PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG GARDEN, JALAN IPOH DAN JALAN JINJANG

dokumen-dokumen yang mirip
PEMBERITAHU PERTANYAAN DEWAN RAKYAT, MALAYSIA LISAN . KHAMIS, 19 JUN 2014 L11 [PR-1322-L62909]

NIKMATI KEHIJAUAN DI KEDIAMAN YANG SERBA LENGKAP & MODEN

MULAI / EFFECTIVE: 27 MEI 2016

SYNERGY CARDS SDN BHD

Berurusan dengan Pengantara Takaful

i. Aras spot level 8.56m ODL hingga 34.04m ODL seperti yang ditunjukkan di dalam pelan ukur no.sg/sel/183/site/ab.

POLISI EMPUNYARUMAH / ISIRUMAH APAKAH YANG MEMBENTUK POLISI INI

RUMAH TERES 2 TINGKAT 376 UNIT

Contoh: Setiap pek MILO 2kg (pek keseluruhan), peserta akan mendapat 10 Mata.

PERTUBUHAN PELADANG KEBANGSAAN (NAFAS) BORANG PERMOHONAN PENDAFTARAN PEMBEKAL /KONTRAKTOR

PROJEK BLISS: TRANSFORMASI DIRIKU TERMA DAN SYARAT

KEJOHANAN BALAPAN DAN PADANG MSSD KLUANG KE-49, 2016 PERATURAN PERTANDINGAN

LEMBARAN MAKLUMAT PRODUK

TARIKH TUTUP: 03 APRIL 2018

KENYATAAN AKHBAR MENTERI KESIHATAN MALAYSIA. SITUASI SEMASA DEMAM DENGGI DI MALAYSIA Bagi Minggu 11 tahun 2014 ( 9 15 Mac 2014 )

PENGENALAN DAN PANDUAN KEPADA GOLD ACCUMULATION PROGRAM (GAP)

B O R A N G K O M P O S I T PERMOHONAN LESEN PREMIS DAN LESEN IKLAN PAPAN TANDA

TARIKH TUTUP: 21 MARCH 2017

TAHNIAH di atas kejayaan anda menamatkan pengajian di Politeknik Sultan Idris Shah.

2. Promosi ini hanya dibuka kepada Kad UOB Lady s Solitaire yang dikeluarkan di Malaysia.

Sistem e-transit Modul Pergerakan

UiTM KELUAR Dari Rawang / Ipoh Lebuhraya Utara - Selatan. LEBUHRAYA LATAR Rawang/KL/Gombak/Selayang. Elmina Tol KEUNGGULAN DI PUNCAK KEMEWAHAN

Saher System. English. indonesia. Road Safety 996

B O R A N G PERMOHONAN LESEN IKLAN IKLAN PAPAN TANDA / TIANG LAMPU / SEPANDUK / BELON / PAPARAN SEMENTARA / PAPARAN LUAR

POLITEKNIK SULTAN IDRIS SHAH KEMENTERIAN PENDIDIKAN MALAYSIA Sungai Lang Sungai Air Tawar SELANGOR, MALAYSIA

PERATURAN SPESIFIK (LEBUHRAYA)

PENDUDUK PINGGIR ZAABA TAHU BAHAWA RUNDINGAN BAGI PEMBELIAN ATAS DASAR SUKARELA

SENARAI SEMAK GRADUAN

Contoh: Setiap pek MILO 2kg (pek keseluruhan), peserta akan mendapat 10 Mata.

SYARAT-SYARAT PENYERTAAN. Maklumat Penuh Larian Amal 50 Tahun FSPU. UiTM)

K U M P U L A N W A N G S I M P A N A N P E K E R J A SENARAI SEMAKAN DOKUMEN PERMOHONAN PENGELUARAN PEKERJA BERPENCEN / PESARA PILIHAN

Sekiranya Tuan/Puan mempunyai sebarang pertanyaan atau memerlukan penjelasan, sila hubungi pegawai kami:

TARIKH TUTUP: 05 SEPTEMBER 2017

1.3 Sebarang penyertaan yang diterima selepas 31 Julai 2015 pada pm akan dianggap tidak sah.

POLITEKNIK SULTAN IDRIS SHAH KEMENTERIAN PENDIDIKAN MALAYSIA Sungai Lang Sungai Air Tawar SELANGOR, MALAYSIA

ECO-SCHOOLS. Helaian Sumber Fasilitator 9 Pemerolehan Anugerah

Berurusan dengan Pengantara Insurans

KEDIAMAN IMPIAN DI LOKASI TUMPUAN

Cek Tak Laku AKAUN ANDA DAN PERKHIDMATAN. Cek Tak Laku. Program pendidikan pengguna oleh:

ADDING RTGS BENEFICIARY FOR CHECKER MAKER SYSTEM

ZULKIFLI ALANG MAHAT. 1 P a g e

PUBLIC ISLAMIC GLOBAL EQUITY FUND

TERMA DAN SYARAT KEMPEN PELANGGAN KITA-KITA AJE

BORANG PERMOHONAN PENANGGUHAN BAYARAN BALIK PEMBIAYAAN PENDIDIKAN

20% DISKAUN 20% DISKAUN

LEMBARAN MAKLUMAT PRODUK

Bank of America Malaysia Berhad Piagam Perkhidmatan Pelanggan

ALIRAN TUNAI PERIBADI-i TAWARRUQ

Tempoh Kempen bermaksud 2 Oktober 2017 sehingga 30 Mac 2018 (termasuk kedua-dua tarikh tersebut) melainkan jika diberitahu sebaliknya.

HELAIAN PENDEDAHAN PRODUK

POLISI PERLINDUNGAN DATA PERIBADI

PUNCAK NIAGA HOLDINGS BERHAD KENYATAAN MEDIA PUNCAK NIAGA HOLDINGS BERHAD ( PNHB ATAU SYARIKAT )

Peraduan Menangi Percutian Ke Disneyland TOKYO bersama NESTLÉ BLISS GO Syarat dan Peraturan Peraduan

BORANG PERMOHONAN LESEN HIBURAN DAN TEMPAT HIBURAN

PERADUAN MAGGI LEBIH MASAK LEBIH GEMPAK RAYA TERMA DAN SYARAT

FAQ s LMPK. 2) Sekiranya salah satu kertas perkaedahan tidak lulus, bolehkah LMPK dijalankan?

Following are the transfer of the traffic flow, as announced by the Traffic Management Center City Police on Sunday night, 30 Desember 2012:

LOKASI STRATEGIK DI BANDAR KULIM

KONSORTIUM MULTIMEDIA SWASTA SDN BHD (KOMMS)

PEMBIAYAAN PERIBADI-I TAWARRUQ

Jawatan 1 : Pengurus Kanan (Perancangan Bisnes) - (1 Kekosongan )

NOTIS PENTING Accident Assist

NO OUTLET ADDRESS CONTACT SELANGOR 1 Klang 84, Jalan Nanas, Klang, Selangor Darul Ehsan.

Kad Caj: KAD PERIBADI AMERICAN EXPRESS Jun 2012

SENARAI SEMAK PERMOHONAN KENAIKAN JUMLAH PEMBIAYAAN PENDIDIKAN

MAKLUMAT LAPOR DIRI PELAJAR SENIOR SESI JUN 2017

BORANG PERMOHONAN PENANGGUHAN BAYARAN BALIK PEMBIAYAAN PENDIDIKAN

SYARAT-SYARAT JUALAN

4.0 PENGENALAN LEMBANGAN SUNGAI KLANG. LAPORAN PROJEK PEMULIHARAAN DAN PEMBANGUNAN SUNGAI KLANG 16 Projek di bawah Pakej Rangsangan Ekonomi Selangor

PENYATA PENDEDAHAN PRODUK. Sewa Beli - NonBPA

NOTIS PRIVASI. Di bawah PDPA, AmFIRST Real Estate Investment Trust ( AmFIRST REIT ) dikehendaki untuk memaklumkan kepada anda seperti yang berikut:

Dato Sri Azalina binti Dato Othman Said [ Pengerang ] minta

Baki 2/3 daripada aset akan diagihkan kepada waris Faraid anda mengikut perkadaran Faraid.

SENARAI SEMAK PERMOHONAN PERLANJUTAN TEMPOH PEMBIAYAAN DEN GAKUAN PELAJA Nama Pelajar :... No. Kad Pengenalan :... Nama IPTA/ IPTS/ POLITEKNIK:...

Lembaran Maklumat Produk- Pembiayaan Aliran Tunai Peribadi-i

*Nota : Sila Rujuk Kepada Surat Makluman Dan Borang-Borang Yang Dikepilkan

UJIAN PENCAPAIAN SEKOLAH RENDAH 2013

Lembaran Maklumat Produk- Pembiayaan Aliran Tunai Peribadi-i LEMBARAN MAKLUMAT PRODUK

WILAYAH PERSEKUTUAN INFRASTRUCTURE SDN. BHD. ( X) PERMOHONAN UNTUK PEMBINAAN INFRASTRUKTUR TELEKOMUNIKASI DI WILAYAH PERSEKUTUAN

BANTUAN KEWANGAN 1.0 PEMBIAYAAN PINJAMAN PERBADANAN TABUNG PENDIDIKAN TINGGI NASIONAL (PTPTN)

Lembaran Maklumat Produk- Pembiayaan Peribadi-i

HELAIAN PENDEDAHAN PRODUK

SENARAI KLINIK PANEL UNIVERSITI KEBANGSAAN MALAYSIA YANG DILANTIK TAHUN 2011 HINGGA 2012 BIL NAMA KLINIK PANEL TEL/FAX KAJANG

BORANG PERMOHONAN KELULUSAN BAGI PEMBINAAN, PENGUBAHAN DAN PENUTUPAN KEMUDAHAN PENGURUSAN SISA PEPEJAL DITETAPKAN

PB ISLAMIC ASIA EQUITY FUND

PEMBIAYAAN PENDIDIKAN PTPTN

BAB VI KESIMPULAN DAN SARAN

1 of 5 PENYATAAN PRIVASI EDUCATE TO LEARN SDN BHD

PERATURAN PERMAINAN SUKAN AIR ROWING-KAYAK. Disediakan oleh :

LAPORAN LAWATAN SAMBIL BELAJAR KE FOREST RESEARCH INSTITUTE OF MALAYSIA ( FRIM), KEPONG ASASI UITM TARIKH LAWATAN. 31 Julai 2011 TEMPAT LAWATAN

1. Tawaran Pengambilan adalah sah untuk setiap permohonan baharu Kad Kredit Hong Leong MATTA yang diserahkan di Pameran MATTA semasa Tempoh Kempen.

POLITEKNIK TUANKU SYED SIRAJUDDIN KEMENTERIAN PENDIDIKAN MALAYSIA Pauh Putra Arau PERLIS, MALAYSIA

Sekiranya Tuan/Puan mempunyai sebarang pertanyaan atau memerlukan penjelasan, sila hubungi pegawai kami:

Cara-cara permohonan Kad Debit i-kopenas/bank Rakyat

LEMBARAN PENERANGAN PRODUK

1. Apakah yang ditawarkan di bawah produk ini? 2. Apakah konsep Syariah yang digunapakai? Page 1 of 6 LEMBARAN MAKLUMAT PRODUK

YAYASAN KUIS. Bersama Merealisasikan Impian, Mencipta Kejayaan SEKSYEN PENTADBIRAN & KEWANGAN PENGURUSAN KAFETARIA YAYASAN KUIS

MAKLUMAT LAPOR DIRI PELAJAR SENIOR BERPINDAH DARI POLITEKNIK LAIN BAGI SESI DISEMBER 2017

SENARAI KLINIK YANG DILULUSKAN DI PBPU KOTA KINABALU. Lot 21-0, Ground Floor, Riverside Plaza Jalan Bangka-Bangka, Kuala Inanam Kota Kinabalu

LEMBARAN MAKLUMAT PRODUK

Transkripsi:

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG GARDEN, JALAN IPOH DAN JALAN JINJANG 28 FEBRUARI 2019 1. LANJUTAN PENUTUPAN PENUH DAN LALUAN ALTERNATIF SEPANJANG JALAN KEPONG GARDEN (ARAH SELAYANG, ARAH KEPONG DAN ARAH KEPONG GARDEN) Tarikh 2 Mac 2019 1 Jun 2019 Masa 10:00 malam 6:00 pagi Jangka masa Sebab 3 bulan Bagi tujuan kerja pelancaran Kekotak Segmen (SBG) dan kerja-kerja lain yang berkaitan Untuk makluman, penutupan penuh dan laluan alternatif secara berkala sepanjang Jalan Kepong Garden (Arah Selayang, Arah Pekan Kepong dan Arah Kepong Garden akan dilanjutkan dari 2 Mac 2019 hingga 1 Jun 2019. Tempoh masa kerja-kerja adalah bermula dari 10.00 malam hingga 6.00 pagi, selama 3 bulan. Pelan Pengurusan Trafik adalah seperti berikut : Penutupan A: Penutupan penuh dari susur Lebuhraya Selayang - Kepong menuju Jalan Kepong Garden (Arah Selayang) sejauh 250 meter. Sepanjang penutupan ini, pemandu dari Sungai Buloh menuju Jalan 57, Apartment Kepong Sentral dan Puncak Desa dikehendaki menggunakan Laluan Alternatif 1 iaitu menggunakan jejambat atas menuju Jalan Kepong dan belok kiri ke Jalan Besar Kepong melalui Jalan Perdana 4, Jalan Perdana 7 dan Jalan Perdana Utama untuk keluar ke Jalan Kepong Garden. Pemandu seterusnya harus belok ke kanan di persimpangan lampu isyarat Taman Ehsan, menggunakan lorong dalam untuk ke Jalan 57, Apartment Kepong Sentral dan Puncak Desa. (Seperti yang ditunjukkan dengan anak panah berwarna HIJAU di peta di bawah). Penutupan B: Penutupan penuh dari susur Jalan Kepong menuju persimpangan lampu isyarat Jalan Kepong dan Jalan Kepong Garden (Arah Taman Kepong Garden) sejauh 250 meter. Sepanjang penutupan ini, pemandu dari Sungai Buloh menuju Taman Kepong Garden dikehendaki menggunakan Laluan Alternatif 2 iaitu menggunakan jejambat atas menuju Jalan Kepong dan seterusnya belok kiri menggunakan Jalan Besar Kepong, melalui Jalan Perdana 4, Jalan Perdana 7 dan Jalan Perdana Utama untuk keluar dan meneruskan perjalanan ke Taman Kepong Garden. (Seperti yang ditunjukkan dengan anak panah berwarna BIRU di peta di bawah). Penutupan C: Penutupan penuh Jalan Kepong Garden (Arah Selayang) dan susur bawah Jalan Kepong hingga ke susur Jalan 47 sejauh 250 meter. Sepanjang penutupan ini, pemandu boleh menggunakan laluan alternatif seperti berikut : Laluan Alternatif 3: Pemandu dari Taman Kepong Garden menuju Arah Selayang perlu belok ke kanan menuju Jalan Kepong dan sterusnya belok ke kiri menggunakan Jalan Besar Kepong, melalui Jalan Perdana 4, Jalan Perdana 7 dan Jalan Perdana Utama untuk Page 1 of 9

keluar dan membuat Pusingan - U untuk meneruskan perjalanan ke arah Selayang. (Seperti yang ditunjukkan dengana anak panah berwarna UNGU di peta di bawah). Laluan Alternatif 4: Pemandu dari Pekan Kepong menuju Arah Selayang perlu menggunakan susur kiri ke Jalan Kepong Garden dan membuat Pusingan -U ke arah Jalan Kepong. Pemandu harus belok kiri ke Jaan Besar Kepong, melalui Jalan Perdana 4, Jalan Perdana 7 dan Jalan Perdana Utama untuk keluar dan membuat Pusingan - U untuk meneruskan perjalanan ke arah Selayang.(Seperti yang ditunjukkan dengan anak panah berwarna OREN di peta di bawah). Penutupan A, B dan C akan dilaksanakan secara berasingan dan berkala. Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.. 1. CONTINUATION OF FULL LANE CLOSURE AND ALTERNATIVE ROUTES ALONG JALAN KEPONG GARDEN (SELAYANG - BOUND, PEKAN KEPONG - BOUND AND TAMAN KEPONG GARDEN - BOUND) Date 2 March 2019 1 June 2019 Time 10.00 pm 6.00 am Duration 3 months Reason To facilitate Segmental Box Girder (SBG) launching and other related works There will be continuation of full bound closure intermittently and alternative routes along Jalan Kepong Garden (Selayang-bound, Pekan Kepong-bound and Taman Kepong Gardenbound) from 2 March 2019 1 June 2019. Construction works will start from 10.00pm until 6.00am for 3 months. The Traffic Management Plan involves the following closures: Closure A: Full bound closure of slip road exiting Lebuhraya Selayang-Kepong onto Jalan Kepong Garden (Selayang-bound) for a total stretch of 250 metres. During this closure, motorists from Sungai Buloh heading to Jalan 57, Apartment Kepong Sentral and Puncak Desa are advised to use the Alternative Route 1 by using the upper flyover to Jalan Kepong and turn left at Jalan Besar Kepong before using the inner road of Jalan Perdana 4, Jalan Perdana 7 and Jalan Perdana Utama to enter Jalan Kepong Garden. Motorists then need to turn right at the traffic light junction of Taman Ehsan and use the inner road to get to Jalan 57, Kepong Sentral Apartment and Puncak Desa (as indicated by the GREEN arrows in the appended map). Closure B: Full bound closure from the sliproad of Jalan Kepong Garden heading to traffic light junction of Jalan Kepong and Jalan Kepong Garden for a total stretch of 250 metres. During this closure, motorists from Sungai Buloh heading to Taman Kepong Garden are advised to use the Alternative Route 2 by using the upper flyover to Jalan Kepong and turn left to Jalan Besar Kepong before using the inner road of Jalan Perdana 4, Jalan Perdana 7 and Jalan Perdana Utama to enter Jalan Kepong Garden. Motorists can head straight to Taman Kepong Garden (as indicated by the BLUE arrows in the appended map). Page 2 of 9

Closure C: Full bound closure of Jalan Kepong Garden (Selayang - Bound) from the slip road entering Jalan Kepong until the junction of Jalan 47 for a total stretch of 250 metres. During this closure, motorists are advised to use these alternative routes: Alternative Route 3: Motorists from Taman Kepong Garden heading to Selayang need to turn right entering Jalan Kepong, turn left onto Jalan Besar Kepong before using the inner road to Jalan Perdana 4, Jalan Perdana 7 and Jalan Perdana Utama to exit to Jalan Kepong Garden. Motorists then can make a U-Turn to continue heading to Selayang (as indicated by the PURPLE arrows in the appended map). Alternative Route 4: Motorists from Pekan Kepong heading to Selayang need to use the sliproad to Jalan Kepong Garden and make a U-Turn at the Jalan Besar kepong before turn left entering Jalan Besar Kepong before using the inner road of Jalan Perdana 4, Jalan Perdana 7 and Jalan Perdana Utama to exit to Jalan Kepong Garden. Motorists then make a U-Turn to continue to heading to Selayang (as indicated by the ORANGE arrows in the appended map). Closure A, B and C will be conducted separately and intermittently. Motorists are advised to follow the traffic signage and flagmen during the road closure. PETA 1: LANJUTAN PENUTUPAN PENUH DAN LALUAN ALTERNATIF SEPANJANG JALAN KEPONG GARDEN (ARAH SELAYANG, ARAH KEPONG DAN ARAH KEPONG GARDEN) Page 3 of 9

2. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN RIMBUNAN RAYA 1, KEPONG BARU Tarikh 2 Mac 2019 1 Jun 2019 Masa 10:00 malam 6:00 pagi Jangka masa 3 bulan Sebab Bagi tujuan kerja pemasangan parapet dan kerja-kerja lain yang berkaitan Untuk makluman, penutupan satu (1) lorong secara berkala sepanjang Jalan Rimbunan Raya 1, Kepong Baru akan dilanjutkan dari 2 Mac 2019 hingga 1 Jun 2019. Tempoh masa kerja-kerja adalah bermula dari 10:00 malam 6:00 pagi, selama 3 bulan. Penutupan ini melibatkan satu lorong sejauh 200 meter bermula dari Public Bank Laman Rimbunan sehingga Kedai Ekzos Albert. Semasa penutupan lorong dilaksanakan, pengawal bendera akan mengawal trafik dengan menggunakan kaedah "Berhenti dan Jalan" (seperti yang ditunjukkan dengan anak panah HIJAU dalam peta). Sila patuhi arahan papan tanda lalu lintas dan pengawal trafik sepanjang masa. Untuk maklumat lanjut, sila rujuk peta di bawah. 2. CONTINUATION OF LANE CLOSURE ALONG JALAN RIMBUNAN RAYA 1, KEPONG BARU Date 2 March 2019 1 June 2019 Time 10:00 pm 6:00 am Duration 3 months Reason To facilitate the installation of parapet wall and other related works There will be one (1) lane closure intermittently along Jalan Rimbunan Raya 1, Kepong Baru starting from 2 March 2019 until 1 June 2019. Construction works will start from 10:00 pm to 6:00 am for 3 months. The closure is for a stretch of 200 metres starting from in front of Public Bank, Laman Rimbunan until the Ekzos Albert Shop. During this closure, motorists will be diverted to the opposite lane by flagmen at both ends using the "Stop and Go' method of traffic flow (as indicated in GREEN arrows in map). Motorists are advised to adhere to safety signage and flagmen at all time. For more info, please refer to the appended map. Page 4 of 9

PETA 2: LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN RIMBUNAN RAYA 1, KEPONG BARU Page 5 of 9

3. PENUTUPAN PENUH JALAN SECARA BERKALA DI JALAN IPOH (ARAH KUALA LUMPUR DAN KEPONG) Tarikh 01 Mac 2019 31 Mei 2019 Masa 09:00 malam 6:00 pagi Jangka masa 3 bulan Untuk kerja- kerja pelancaran kekotak segmen dan sebarang kerja- kerja Tujuan berkaitan Untuk makluman, penutupan penuh jalan secara berkala di Jalan Ipoh dari Perodua ke Paparich (Arah Kuala Lumpur) dan dari Universal Studio ke Winsin Stationary (Arah Kepong) akan bermula dari 01 Mac 2019 sehingga 31 Mei 2019. Tempoh masa untuk kerja- kerja tersebut adalah dari 09:00 malam 6:00 pagi selama 3 bulan. Semasa penutupan dari Perodua ke Paparich (Arah Kuala Lumpur), pemandu yang ingin ke arah Kuala Lumpur akan dilencongkan ke Jalan Ipoh (Arah Kepong) untuk menggunakan aliran kontra (seperti yang ditunjukkan oleh anak panah HIJAU di Peta 3 (a)). Manakala, semasa penutupan dari Universal Studio ke Winsin Stationary (Arah Kepong), pemandu yang ingin ke arah Kepong akan dilencongkan ke Jalan Ipoh (Arah Kuala Lumpur) untuk menggunakan aliran kontra (seperti yang ditunjukkan oleh anak panah UNGU di Peta 2 (a)). Penutupan jalan akan dilaksanakan secara berkala dan salah satu lorong untuk setiap arah boleh diguna oleh pemandu pada setiap masa. Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas... 3. FULL BOUND CLOSURE INTERMITTENTLY ALONG JALAN IPOH (KUALA LUMPUR-BOUND & KEPONG-BOUND) Date 01 March 2019 31 May 2019 Time 09:00pm 6:00am Duration 3 months To facilitate launching of segmental box girder (SBG) and any other related Reason works There will be full bound closure intermittently along Jalan Ipoh from Perodua to Papparich (Kuala Lumpur-bound) and from Universal Studio to Winsin Stationary (Kepong-bound) starting from 01 March 2019 to 31 May 2019. Construction woks will take place from 09:00pm to 6:00am for 3 months. During the closure from Perodua to Papparich (Kuala Lumpur-bound), motorists who want to go to Kuala Lumpur-bound will be diverted to Jalan Ipoh (Kepong-bound) and need to use the provided contraflow (as indicated by GREEN arrows in the appended Map 3 (a)). Page 6 of 9

PETA 3 (a): PENUTUPAN PENUH JALAN SECARA BERKALA DI JALAN IPOH (ARAH KUALA LUMPUR DAN KEPONG) Meanwhile, during the closure from Universal Studio to Winsin Stationary (Kepong-bound), motorists who want to go to Kepong-bound will be diverted to Jalan Ipoh (Kuala Lumpurbound) and need to use the provided contraflow (as indicated by PURPLE arrows in the appended Map 3 (b)). The closures will be conducted intermittently and at any one time there will be one lane available for motorists for each bound. PETA 3 (b): PENUTUPAN PENUH JALAN SECARA BERKALA DI JALAN IPOH (ARAH KUALA LUMPUR DAN KEPONG) Page 7 of 9

4. LANJUTAN PENUTUPAN PENUH LORONG DI JALAN JINJANG PERMAI 3 (BERHAMPIRAN WISMA TNB KEPONG) Tarikh 04 Mac 2019-04 Mei 2019 Masa 10:00 malam 6:00 pagi Jangka masa 2 bulan Untuk kerja- kerja pelancaran kekotak segmen dan sebarang kerja yang Tujuan berkaitan. Untuk makluman, penutupan penuh lorong di Jalan Jinjang Permai 3 (berdekatan dengan Wisma TNB Kepong) akan dilanjutkan dari 04 Mac 2019 sehingga 04 Mei 2019. Tempoh masa untuk kerja-kerja adalah dari 10:00 malam ke 6:00 pagi selama 2 bulan. Semasa penutupan penuh lorong dilaksanakan, pemandu dari Jalan Jinjang Permai 3 yang ingin menuju ke Jalan Kepong (Arah Kuala Lumpur) perlu belok ke kanan ke Jalan Jinjang Permai 3 dan seterusnya belok ke kiri untuk menuju ke Jalan Jinjang Permai 2, belok kiri ke Jalan Jinjang Permai, kemudian belok ke kiri ke Jalan Jinjang Permai 2, selepas itu, belok ke kanan dan belok kiri untuk keluar ke Jalan Kepong (Arah Kuala Lumpur) (seperti yang ditunjukkan dalam anak panah berwarna HIJAU pada peta). Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah. 4. CONTINUATION OF FULL LANE CLOSURE ALONG JALAN JINJANG PERMAI 3 (NEAR WISMA TNB KEPONG) Date 04 March 2019 04 May 2019 Time 10:00 pm 6:00am Duration 2 months Reason To facilitate Segmental Box Girder (SBG) launching and any other related works There will be continuation of full lane closure along Jalan Jinjang Permai 3 (near Wisma TNB Kepong) from 04 March 2019 until 04 May 2019. Construction works will take place for 10:00 pm to 6:00am for 2 months. During the closure period, motorists from Jalan Jinjang Permai 3 heading to Jalan Kepong (Kuala Lumpur-bound) will have to turn right to Jinjang Permai 3, then turn left to Jalan Jinjang Permai 2, make a left turn to Jalan Jinjang Permai, turn left to Jalan Jinjang Permai 2, then turn right and make a left turn to Jalan Kepong (Kuala Lumpur-bound) (as per the GREEN arrows in the appended map). Motorists are advised to follow the traffic signage and flagmen during road closure. Page 8 of 9

PETA 4 : LANJUTAN PENUTUPAN PENUH LORONG DI JALAN JINJANG PERMAI 3 (BERHAMPIRAN WISMA TNB KEPONG) For media enquiries, please contact: Dzul Shuhada (Item 1-2) Tel: +6019 228 3004 dzul@azrb.com Ong Kien Lin (Item 3-4) Tel: +6016 938 2289 klong@ijm.com Mohar Zainal Abidin (Item 1-4) Tel: +603 7493 3961 Mohar@mgjv-kvmrt.com.my MMC GAMUDA KVMRT (PDP SSP) SDN BHD (1117100-V) Block A, Level 17, Menara Mustapha Kamal, PJ Trade Centre No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya Selangor Darul Ehsan, Malaysia T: +603-7494 2222 F: +603-7727 0222 www.mymrt.com.my Page 9 of 9