ESDM untuk Kesejahteraan Rakyat

dokumen-dokumen yang mirip
DIRECTORATE GENERAL OF NEW RENEWABLE AND ENERGY COSERVATION. Presented by DEPUTY DIRECTOR FOR INVESTMENT AND COOPERATION. On OCEAN ENERGY FIELD STUDY

DRAFT GENERAL PLAN OF ELECTRICITY (RUKN)

SCALING SOLUTION OF LAND USE CHALLENGES. Musdhalifah Machmud Deputy to Coordinating Minister for Food and Agriculture

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN DAN KONSERVASI ENERGI. Disampaikan oleh

PT MEDCO POWER INDONESIA

PREPAREDNESS OF TODAY AND FUTURE NATIONAL POWER SUPPLY

Methodology for TWG II Renewable Energy Action Plan

KATA PENGANTAR. Saran dan kritik membangun untuk penerbitan selanjutnya dapat disampaikan melalui e- mail : go.id

Energy from Biomass and Biogas in the Agroindustry

ANALISIS DAMPAK KENAIKAN HARGA MINYAK MENTAH DAN BATUBARA TERHADAP SISTEM PEMBANGKIT DI INDONESIA

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN DAN KONSERVASI ENERGI KEMENTERIAN ENERGI & SUMBER DAYA MINERAL

Dr. Unggul Priyanto Kepala Badan Pengkajian dan Penerapan Teknologi

OUTSTANDING OF MICRO, SMALL, AND MEDIUM ENTERPRISES

BAB I PENDAHULUAN 1.1. Latar Belakang

RENCANA PEMBANGUNAN PEMBANGKIT LISTRIK MW TAHUN

KATA PENGANTAR FOREWORD

DIREKTORAT PERDAGANGAN, PERINDUSTRIAN, INVESTASI DAN HKI DIREKTORAT JENDERAL MULTILATERAL KEMENTERIAN LUAR NEGERI

PPPs PRIORITY PROJECTS

DRAFT BUKU STATISTIK

2 Nomor 96, Tambahan Lembaran Negara Republik Indonesia Nomor 4746); 3. Undang-Undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan (Lembaran Negara R

Disampaikan pada: Komunikasi Nasional Jogjakarta, 5 Desember 2007 Persero) Electricity For A Better Life

PROGRESS REPORT TWG II: Renewable Energy Action Plan

Pre High Level Meeting FIT Energi Angin. Jakarta, 31 st January 2013 WHyPGen Project

KATA PENGANTAR FOREWORD

Statistik Ketenagalistrikan

PERKEMBANGAN BAKI DEBET KREDIT USAHA MIKRO, USAHA KECIL, DAN USAHA MENENGAH (UMKM) PERBANKAN 1

DIREKTORAT ANEKA ENERGI BARU DAN ENERGI TERBARUKAN OLEH : AGUNG PRASETYO

Pendapatan Regional/ Regional Income

FEED IN TARIFF & QUOTA IN RENEWABLE ENERGY IN INDONESIA

SISTEM KELISTRIKAN LUAR JAMALI TAHUN 2003 S.D. TAHUN 2020

1 Data source: Bank Indonesia ( MSMEs Development Group - Financial Access and MSME Development Department ) -

OLEH : FITRI SUHARIYADI NIM:

I.1.B PERKEMBANGAN NET EKSPANSI KREDIT MKM DAN KREDIT PERBANKAN NET EXPANSION OF MSM CREDIT AND BANKING CREDIT. I.1.B

Geothermal Development Program and Status in Indonesia

International & National Trends related to Countries Forest Policy & Current Issues on Forest Plantation for Community


PLTU SURALAYA BANTEN

PERKEMBANGAN BAKI DEBET KREDIT USAHA MIKRO, USAHA KECIL, DAN USAHA MENENGAH(UMKM) PERBANKAN 1

Jambi Dalam Angka 2007/

PERKEMBANGAN BAKI DEBET KREDIT USAHA MIKRO, USAHA KECIL, DAN USAHA MENENGAH (UMKM) PERBANKAN 1

Indonesian Policy of Supplying Natural Gas & LNG for Power, Industries & Shipping

ANALISIS PERENCANAAN KETERJAMINAN ALIRAN DAYA DAN BIAYA PRODUKSI PLN SUB REGION BALI TAHUN TESIS

PENDAPATAN REGIONAL REGIONAL INCOME

Keekonomian Pengembangan PLTP Skala Kecil

I.1.B PERKEMBANGAN NET EKSPANSI KREDIT MKM DAN KREDIT PERBANKAN NET EXPANSION OF MSM CREDIT AND BANKING CREDIT. I.1.B

QUESTION & ANSWER. MCA-Indonesia Community Renewable Energy Grant (Window 3A)

Pendapatan Regional/ Regional Income

KATA PENGANTAR. Saran dan kritik membangun untuk penerbitan selanjutnya dapat disampaikan melalui go.id

STUDI PENGARUH PENAMBAHAN UNIT PLTA IV & V TERHADAP POLA OPERASI WADUK KARANGKATES KABUPATEN MALANG

POTENSI DAN WILAYAH KERJA PERTAMBANGAN PANAS BUMI DI INDONESIA

REALISASI PENYERAPAN BULANAN DANA PINJAMAN JBIC TAHUN ANGGARAN Posisi : 30 Juni 2003

PROGRAM IPTEK BAGI INOVASI DAN KREATIVITAS KAMPUS (IbIKK)

SOLAR PV DIESEL HYBRID POWER FOR MICRO/MINI GRIDS IN INDONESIA

LAPORAN PENGELOLAAN PINJAMAN DAN HIBAH

POKOK-POKOK PENGATURAN PEMANFAATAN BATUBARA UNTUK PEMBANGKIT LISTRIK DAN PEMBELIAN KELEBIHAN TENAGA LISTRIK (Permen ESDM No.

2013 Net Ekspansi 2011 s.d Feb s.d Mar s.d Apr s.d Mei s.d Juni s.d Juli s.d Ags s.d Sept s.d Okt s.d Nov s.d Des s.d Jan s.d Feb Net Expansion

NET EXPANSION OF MICRO, SMALL, AND MEDIUM

PENGENDALIAN BEBAN MIKROHIDRO

LAPORAN TUGAS SARJANA

PERINDUSTRIAN, LISTRIK DAN AIR MINUM

PROGRAM DAN KEGIATAN DEPUTI BIDANG PERUMAHAN SWADAYA TAHUN 2014

PLN STATISTICS Catalogue in Publication. Catalogue No. : 31:621.3 ISSN : Publication No. :

Energy Conservation Policy in Indonesia

STUDI PENGEMBANGAN DERMAGA MUARAJATI PELABUHAN CIREBON

2014, No Daya Mineral Nomor 12 Tahun 2014 tentang Pembelian Tenaga Listrik Dari Pembangkit Listrik Tenaga Air Oleh PT Perusahaan Listrik Negara

Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap Coal Power Plant

STUDI SIMULASI PEMBANGKIT LISTRIK TENAGA ARUS LAUT MENGGUNAKAN HORIZONTAL AXIS TURBIN DENGAN METODE CFD

PERKEMBANGAN BAKI DEBET KREDIT USAHA MIKRO, USAHA KECIL, DAN USAHA MENENGAH (UMKM) PERBANKAN 1

Percentage on Business Plan of MSM Bisnis Kredit MKM % 77.58% %

Indonesia Water Learning Week

1 in english language.

IDENTIFIKASI PERMASALAHAN DAN TANTANGAN MEMBANGUN DUNIA INDUSTRI KONSTRUKSI YANG KONSTRUKTIF DI INDONESIA

BPS-Statistics DKI Jakarta Provincial Office 259

ANALISIS PELAKSANAAN TUNTUTAN PADA PROYEK PEMBANGUNAN JALAN LAYANG DAN JEMBATAN PASTEUR - CIKAPAYANG - SURAPATI AKIBAT LOAN SUSPENSION

PLN STATISTICS Catalogue in Publication. Catalogue No. : 31:621.3 ISSN : Publication No. :

PLN STATISTICS Catalogue in Publication. Catalogue No. : 31:621.3 ISSN : Publication No. :

LINTAS EBTKE LAYANAN INFORMASI ENERGI BERSIH INDONESIA

PROFIL PLTS 1,6 MW JAKABARING

ANALISIS PENGARUH KONSERVASI LISTRIK DI SEKTOR RUMAH TANGGA TERHADAP TOTAL KEBUTUHAN LISTRIK DI INDONESIA

STRATEGI BERSAING PT PJB UNIT PEMBANGKITAN PAITON DALAM MEMENANGKAN KOMPETISI PENYEDIAAN TENAGA LISTRIK

SMI s Insight Triwulan II

PERANCANGAN DAN IMPLEMENTASI KONTROL LEVEL AIR PADA TANGKI BERBASIS PLC (DESIGN AND IMPLEMENTATION OF WATER LEVEL CONTROL AT A TANK BASED ON PLC)

PENERAPAN MODEL KEBUTUHAN TRANSPORTASI PADA PENYUSUNAN PROGRAM PENANGANAN JALAN BERBASIS IRMS (STUDI KASUS PROVINSI JAWA BARAT)

Menuju Warsawa: Isu-isu Utama Negosiasi Pendanaan. Suzanty Sitorus Pokja Pendanaan Dewan Nasional Perubahan Iklim

BERITA NEGARA REPUBLIK INDONESIA DEPARTEMEN ENERGI DAN SUMBER DAYA MANUSIA. Harga Pembelian Listrik Skala Kecil. Menengah..

KAJI ANALITIK POTENSI DAYA LISTRIK PLTMH DI AIR TERJUN MUARA JAYA DESA ARGAMUKTI KABUPATEN MAJALENGKA PROVINSI JAWA BARAT

POTENSI UNGGULAN DI PROVINSI BALI

KONSEP PENGATURAN PEMANFAATAN BERSAMA JARINGAN TENAGA LISTRIK (POWER WHEELING)

TESIS. Dr. Ir. Indratmo Soekarno, MSc. Pembimbing :

STUDI KELAYAKAN EKONOMI PEMBANGUNAN PEMBANGKIT LISTRIKTENAGA AIR (PLTA) KALIBEBER KABUPATEN WONOSOBO

ESDM untuk Kesejahteraan Rakyat

KEMENTERIAN KEUANGAN REPUBLIK INDONESIA

Pendapatan Regional/ Regional Income

MEDIA RELEASE 10M17 Kontrak Baru ADHI hingga September 2017

AUTOMOTIVE INDUSTRY DEVELOPMENT POLICY. Presented at Public Dialog Fuel Economy Standard and Policy Option Jakarta, 14 November 2014

billion) Total 1,191, % 1,400, ,399, ,409,196.2 Total MSM

LISTRIK DAN AIR MINUM Electricity and Water Supply

LISTRIK DAN AIR MINUM Electricity and Water Supply

REALISASI PENYERAPAN BULANAN DANA PINJAMAN ADB TAHUN ANGGARAN Posisi : 31 Maret 2001

Perkembangan Kelistrikan Indonesia dan Kebutuhan Sarjana Teknik Elektro

Transkripsi:

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN DAN KONSERVASI ENERGI DIREKTORAT ANEKA ENERGI BARU DAN ENERGI TERBARUKAN (DEA) Jakarta, November 2013

1. CURRENT CONDITION Hydro Power Plant installed capacity : 5,711 MW Micro-Mini Hydro Power Plant installed capacity : 230 MW 2. DEVELOPMENT PROGRAM Micro-Mini Hydro PP Encouraging investment in Micro-Mini Hydro PP through cooperative, private and other business enterprises in electricity supply based renewable energy, through the establishment of FiT (for on-grid system ) for Micro-Mini Hydro Power Plant appropriate economic price Encouraging capability of domestic manufacturer; Improving capacity building and technical assistance; Providing governmnet fund (APBN) MICRO-MINI HYDRO POWER PLANT FEED IN TARIFF (MEMR REGULATION Price NO for 4 YEAR 2012) High WILAYAH Voltage (Rp/kWh) Jawa and Bali 656 1,004 Sumatera and Sulawesi Kalimantan, West and East Nusa Tenggara 787 1,205 853 1,305 Maluku and Papua 984 1,506 Incentive Factor (F): Jawa, Bali : F = 1 Sumatera dan Sulawesi : F = 1,2 Kalimantan, NTB dan NTT : F = 1,3 Maluku dan Papua : F = 1,5 Price for Medium Voltage (Rp/kWh)

Hydro Energy

HYDROPOWER POTENTIAL IDENTIFICATION Hydro Power Potential Study (1983) : 75.000 MW - 1249 Location Review Hydro Power Potential Study (1999) 3 rd Screening : 21.480 MW - 167 Location Hydropower Master Plan Study ( 2011 ) : 12.893,9 MW 89 Location Sumatera 4.408,4 MW Kalimantan 431 MW Sulawesi 3239,6 MW Papua & West Papua 49 MW Molluca 156,4 MW Java 4.594,5 MW NTT 15 MW PROMISING SCHEME TO BE DEVELOPED IN FIXED TIME HORIZON

HYDROPOWER and MINI HYDROPOWER IN OPERATION REGION PLN IPP TOTAL TOTAL CAP (kw) PLANT CAP (kw) PLANT CAP (kw) West Indonesia 10 855,060 1 180.000 11 1,035,060 East Indonesia 7 217,380 7 217,380 Java - Bali 19 2,335,220 19 2,335,220 GRAND TOTAL 36 3,407,660 1 180.000 37 3,587,660 REGION PLN IPP PLANT CAP (kw) PLANT CAP (kw) TOTAL TOTAL CAP (kw) West Indonesia 34 15,582 7 21,095 41 36,677 East Indonesia 37 43,430 8 26,340 45 69,770 Java - Bali 36 72,768 8 2,055 44 74,823 GRAND TOTAL 107 131,780 23 49,490 130 181,270

HYDROPOWER DEVELOPMENT PLAN ( 2011-2020 ) MW 1200 1000 West Indonesia East Indonesia Java - Bali 1102 968 800 600 400 200 0 493 405 450 254 257 252 296 235 145 132 95 119 78 68 77 93 62 29 43 0 9 0 4 18 37 0 0 0 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 COD / Capacity ( MW ) REGION 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 GRAND TOTAL West Indonesia 0 0 95 77 62 493 405 132 0 0 1264 East Indonesia 29 254 78 93 43 252 145 235 296 119 1544 Java - Bali 9 4 68 18 257 1102 37 0 450 968 2914 GRAND TOTAL 38 258 241 188 362 1847 587 367 746 1087 5722

MINI HYDROPOWER DEVELOPMENT PLAN ( 2011-2016 ) MW 180.0 160.0 West Indonesia East Indonesia Java - Bali 152.7 151.8 140.0 120.0 100.0 93.4 104.8 80.0 60.0 40.0 20.0 0.0 57.6 59.0 55.4 47.7 41.1 43.1 26.9 28.6 17.1 7.7 9.2 12.0 0.0 3.6 2011 2012 2013 2014 2015 2016 COD / Capacity ( MW ) REGION 2011 2012 2013 2014 2015 2016 GRAND TOTAL West Indonesia 7.7 9.2 47.7 152.7 151.8 28.6 397.6 East Indonesia 17.1 26.9 93.4 59.0 55.4 12.0 263.8 Java - Bali 0 3.6 57.6 41.1 104.8 43.1 250.2 GRAND TOTAL 24.8 39.7 198.7 252.8 312.0 83.7 911.6

HYDROPOWER DEVELOPMENT MASTERPLAN August 2011 Masterplan Study of Hydropower Development in Indonesia (Nippon-Koei) : Highly promising Hydropower schemes can be developed until 2027 is 12.319 MW (no scheme in protected forest, resettlement ± 2.500 hoseholds). Promising Hydropower schemes which already had a Prefeasibility Study or pass through the social and environmental screening can be developed to replace fuel fossil power plant in the system, i.e : Hydropower with reservoir or daily pondage can replace peaking gaspower plant. PLN will develop around 60%, the other 40% will be developed by IPP.

HYDROPOWER PUMP STORAGE POWER PLANT To meet the electricity demand during the peak load in Java-Bali system, a total of 2,440 MW Pump Storage Power Plant has been planned for the next ten years, consist of: UPPER CISOKAN P/S : 1,040 MW (Pre-construction Stage, expected COD : 2016) MATENGGENG P/S : 900 MW (Design Stage, expected COD : 2019/2020) GRINDULU P/S : 500 MW (expected COD : 2020) 75,5 m height of Upper Dam and 98 m height of Lower Dam will be build using RCC for Upper Cisokan P/S. 4 units of adjustable speed pump turbine and generator will be install in the underground Power House. Pump Storage with capacity of 400 MW in Sumatera and 800 MW sea water Pump Storage in East Java has been identified for future study.

Resouces PRIMERY INDUSTRY FINAL UTILITY Upstream (Utilize Energy Resources) Downstream (Energy Conversion) Product PRODUK ENERGI PLTA Turbine Power Plant Electricity Water flow and Waterfall Resources Potention Survey Water flow and Waterfall Energy PLTM/H Household Transportation Industry Wheel Commercial Mechanical Equipment (rice grinder, water pump, small industry) Non Electricity

INSTITUTION RELATION TO UTILIZE WATER FLOW AND WATERFALL ENERGY LEMBAGA Upstream Downstream MEMR Water flow and water fall policy Determination of WATA IUKU Commissioning Department of Public Works Ministry of Forestry Ministry of Environment Indonesia Investment Coordinating Board Local Government PLN Irrigation and Dam Construction Permission to Use Water Resources Permission to Borrow and Use Land AMDAL (large scale) Permission of Investment Permission of Location AMDAL / UKL-UPL (small scale) Permission to Build Power Plant Establish the Management Institutions Tender Process (large scale) Evaluation of Bid Documents(large and small scale) PPA Operation and Maintenance Power Plant Transmission/ Distribution Operation and Maintenance Untuk Bantuan pemerintah diperlukan lembaga pengelola yang dibentuk dan ditunjuk oleh Pemda yang salah satu fungsinya untuk melakukan pengusahaan dalam rangka keberlanjutan operasi pembangkit.

Total: 75.000 MW

HYDRO POWER JENIS ENERGI 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Additional Capacity (MW) 1,8 3,0 213,0 1.260,0 909,0 342,0 488,2 536,3 2.348,1 1.141,4 800,0 424,5 1.136,8 330,0 Cumulative Installed Capacity (MW) 6.866,9 6.869,9 7.082,9 8.342,9 9.251,9 9.593,9 10.082, 1 10.618, 4 12.966, 5 14.107, 9 14.907, 9 15.332, 4 16.469, 2 16.799, 2 Million STM 6,27 6,27 6,47 7,62 8,45 8,76 9,21 9,70 11,84 2,88 13,62 14,00 15,04 15,34 REALIZATION (MW) 6,654 % Reelization 99%

Law that Regulate Utilization of New and Renewable Energy (Hydro Power)

Coordination and Synchronization Regulation about Utilization of Water Energy for Power Plant

Law 30/2007 about Energy Law 7/2004 about Water Resources Hydro Energy is energy contained in the water flow and waterfall (Law 7/2004 ) Based onlaw 30/2007 Article 1 point 6, water energy is classified as a renewable energy

Potential Identification Proposal Started from the acceptance of proposal from prospective developer to PLN Unit until approval of permission proposal of application for appointment of Direct Power Purchase by PLN Unit to PLN center Started from the acceptance of permission proposal of application for appointment of Direct Power Purchase by PLN Unit until approval of Power Purchase Direct Appointment of the Director General of Electricity / Ministry of Energy and Mineral Resources PPA Process Started from the acceptance of Power Purchase Direct Appointment of the Director General of Electricity / Ministry of Energy and Mineral Resources until PPA is signed by PLN PPA Started from signature for the PPA between PLN Unit and prospective developer until the financial closure date is agreed Construction Started from agreement of the financial closure date between PLN unit and prospective developer until agreement of commercial operation date (COD) Operation Started from the implementation of COD until the end of the contract

Studies, Budgeting & Procurement Started from Feasibility Study, design (basic design and detail design. Bid document, procurement process until preparation of the construction (design report, budgeting: government budget, assistance, loan, etc) Construction Started from early stage of construction until COD Operation Started from the implementation of COD until the end of the contract

Terima Kasih Go Green Indonesia! KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN, DAN KONSERVASI ENERGI Jl. Pegangsaan Timur No. 1A, Cikini, Jakarta 10320 Tlp. (021) 39830077 www.ebtke.esdm.go.id ipppltsesdm@yahoo.co.id