Geothermal Development Program and Status in Indonesia Dr. Surya Darma Indonesia Geothermal Association (INAGA) & Indonesia Renewable Energy Society (METI - IRES) Argeo C6, Addis Ababa November 2016
Outline Indonesia Energy condition Geothermal Energy Status National Energy Policy National Energy Mix Target Development Plan Geothermal & RE Road Map and Strategy
Indonesia Energy Condition
Current energy conditions Energy supply in Indonesia is still dominated by fossil fuel Not all of Indonesians have enjoyed electricity; electrification ratio is only about 84% Due to energy crisis, Indonesia government has to prioritize fossil based energy compared to renewable, since fossil based energy takes shorter time for deployment Implications: energy sector will become the major source of emission after 2020
ELECTRICITY CONDITION Persentage of installed capacity Total Installed Capacity: 53.585 MW (PLN: 37.280 MW, IPP: 10.995 MW, PPU: 2.634 MW, IO Non BBM: 2.677 MW) Persentase Pemakaian Listrik Per-golongan Geother mal 4.4% Persentage of Energy Mix Hydro Others 6.5% 0.4% Gas 24.2% Coal 52.8% *) Hanya PLN dan IPP Diesel 11.7% Power Consumption 199 TWh Power Production *) Electrification Ratio 84,35% 228 TWh Power Condition (March 2015) Total System Indonesia = 24 System (5 Normal; 14 Emergency; and 5 Deficit) Note: Normal = Reserve > 20%; Emergency = Reserve < 1 5 the Biggest Unit ; Deficit = Black out partially
Geothermal Energy Status
Current Geothermal Reserves & Installed Status 1. Geothermal Power Plant Installed Capacity 1.493,5 MW New 4 Geothermal PP COD around 215 MW (Ulubelu 55 MW, Sarulla 110 MW, Lahendong 20 MW, Karaha Bodas 30 MW) Resources 12,386 MW Reserves16,524 MW Total Potential 28,910 MW 3. Resources : 12,386 MW and Reserves : 16,524 MW Total Potential : 28,910 MW Rp 2. State Revenue (non-tax) Rp. 518 billion (82,2% from Rp. 630 billion, target in 2016 ) 7
GEOTHERMAL ISNTALLED CAPACITY No. WKP, Location Power Plant Developer/ Operator Turbine Unit Capasity Total (MW) 1 Sibayak Sinabung, SUMUT 1 Sibayak PT. Pertamina Geothermal Energy 1 x 10 MW; 2 MW monoblok) 12,0 2 Cibeureum Parabakti, JABAR 2 Salak Chevron Geothermal Salak, Ltd 3 x 60 MW; 3 x 65,6 MW 377,0 3 Pangalengan, JABAR 3 Wayang Windu Star Energy Geothermal Wayang Windu 1 x 110 MW; 1 x 117 MW 227,0 4 Patuha PT Geo Dipa Energi 1 x 55 MW 55,0 4 Kamojang Darajat, JABAR 5 Kamojang PT. Pertamina Geothermal Energy 1 x 30 MW; 2 x 55 MW; 1 x 60MW 1 x 35 MW 235,0 6 Darajat Chevron Geothermal Indonesia, Ltd 1 x 55 MW; 1 x 94 MW; 1 x 121 MW 270,0 5 Dataran Tinggi Dieng, JATENG 7 Dieng PT. Geo Dipa Energi 1 x 60 MW 60,0 6 Lahendong Tompaso, SULUT 8 Lahendong 7 Waypanas, LAMPUNG 9 Ulubelu PT. Pertamina Geothermal Energy PT. Pertamina Geothermal Energy 4 x 20 MW 80,0 3 x 55 MW 165,0 8 Ulumbu, NTT 10 Ulumbu PT. PLN (Persero) 4 x 2,5 MW 10,0 9 Mataloko, NTT 11 Mataloko PT. PLN (Persero) 1 x 2,5 MW 2,5 TOTAL 1.493,5
INVESTMENT 1. Geothermal Investment 0.56 billion USD (58.3% of target 0.96 billion USD) 2. Renewable Investment 1 st semester 2016 : 0,87 billion USD 2016 target : 1,37 billion USD 0.018 billion USD (18% of target 0.1 billion USD) 3. Bioenergy Investment 0.298 billion USD (94.7% of target 0.31 billion USD) 9
National Energy Policy
National Energy Policy Principles 1. Maximize renewable energy utilization; 2. Optimize gas and new energy utilization; 3. Minimize oil utilization. 4. Utilization of coal as the main national energy supply; 5. Utilization of Nuclear Power Plant as the last option. Paragraph (2) of article 11 Government Regulation Number 79 Year 2014 concerning National Energy Policy (KEN) 11
National Energy Mix Target
TARGET OF NATIONAL ENERGY MIX TARGET RUEN 2050 New and Renewable Energy Oil Gas Coal 25 % 24 % 2050 1.030 MTOE 31 % CURRENT CONDITION 26% 30 % TARGET RUEN 2025 22 % 2025 412 MTOE 25 % 23 % 20 % 2015 166 MTOE 46% 23% 5%
Target of RE in 2025 Note: NRE = New & Renewable Energy Energy elasticity < 1 Optimize use of RE Electricity: 60% Fossil (68.2 GW), 40% RE (46.8 GW) Total Demand: 115 GW by 2025 Need a leapfrog to meet NRE contribution in energy mix from 5% in 2016 to 23% in 2025: possible?
Development Plan
Geothermal Development Status Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral EKSPLOITATION: 9 WKP (1.403,5 MW) Under Going: 17 WKP (1.930 MW) EXPLORATION: 30 WKP ( 3.205 MW) 67 WKP (6.198,5 MW) Expected produce: 3.370 MW Under process License: 2 WKP (165 MW) Bidding Process: 26 WKP (1.425 MW) Stagnant: 13 WKP (1.275 MW) Ministry Regulation 17/2014 to Accelerate 13 Stagnant WKP)
1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Development plans 12,000 Geothermal Growth (Cumulative MW) 10,000 8,000 6,000 4,000 Low estimate: Number of developments is similar to MEMR plan, but Size of some individual projects is smaller and some are delayed 2,000 0 Low estimate MEMR PLN Roadmap 17
Development plans, cont. 60 Number of Power Projects 50 40 30 20 10 0 1983 1988 1993 1998 2003 2008 2013 2018 Annual build MEMR Annual build low estimate MEMR Low Estimate 18
Geothermal & RE Road Map and Strategies
GEOTHERMAL BUSINESS ACTIVITIES AND PROCESS Pasal 17 ayat (4) Pemerintah/ Pemerintah Daerah/ Badan Usaha Government/ Local Government/ Business Entity Pemerintah/ Badan Usaha Government/ Business Entity Badan Usaha Business Entity Badan Usaha Business Entity Badan Usaha Business Entity Potensi Panas Bumi Geothermal Potential Survey Pendahuluan Preliminary Survey Eksplorasi Exploration Eksplorasi Exploration Studi Kelayakan Feasibility Study Pemanfaatan Utilization Eksploitasi Exploitation 3G Geophysic Geochemical Geologic Sumur uji Deliniation well Sumur eksplorasi Exploration well Sumur pengembangan & injeksi Dev t & Injection well Pemb. fasiltas lap & penunjangnya Steamfield & supporting facilities Operasi produksi Production operation Paling lama 5 tahun + 1 tahun + 1 tahun Maximum 5 years + 1 year + 1 year Ijin Panas Bumi Geothermal License 30Years Maximum 30 years WILAYAH KERJA PANAS BUMI
RE Roadmap and Strategies 2015-2025 Energy type 2015 2016 2017 2018 2019 2020 2025 Oil 37% 35% 34% 32% 31% 29% 25% Gas 21% 21% 21% 21% 21% 21% 22% Coal 33% 33% 34% 35% 36% 36% 30% RE 10% 10% 11% 12% 13% 14% 23% TOTAL 100% 100% 100% 100% 100% 100% 100% Power 2015 2016 2017 2018 2019 2020 2025 Plant Geothermal 1.439 1.654 2.004 2.344 2.979 3.804 7.239 PP Hydro/Mini 5.024 5.139 5.266 5.619 7.154 7.735 20.960 /Micro PP Bio PP 1.740 1.886 2.093 2.359 2.674 3.024 5.532 PV PP 79 229 429 679 979 1.379 6.379 Wind PP 7 57 107 207 307 507 1.807 Others 372 1.860 1.860 1.860 1.861 1.863 3.128 TOTAL 8.660 10.842 11.758 13.067 15.953 18.310 45.044 STRATEGY 1. Good governance, clean and accountable; 2. Completing regulations; 3. Business licensed simplification; 4. Creating Incentives; 5. Preserving renewable energy subsidy; 6. Coordinating with ministries/regional government and association; 7. Energy saving campaign; 8. Updating renewable energy data; 9. Enhancing the networking; + 36,3 GW electricity from RE Within 10 years 3,6 GW per annum ± Rp. 1.600 trillion needed 21
Development Strategy GOI is actively promote and set up the RE strategy development. Some effort has been done such as: improving policy and regulation, creating the market, subsidy, feed in tariff, incentives and facilities, funding and financial supports, and developing cooperation with other countries and international institutions. 22
REGULATION TO SUPPORT GEOTHERMAL DEVELOPMENT Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral 1. Ammandment of the Geothermal Law No.27/2003 to Law No.21/2014; 2. Revise Goernment Regulation No. 59/2007 and GR No. 70/2010 on Geothermal Business; 3. GR No. 79 Year 2014 on NEP; 4. President Regulation No. 4 / 2010 to Mandated Public Utilities - PT. PLN to Accelerate utilie RE; 5. Ministry of Energy Regulation No 11/2008 on Procedure of Geothermal Working Area; No 02/2009 on the Procedure of Preliminary Survey by Private Company; No 11/2009 on Geothermal Business Process and Bidding; No 17/2014 on Geothermal Pricing; No 40/2014 on the List of the Geothermal Project to be