabilitas Tubuh Embung 6.1.1 Stabilitas Embung Terhadap Formasi Garis Depresi 111 6.1.2 Stabilitas Embung Terhadap Gelincir 116 6.2 Kestabilan Pelimpah 128 BAB VII KESIMPULAN 143 7.1 Kesimpulan 143 DAFTAR PUSTAKA v

DAFTAR TABEL Tabel 2.1 Karakteristik distribusi frekwensi 7 Tabel 2.2 Nilai Variabel Reduksi GAUSS 8 Tabel 2.3 Nilai kritis D 0 untuk uji Smirnov Kolmogorov 13 Tabel 2.4 Wilayah luas di bawah kurva normal 14 Tabel 2.5 Koefesien Aliran 16 Tabel 2.6 Harga Harga K dan n 25 Tabel 2.7 Sudut β, α1dan α 2 30 Tabel 4.1 Curah hujan Daerah DPS Embung Robatal 37 Tabel 4.2 Perhitungan Parameter Dasar Statistik Hujan HarianMaksimum 38 Tabel 4.3 Hasil Perhitungan Metode Distribusi Normal 40 Tabel 4.4 Hasil Perhitungan Hujan Rencana Metode Gumbel 41 Tabel 4.5 Perhitungan Metode Log Person Tipe III 42 Tabel 4.6 Hasil Perhitungan Curah Hujan Rencana Dengan Metode Log Pearson Type III 43 Tabel 4.7 Rekapitulasi Curah Hujan Rencana Embung Robatal 44 Tabel 4.8 Hasil Uji Smirnov - Kolmogorov 45 Tabel 4.9 Peringkat Peluang Periode Ulang Curah Hujan Embung Robatal 46 Tabel 4.10 Perhitungan Uji Chi-Kuadrat Untuk Distribusi Normal 48 Tabel 4.11 Perhitungan Uji Chi Kuadrat untuk Distribusi Gumbel 49 Tabel 4.12 Uji Chi-Kuadrat untuk Metode Distribusi Log Pearson Type III 51 Tabel 4.13 Rekapitulasi Hasil Perhitungan Uji Distribusi Frekuensi 52 Tabel 4.14 Distribusi Hujan 54 Tabel 4.15 Distribusi Hujan Effektif 54 vi

Tabel 4.16 Hasil Perhitungan Hidrograf Banjir Nakayasu Kurva Naik( 0 < t < 0.526 ) 56 Tabel 4.17 Hasil Perhitungan Hidrograf Banjir Nakayasu Kurva Turun ( 0.526 < t < 1.138 ) 56 Tabel 4.18 Hasil Perhitungan Hidrograf Banjir Nakayasu Kurva Turun ( 1.138 < t < 2.056 ) 57 Tabel 4.19 Hasil Perhitungan Hidrograf Banjir Nakayasu Kurva Turun ( t > 2.056 ) 58 Tabel 4.20 Hidrograf Banjir 2 Tahun (Nakayasu ) 60 Tabel 4.21 Hidrograf Banjir 5 Tahun (Nakayasu ) 61 Tabel 4.22 Hidrograf Banjir 10 Tahun (Nakayasu ) 62 Tabel 4.23 Hidrograf Banjir 20 Tahun (Nakayasu ) 63 Tabel 4.24 Hidrograf Banjir 25 Tahun (Nakayasu ) 64 Tabel 4.25 Hidrograf Banjir 50 Tahun (Nakayasu ) 65 Tabel 4.26 Hidrograf Banjir 100 Tahun (Nakayasu ) 66 Tabel 4.27 Rekapitulasi Hidrograf Banjir Nakayasu Periode Ulang 67 Tabel 4.28 Hidrograf Banjir 2 Tahun (Snyder ) 71 Tabel 4.29 Hidrograf Banjir 5 Tahun (Snyder ) 72 Tabel 4.30 Hidrograf Banjir 10 Tahun (Snyder ) 73 Tabel 4.31 Hidrograf Banjir 20 Tahun (Snyder) 74 Tabel 4.32 Hidrograf Banjir 25 Tahun (Snyder) 75 Tabel 4.33 Hidrograf Banjir 50 Tahun (Snyder ) 76 Tabel 4.34 Hidrograf Banjir 100 Tahun (Snyder ) 77 Tabel 4.35 Rekapitulasi Hidrograf Banjir Nakayasu Periode Ulang 78 Tabel 4.35 Perbandingan Koefisien Pengaliran Nakayasu Dan Snyder 79 vii

Tabel 5.1 Hubungan antara Elevasi, Luas dan Volume Tampungan EmbungRobatal 82 Tabel 5.2 Debit Daerah Aliran Sungai Kali Kemuning (Embung Robatal) 83 Tabel 5.3 Debit Andalan Daerah Aliran Sungai Kali Kemuning(Embung Robatal) 84 Tabel 5.4 Evapotranspirasi Embung Robatal 89 Tabel 5.5 Analisa Kapasitas Effektif Embung Robatal 91 Tabel 5.6 Hubungan Antara Elevasi Debit dan Storage 95 Tabel 5.7 Penelusuran Banjir Melalui Bangunan Pelimpah (Q 100 -Embung Robatal) 96 Tabel 5.8 Rekapitulasi Debit Inflow dan Outflow 97 Tabel 5.9 Perhitungan lengkung downstream untuk spillway 99 Tabel 6.1 Titik Titik Koordinat Garis Depresi (Kondisi muka air banjir) 113 Tabel 6.2 Titik Titik Koordinat Garis Depresi (Kondisi air setinggi mercu) 115 Tabel 6.3 Tabel 6.4 Perhitungan kestabilan lereng hulu kondisi kosong untuk percobaan 1 119 Perhitungan kestabilan lereng hulu kondisi kosong untuk percobaan 2 120 Tabel 6.5 Perhitungan kestabilan lereng hulu kondisi muka air setinggi mercu 120 Tabel 6.6 Perhitungan kestabilan lereng hulu kondisi muka air banjir 121 Tabel 6.7 Perhitungan kestabilan lereng hulu kondisi muka air tiba-tiba turun dari muka air setinggi mercu 122 viii

Tabel 6.8 Perhitungan kestabilan lereng hulu kondisi muka air tiba-tiba turun dari muka air banjir 122 Tabel 6.9 Perhitungan kestabilan lereng hilir kondisi kosong untuk percobaan 1 123 Tabel 6.10 Perhitungan kestabilan lereng hilir kondisi kosong untuk percobaan 2 124 Tabel 6.11 Perhitungan kestabilan lereng hulu kondisi muka air setinggi mercu 125 Tabel 6.12 Perhitungan kestabilan lereng hulu kondisi muka air banjir 126 Tabel 6.13 Perhitungan kestabilan lereng hulu kondisi muka air tiba-tiba turun dari muka air setinggi mercu. 126 Tabel 6.14 Perhitungan kestabilan lereng hulu kondisi muka air tiba-tiba turun dari muka air banjir 127 Tabel 6.15 Perhitungan Tekanan Up lift (Kondisi muka air setinggi mercu) 129 Tabel 6.16 Perhitungan gaya vertikal dan momen (kondisi muka air setinggi mercu) 131 Tabel 6.17 Perhitungan gaya horisontal dan momen (kondisi muka air setinggi mercu) 132 Tabel 6.18 Rekapitulasi Momen Tahan (Mt) dan Momen Guling (Mg) (kondisi muka air setinggi mercu) 132 Tabel 6.19 Perhitungan Tekanan Up lift (Kondisi Banjir) 136 Tabel 6.20 Perhitungan gaya vertikal dan momen (kondisi banjir) 138 Tabel 6.21 Perhitungan gaya horisontal dan momen (kondisi banjir) 139 ix

Tabel 6.22 Rekapitulasi momen tahan (Mt) dan momen guling (Mg) (kondisi Banjir) 139 x

DAFTAR GAMBAR Gambar 1.1 Peta Lokasi Embung Robatal 3 Gambar 2.1 Bentuk Hidrograf Satuan Sintetik Nakayasu 18 Gambar 2.2 Bentuk Hidrograf Satuan Sintetik Snyder 19 Gambar 2.1 Tinggi air di atas mercu spillway 24 Gambar 2.2 Grafik hubungan antara bilangan Froude dengan nilai L 27 D 2 Gambar 2.3 Gaya gaya yang bekerja pada Irisan 29 Gambar 2.4 Metode Fellinius 30 Gambar 2.5 Garis Depresi 31 Gambar 2.6 Modifikasi Garis Depresi 32 Gambar 3.1 Metodologi Perencanaan Embung 36 Gambar 5.4 Tinggi Muka air diatas Spillway 100 Gambar 5.5 Sketsa Perencanaan Kolam Olak 101 Gambar 5.6 Kolam olak USBR type III 103 Gambar 5.7 Sketsa kolam olak USBR type III 106 Gambar 5.8 Sket Perencanaan Bangunan Embung 107 Gambar 6.1 Potongan Melintang Embung (Kondisi Banjir) 114 Gambar 6.2 Potongan Melintang Embung (Kondisi muka air setinggi mercu ) 116 Gambar 6.3 Metode Irisan Bishop 118 Gambar 6.4 Perhitungan keamanan bahaya longsor hulu (Percobaan 1) 119 Gambar 6.5 Perhitungan keamanan bahaya longsor hulu (Percobaan 2) 119 Gambar 6.6 Perhitungan keamanan bahaya longsor hulu (Kondisi muka air setinggi mercu). 120 xi

Gambar 6.7 Perhitungan keamanan bahaya longsor hulu (Kondisi muka air banjir) 121 Gambar 6.8 Perhitungan keamanan bahaya longsor hilir (Percobaan 1) 123 Gambar 6.9 Perhitungan keamanan bahaya longsor hilir (Percobaan 9) 123 Gambar 6.10 Perhitungan keamanan bahaya longsor hilir (Kondisi muka air setinggi mercu). 124 Gambar 6.11 Perhitungan keamanan bahaya longsor hilir (Kondisi muka air banjir) 125 xii

DAFTAR GRAFIK Grafik 2.1 Bentuk Hidrograf Satuan Sintetik Nakayasu 18 Grafik 2.2 Bentuk Hidrograf Satuan Sintetik Snyder 19 Grafik 4.1 Grafik Rekapitulasi Hidrograf Banjir Nakayasu 68 Grafik 4.2 Grafik Rekapitulasi Hidrograf Banjir Snyder 79 Grafik 5.1 Hubungan Antara Elevasi, Luas Genangan DanVolume Tampungan Waduk 82 Grafik 5.2 Duration Curve Debit Andalan Embung Robatal 85 Grafik 5.3 Penelusuran Banjir Q100 Tahun 98 xiii