UNIT COST BAHAN PRAKTIK KERJA BENGKEL JURUSAN BANGUNAN DI SMK NEGERI 2 YOGYAKARTA

dokumen-dokumen yang mirip
ANALISIS KEBUTUHAN BAHAN PRAKTEK REKAYASA BATU DAN BETON PADA WORKSHOP KONSTRUKSI JURUSAN TEKNIK SIPIL FT-UNP

UNIT COST BAHAN PRAKTIK KERJA BENGKEL BATU DAN BETON STUDI KASUS DI JURUSAN BANGUNAN SMK NEGERI 2 WONOSARI

KELAYAKAN SARANA PRASARANA BENGKEL PENGELASAN SMK MUHAMMADIYAH 3 YOGYAKARTA

KISI-KISI SOAL UJI KOMPETENSI AWAL SERTIFIKASI GURU DALAM JABATAN TAHUN 2011

SILABUS KEGIATAN PEMBELAJARAN. Memahami Ilmu dasar statika Memahami besaran Skalar dan besaran Vektor Memahami sistim satuan Memahami Hukum Newton

BAB VIII RENCANA ANGGARAN BIAYA

BAB 8 RENCANA ANGGARAN BIAYA

DAFTAR ISI. Halaman Judul Pengesahan Persetujuan ABSTRAK ABSTRACT KATA PENGANTAR

DAFTAR ANALISA PEKERJAAN

Edu Elektrika Journal

PT / CV. Alamat :. LOGO PT / CV. Kegiatan Pekerjaan Lokasi Sumber Dana

PERBANDINGAN RENCANA ANGGARAN BIAYA RUMAH M-PANEL DENGAN RUMAH KONVENSIONAL PROYEK PEMBANGUNAN RUMAH TIPE 60/99 PONDOK PERMATA SUCI GRESIK

RINCIAN KEGIATAN DAN ALOKASI PERTEMUAN DALAM SEMESTER

FAKULTAS TEKNIK UNIVERSITAS NEGERI YOGYAKARTA

SATUAN ACARA PERKULIAHAN

KISI UJI KOMPETENSI 2013 PROGRAM STUDI KEAHLIAN TEKNIK BANGUNAN

DAFTAR KUANTITAS HARGA DAN BAHAN

PERBANDINGAN RENCANA ANGGARAN BIAYA RUMAH MPANEL DENGAN RUMAH PRACETAK PADA PEMBANGUNAN RUMAH SEDERHANA DI SAWOJAJAR MALANG

karakteristik peserta fisik, intelektual, sosial-emosional, moral-spiritual, dan sosial budaya dalam kompetensi keahlian teknik bangunan

Mahasiswi Pendidikan Teknik Sipil dan Perencanaan FT UNY 2) Kata Kunci: luas, peralatan, penataan, ruang bengkel batu dan beton

KESIAPAN BENGKEL PEMESINAN MENUJU KEMANDIRIAN DI SMK N 1 SEYEGAN

BAB V. akan. Pembahasan. dianalisa. adalah: data untuk. di Ujung Berung. PGRI, terletak. Gambar 11 Bagan

DAFTAR ANALISA SNI DINAS PU CIPTA KARYA DAN TATA RUANG KABUPATEN JEMBER TAHUN ANGGARAN 2012

BAB III METODOLOGI PENELITIAN

KISI UJI KOMPETENSI 2014 PROGRAM STUDI KEAHLIAN TEKNIK BANGUNAN

EVALUASI STANDAR KELAYAKAN SARANA DAN PRASARANA RUANG PRAKTIK PADA PROGAM KEAHLIAN TEKNIK KONSTRUKSI BANGUNAN SMK N 1 MAGELANG

ADDENDUM DOKUMEN PENGADAAN. Nomor : Add. 02/03/PK/Indag.01/ULP-HB/VII/2015. Tanggal : 22 Juli untuk Pekerjaan PEMBANGUNAN PASAR RAKYAT

Rencana Anggaran Biaya

Panduan Menghitung Volume Pekerjaan Pondasi

RSNI Rancangan Standar Nasional Indonesia

ADDENDUM DOKUMEN PENGADAAN PEKERJAAN PEKERJAAN LANJUTAN PEMBANGUNAN FASILITAS PELABUHAN LAUT SEPO/SAGEA Nomor : PL.106/2/3.1/ULP/KSOP.

Direktorat Pembinaan Sekolah Menengah Kejuruan Direktorat Jenderal Manajemen Pendidikan Dasar dan Menengah Departemen Pendidikan Nasional

Lampiran A. Koefisien tenaga kerja dan koefisien bahan

RENCANA ANGGARAN BIAYA RUANG KELAS BARU DAN REHAB RUANG BENGKEL SMK MUHAMMADIYAH KUTOWINANGUN TAHUN 2009

Panduan Menghitung Volume Pekerjaan Atap

PENERAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) DI BENGKEL PROGRAM KEAHLIAN TEKNIK BANGUNAN SMK NEGERI 1 MAGELANG

STUDI PERBANDINGAN KOMPETENSI PRAKTIK KELISTRIKAN OTOMOTIF MAHASISWA LULUSAN SMA DAN SMK PADA PROGRAM STUDI PENDIDIKAN TEKNIK MESIN JPTK FKIP UNS

KATA PENGANTAR. Dengan modul ini peserta diklat dapat melaksanakan praktik tanpa harus banyak dibantu oleh instruktur.

UNIT COST BAHAN PRAKTIK KERJA BENGKEL JURUSAN BANGUNAN DI SMK NEGERI 2 YOGYAKARTA SKRIPSI

IMPLEMENTASI PEMBELAJARAN MATA PELAJARAN KEJURUAN PAKET KEAHLIAN TEKNIK INSTALASI PEMANFAATAN TENAGA LISTRIK SMK N 1 PURWOREJO

LABORATORIUM / WORKSHOP KERJA BATU JURUSAN PENDIDIKAN TEKNIK SIPIL FAKULTAS PENDIDIKAN TEKNOLOGI DAN KEJURUAN UNIVERSITAS PENDIDIKAN INDONESIA

REKAPITULASI TOTAL BILL of QUANTITY (BOQ) REKAPITULASI

BILL OF QUANTITY PEKERJAAN : LANJUTAN PEMBANGUNAN FASPEL LAUT AIR BUAYA TAHAP III TERDIRI DARI :

URAIAN. Tenaga Oh Tukang 90, Oh Kepala Tukang 110, Oh Pekerja 75, Oh Mandor 120,000.

MATA PELAJARAN : KERJA KAYU JENJANG PENDIDIKAN : SEKOLAH MENENGAH KEJURUAN

KOP PERUSAHAAN R E K A P I T U L A S I

ESTIMASI ANGGARAN BIAYA PADA PROYEK REHABILITASI KANTOR UPT PEMADAM KEBAKARAN KABUPATEN LAMONGAN MENURUT ANALISA SNI DAN METODE BOW

BILL of QUANTITY (BQ) RENCANA ANGGARAN BIAYA ( RAB )

PERBANDINGAN BIAYA DAN WAKTU PENGERJAAN PONDASI PADA PROYEK YANG MENGGUNAKAN UP DOWN CONSTRUCTION DENGAN MENGGUNAKAN METODA KONVENSIONAL

BAB 8 RENCANA ANGGARAN BIAYA

A. GAMBAR ARSITEKTUR.

PANITIA PENGADAAN BARANG/JASA PEMERINTAH DINAS KESEHATAN KOTA JAMBI TAHUN ANGGARAN 2012

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) URAIAN ITEM PEKERJAAN I PEKERJAAN PENDAHULUAN ,50 II PEKERJAAN BENDUNGAN

PSD III D.Ars Undip TA 31

PSD III Desain Ars Undip TA 31

Daftar Harga & Upah. Daftar upah tenaga harian untuk perumahan.

KERANGKA ACUAN KERJA ( KAK )

RINCIAN KEGIATAN DAN ALOKASI PERTEMUAN DALAM SEMESTER

KINERJA GURU DALAM BIDANG PEMBELAJARAN PASCA SERTIFIKASI DI SMK N 2 WONOSARI

Cara menghitung Volume pekerjaan Untuk bangunan sederhana Di susun oleh : Gazali Rahman, ST

DAFTAR HARGA SATUAN ANALISA PEKERJAAN

RELEVANSI PENERAPAN KURIKULUM KOMPETENSI KEAHLIAN AUDIO VIDEO SMK NEGERI 2 DENGAN KEBUTUHAN INDUSTRI DI KOTA BANDAR LAMPUNG

Pemb. Instalasi Pengolah Limbah Pusk.. Blangkejeren

Perubahan Aktivitas. Aktivitas 1. Pengukuran (Sama dengan aktivitas awal)

Novie Susanto, Ratna Purwaningsih, Erwin Ardiansyah. Abstrak

DAFTAR PUSTAKA. Akmal, Imelda Plafon Kreatif. Jakarta : Gramedia. Arikunto, Suharsimi Prosedur Penelitian Suatu Pendekatan Praktek.

BILL OF QUANTITY ( BQ )

STUDI PERBANDINGAN KOEFISIEN MATERIAL DAN EVALUASI INDEKS PRODUKTIFITAS PADA PEKERJAAN PASANGAN BATU BATA, PLESTERAN DAN ACIAN

STUDI TENTANG FAKTOR-FAKTOR YANG MEMPENGARUHI BIAYA PENAWARAN KONTRAKTOR PADA SUATU PROYEK KONSTRUKSI

KISI-KISI MATERI PLPG MATA PELAJARAN TEKNIK GAMBAR BANGUNAN

Pintu dan Jendela. 1. Pendahuluan

BAB V KESIMPULAN DAN SARAN

LAPORAN PEKERJAAN BANGUNAN PENGHUBUNG

ABSTRAK. Kata Kunci: nilai hasil belajar mata pelajaran produktif, efikasi diri, nilai Praktik Kerja Lapangan, kesiapan kerja

ANALISIS PERBANDINGAN KOEFISIEN HARGA SATUAN UPAH PEKERJAAN BERDASARKAN HASIL PENGAMATAN DI LAPANGAN DAN STANDAR NASIONAL INDONESIA (SNI)

PROPORSI BIAYA TIAP SATUAN PEKERJAAN STRUKTUR BETON BERTULANG PROYEK KONSTRUKSI BANGUNAN TINGGI

UNIT LAYANAN PENGADAAAN WILAYAH VII KELOMPOK KERJA PEMILIHAN PENYEDIA BARANG/JASA SATKER KANTOR OTORITAS BANDAR UDARA WILAYAH VII

Kompetensi Dasar Indikator Esensial. Kompetensi Keahlian : Teknik Konstruksi Batu dan Beton. sda

BACK UP DATA QUANTITY Back UP MC Nomor = 01 Paket Tanggal = Kontraktor No. mata pembayaran = Konsultan Jenis pekerjaan =

DAFTAR ANALISA SNI HARGA SATUAN PEKERJAAN

RINCIAN RENCANA ANGGARAN BIAYA

Journal of Mechanical Engineering Learning

RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG PENGADILAN AGAMA MUNGKID MAGELANG TAHUN 2012

PERENCANAAN DAN PERANCANGAN PENGEMBANGAN RUANG PENDIDIKAN JURUSAN BANGUNAN SMK NEGERI 1 PADANG BERDASARKAN STANDAR NASIONAL PENDIDIKAN

KOP PERUSAHAAN REKAPITULASI DAFTAR KUANTITAS DAN HARGA

OWNERS ESTIMATE. : Pembangunan Saran Pendidikan Islam pada Madrasah : Pembangunan Pagar Sekolah MIN Koya Barat. Tahun Anggaran : 2015

BAB 8 RENCANA ANGGARAN BIAYA

ANALISA VARIAN UPAH KERJA ANTARA STANDARISASI PEMERINTAH KABUPATEN, ASOSIASI, DAN IMPLEMENTASINYA TUGAS AKHIR. Diajukan Oleh :

BAB V KESIMPULAN DAN SARAN

ADDENDUM DOKUMEN PENGADAAN Nomor : 02.a.1/Add/15.2/53/IX/ Bab XIII. DAFTAR KUANTITAS DAN HARGA...(berubah dan tertulis) KOP PERUSAHAAN

STUDI EKSPLORASI FASILITAS WORKSHOP TEKNIK OTOMOTIF SMK NEGERI 2 GARUT BERDASARKAN STANDAR SARANA PRASARANA

Petunjuk Operasional IPAL Domestik PT. UCC BAB 5 SPESIFIKASI BANGUNAN IPAL DAN PERALATAN

b. Komponen D2 Berat komponen adalah 19,68 kg Gambar 65. Komponen D1 Gambar 66. Komponen D2

Jurnal Pendidikan Akuntansi Indonesia, Vol. XIII, No.1, Tahun 2015 Adelina Vina Hapsari & Sukirno 27-34

PERBANDINGAN ESTIMASI ANGGARAN BIAYA DENGAN METODE SNI DAN BOW

HARGA JUMLAH NO. URAIAN PEKERJAAN VOL. SAT. ( Rp ) ( Rp )

BAB VIII RENCANA ANGGARAN BIAYA DAN JADWAL PELAKSANAAN

69/ /120 BRONZE. LB/LT Standar LB/LT Standar dengan Kantor. tipe

B. BENTUK, FORMAT DAN ISI FORMULIR PERMOHONAN SERTIFIKAT LAIK FUNGSI FORMULIR PERMOHONAN SERTIFIKAT LAIK FUNGSI

RENCANA ANGGARAN BIAYA (RAB) REKAPITULASI AKHIR

Transkripsi:

UNIT COST BAHAN PRAKTIK KERJA BENGKEL JURUSAN BANGUNAN DI SMK NEGERI 2 YOGYAKARTA Oleh : Eka Purwanti *) Sumarjo **) ABSTRAK Tujuan penelitian ini adalah untuk mengetahui besar unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta berdasarkan analisis perhitungan riil dan anggaran sekolah. Penelitian ini merupakan jenis penelitian deskriptif. Pendekatan yang digunakan yaitu pendekatan kuantitatif. Pendekatan kuantitatif yaitu pendekatan yang memungkinkan dilakukan pencatatan dan analisis data hasil penelitian secara eksak. Teknik pengumpulan data dilakukan melalui observasi, wawancara, dan dokumentasi. Analisa data yang digunakan dalam penelitian ini adalah teknik analisis deskriptif kuantitatif. Hasil penelitian diperoleh unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta pada Kompetensi Keahlian Teknik Konstruksi Batu dan Beton berdasarkan perhitungan riil per tahun yaitu sebesar Rp. 47.735.920,00, dengan rincian : Bengkel Kayu Rp. 20.993.837,00, Bengkel Plumbing Rp. 2.238.065,00, Bengkel Batu dan Beton Rp. 12.899.699.00, dan untuk perlengkapan Keselamatan dan Kesehatan Kerja (K3) Rp. 3.648.333,00. Besar unit cost bahan praktik kerja bengkel per siswa per tahun untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton yaitu Rp. 561.599,00. Anggaran bahan praktik sekolah per tahun yaitu sebesar Rp. 62.479.800,00. Dengan demikian ada sisa anggaran dari kebutuhan riil sebesar Rp. 14.733.880,00, yang digunakan untuk kebutuhan lain yang mendukung pada pelaksanaan pengadaan/pembelian bahan-bahan praktik. Kata kunci : Unit Cost, Bahan Praktik Kerja Bengkel Jurusan Bangunan ABSTRACT The purpose of this study was to determine the units cost of the machine workshop practices materials of the Building Department at State Vocational High School 2 Yogyakarta based on the real calculations analysis and school estimates. This research was a descriptive research. The approach was using quantitative approach. The quantitative approach was a possible of data recording and analysis with an exact way. Data collection techniques were using observation, interviews, and documentation. The data analysis techniques were quantitative descriptive analysis. The results obtained for unit cost of machine workshop practices materials at Building Department of State Vocational High School 2 Yogyakarta on the Stone and Concrete Construction Competency based on real calculations per year were Rp. 47,735,920.00, with details of: Wood Workshop as Rp. 20,993,837.00, Plumbing Workshop as Rp. 2,238,065.00, Stone and Concrete Workshop as Rp. 12.899.699.00, and the equipments for Occupational Health and Safety (K3) as Rp. 3,648,333.00. The unit cost value of machine workshop practices materials per student per year for the Stone and Concrete Construction Competency were Rp. 561,599.00. Based on the school estimates per year was Rp. 62,479,800.00. The estimate residual of the Rp real needs were 14,733,880.00, which was using for the other requirements to support the procurement/purchasing practice materials. Keywords: Unit Cost, the Materials of Workshop Practices in the Building Department

PENDAHULUAN Diantara masalah esensial dalam administrasi pendidikan yaitu ekonomi pendidikan. Dalam skala mikro, kajian difokuskan pada masalah pembiayaan pendidikan yang meliputi penerimaan, alokasi, akuntabilitas dan efisiensi. Seberapa besar biaya yang harus dihitung dan dikeluarkan, dari mana saja cara mendapatkannya, prioritas apa yang mesti didahulukan dan bagaimana mengoptimalkan segala sumber dayanya. Penentuan unit cost dalam analisis biaya, atau yang dikenal secara umum dengan harga pokok, diperlukan untuk menentukan tarif yang sesuai dengan biaya yang benar-benar terjadi (the riil costs), disamping tujuan lainnya seperti mengidentifikasi sistem akuntansi biaya, menilai efisiensi, dan anggaran. Perhitungan unit cost dapat berdasarkan kurikulum praktik, yang terdiri dari silabussilabus mata pelajaran praktik. Dalam kurikulum praktik tersebut dapat dihitung biaya bahan, biaya pembelian alat, biaya perawatan alat, biaya daya listrik yang digunakan, keselamatan dan kesehatan kerja (K3). Penelitian ini difokouskan pada Kompetensi Keahlian Teknik Konstruksi Batu dan Beton. Penelitian ini bertujuan untuk mengetahui besar unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Teknik Keahlian Konstruksi Batu dan Beton berdasarkan analisis riil, pada setiap bengkel dan per siswa dan mengetahui besar unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta berdasarkan anggaran sekolah. METODE PENELITIAN Penelitian ini merupakan jenis penelitian deskriptif dengan menggunakan pendekatan kuantitatif. Penelitian ini dilaksanakan di Bengkel Kerja Praktik Jurusan Bangunan SMK Negeri 2 Yogyakarta pada pertengahan bulan Juni 2012 sampai bulan September 2012 dengan menyesuaikan jam standar kompetensi praktik kerja bengkel Jurusan Bangunan. Metode yang digunakan dalam pengumpulan data adalah observasi, dokumentasi dan wawancara langsung dengan Ketua Jurusan, Ketua Bengkel dan guru mata pelajaran praktik Jurusan Bangunan SMK Negeri 2 Yogyakarta. Teknik analisis data yang digunakan dalam penelitian ini sebagian besar berupa analisis deskriptif kuantitatif.

HASIL PENELITIAN DAN PEMBAHASAN Berdasarkan kompetensi dasar, jobsheet dan gambar kerja unit cost bahan praktik untuk masing-masing bengkel untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton Jurusan Bangunan yaitu : Tabel 1. Unit Cost Bahan Praktik Kerja di Bengkel Kayu No. Kompetensi Dasar Siswa Kelompok Harga Satuan Harga 1. Membuat sambungan kayu memanjang 23 23 39.900,00 917.700,00 2. Membuat sambungan kayu melebar 23 23 18.900,00 434.700,00 3. Membuat sambungan kayu menyudut 23 23 39.900,00 917.700,00 4. Membuat sambungan kayu menyilang 23 23 39.900,00 917.700,00 5. Membuat kursi kelas 29 15 179.760,00 2.696.400,00 6. Membuat kusen pintu 29 7 469.563,00 3.286.941,00 7. Membuat kusen pintu 33 8 476.792,00 3.814. 336,00 8. Membuat kusen jendela 33 8 433.448,00 3.467.584,00 9. Membuat daun pintu panel 10. Membuat daun jendela kaca 33 8 378.458,00 3.027.664,00 33 8 189.139,00 1.513.112,00 20.993.837,00 Keterangan : Kompetensi dasar nomor 1-4 untuk Kelas X Kompetensi dasar nomor 5-6 untuk Kelas XI Kompetensi dasar nomor 7-10 untuk Kelas XII Tabel 2. Unit Cost Bahan Praktik Kerja di Bengkel Plumbing No. Kompetensi Dasar 1. Membuat sambungan plat sistem lipat 2. Membuat sambungan plat sistem keeling 3. Membuat sambungan plat sistem patri 4. Membuat sambungan pipa galvanis 5. Membuat sambungan pipa PVC Siswa Kelompok Harga Satuan Harga 23 23 735,00 16.905,00 23 23 10.668,25 245.369,00 23 23 668,25 15.369,00 23 6 89.000,00 534.000,00 23 6 237.737,00 1.426.422,00 2.238.065,00 Keterangan : Kompetensi dasar nomor 1-5 untuk Kelas X

Tabel 3. Unit Cost Bahan Praktik Kerja di Bengkel Batu dan Beton No. Kompetensi Dasar 1. Membuat adukan pasangan batu bata 2. Memasang dinding ½ bata 3. Memasang bouwplank (papan pengumuman) 4. Membuat adukan pasangan pondasi batu kali 5. Memasang pasangan pondasi batu kali 6. Melaksanakan pekerjaan perancah/bekisting 7. Melakukan pekerjaan beton normal 8. Melaksanakan pekerjaan plesteran bidang tembok 9. Melaksanakan pekerjaan acian bidang tembok 10. Memasang keramik pada lantai 11. Memasang keramik pada dinding Siswa Kelompok Harga Satuan Harga 23 6 4.322,50 25.935,00 23 6 69.438,00 416.628,00 23 1 1.219.610,00 1.219.610,00 23 6 4.322,50 25.935,00 23 4 117.500,00 470.000,00 23 6 533.700,00 5.870.700,00 29 15 128.507,00 1.927.605,00 29 15 6.202,00 93.030,00 29 15 7.930,00 118.950,00 29 7 162.176,00 1.135.232,00 29 7 210.082,00 1.470.574,00 12.899.699.00 Keterangan : Kompetensi dasar nomor 1-6 untuk Kelas X Kompetensi dasar nomor 7-11 untuk Kelas XI Unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton yang paling besar yaitu pada Bengkel Kayu Rp. 20.993.837,00, untuk pembelajaran praktik kelas X, XI, dan XII. Unit cost bahan praktik untuk Bengkel Plumbing Rp. 2.238.065,00, untuk pembelajaran praktik kelas X. Unit cost bahan praktik untuk Bengkel Batu dan Beton Rp. 12.899.699.00, untuk pembelajaran praktik kelas X dan XI. Untuk perlengkapan Keselamatan dan Kesehatan Kerja (K3) praktik kerja bengkel tidak dibeli pada setiap tahun, pembeliannya setiap 3 tahun sekali sehingga unit cost bahan perlengkapan Keselamatan dan Kesehatan Kerja (K3) menjadi Rp. 3.648.333,00. Unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta berdasarkan anggaran sekolah yaitu Rp. 104.133.000,00 per tahun, untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton per tahun sebesar 60 % dari anggaran sekolah. Berdasarkan anggaran sekolah unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Kompetensi Keahlian Teknik

Konstruksi Batu dan Beton per tahun sebesar 60 % dari anggaran sekolah Rp. 104.133.000,00 yaitu Rp. 62.479.800,00. Berdasarkan perhitungan riil, unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Teknik Keahlian Konstruksi Batu dan Beton per tahun yaitu sebesar Rp. 47.735.920,00. Dengan rincian untuk masing-masing bengkel yaitu Bengkel Kayu sebesar Rp. 20.993.837,00, Bengkel Plumbing sebesar Rp. 2.238.065,00, Bengkel Batu dan Beton sebesar Rp. 12.899.699.00, dan perlengkapan Keselamatan dan Kesehatan Kerja (K3) sebesar Rp. 3.648.333,00. Besar unit cost bahan praktik kerja bengkel untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton per siswa per tahunnya yaitu sebesar Rp. 561.599,00. Dengan demikian ada sisa anggaran dari perhitungan riil sebesar Rp. 14.733.880,00, anggaran tersebut digunakan untuk pembuatan pengajuan proposal, sebagai biaya perjalanan pembelian bahan-bahan praktik dan untuk kebutuhan lain yang mendukung pada pelaksanaan pengadaan/pembelian bahan-bahan praktik. KESIMPULAN Kesimpulan dari penelitian ini adalah berdasarkan perhitungan riil unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton per tahun yaitu sebesar Rp. 47.735.920,00, dengan rincian: Bengkel Kayu sebesar Rp. 20.993.837,00, Bengkel Plumbing sebesar Rp. 2.238.065,00, Bengkel Batu dan Beton sebesar Rp. 12.899.699.00, dan perlengkapan Keselamatan dan Kesehatan Kerja (K3) sebesar Rp. 3.648.333,00. Besar unit cost bahan praktik kerja bengkel untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton per siswa per tahun yaitu sebesar Rp. 561.599,00. Berdasarkan anggaran sekolah unit cost bahan praktik kerja bengkel Jurusan Bangunan di SMK Negeri 2 Yogyakarta untuk Kompetensi Keahlian Teknik Konstruksi Batu dan Beton per tahun sebesar Rp. 62.479.800,00. Ada sisa anggaran dari perhitungan riil sebesar Rp. 14.733.880,00 digunakan untuk kebutuhan lain yang mendukung pada pelaksanaan pengadaan/pembelian bahan-bahan praktik.

DAFTAR PUSTAKA Bachtiar Ibrahim. (2007). Rencana dan Estimasi Real Of Cost. Jakarta : Bumi Aksara. Dedi Supriadi. (2004). Satuan Biaya Pendidikan Dasar dan Menengah. Bandung : PT. Remaja Rosdakarya. http://www.google.co.id/pengertian unit cost.htm/. pada tanggal 08 Februari 2012. Jam 11.54 WIB. http://www.google.co.id/definisi-sekolah-menengah-kejuruan.htm. pada tanggal 19 April 2012. Jam 12.21 WIB. http://www.google.co.id/wikipedia-pengertian_sekolah_menengah_kejuruan.htm. pada tanggal 19 April 2012. Jam 12.25 WIB. Purnomo Dahono. (2009). Evaluasi Pemanfaatan Bengkel Listrik di Sekolah Menengah Kejuruan (SMK) : Studi Kasus di SMK YAPPI Gunungkidul. Tesis tidak diterbitkan. PPs-Universitas Negeri Yogyakarta. SNI 2836-2008. Tata cara perhitungan harga satuan pekerjaan pondasi untuk konstruksi bangunan gedung dan perumahan. SNI 2837-2008. Tata cara perhitungan harga satuan pekerjaan plesteran untuk konstruksi bangunan gedung dan perumahan. SNI 3434-2008. Tata cara perhitungan harga satuan pekerjaan kayu untuk konstruksi bangunan gedung dan perumahan. SNI 6897-2008. Tata cara perhitungan harga satuan pekerjaan dinding untuk konstruksi bangunan gedung dan perumahan. SNI 7394-2008. Tata cara perhitungan harga satuan pekerjaan beton untuk konstruksi bangunan gedung dan perumahan. SNI 7395-2008. Tata cara perhitungan harga satuan pekerjaan penutup lantai dan dinding untuk konstruksi bangunan gedung dan perumahan. Sugiyono. (2009). Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung : Alfabeta. Sukardi. (2003). Metodologi Penelitian Pendidikan. Jakarta : Bumi Aksara. Wulfram. I Ervianto. (2007). Cara Tepat Menghitung Biaya Bangunan. Yogyakarta : Andy Offset.