15. Eli Dahi (1989), Environmental Engineering In Developing Countries, University of Denmark, Copenhagen. 16. Simon Benninga (2000), Financial

Ukuran: px
Mulai penontonan dengan halaman:

Download "15. Eli Dahi (1989), Environmental Engineering In Developing Countries, University of Denmark, Copenhagen. 16. Simon Benninga (2000), Financial"

Transkripsi

1 DAFTAR PUSTAKA 1. Republik Indonesia (2004), Undang-Undang No.7 tahun 2004 tentang Sumber Daya Air, Jakarta 2. Direktorat Jenderal Pengairan (1986), Kriteria Perencanaan Irigasi, Departemen Pekerjaan Umum, Jakarta 3. Paul J. Ossenbruggen (1984), System Analysis For Civil Engineers, John Wiley & Sons, Inc, USA 4. Leland T. Blank, Anthony J. Tarquin (1989), Engineering Economy, McGraw-Hill Book Company, Inc., Singapore. 5. Ven Te Chow, David R. Maidment, Larry W. Mays (1988), Applied Hydrology, McGraw-Hill Book Company, Inc., Singapore. 6. Suyono Sosrodarsono, Kensaku Takeda (2006), Hidrologi Untuk Pengairan, Pradnya Paramita, Jakarta. 7. Chay Asdak (2007), Hidrologi dan Pengelolaan Daerah Aliran Sungai, Gadjah Mada University Press, Yogyakarta. 8. Muljadi Pudjosumarto (1985), Evaluasi Proyek, Uraian Singkat dan Soal Jawab, Liberty, Yogyakarta. 9. Soewarno (1995), Hidrologi : Aplikasi Metode Statistik untuk Analisa Data, Nova, Bandung. 10. Adhi Suyanto, Trie M. Sunaryo, Roestam Sjarief (2001), Ekonomi Teknik Proyek Sumber Daya Air Suatu Pengantar Praktis, MHI, Jakarta. 11. I Nyoman Pujawan (2003), Ekonomi Teknik, Guna Widya, Surabaya. 12. E. Paul DeGarmo, William G. Sullivan, James A. Bontadelli, Elin M. Wicks (1999), Engineering Economy Tenth Edition, Edisi Indonesia, Simon & Schuster (Asia) Pte. Ltd, New Jersey. 13. J. Price Gittinger (1986), Economic Analysis of Agriculture Project (Analisa Ekonomi Proyek-Proyek Pertanian), Universitas Indonesia (UI Press), Jakarta. 14. FX. Marsudi Joyowiyono (1983), Ekonomi Teknik (Engineering Economics), Badan Penerbit Departemen PU, Jakarta.

2 15. Eli Dahi (1989), Environmental Engineering In Developing Countries, University of Denmark, Copenhagen. 16. Simon Benninga (2000), Financial Modelling, Massachussets Institute of Technology, London. 17. PT. Transka Dharma Konsultan (2004), Studi Kelayakan Potensi Pengembangan Sungai Waigeo Kabupaten Raja Ampat, Departemen Kimpraswil, Sorong 18. Nippon KOEI Co. Ltd in Association with Japan Irrigation and Reclamation Consultants Co. Ltd, JICA (1993), The Study for Formulation of Irrigation Development Program in The Republic of Indonesia, Dep. PU-Bappenas, Jakarta. 19. Freddy Rangkuti (2000), Analisis SWOT Teknik Membedah Kasus Bisnis, Reorientasi Konsep Perencanaan Strategis Menghadapi Abad 21, Gramedia Pustaka Utama, Jakarta. 20. Thomas L. Saaty (1988), The Analytic Hierarchy Process, Planning, Priority Setting, Resource Allocation, University of Pittsburgh, USA. 21. Thomas L. Saaty, Luis G. Vargas (1994), Decision Making in Economic, Political, Social and Technological Environments with The Analytic Hierarchy Process, University of Pittsburgh, USA.

3 LAMPIRAN Lampiran 1 Data Curah Hujan dan Hari Hujan Bulanan Stasiun Jefman Elevasi : + 3 m DATA CURAH HUJAN BULANAN STASIUN JEFMAN TAHUN BULAN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL , , , , , , , , , , , , , ,979.3 Sumber : BMG Sorong Elevasi : + 3 m DATA HARI HUJAN BULANAN STASIUN JEFMAN TAHUN BULAN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL Sumber : BMG Sor ong L - 1

4 Lampiran 2 Data Curah Hujan Setengah Bulanan Stasiun Jefman Elevasi : + 3 m DATA CURAH HUJAN SETENGAH BULANAN STASIUN JEFMAN BULAN TAHUN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC I II I II I II I II I II I II I II I II I II I II I II I II TOTAL , , , , , , , , , , , , , ,979.3 Sumber : BMG Sorong L - 2

5 Lampiran 3 Data Hari Hujan Setengah Bulanan Stasiun Jefman Elevasi : + 3 m DATA HARI HUJAN SETENGAH BULANAN STASIUN JEFMAN BULAN TAHUN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL I II I II I II I II I II I II I II I II I II I II I II I II Sumber : BMG Sor ong L - 3

6 Lampiran 4 Hidrograf Satuan Sintetik Nakayasu HIDROGRAF BANJIR RANCANGAN M et ode Nakayasu Dat a daerah aliran sungai 1 Daerah Alir an Sungai, A = km 2 2 Panjang sungai ut ama, L = km 3 Tg = L (u/ L> 15km) = 1.62 Jam 4 Tr = (0.5~1) Tg = 1.62 Jam 5 Tp = Tg Tr = Koefisien, T 0.3 ( α ) --> (1,5~ 3,5) = T 0.3 = α Tg = C = 0.6 Ro = 1.00 Jam Qp = C.A.Ro = (0.3 Tp + T 0.3 ) 10 Tp + T 0,3 = 7.77 Jam 11 Tp + T 0, T 0.3 = Jam 12 Tb = Tp + T T 0,3 + 2 T 0,3 = Jam Wakt u naik : 0 t 1 < 2.91 Qt = Qp * (t /Tp) 2,4 Wakt u t urun -1 : 2.91 t 2 < 7.77 Qt = Qp * 0,3 ^ [ (t -Tp)/(T 0,3 ) ] Wakt u t urun -2 : 7.77 t 3 < Qt = Qp * 0,3^ [ (t-tp+ 0,5T 0,3 )/(1,5T 0,3 ) ] Wakt u t urun -3 : t Qt = Qp * 0,3^ [ (t-tp+ 1,5T 0,3 )/(2T 0,3 ) ] Base Flow Dd = L / A = 0.60 Qb = 0,475. A 0,6444. D 0,9435 = 2.90 m 3 /det Unit Hidrograf Nakayasu Q (m3/det) waktu (jam) L - 4

7 Lampiran 5 Hidrograf Satuan Snyder HIDROGRAF BANJIR RANCANGAN METODE SNYDER : Dat a daerah aliran sungai 1 Luas DAS = km 2 2 Panjang Sungai ( L ) = km 3 Panjang Sungai t er dekat t t k berat ( Lc ) = 6.10 km 4 Koefisien Pengalir an = Kemir ingan DAS = Ct = (0.75 ~ 3.00) = Cp = (0.9 ~ 1.4 ) = Hujan sat uan, h = 1.00 mm Perhit ungan : t p = Ct (L. Lc) 0.3 = jam Te = tp/5,5 = 2.03 jam tr = te/2 + tp = jam W = 1000.h.A = 34,960 m 3 --> Te > t r tp' = tp (Te-tr) = 8.62 jam Tp = tp' = 9.12 jam q p = ( 0,278 Cp/Tp ) = m 3 /dt /km 2.mm Qp = q p. A = 1.07 m 3 /dt.mm Alexeyev Fact or λ = Qp.Tp/W = 1.00 a = 1.32 λ λ = 1.52 Tb = 4t p (for small wat er shed A 100mi 2 ) = jam Koordinat X = t / tp Y = Q / Qp (-a(1 -x)^ 2 /x) Y = 10^ 1.2 Unit Hidrograf Snyder 1.0 Q (m3/det) waktu (jam) L - 5

8 Lampiran 6 Evapotranspirasi (Eto) Bulanan Stasiun Jefman Evapot ranspirasi (Et o) Bulanan St asiun Jefman TAHUN BULAN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Et o mm/hr Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Jml hari Eto mm/bln Sumber : Hasil Per hit ungan L - 6

9 Lampiran 7 Perhitungan Debit Sungai Waisai Metode FJ. Mock km 2 km 2 Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun 1992 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 7

10 km 2 km 2 Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 1993 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapotranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 1994 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapotranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 8

11 km 2 km 2 Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 1995 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapotranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 1996 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapotranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 9

12 km 2 km 2 Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun 1997 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun 1998 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 10

13 km 2 km 2 Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun 1999 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai M et ode FJ M ock Luas DAS : Tahun 2000 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 11

14 km 2 km 2 Perhitungan Debit Sungai Waisai Metode FJ Mock Luas DAS : Tahun 2003 No. Keterangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhitungan Debit Sungai Waisai Metode FJ Mock Luas DAS : Tahun 2004 No. Keterangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Data Meteorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Potensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Wat er St orage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+ K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 12

15 km 2 km 2 Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 2005 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Water Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan Perhit ungan Debit Sungai Waisai Met ode FJ Mock Luas DAS : Tahun 2006 No. Ket erangan Unit Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Ket. I Dat a Met eorologi 1 Hujan Bulanan Rata-Rata (R) mm Hari Hujan Rat a-rat a (N) hari II Evapot ranspirasi Pot ensial (ETo) mm/bl III Limit Evapot ranspirasi 3 Exposed Surface (M) % E/ETo = (M/20) x (18 - N) % E = ETo (M/20) x (18 - N) mm EL = ETo - E mm IV Water Balance 7 Water Surplus, Ws = R - EL mm V Run Off / Ground Water Storage 8 fakt or reduksi infilt rasi, f Infiltrasi (i) = f * Ws mm ,5 (1 + K) i ---> K = 0,6 mm K (V n-1) mm V n = 0,5 (1+K) i + K (V n-1) mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm K (V n-1) lanjut an mm V n lanjut an mm V a = V n - (V n-1) mm Base Flow, BF = i - V a mm Direct Run Off, DRO = Ws - i mm Run Off = BF + DRO mm Jumlah Hari dalam 1 bulan hari Debit Bulanan Rat a-rat a m 3 /dt Sumber : Hasil Perhit ungan L - 13

16 Lampiran 8 Perhitungan Debit Sungai Waisai Metode NRECA PERHITUNGAN DEBIT SUNGAI WAISAI METODE NRECA Paramet er Ket Ar eal (km 2 ) km 2 Hujan Tahunan Rat a mm C 0.20 NOMINAL C*CHTR PSUB 0.44 Trial GWF Tr ial Nilai Awal SMS 741 mm Trial GWS 6 5 mm Tr ial CF 0.6 Koef Tanaman Hasil Q Model (m 3 /det ) Rerata 0.58 Minimum 0.07 Maksimum 1.74 Range C= 0.2; C< PSUB GWF 0.8 Fr ee Fr ee Tabel Year Mont h NDays P PET ET Moisture MS / NOMINAL WATER EXCESS EXCESS S RECHG BEGIN ST END STO GW DIRECT TOTAL Q_Com P / ET AET / ET AET St orage (St orage Rat io) BALANCE MOIST RAT MOIST (Delt a St orage) TO GW ORAGE GW RAGE GW FLOW FLOW DISCHA m 3 /s Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec L - 14

17 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec L - 15

18 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec L - 16

19 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec L - 17

20 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec L - 18

21 Lampiran 9 Proyeksi Populasi Penduduk Distrik Waigeo Selatan Proyeksi Populasi Penduduk Dist rik Waigeo Selat an Jumlah Tahun Penduduk (jiwa) , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,819 Sumber : Hasil per hit ungan L - 19

22 Lampiran 10 Proyeksi Populasi Ternak Distrik Waigeo Selatan Proyeksi Populasi Ternak Dist rik Waigeo Selat an Jml Ter nak Besar -Sedang Jml Ternak Unggas Tahun Ayam Sapi Kambing Babi Kampung It ik/ent ok , , , , , , , ,062 9, ,141 10, ,227 11, ,319 11, ,418 12, ,524 13, ,639 14, ,762 16, ,894 17, ,036 18, ,188 19, ,353 21, ,529 22,985 1, ,719 24,709 1, ,923 26,562 1, ,142 28,554 1, ,036 3,377 30,695 1, ,113 3,631 32,998 1, ,197 3,903 35,472 1, ,287 4,196 38,133 1, ,383 4,510 40,993 1, ,487 4,849 44,067 2, ,599 5,212 47,372 2, ,718 5,603 50,925 2, ,847 6,023 54,745 2, ,986 6,475 58,851 2, ,135 6,961 63,264 2, ,295 7,483 68,009 3, ,006 2,467 8,044 73,110 3, ,081 2,652 8,647 78,593 3, ,162 2,851 9,296 84,488 3, ,249 3,065 9,993 90,824 4, ,343 3,295 10,743 97,636 4, ,444 3,542 11, ,959 4, ,552 3,807 12, ,831 5, ,668 4,093 13, ,293 5, ,793 4,400 14, ,390 6, ,928 4,730 15, ,169 6, ,072 5,085 16, ,682 7, ,228 5,466 17, ,983 7, ,395 5,876 19, ,132 8, ,575 6,317 20, ,192 8, ,768 6,790 22, ,231 9, ,975 7,300 23, ,323 10, ,198 7,847 25, ,547 10, ,438 8,436 27, ,989 11, ,696 9,068 29, ,738 12, ,973 9,748 31, ,893 13, ,271 10,479 34, ,560 14, ,592 11,265 36, ,852 15, ,936 12,110 39, ,891 16, ,306 13,019 42, ,808 18,016 Sumber : Hasil per hit ungan L - 20

23 Lampiran 11 Proyeksi Produksi Perikanan Distrik Waigeo Selatan Proyeksi Produksi Perikanan Dist rik Waigeo Selat an Tahun Nelayan Pr oduksi (Ton) ,781 4, ,860 5, ,940 5, ,022 5, ,105 5, ,189 5, ,275 5, ,362 5, ,451 5, ,541 5, ,632 5, ,725 5, ,820 6, ,916 6, ,014 6, ,113 6, ,214 6, ,317 6, ,421 6, ,528 6, ,635 6, ,745 6, ,857 7, ,970 7, ,085 7, ,202 7, ,321 7, ,442 7, ,565 7, ,690 7, ,817 8, ,946 8, ,078 8, ,211 8, ,347 8, ,485 8, ,625 8, ,767 9, ,912 9, ,059 9, ,209 9, ,361 9, ,516 9, ,673 10, ,833 10, ,996 10, ,161 10, ,329 10, ,499 10, ,673 11, ,849 11, ,028 11, ,211 11, ,396 11, ,584 12, ,776 12, ,970 12, ,168 12, ,369 12, Sumber : Hasil per hit ungan L - 21

24 Lampiran 12 Perhitungan Rasio Luas Panen Palawija Distrik Waigeo Selatan Tahun Luas Panen (Ha) Jagung Pr oduksi (Ton) Rat a2 (Ton/Ha) Luas Panen (Ha) Pr oduksi (Ton) Rat a2 (Ton/Ha) Luas Panen (Ha) Pr oduksi (Ton) Rat a2 (Ton/Ha) Luas Panen (Ha) Pr oduksi (Ton) Rat a2 (Ton/Ha) Luas Panen (Ha) Pr oduksi (Ton) N/A N/A N/A Rat a Tot al luas panen r at a-r at a/t hn = 13.5 Ha Rasio luas panen : Jagung = Keladi = Ubu Jalar = Ubi Kayu = Kacang Tanah = Dat a Tanaman Palawija Dist rik Waigeo Selat an Keladi Ubi Jalar Ubi Kayu Kacang Tanah Rat a2 (Ton/Ha) L - 22

25 Lampiran 13 Proyeksi Sarana Prrasarana Desa Waisai (Ibu kota Kabupaten Raja Ampat) Proyeksi Sarana Prasarana Desa Waisai (Ibu Kot a Kab. Raja Ampat ) Sarana Kesehat an Sarana Ibadah Kant or Pemer int ah Barak Pegawai Wisma Pendidikan Tahun Puskesmas Kapasit as Masjid / Kapasit as Jml Kapasit as Kapasit as Kapasit as PEMDA PEMDA PEMDA Sekolah rawat inap pasien Musholla Jama'ah Pegawai (or ang) (or ang) (or ang) Sumber : Hasil per hit ungan L - 23

26 Lampiran 14 Curah Hujan Efektif Palawija Waigeo Tabel Perhit ungan Curah Hujan Efekt if Unt uk Palawija BULAN Et o R5 0 f D Re mm/hr mm/hr Kedelai Jagung Kc. Tanah Bawang Kedelai Jagung Kc. Tanah Bawang Ket erangan Januari Februari Maret April Mei Juni Juli Agust us Sept ember Okt ober November I D : II I Kedelai = 75 II I Jagung = 80 II I Kacang Tnh = 55 II I Bawang = 35 II I Bila < 0, anggap = 0 II I II I II I II I II I II I Desember II Sumber : Hasil Perhit ungan Ket erangan : Re = f D * (1,25 * R50 0,824 0, * ETo - 2,93) * 10 f D = 0,53 + (0,00016 * D) - (8,94 * 10-5 * D 2 ) + (2,32 * 10-7 * D 3 ) D = 80 mm ---> Unt uk Jagung D = 75 mm ---> Unt uk Kedelai D = 55 mm ---> Unt uk Kacang Tanah D = 35 mm ---> Unt uk Bawang D = kedalaman air t anah yang t er sedia L - 24

27 Lampiran 15 Perhitungan Kebutuhan Air Selama Penyiapan Lahan (LP) Irigasi Waigeo PERHITUNGAN KEBUTUHAN AIR IRIGASI SELAMA PENYIAPAN LAHAN (LP) IRIGASI WAIGEO Bulan Eto Eo=1,1*ETo P M=Eo+P K = MT/S LP= (M * e k ) / (e k - 1) (mm/hr) T = 30 hari T = 45 hari T = 30 hari T = 4 5 har i S= 250 mm S= 300 mm S= 250 mm S= 300 mm S= 250 mm S= 300 mm S= 250 mm S= 300 mm Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des Sumber : Hasil Per hit ungan L - 25

28 Lampiran 16 Perhitungan Alternatif Kebutuhan Air Irigasi Waigeo PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 1 No. Uraian Sat Bulan/Periode Nopember Desember Januari Pebruari Maret April Mei Juni Juli Agustus Sept ember Okt ober I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebut uhan net o air t anaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 2 No. Uraian Sat Bulan/Periode Desember Januari Pebruari Maret April Mei Juni Juli Agust us Sept ember Okt ober Nopember I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan L - 26

29 PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 3 No. Uraian Sat Bulan/Periode Januari Pebruari Maret April Mei Juni Juli Agust us Sept ember Okt ober Nopember Desember I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebutuhan neto air tanaman (NFR) l/dt/ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 4 No. Uraian Sat Bulan/Periode Pebruari Maret April Mei Juni Juli Agust us Sept ember Okt ober Nopember Desember Januari I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan L - 27

30 PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 5 No. Uraian Sat Bulan/Periode M aret April M ei Juni Juli Agust us Sept ember Okt ober Nopember Desember Januari Februari I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebut uhan net o air t anaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 6 No. Uraian Sat Bulan/Periode April Mei Juni Juli Agust us Sept ember Okt ober Nopember Desember Januari Februari Maret I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebut uhan net o air t anaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan L - 28

31 PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 7 No. Uraian Sat Bulan/Periode Mei Juni Juli Agust us Sept ember Okt ober Nopember Desember Januari Februari M aret April I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebut uhan net o air t anaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 8 No. Uraian Sat Bulan/Periode Juni Juli Agust us Sept ember Okt ober Nopember Desember Januari Februari Maret April Mei I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebut uhan net o air t anaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan L - 29

32 PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 9 No. Uraian Sat Bulan/Periode Juli Agust us Sept ember Okt ober Nopember Desember Januari Februari M aret April M ei Juni I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alt ernat if 1 0 No. Uraian Sat Bulan/Periode Agust us Sept ember Okt ober Nopember Desember Januari Februari Maret April Mei Juni Juli I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebutuhan neto air tanaman (NFR) l/dt/ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Perhit ungan L - 30

33 PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 11 No. Uraian Sat Bulan/Periode Sept ember Okt ober Nopember Desember Januari Februari Maret April M ei Juni Juli Agust us I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan PERHITUNGAN KEBUTUHAN AIR IRIGASI D.I WAISAI Alternatif 12 No. Uraian Sat Bulan/Periode Okt ober Nopember Desember Januari Februari Maret April M ei Juni Juli Agust us Sept ember I II I II I II I II I II I II I II I II I II I II I II I II 1 Pola Tat a Tanam Usulan LP PALAWIJA PALAWIJA PALAWIJA 2 Koefisien Tanaman ( c1 ) LP Koefisien Tanaman ( c2 ) LP LP Koefisien Tanaman Rerat a ( c ) LP LP Evapotranspirasi potensial (ETo) mm/hari Perkolasi (P) mm/hari Curah Hujan Efekt if (R 50 ) mm/hari Keb. air ut k. penjenuhan & lap. Air (LP) mm/hari Pengant ian lapisan air Rerat a (WLR1) mm/hari Pengant ian lapisan air Rerat a (WLR2) mm/hari Pengant ian lapisan air Rerat a (WLR) mm/hari 9 Evapotranspirasi tanaman (Etc) mm/hari Kebut uhan air t ot al penyiapan lahan mm/hari Kebutuhan neto air tanaman (NFR) mm/hari Kebut uhan net o air t anaman (NFR) l/dt /ha Kebut uhan air irigasi (DR) l/dt /ha Sumber : Hasil Per hit ungan L - 31

34 Lat it ude : 0 24' 30" LS = 0.43 LS B e s a r a n Sat. Ket. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Temperat ur, t C Dat a Kec. Angin, v knot Dat a Kec. Angin, v mile/hari Konversi ea mmhg Tabel RH (%) Dat a ed = ea x RH/100 mmhg ea - ed mmhg E= 0.35 (ea-ed) (1+ v/100) mm/hari Jml hari / bulan hari E m/bulan Sumber : Hasil Perhit ungan Rumus Empiris Penman : E = 0.35 (ea - ed) (1 + v/100) E = Evaporasi (mm/hari) ea = Tekanan uap jenuh pada suhu rat a2 harian (mmhg) ed = t ekanan uap sebenarnya (mmhg) v = Kec. angin pada ket inggian 2m di at as permukaan t anah (mile/hari) Perhit ungan Evaporasi Waigeo dengan Met oda Penman 1 mbar = 0.75 mmhg 1 knot = 1.15 mile/jam 27.6 mile/hari L - 32

35 Lampiran 17 Simulasi Water Balance Embung Waigeo Year Mont h Inflow Rat e I t SIMULASI WATER BALANCE EMBUNG WAIGEO Demand Wit hdr awal Net Surface Evapor at ion Spill St orage St or age Aver age fact or rat e evapor at ion ar ea loss Q t S t S t St orage Ndays (t ) (m 3 /det ) (m 3 ) (d t ) Y.d t (m 3 ) e t (m) A t (m 2 ) A t.e t (m 3 ) (m 3 ) (m 3 ) (m 3 ) (m 3 ) Fir m yield (Y) ,601, m 3 Init ial at elevat ion = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,601, Fir m yield (Y) ,609, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,609, Fir m yield (Y) ,632, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,632, Fir m yield (Y) ,641, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,641, Fir m yield (Y) ,650, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,650, Fir m yield (Y) ,659, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,659, Fir m yield (Y) ,669, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,669, L - 33

36 Firm yield (Y) ,700, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,700, Firm yield (Y) ,711, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,711, Firm yield (Y) ,722, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,722, Firm yield (Y) ,734, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,734, Firm yield (Y) ,746, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,746, Firm yield (Y) ,780, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,780, Firm yield (Y) ,794, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,794, L - 34

37 Firm yield (Y) ,809, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,809, Firm yield (Y) ,824, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , Mar , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,824, Firm yield (Y) ,839, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,839, Firm yield (Y) ,880, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,880, Firm yield (Y) ,898, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,898, Firm yield (Y) ,916, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,916, Firm yield (Y) ,935, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,935, L - 35

38 Firm yield (Y) ,983, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,983, Firm yield (Y) ,004, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,004, Firm yield (Y) ,027, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,027, Firm yield (Y) ,050, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,050, Firm yield (Y) ,075, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,075, Firm yield (Y) ,100, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,100, Firm yield (Y) ,160, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,160, L - 36

39 Fir m yield (Y) ,188, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,188, Fir m yield (Y) ,218, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,218, Fir m yield (Y) ,249, m 3 Init ial = 188, Jan , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,249, Fir m yield (Y) ,281, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,281, Fir m yield (Y) ,315, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,315, Fir m yield (Y) ,350, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , , Apr , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,350, Fir m yield (Y) ,386, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Tot al ,386, L - 37

40 Firm yield (Y) ,424, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,424, Firm yield (Y) ,464, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,464, Firm yield (Y) ,505, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,505, Firm yield (Y) ,548, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,548, Firm yield (Y) ,593, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,593, Firm yield (Y) ,640, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,640, Firm yield (Y) ,689, m 3 Init ial = 188, Jan , , , , , , , Feb , , , , , , , Mar , , , , , , , Apr , , , , , , , , May ,059, , , , , , , Jun , , , , , , , Jul ,088, , , , , , , Aug , , , , , , , Sep , , , , , , , Oct , , , , , , , Nov , , , , , , , Dec , , , , , , , Total ,689, L - 38

41 Lampiran 18 Biaya-Biaya Produksi Pertanian Waigeo Biaya Bibit Palawija Volume Har ga Biaya No. Fakt or Pr oduksi Satuan Per Ha Satuan Per Ha (Rp) (Rp) Bibit - Jagung Kg 50 40,000 2,000,000 - Keladi pohon 7,500 1,500 11,250,000 - Ubi Jalar Stek 15, ,500,000 - Ubi Kayu Stek 15, ,875,000 - Kacang Tanah Kg 50 12, ,000 Biaya Pupuk dan Obat -obat an Palawija Volume Har ga Biaya No. Fakt or Pr oduksi Sat uan Per Ha Satuan Per Ha (Rp) (Rp) Pupuk - Urea Kg 50 2, ,000 - TSP Kg 50 2, ,500 - KCl Kg 50 2, ,000 2 Obat - obat an - Pestisida Liter 2 80, ,000 Biaya Upah produksi Palawija Volume Har ga Biaya No. Jenis Kegiat an Sat uan Per Ha Satuan Per Ha (Rp) (Rp) Pengolahan tanah OH 2 35,000 70,000 2 Penanaman OH 5 40, ,000 3 Pemupukan OH 5 40, ,000 4 Penyemprotan OH 2 40,000 80,000 5 Panen OH 10 35, ,000 6 Angkutan Unit Hari 1 2,000,000 2,000,000 Sumber : Hasil per hit ungan L - 39

42 Lampiran 19 Benefit Pertanian Waigeo BENEFIT PERTANIAN TANPA PROYEK DENGAN PROYEK Harga Tot al Harga Tot al Incr ement al Uraian No Luas Hasil per t ahun Manfaat Luas Hasil per t ahun Manfaat Sat uan Manfaat Sat uan Manfaat Benefit (Ha) (Ton) (Rp/Ton) (Rp./Ha) (Rp.) (Ha) (Ton) (Rp/Ton) (Rp./Ha) (Rp.) (Rp.) = (4*5) / 3 7 = (3 * 6) = (9*10) / 8 12 = (8*11) 13 1 Palawija - Jagung 2 2 6,000, ,000, ,000, ,000, ,000, ,777, Keladi 1 5 5,000, ,000, ,000, ,000, ,000, ,703, Ubi Jalar ,000, ,428, ,500, ,000, ,428, ,388, Ubi Kayu ,000, ,500, ,000, ,000, ,500, ,393,888, Kacang Tanah ,000, ,000, ,000, ,000, ,000, ,222, Tot al ,500, ,676,981, ,302,481,481 BIAYA SARANA PRODUKSI PERTANIAN A. BIAYA BIBIT TANPA PROYEK DENGAN PROYEK Biaya Tot al Luas Biaya Tot al Incr ement al No Uraian Luas per Ha Biaya per Ha Biaya Cost (Ha) (Rp/Ha) (Rp.) (Ha) (Rp/Ha) (Rp.) (Rp.) = (3*4) = (6*7) 9 1 Palawija - Jagung 2 2,000, ,000, ,000, ,592, Keladi 1 11,250, ,250, ,250, ,416, Ubi Jalar 3.5 1,500, ,250, ,500, ,527, Ubi Kayu 6 1,875, ,250, ,875, ,416, Kacang Tanah 1 625, , , ,467, Tot al ,375, ,421, ,046,296 B. BIAYA PUPUK DAN OBAT-OBATAN TANPA PROYEK DENGAN PROYEK Biaya Tot al Luas Biaya Tot al Incr ement al No Uraian Luas per Ha Biaya per Ha Biaya Cost (Ha) (Rp/Ha) (Rp.) (Ha) (Rp/Ha) (Rp.) (Rp.) = (3*4) = (6*7) 9 1 PupuPupuk - Urea , ,687, , ,062, TSP , ,518, , ,856, KCl , ,350, , ,650, Obat -obat an - Pestisida , ,160, , ,440, Tot al 6,716, ,008, ,292,500 C. BIAYA UPAH TANPA PROYEK DENGAN PROYEK Biaya Tot al Luas Biaya Tot al Incr ement al No Uraian Luas per Ha Biaya per Ha Biaya Cost (Ha) (Rp/Ha) (Rp.) (Ha) (Rp/Ha) (Rp.) (Rp.) = (3*4) = (6*7) , , , ,755, Pengolahan tanah Penanaman , ,700, , ,300, Pemupukan , ,700, , ,300, Penyemprotan , ,080, , ,720, Panen , ,725, , ,775, Angkutan ,000, ,000, ,000, ,000, Tot al 39,150, ,850, ,700,000 PERHITUNGAN NET BENEFIT PERTANIAN No. Uraian Increment al (Rp) I. BENEFIT 2,302,481,481 Palawija 2,302,481,481 II. COST 481,038,796 A. Bibit 199,046,296 B. Pupuk dan Obat-Obatan 41,292,500 C. Upah Pekerja 240,700,000 Net Benefit = 1,821,442,685 Sumber : Hasil perhit ungan L - 40

43 Lampiran 20 Nilai Perbandingan Kriteria (Level 2) dan Sub Kriteria (Level 3) NILAI PERBANDINGAN KRITERIA (LEVEL 2 ) PENETAPAN PRIORITAS PENGEMBANGAN DAS WAISAI A SKALA PERBANDINGAN B SOS 3 LINGK SOS 2 TEK SOS 1 EKON SOS 2 HUK LINGK 3 TEK LINGK 1 EKON LINGK 2 HUK TEK 3 EKON TEK 2 HUK EKON 3 HUK NILAI PERBANDINGAN SUB KRITERIA (LEVEL 3 ) SOSIAL A SKALA PERBANDINGAN B LAPKER 2 SDM LAPKER 1 KUAHID SDM 2 KUAHID LINGKUNGAN A SKALA PERBANDINGAN B ALAM 1 SDA ALAM 1 EKOL ALAM 2 MAS SDA 1 EKOL SDA 2 MAS EKOL 3 MAS TEKNIS A SKALA PERBANDINGAN B SAFE 3 EFEKT SAFE 2 FLEXI EFEKT 1 FLEXI EKONOMI A SKALA PERBANDINGAN B PENDA 3 PENMAS HUKUM DAN KELEMBAGAAN A SKALA PERBANDINGAN B PERBIJ 3 BAPEL L - 41

44 Lampiran 21 Nilai Perbandingan Alternatif (Level 4) NILAI PERBANDINGAN ALTERNATIF (LEVEL 4 ) TERBUKANYA LAPANGAN KERJA DAMPAK TERHADAP ALAM SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 5 NIA DOM 4 NIA DOM 4 IND DOM 5 IND DOM 3 SARPRAS DOM 2 SARPRAS DOM 2 IRIG DOM 3 IRIG DOM 5 MF DOM 3 MF NIA 2 IND NIA 3 IND NIA 3 SARPRAS NIA 3 SARPRAS NIA 2 IRIG NIA 2 IRIG NIA 4 MF NIA 4 MF IND 3 SARPRAS IND 3 SARPRAS IND 2 IRIG IND 2 IRIG IND 5 MF IND 6 MF SARPRAS 2 IRIG SARPRAS 3 IRIG SARPRAS 2 MF SARPRAS 2 MF IRIG 3 MF IRIG 3 MF PENINGKATAN SDM DAM PAK TERHADAP SDA SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 3 NIA DOM 5 NIA DOM 4 IND DOM 3 IND DOM 5 SARPRAS DOM 4 SARPRAS DOM 2 IRIG DOM 3 IRIG DOM 2 MF DOM 2 MF NIA 3 IND NIA 3 IND NIA 2 SARPRAS NIA 2 SARPRAS NIA 2 IRIG NIA 4 IRIG NIA 2 MF NIA 2 MF IND 3 SARPRAS IND 2 SARPRAS IND 3 IRIG IND 3 IRIG IND 2 MF IND 2 MF SARPRAS 4 IRIG SARPRAS 5 IRIG SARPRAS 5 MF SARPRAS 4 MF IRIG 3 MF IRIG 2 MF PENINGKATAN KUALITAS HIDUP MASYARAKAT DAMPAK TERHADAP EKOLOGI SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 3 NIA DOM 2 NIA DOM 5 IND DOM 2 IND DOM 2 SARPRAS DOM 3 SARPRAS DOM 2 IRIG DOM 3 IRIG DOM 4 MF DOM 3 MF NIA 3 IND NIA 4 IND NIA 3 SARPRAS NIA 4 SARPRAS NIA 2 IRIG NIA 2 IRIG NIA 3 MF NIA 5 MF IND 5 SARPRAS IND 6 SARPRAS IND 3 IRIG IND 3 IRIG IND 2 MF IND 8 MF SARPRAS 3 IRIG SARPRAS 3 IRIG SARPRAS 2 MF SARPRAS 3 MF IRIG 2 MF IRIG 7 MF DAMPAK TERHADAP MASYARAKAT SKALA PERBANDINGAN A B DOM 5 NIA DOM 6 IND DOM 4 SARPRAS DOM 3 IRIG DOM 3 MF NIA 2 IND NIA 4 SARPRAS NIA 1 IRIG NIA 5 MF IND 2 SARPRAS IND 2 IRIG IND 6 MF SARPRAS 3 IRIG SARPRAS 3 MF IRIG 7 MF L - 42

45 SAFETY KONTRIBUSI TERHADAP PENDAPATAN DAERAH SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 1 NIA DOM 4 NIA DOM 4 IND DOM 5 IND DOM 1 SARPRAS DOM 6 SARPRAS DOM 3 IRIG DOM 7 IRIG DOM 2 MF DOM 8 MF NIA 2 IND NIA 2 IND NIA 1 SARPRAS NIA 5 SARPRAS NIA 3 IRIG NIA 4 IRIG NIA 2 MF NIA 8 MF IND 5 SARPRAS IND 3 SARPRAS IND 1 IRIG IND 4 IRIG IND 1 MF IND 7 MF SARPRAS 4 IRIG SARPRAS 4 IRIG SARPRAS 3 MF SARPRAS 3 MF IRIG 1 MF IRIG 2 MF EFEKTIFITAS PENINGKATAN PENDAPATAN MASYARAKAT SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 5 NIA DOM 4 NIA DOM 4 IND DOM 3 IND DOM 1 SARPRAS DOM 1 SARPRAS DOM 3 IRIG DOM 5 IRIG DOM 2 MF DOM 2 MF NIA 2 IND NIA 3 IND NIA 3 SARPRAS NIA 4 SARPRAS NIA 1 IRIG NIA 4 IRIG NIA 2 MF NIA 2 MF IND 5 SARPRAS IND 2 SARPRAS IND 2 IRIG IND 3 IRIG IND 3 MF IND 3 MF SARPRAS 4 IRIG SARPRAS 5 IRIG SARPRAS 5 MF SARPRAS 2 MF IRIG 3 MF IRIG 4 MF FLEKSIBILITAS PERATURAN DAN KEBIJAKAN YANG JELAS SKALA PERBANDINGAN SKALA PERBANDINGAN A B A B DOM 3 NIA DOM 5 NIA DOM 5 IND DOM 4 IND DOM 1 SARPRAS DOM 1 SARPRAS DOM 4 IRIG DOM 3 IRIG DOM 2 MF DOM 3 MF NIA 2 IND NIA 2 IND NIA 3 SARPRAS NIA 4 SARPRAS NIA 3 IRIG NIA 2 IRIG NIA 4 MF NIA 4 MF IND 5 SARPRAS IND 3 SARPRAS IND 2 IRIG IND 3 IRIG IND 3 MF IND 5 MF SARPRAS 4 IRIG SARPRAS 4 IRIG SARPRAS 2 MF SARPRAS 2 MF IRIG 2 MF IRIG 3 MF BADAN PENGELOLA YANG MANDIRI SKALA PERBANDINGAN A B DOM 3 NIA DOM 4 IND DOM 1 SARPRAS DOM 6 IRIG DOM 5 MF NIA 1 IND NIA 3 SARPRAS NIA 3 IRIG NIA 4 MF IND 2 SARPRAS IND 2 IRIG IND 3 MF SARPRAS 4 IRIG SARPRAS 5 MF IRIG 2 MF L - 43

46 Lampiran 22 Pembobotan Kriteria (Level 2) a. b. c. 1. PEM BOBOTAN KRITERIA (LEVEL 2 ) Membuat suat u mat rik yang menggambarkan per bandingan ber pasangan (pair wise compar ison). Nilainilai pada set iap bar is pada mat r ik mer upakan per bandingan ant ar a fakt or-fakt or nya dengan masingmasing fakt or it u sendir i, dan menjumlahkan nilai t ot al dari suat u kolom pada mat r ik t ersebut. Krit eria SOS LINGK TEK EKON HUK SOS LINGK 1/ TEK 1/2 1/3 1 1/3 1/2 EKON HUK 1/2 1/2 2 1/3 1 Total Membagi nilai (bobot ) t iap perbandingan dengan jumlah t ot al t iap kolom. Misalnya unt uk kolom sosial terhadap lingkungan nilai 3/5,8333 = 0,5143. Maka matrik tersebut akan berbentuk sebagai berikut : Krit eria SOS LINGK TEK EKON HUK SOS LINGK TEK EKON HUK Tot al Menjumlahkan nilai t ot al dari suat u baris pada mat r ik dan menor malisasi mat r ik dengan membagi bobot masing-msing krit er ia t erhadap jumlah t ot alnya. Krit eria Bobot Eigen Vect or SOS LINGK TEK EKON HUK Tot al 5 1 Nilai Eigenvect or yang diperoleh adalah pr ior it as masing-masing krit eria. d. Uji Konsist ensi 1.) Melakukan perkalian Mat r ik penilaian dengan Mat rik Pr ior it as Mat rik Penilaian [N] Krit eria SOS LINGK TEK EKON HUK SOS LINGK 1/ TEK 1/2 1/3 1 1/3 1/2 EKON HUK 1/2 1/2 2 1/3 1 Mat rik Priorit as [P] Mat rik [NxP] Krit eria Priorit as Krit eria Nilai SOS SOS LINGK LINGK TEK TEK EKON EKON HUK HUK ) Membagi bar is pada Mat r ik [NxP] dengan baris pada Mat r ik [P] 3.) Menghit ung nilai eigenvalue (λmax) Krit eria Nilai Krit eria Nilai SOS SOS LINGK LINGK TEK TEK EKON EKON HUK HUK = λmax = ) Menghit ung Indeks Konsist ensi / Consist ency Index (CI) 5 = λ dimana : CI = Consist ency Index max n CI = λmax = eigenvalue max Tabel Indeks Acak (RI) n 1 n = orde mat r ix by E. For man Or de Mat r ix (n) RI CI = = = ) Menghit ung Rasio Konsist ensi / Consist ency Rat io (CR) CI CR = RI dimana : CR = Consist ency Rat io CI = Consist ency Index RI = Random Index (t abel) unt uk n = 5, maka RI = CR = Sumber : Thomas L. Saaty, = Syarat : CR < 0.1 Ok! L - 44

47 Lampiran 23 Pembobotan Sub Kriteria (Level 3) 2. PEMBOBOTAN SUBKRITERIA (LEVEL 3 ) a. Sosial SOS LAPKER SDM KUAHID LAPKER SDM 1/2 1 1/2 KUAHID Total SOS LAPKER SDM KUAHID Bobot Priorit as LAPKER SDM KUAHID Tot al Uji Konsist ensi n = 3 SOS [NxP] Nilai λ max = LAPKER CI = SDM RI = 0.52 KUAHID CR = Total Check = Ok! b. Lingkungan LINGK ALAM SDA EKOL MAS ALAM /2 SDA /2 EKOL /3 MAS Total LINGK ALAM SDA EKOL MAS Bobot Priorit as ALAM SDA EKOL MAS Tot al Uji Konsist ensi n = 4 LINGK [NxP] Nilai λ max = ALAM CI = SDA RI = 0.89 EKOL CR = MAS Check = Ok! Total L - 45

48 c. Teknis TEK SAFE EFEKT FLEXI SAFE EFEKT 1/3 1 1 FLEXI 1/2 1 1 Total TEK SAFE EFEKT FLEXI Bobot Priorit as SAFE EFEKT FLEXI Tot al Uji Konsist ensi n = 3 TEK [NxP] Nilai λ max = SAFE CI = EFEKT RI = 0.52 FLEXI CR = Tot al Check = Ok! d. Ekonomi EKON PENDA PENM AS PENDA 1 1/3 PENMAS 3 1 Total EKON PENDA PENM AS Bobot Prior it as PENDA PENMAS Tot al Uji Konsist ensi n = 2 EKON [NxP] Nilai λ max = PENDA CI = PENMAS RI = 0.00 Tot al CR = Ok! e. Hukum dan Kelembagaan HUK PERBIJ BAPEL PERBIJ 1 3 BAPEL 1/3 1 Total HUK PERBIJ BAPEL Bobot Prior it as PERBIJ BAPEL Tot al Uji Konsist ensi n = 2 HUK [NxP] Nilai λ max = PERBIJ CI = BAPEL RI = 0.00 Tot al CR = Ok! L - 46

49 Lampiran 24 Pembobotan Alternatif (Level 4) 3. PEMBOBOTAN ALTERNATIF (LEVEL 4 ) a. Terbukanya Lapangan Kerja LAPKER DOM NIA IND SARPRAS IRIG MF DOM 1 1/5 1/4 1/3 1/2 5 NIA 5 1 1/ IND SARPRAS 3 1/3 1/3 1 1/2 2 IRIG 2 1/2 1/ MF 1/5 1/4 1/5 1/2 1/3 1 Total LAPKER DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Total Uji Konsist ensi n = 6 LAPKER [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al b. Peningkat an Sumber Daya Manusia SDM DOM NIA IND SARPRAS IRIG MF DOM 1 1/3 1/4 1/5 1/2 2 NIA 3 1 1/3 1/2 1/2 2 IND /3 3 2 SARPRAS IRIG 2 2 1/3 1/4 1 3 MF 1/2 1/2 1/2 1/5 1/3 1 Total SDM DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Total Uji Konsist ensi n = 6 SDM [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 47

50 c. Peningkat an Kualit as hidup masyarakat KUAHID DOM NIA IND SARPRAS IRIG M F DOM /2 2 4 NIA 1/ /3 1/2 1/3 IND 1/5 1/3 1 1/5 1/3 1/2 SARPRAS IRIG 1/ /3 1 1/2 MF 1/ /2 2 1 Total KUAHID DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Total Uji Konsist ensi n = 6 KUAHID [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 48

51 d. Dampak Terhadap Alam ALAM DOM NIA IND SARPRAS IRIG MF DOM /2 3 1/3 NIA 1/ /3 2 1/4 IND 1/5 1/3 1 1/3 1/2 1/6 SARPRAS /2 IRIG 1/3 1/2 2 1/3 1 1/3 MF Total ALAM DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 ALAM [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al e. Dampak Terhadap Sumber Daya Air SDA DOM NIA IND SARPRAS IRIG MF DOM 1 1/5 1/3 1/4 3 1/2 NIA 5 1 1/3 1/2 4 2 IND /2 3 2 SARPRAS IRIG 1/3 1/4 1/3 1/5 1 1/2 MF 2 1/2 1/2 1/4 2 1 Total SDA DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 SDA [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 49

52 f. Dampak Terhadap Ekologi EKOL DOM NIA IND SARPRAS IRIG MF DOM 1 1/2 2 1/3 3 1/3 NIA /4 2 1/5 IND 1/2 1/4 1 1/6 1/3 1/8 SARPRAS /3 IRIG 1/3 1/2 3 1/3 1 1/7 MF Total EKOL DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 EKOL [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al g. Dampak Terhadap Masyarakat MAS DOM NIA IND SARPRAS IRIG MF DOM /3 NIA 1/5 1 1/2 1/4 1 1/5 IND 1/ /2 2 1/6 SARPRAS 1/ /3 IRIG 1/3 1 1/2 1/3 1 1/7 MF Total MAS DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 M AS [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 50

53 h. Safet y SAFE DOM NIA IND SARPRAS IRIG MF DOM NIA 1 1 1/ IND 1/ /5 1 1 SARPRAS IRIG 1/3 1/3 1 1/4 1 1 MF 1/2 1/2 1 1/3 1 1 Total SAFE DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 SAFE [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al i. Efektifitas EFEKT DOM NIA IND SARPRAS IRIG MF DOM NIA 1/5 1 1/2 1/3 1 1/2 IND 1/ /5 2 1/3 SARPRAS IRIG 1/3 1 1/2 1/4 1 1/3 MF 1/ /5 3 1 Total EFEKT DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 EFEKT [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 51

54 j. Fleksibilit as FLEXI DOM NIA IND SARPRAS IRIG MF DOM NIA 1/3 1 1/2 1/3 3 1/4 IND 1/ /5 2 1/3 SARPRAS IRIG 1/4 1/3 1/2 1/4 1 1/2 MF 1/ /2 2 1 Total FLEXI DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 FLEXI [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 52

55 k. Kont ribusi Terhadap Pendapat an Daerah PENDA DOM NIA IND SARPRAS IRIG M F DOM NIA 1/ IND 1/5 1/ SARPRAS 1/6 1/5 1/ IRIG 1/7 1/4 1/4 1/4 1 2 MF 1/8 1/8 1/7 1/3 1/2 1 Total PENDA DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Total Uji Konsist ensi n = 6 PENDA [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al l. Peningkat an Pendapat an Masyarakat PENM AS DOM NIA IND SARPRAS IRIG M F DOM 1 1/4 1/3 1 1/5 2 NIA /4 2 IND 3 1/ /3 3 SARPRAS 1 1/4 1/2 1 1/5 2 IRIG MF 1/2 1/2 1/3 1/2 1/4 1 Total PENMAS DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Total Uji Konsist ensi n = 6 PENMAS [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 53

56 m. Perat uran dan Kebijakan Yang Jelas PERBIJ DOM NIA IND SARPRAS IRIG MF DOM /3 NIA 1/5 1 1/2 1/4 2 1/4 IND 1/ /3 3 1/5 SARPRAS /2 IRIG 1/3 1/2 1/3 1/4 1 1/3 MF Total PERBIJ DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 PERBIJ [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al n. Badan Pengelola Yang Mandiri BAPEL DOM NIA IND SARPRAS IRIG MF DOM NIA 1/ /3 3 4 IND 1/ /2 2 3 SARPRAS IRIG 1/6 1/3 1/2 1/4 1 2 MF 1/5 1/4 1/3 1/5 1/2 1 Total BAPEL DOM NIA IND SARPRAS IRIG MF Bobot Priorit as DOM NIA IND SARPRAS IRIG MF Tot al Uji Konsist ensi n = 6 BAPEL [NxP] Nilai λ max = DOM CI = NIA RI = 1.25 IND CR = SARPRAS Check = Ok! IRIG MF Tot al L - 54

57 Lampiran 25 Pembobotan Total Untuk Mendapatkan Urutan Prioritas Bobot Total = A x B x C A = Bobot Kr it er ia (Level 2) B = Bobot Sub Kr it er ia (Level 3) C = Bobot Alt er nat if pada Sub Kr it er ia (Level 4) A B Bobot Level 2 SOS LINGK TEK EKON HUK Bobot LAPKER SDM KUAHID ALAM SDA EKOL MAS SAFE EFEKT FLEXI PENDA PENMAS PERBIJ BAPEL Level C Bobot Alternatif (Level 4) LAPKER SDM KUAHID ALAM SDA EKOL MAS SAFE EFEKT FLEXI PENDA PENMAS PERBIJ BAPEL DOM NIA IND SARPRAS IRIG MF SOS LINGK TEK EKON HUK TOTAL BOBOT LAPKER SDM KUAHID ALAM SDA EKOL MAS SAFE EFEKT FLEXI PENDA PENM AS PERBIJ BAPEL BOBOT DOM NIA IND SARPRAS IRIG MF TOTAL Urut an Priorit as Pengembangan DAS Waisai NO. RENCANA PEMANFAATAN TOTAL BOBOT 1 SARANA PRASARANA DOMESTIK MAINTENANCE FLOW NIAGA IRIGASI INDUSTRI GOAL = 1 Sumber : Hasil per hit ungan URUTAN PRIORITAS I II III IV V VI L - 55

58 Lampiran 26 Foto Dokumentasi Lokasi Kajian di Waisai ( Kab. Raja Ampat ) L - 56

59 L - 57

60 L - 58

61 L - 59

62 Lampiran 27 Foto Satelit Situ Nagrog L - 60

63 Lampiran 28 Referensi Estimasi Rata-Rata Evapotranspirasi Tanaman untuk Irigasi Situ Nagrog (stasiun terdekat Pusakanegara) L - 61

64 Lampiran 29 Referensi Kebutuhan Air LP untuk Irigasi Situ Nagrog Kebut uhan Air Selama Penyiapan Lahan (LP) Ir igasi Sit u Nagrog LP (mm/hr) ( Referensi Pusakanegara) mm/bln mm/hr Sumber : JICA, 1993 L - 62

65 Lampiran 30 Data Curah Hujan dan Hari Hujan Setengah Bulanan Stasiun Pagaden DATA CURAH HUJAN SETENGAH BULANAN PAGADEN BULAN No. JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC I II I II I II I II I II I II I II I II I II I II I II I II Sumber : Puslit bang Pengairan Dep. PU KET. DATA HARI HUJAN SETENGAH BULANAN PAGADEN BULAN No. JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC I II I II I II I II I II I II I II I II I II I II I II I II Sumber : Puslit bang Pengairan Dep. PU KET. Lampiran 31 Perhitungan Evaporasi Situ Nagrog Perhit ungan Evaporasi Sit u Nagrog Besaran Sat. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Eto mm/bulan m/bulan fakt or Evaporasi asumsi 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% E m/bulan Sumber : Hasil Perhit ungan L - 63

66 Lampiran 32 Perhitungan Kebutuhan Air Irigasi Situ Nagrog Sistem Golongan L - 64

67 L - 65

68 Lampiran 33 Alternatif Terpilih Sistem 2 Golongan Kebutuhan Air Irigasi Situ Nagrog ALTERNATIF KEBUTUHAN PENGAMBILAN AIR IRIGASI PAGADEN (SITU NAGROG) DALAM L/DT/HA BULAN OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP PERIODE I II I II I II I II I II I II I II I II I II I II I II I II MAX MIN RATA2 ALTERNATIF GOLONGAN 1 A B C D AB AC AD BC BD CD Sumber : Hasil per hit ungan Lampiran 34 Perhitungan Inflow Rata-Rata Bulanan Situ Nagrog PERHITUNGAN INFLOW BULANAN SITU NAGROG CA = 800, m 2 No. BULAN JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC KET Hujan rata mm m Inflow rate 313, , , , ,880 51,360 31,520 5, , , ,360 m 3 CA = Cat chment Ar ea L - 66

69 Lampiran 35 Foto Dokumentasi Bangunan Pembanding Situ Nagrog ( Kab. Subang ) L - 67

70 Lampiran 36 Peta Tata Guna Lahan Papua L - 68

Tabel 4.31 Kebutuhan Air Tanaman Padi

Tabel 4.31 Kebutuhan Air Tanaman Padi Tabel 4.31 Kebutuhan Air Tanaman Padi Kebutuhan Tanaman Padi UNIT JAN FEB MAR APR MEI JUNI JULI AGST SEPT OKT NOV DES Evapotranspirasi (Eto) mm/hr 3,53 3,42 3,55 3,42 3,46 2,91 2,94 3,33 3,57 3,75 3,51

Lebih terperinci

Lampiran 1.1 Data Curah Hujan 10 Tahun Terakhir Stasiun Patumbak

Lampiran 1.1 Data Curah Hujan 10 Tahun Terakhir Stasiun Patumbak 13 Lampiran 1.1 Data Curah Hujan 1 Tahun Terakhir Stasiun Patumbak TAHUN PERIODE JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER 25 I 11 46 38 72 188 116 144 16 217

Lebih terperinci

DESAIN ULANG BENDUNG UNTUK PENINGKATAN DEBIT AIR IRIGASI DI WAEKOKAK KEC LELAK KAB MANGGARAI NTT

DESAIN ULANG BENDUNG UNTUK PENINGKATAN DEBIT AIR IRIGASI DI WAEKOKAK KEC LELAK KAB MANGGARAI NTT DESAIN ULANG BENDUNG UNTUK PENINGKATAN DEBIT AIR IRIGASI DI WAEKOKAK KEC LELAK KAB MANGGARAI NTT Gregorius Mayus Angi, Adi Prawito Program Studi Teknik Sipil Fakultas Teknik, Universitas Narotama Email

Lebih terperinci

BAB IV HASIL DAN ANALISIS

BAB IV HASIL DAN ANALISIS BAB IV HASIL DAN ANALISIS 4.1 PENGOLAHAN DATA HIDROLOGI 4.1.1 Data Curah Hujan Curah hujan merupakan data primer yang digunakan dalam pengolahan data untuk merencanakan debit banjir. Data ini diambil dari

Lebih terperinci

BAB 4 ANALISIS DATA DAN PEMBAHASAN

BAB 4 ANALISIS DATA DAN PEMBAHASAN BAB 4 ANALISIS DATA DAN PEMBAHASAN 4.1. Data Penelitian ini menggunakan data curah hujan, data evapotranspirasi, dan peta DAS Bah Bolon. Data curah hujan yang digunakan yaitu data curah hujan tahun 2000-2012.

Lebih terperinci

ANALISIS DEBIT ANDALAN

ANALISIS DEBIT ANDALAN ANALISIS DEBIT ANDALAN A. METODE FJ MOCK Dr. F.J. Mock dalam makalahnya Land Capability-Appraisal Indonesia Water Availability Appraisal, UNDP FAO, Bogor, memperkenalkan cara perhitungan aliran sungai

Lebih terperinci

ANALISIS DEBIT BANJIR RANCANGAN BANGUNAN PENAMPUNG AIR KAYANGAN UNTUK SUPLESI KEBUTUHAN AIR BANDARA KULON PROGO DIY

ANALISIS DEBIT BANJIR RANCANGAN BANGUNAN PENAMPUNG AIR KAYANGAN UNTUK SUPLESI KEBUTUHAN AIR BANDARA KULON PROGO DIY ANALISIS DEBIT BANJIR RANCANGAN BANGUNAN PENAMPUNG AIR KAYANGAN UNTUK SUPLESI KEBUTUHAN AIR BANDARA KULON PROGO DIY Edy Sriyono Jurusan Teknik Sipil, Fakultas Teknik, Universitas Janabadra Jalan Tentara

Lebih terperinci

BAB IV PEMBAHASAN DAN HASIL

BAB IV PEMBAHASAN DAN HASIL BAB IV PEMBAHASAN DAN HASIL 4.1. Analisis Curah Hujan 4.1.1. Ketersediaan Data Curah Hujan Untuk mendapatkan hasil yang memiliki akurasi tinggi, dibutuhkan ketersediaan data yang secara kuantitas dan kualitas

Lebih terperinci

BAB IV ANALISIS. Tabel 4. 1 Hasil Perhitungan Uji Outliers Data Hujan Harian Maximum Tahunan UJI OUTLIERS DATA 1H MAX WAIGEO

BAB IV ANALISIS. Tabel 4. 1 Hasil Perhitungan Uji Outliers Data Hujan Harian Maximum Tahunan UJI OUTLIERS DATA 1H MAX WAIGEO BAB IV ANALISIS 4.1. Analisis Banjir Dalam analisis banjir, data yang digunakan adalah data curah hujan maksimum harian dari tahun 1991 sampai dengan 2006 (data 2001 dan 2002 tidak dipakai karena tidak

Lebih terperinci

BAB IV HASIL DAN PEMBAHASAN

BAB IV HASIL DAN PEMBAHASAN 4.1 Analisis Tangkapan Hujan BAB IV HASIL DAN PEMBAHASAN Berdasarkan stasiun curah hujan Jalaluddin dan stasiun Pohu Bongomeme. Perhitungan curah hujan rata-rata aljabar. Hasil perhitungan secara lengkap

Lebih terperinci

ANALISIS KETERSEDIAAN AIR PULAU-PULAU KECIL DI DAERAH CAT DAN NON-CAT DENGAN CARA PERHITUNGAN METODE MOCK YANG DIMODIFIKASI.

ANALISIS KETERSEDIAAN AIR PULAU-PULAU KECIL DI DAERAH CAT DAN NON-CAT DENGAN CARA PERHITUNGAN METODE MOCK YANG DIMODIFIKASI. ANALISIS KETERSEDIAAN AIR PULAU-PULAU KECIL DI DAERAH CAT DAN NON-CAT DENGAN CARA PERHITUNGAN METODE MOCK YANG DIMODIFIKASI Happy Mulya Mahasiswa Program Doktor Teknik Sipil Universitas Diponegoro, Semarang,

Lebih terperinci

DAFTAR PUSTAKA. Ariansyah Tinjauan Sistem Pipa Distribusi Air Bersih di Kelurahan Talang

DAFTAR PUSTAKA. Ariansyah Tinjauan Sistem Pipa Distribusi Air Bersih di Kelurahan Talang Daftar Pustaka DAFTAR PUSTAKA Ariansyah. 2009. Tinjauan Sistem Pipa Distribusi Air Bersih di Kelurahan Talang Betutu Palembang [Jurnal]. Palembang: Politeknik Negeri Sriwijaya. Badan Pusat Statistik [BPS].

Lebih terperinci

PERENCANAAN OPTIMALISASI WADUK GEDANG KULUD KABUPATEN CERME GRESIK ABSTRAK

PERENCANAAN OPTIMALISASI WADUK GEDANG KULUD KABUPATEN CERME GRESIK ABSTRAK PERENCANAAN OPTIMALISASI WADUK GEDANG KULUD KABUPATEN CERME GRESIK RACHMAT HARIONO NIM. 03111093 ABSTRAK Tujuan Perencanaan Optimalisasi Waduk Gedang Kulud ini dilakukan beberapa analisis untuk mengidentifikasi

Lebih terperinci

KAJIAN SEDIMENTASI RENCANA BANGUNAN PENAHAN SEDIMEN SUNGAI KAPUR KECIL

KAJIAN SEDIMENTASI RENCANA BANGUNAN PENAHAN SEDIMEN SUNGAI KAPUR KECIL Kajian Sedimentasi Rencana Bangunan Penahan Sedimen KAJIAN SEDIMENTASI RENCANA BANGUNAN PENAHAN SEDIMEN SUNGAI KAPUR KECIL Siswanto, Manyuk Fauzi, Hendra Muchlis ABSTRAK Pengurangan hutan karena kebutuhan

Lebih terperinci

Irigasi Dan Bangunan Air. By: Cut Suciatina Silvia

Irigasi Dan Bangunan Air. By: Cut Suciatina Silvia Irigasi Dan Bangunan Air By: Cut Suciatina Silvia DEBIT INTAKE UNTUK PADI Debit intake untuk padi adalah debit yang disadap dan kemudian dialirkan ke dalam saluran irigasi untuk memenuhi kebutuhan air

Lebih terperinci

PERENCANAAN SALURAN PENANGGULANGAN BANJIR MUARA SUNGAI TILAMUTA

PERENCANAAN SALURAN PENANGGULANGAN BANJIR MUARA SUNGAI TILAMUTA PERENCANAAN SALURAN PENANGGULANGAN BANJIR MUARA SUNGAI TILAMUTA Rike Rismawati Mangende Sukarno, Alex Binilang Fakultas Teknik Jurusan Sipil Universitas Sam Ratulangi Email : rikem82@gmail.com ABSTRAK

Lebih terperinci

BAB 6 KESIMPULAN DAN SARAN

BAB 6 KESIMPULAN DAN SARAN BAB 6 KESIMPULAN DAN SARAN 6.1 Kesimpulan Berdasarkan atas kajian dalam bab-bab sebelumnya, maka dapat ditarik kesimpulan sebagai berikut: 1. Hasil evaluasi aspek teknis menunjukkan penyebab banjir dan

Lebih terperinci

4. BAB IV ANALISA DAN PENGOLAHAN DATA ANALISA DAN PENGOLAHAN DATA

4. BAB IV ANALISA DAN PENGOLAHAN DATA ANALISA DAN PENGOLAHAN DATA 4. BAB IV ANALISA DAN PENGOLAHAN DATA ANALISA DAN PENGOLAHAN DATA 4.1. TINJAUAN UMUM Dalam rangka perencanaan bangunan dam yang dilengkapi PLTMH di kampus Tembalang ini sebagai langkah awal dilakukan pengumpulan

Lebih terperinci

BAB IV ANALISIS DATA

BAB IV ANALISIS DATA 90 BAB IV ANALISIS DATA 4.1. Tinjauan Umum Dalam merencanakan jaringan irigasi tambak, analisis yang digunakan adalah analisis hidrologi dan analisis pasang surut. Analisis hidrologi yaitu perhitungan

Lebih terperinci

PERENCANAAN SISTEM DRAINASE DI DAERAH ALIRAN SUNGAI (DAS) KALI DAPUR / OTIK SEHUBUNGAN DENGAN PERKEMBANGAN KOTA LAMONGAN

PERENCANAAN SISTEM DRAINASE DI DAERAH ALIRAN SUNGAI (DAS) KALI DAPUR / OTIK SEHUBUNGAN DENGAN PERKEMBANGAN KOTA LAMONGAN Redesain Bendungan Way Apu Kabpaten Buru Provinsi Maluku PERENCANAAN SISTEM DRAINASE DI DAERAH ALIRAN SUNGAI (DAS) KALI DAPUR / OTIK SEHUBUNGAN DENGAN PERKEMBANGAN KOTA LAMONGAN Ichsan Rizkyandi, Bambang

Lebih terperinci

TUGAS AKHIR PERHITUNGAN DEBIT ANDALAN SEBAGAI. Dosen Pembimbing : Dr. Ali Masduqi, ST. MT. Nohanamian Tambun

TUGAS AKHIR PERHITUNGAN DEBIT ANDALAN SEBAGAI. Dosen Pembimbing : Dr. Ali Masduqi, ST. MT. Nohanamian Tambun TUGAS AKHIR PERHITUNGAN DEBIT ANDALAN SEBAGAI SUMBER AIR BERSIH PDAM JAYAPURA Dosen Pembimbing : Dr. Ali Masduqi, ST. MT Nohanamian Tambun 3306 100 018 Latar Belakang Pembangunan yang semakin berkembang

Lebih terperinci

ANALISIS KETERSEDIAAN AIR PADA DAERAH IRIGASI BLANG KARAM KECAMATAN DARUSSALAM KEBUPATEN ACEH BESAR

ANALISIS KETERSEDIAAN AIR PADA DAERAH IRIGASI BLANG KARAM KECAMATAN DARUSSALAM KEBUPATEN ACEH BESAR ISSN 2407-733X E-ISSN 2407-9200 pp. 35-42 Jurnal Teknik Sipil Unaya ANALISIS KETERSEDIAAN AIR PADA DAERAH IRIGASI BLANG KARAM KECAMATAN DARUSSALAM KEBUPATEN ACEH BESAR Ichsan Syahputra 1, Cut Rahmawati

Lebih terperinci

Analisis Ketersediaan Air Embung Tambakboyo Sleman DIY

Analisis Ketersediaan Air Embung Tambakboyo Sleman DIY Analisis Ketersediaan Air Embung Tambakboyo Sleman DIY Agung Purwanto 1, Edy Sriyono 1, Sardi 2 Program Magister Teknik Sipil, Fakultas Teknik, Universitas Janabadra Yogyakarta 1 Jurusan Teknik Sipil,

Lebih terperinci

PERENCANAAN EMBUNG SEMAR KABUPATEN REMBANG. Muchammad Chusni Irfany, Satriyo Pandu Wicaksono, Suripin *), Sri Eko Wahyuni *)

PERENCANAAN EMBUNG SEMAR KABUPATEN REMBANG. Muchammad Chusni Irfany, Satriyo Pandu Wicaksono, Suripin *), Sri Eko Wahyuni *) JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 3, Tahun 2014, Halaman 685 JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 3, Tahun 2014, Halaman 685 694 Online di: http://ejournal-s1.undip.ac.id/index.php/jkts

Lebih terperinci

BAB IV HASIL DAN ANALISIS. menyimpan semua atau sebagian air yang masuk (inflow) yang berasal dari

BAB IV HASIL DAN ANALISIS. menyimpan semua atau sebagian air yang masuk (inflow) yang berasal dari BAB IV HASIL DAN ANALISIS 4.1 Uraian Umum Bendungan (waduk) mempunyai fungsi yaitu menampung dan menyimpan semua atau sebagian air yang masuk (inflow) yang berasal dari daerah pengaliran sunyainya (DPS).

Lebih terperinci

EVALUASI POTENSI SUMBERDAYA AIR SUNGAI UNTUK PENGAIRAN DI PROVINSI JAWA BARAT DAN BANTEN

EVALUASI POTENSI SUMBERDAYA AIR SUNGAI UNTUK PENGAIRAN DI PROVINSI JAWA BARAT DAN BANTEN JRL Vol. 5 No.1 Hal 61-67 Jakarta, Januari 2009 ISSN : 2085-3866 EVALUASI POTENSI SUMBERDAYA AIR SUNGAI UNTUK PENGAIRAN DI PROVINSI JAWA BARAT DAN BANTEN Ig. Setyawan Purnama Fakultas Geografi, Universitas

Lebih terperinci

Tujuan: Peserta mengetahui metode estimasi Koefisien Aliran (Tahunan) dalam monev kinerja DAS

Tujuan: Peserta mengetahui metode estimasi Koefisien Aliran (Tahunan) dalam monev kinerja DAS MONEV TATA AIR DAS ESTIMASI KOEFISIEN ALIRAN Oleh: Agung B. Supangat Balai Penelitian Teknologi Kehutanan Pengelolaan DAS Jl. A.Yani-Pabelan PO Box 295 Surakarta Telp./fax. (0271)716709, email: maz_goenk@yahoo.com

Lebih terperinci

EVALUASI KETERSEDIAAN DAN TINGKAT PEMENUHAN KEBUTUHAN AIR DI SUB DAS CIKERUH

EVALUASI KETERSEDIAAN DAN TINGKAT PEMENUHAN KEBUTUHAN AIR DI SUB DAS CIKERUH 72 Gea. Jurnal Pendidikan Geografi, Volume 18, Nomor 1, April 2018. EVALUASI KETERSEDIAAN DAN TINGKAT PEMENUHAN KEBUTUHAN AIR DI SUB DAS CIKERUH M. Restu Zarkasih 1, Dede Rohmat 2, Djakaria M. Nur 3 1

Lebih terperinci

PERENCANAAN BENDUNG CIKAWUNG PADA DAERAH NON-CEKUNGAN AIR TANAH DI KABUPATEN CILACAP, JAWA TENGAH

PERENCANAAN BENDUNG CIKAWUNG PADA DAERAH NON-CEKUNGAN AIR TANAH DI KABUPATEN CILACAP, JAWA TENGAH PERENCANAAN BENDUNG CIKAWUNG PADA DAERAH NON-CEKUNGAN AIR TANAH DI KABUPATEN CILACAP, JAWA TENGAH ABSTRAK Etika Herdiarti, Shalli Malia Nisa Robert J. Kodoatie, Hari Nugroho *) Jurusan Teknik Sipil, Fakultas

Lebih terperinci

Kajian Model Hidrograf Banjir Rencana Pada Daerah Aliran Sungai (DAS)

Kajian Model Hidrograf Banjir Rencana Pada Daerah Aliran Sungai (DAS) Kajian Model Hidrograf Banjir Rencana Pada Daerah Aliran Sungai (DAS) Studi Kasus Daerah Aliran Sungai (DAS) Bedadung di Kabupaten Jember Nanang Saiful Rizal, ST. MT. Jl. Karimata 49 Jember - JATIM Tel

Lebih terperinci

Perencanaan Sistem Drainase Pada Sungai Buntung Kabupaten Sidoarjo ABSTRAK:

Perencanaan Sistem Drainase Pada Sungai Buntung Kabupaten Sidoarjo ABSTRAK: NEUTRON, Vol., No., Februari 00 9 Perencanaan Sistem Drainase Pada Sungai Buntung Kabupaten Sidoarjo ABSTRAK: Sungai Buntung terletak di kabupaten Sidoarjo, pada musim hujan daerah sekitar sungai Buntung

Lebih terperinci

KEANDALAN ANALISA METODE MOCK (STUDI KASUS: WADUK PLTA KOTO PANJANG) Trimaijon. Jurusan Teknik Sipil, Fakultas Teknik, Universitas Riau, Pekanbaru

KEANDALAN ANALISA METODE MOCK (STUDI KASUS: WADUK PLTA KOTO PANJANG) Trimaijon. Jurusan Teknik Sipil, Fakultas Teknik, Universitas Riau, Pekanbaru Jurnal Teknobiologi, 1(2) 2010: 70-83 ISSN: 208-5428 KEANDALAN ANALISA METODE MOCK (STUDI KASUS: WADUK PLTA KOTO PANJANG) Trimaijon Jurusan Teknik Sipil, Fakultas Teknik, Universitas Riau, Pekanbaru ABSTRAK

Lebih terperinci

BAB III ANALISIS HIDROLOGI

BAB III ANALISIS HIDROLOGI BAB III ANALISIS HIDROLOGI 3.1 Data Hidrologi Dalam perencanaan pengendalian banjir, perencana memerlukan data-data selengkap mungkin yang berkaitan dengan perencanaan tersebut. Data-data yang tersebut

Lebih terperinci

PENDAHULUAN. Latar Belakang

PENDAHULUAN. Latar Belakang PERHITUNGAN KEBUTUHAN AIR IRIGASI DAN POLA TANAM PADA DAERAH IRIGASI RAWA SALIM BATU DENGAN LUAS AREAL 350 HA, KABUPATEN BULUNGAN, PROVINSI KALIMANTAN UTARA MUHAMMAD SANDI VADILLAH 12.11.1001.7311.097

Lebih terperinci

Perkiraan Koefisien Pengaliran Pada Bagian Hulu DAS Sekayam Berdasarkan Data Debit Aliran

Perkiraan Koefisien Pengaliran Pada Bagian Hulu DAS Sekayam Berdasarkan Data Debit Aliran Jurnal Vokasi 2010, Vol.6. No. 3 304-310 Perkiraan Koefisien Pengaliran Pada Bagian Hulu DAS Sekayam Berdasarkan Data Debit Aliran HARI WIBOWO Fakultas Teknik Universitas Tanjungpura Jalan Ahmad Yani Pontianak

Lebih terperinci

BAB IV ANALISIS HIDROLOGI

BAB IV ANALISIS HIDROLOGI IV-1 BAB IV ANALISIS HIDROLOGI 4.1. Tinjauan Umum Analisis hidrologi digunakan untuk mengetahui debit aliran sungai dan parameter-parameter lainnya yang diperlukan dalam perencanaan Embung Panohan. Analisis

Lebih terperinci

BAB IV ANALISIS HIDROLOGI

BAB IV ANALISIS HIDROLOGI BAB IV ANALISIS HIDROLOGI IV - 1 BAB IV ANALISIS HIDROLOGI 4.1 TINJAUAN UMUM Dalam merencanakan bangunan air, analisis yang penting perlu ditinjau adalah analisis hidrologi. Analisis hidrologi diperlukan

Lebih terperinci

INFRASTRUKTUR KETELITIAN METODE EMPIRIS UNTUK MENGHITUNG DEBIT BANJIR RANCANGAN DI DAS BANGGA

INFRASTRUKTUR KETELITIAN METODE EMPIRIS UNTUK MENGHITUNG DEBIT BANJIR RANCANGAN DI DAS BANGGA INFRASTRUKTUR KETELITIAN METODE EMPIRIS UNTUK MENGHITUNG DEBIT BANJIR RANCANGAN DI DAS BANGGA The Precision of Empirical Methods in Calculating Flood Discharge Design in Bangga Watershed Marcelia Alumni

Lebih terperinci

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang JURNAL TEKNIK POMITS Vol. 1, No. 1, (2012) 1-5 1 Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang Dika Aristia Prabowo, Abdullah Hidayat dan Edijatno Jurusan Teknik Sipil, Fakultas

Lebih terperinci

BAB V HASIL DAN PEMBAHASAN

BAB V HASIL DAN PEMBAHASAN BAB V HASIL DAN PEMBAHASAN 5.1 Analisis Curah Hujan Curah hujan diukur setiap hari dengan interval pengukuran dua puluh empat jam dengan satuan mm/hari. Pengukuran curah hujan dilakukan oleh Automatic

Lebih terperinci

4.6 Perhitungan Debit Perhitungan hidrograf debit banjir periode ulang 100 tahun dengan metode Nakayasu, ditabelkan dalam tabel 4.

4.6 Perhitungan Debit Perhitungan hidrograf debit banjir periode ulang 100 tahun dengan metode Nakayasu, ditabelkan dalam tabel 4. Sebelumnya perlu Dari perhitungan tabel.1 di atas, curah hujan periode ulang yang akan digunakan dalam perhitungan distribusi curah hujan daerah adalah curah hujan dengan periode ulang 100 tahunan yaitu

Lebih terperinci

Kata Kunci : Waduk Diponegoro, Rekayasa Nilai.

Kata Kunci : Waduk Diponegoro, Rekayasa Nilai. REKAYASA NILAI PERENCANAAN PEMBANGUNAN WADUK DIPONEGORO KOTA SEMARANG Value Engineering of Construction Design of Diponegoro Reservoir Semarang City Binar Satriyo Dwika Lazuardi, Septianto Ganda Nugraha,

Lebih terperinci

BAB II TINJAUAN PUSTAKA

BAB II TINJAUAN PUSTAKA BAB II TINJAUAN PUSTAKA 2.1 Hidrologi Air di bumi ini mengulangi terus menerus sirkulasi penguapan, presipitasi dan pengaliran keluar (outflow). Air menguap ke udara dari permukaan tanah dan laut, berubah

Lebih terperinci

SILABUS. Kode : GG 309

SILABUS. Kode : GG 309 SILABUS Mata Kuliah : Hidrologi Kode : GG 309 Jumlah sks : 2 sks Semester : 2 Kelompok mata kuliah : MKK Program Studi Jurusan/Program : Pendidikan Geografi/S1 Status mata kuliah : Mata kuliah dasar Dosen

Lebih terperinci

OPTIMASI POLA OPERASI WADUK TILONG DENGAN PROGRAM DINAMIK DETERMINISTIK TESIS COSTANDJI NAIT NIM

OPTIMASI POLA OPERASI WADUK TILONG DENGAN PROGRAM DINAMIK DETERMINISTIK TESIS COSTANDJI NAIT NIM OPTIMASI POLA OPERASI WADUK TILONG DENGAN PROGRAM DINAMIK DETERMINISTIK TESIS Karya tulis sebagai salah satu syarat Untuk memperoleh gelar Magister dari Institut Teknologi Bandung Oleh COSTANDJI NAIT NIM.

Lebih terperinci

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang

Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang JURNAL TEKNIK ITS Vol. 1, No. 1, (Sept. 2012) ISSN: 2301-9271 D-82 Perencanaan Embung Gunung Rancak 2, Kecamatan Robatal, Kabupaten Sampang Dika Aristia Prabowo dan Edijatno Jurusan Teknik Sipil, Fakultas

Lebih terperinci

BAB IV HASIL DAN PEMBAHASAN. Sungai Banjaran merupakan anak sungai Logawa yang mengalir dari arah

BAB IV HASIL DAN PEMBAHASAN. Sungai Banjaran merupakan anak sungai Logawa yang mengalir dari arah BAB IV HASIL DAN PEMBAHASAN 4.1. Deskripsi Lokasi Studi Sungai Banjaran merupakan anak sungai Logawa yang mengalir dari arah Utara ke arah Selatan dan bermuara pada sungai Serayu di daerah Patikraja dengan

Lebih terperinci

BAB V ANALISIS HIDROLOGI DAN HIDROLIKA

BAB V ANALISIS HIDROLOGI DAN HIDROLIKA BAB V ANALISIS HIDROLOGI DAN HIDROLIKA A. Analisis Hidrologi 1. Curah Hujan Rencana Curah hujan adalah jumlah air yang jatuh di permukaan tanah datar selama periode tertentu yang diukur dengan satuan tinggi

Lebih terperinci

BAB 6 KESIMPULAN DAN SARAN

BAB 6 KESIMPULAN DAN SARAN BAB 6 KESIMPULAN DAN SARAN 6.1. Kesimpulan Berdasarkan hasil penelitian mengenai kelayakan perusahaan CV. Vian Pratama untuk memilih alternatif sewa atau beli armada truk baru sebagai pengiriman TBS ke

Lebih terperinci

KOMPARASI DEBIT ANALITIK METODE MOCK DENGAN DEBIT TERUKUR CATCHMENT AREA BOGOWONTO TERUKUR DI STASIUN PUNGANGAN

KOMPARASI DEBIT ANALITIK METODE MOCK DENGAN DEBIT TERUKUR CATCHMENT AREA BOGOWONTO TERUKUR DI STASIUN PUNGANGAN KOMPARASI DEBIT ANALITIK METODE MOCK DENGAN DEBIT TERUKUR CATCHMENT AREA BOGOWONTO TERUKUR DI STASIUN PUNGANGAN Bambang Sulistiono 1 dan Agustiadi Wiradiputra 2 1 Program Studi Teknik Sipil FTSP UII, email:

Lebih terperinci

SIMULASI OPERASI WADUK LAMONG UNTUK KEPENTINGAN AIR BAKU DAN IRIGASI LAMONG DAM SIMULATION OF OPERATION FOR RAW WATER AND IRRIGATION

SIMULASI OPERASI WADUK LAMONG UNTUK KEPENTINGAN AIR BAKU DAN IRIGASI LAMONG DAM SIMULATION OF OPERATION FOR RAW WATER AND IRRIGATION SIMULASI OPERASI WADUK LAMONG UNTUK KEPENTINGAN AIR BAKU DAN IRIGASI LAMONG DAM SIMULATION OF OPERATION FOR RAW WATER AND IRRIGATION Oleh : Andi Sulistiono *) Dadan Rahmandani **) Joko Triyono **) *) BBWS

Lebih terperinci

: Bagi mahasiswa Prodi D3 TS telah menempuh kuliah Matematika. : Drs. Sukadi, MPd., MT.

: Bagi mahasiswa Prodi D3 TS telah menempuh kuliah Matematika. : Drs. Sukadi, MPd., MT. SILABUS MATA KULIAH 1. Identitas mata kuliah Nama mata kuliah : Hidrologi Nomor kode : TS261 Jumlah SKS : 2 SKS Semester : 4 Kelompok Mata Kuliah : MKKP Program Studi/Program : D3 Teknik Sipil Status mata

Lebih terperinci

BAB VI P E N U T U P

BAB VI P E N U T U P 102 BAB VI P E N U T U P 6.1. KESIMPULAN Dari analisa mengenai Pengaruh Perubahan Peruntukan Lahan Terhadap Aspek Hidrologi dapat disimpulkan hal-hal sebagai berikut: 1. Adanya perubahan tata guna lahan

Lebih terperinci

ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR

ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR Zulfikar Indra M.I. Jasin, A. Binilang, J.D. Mamoto Fakultas Teknik, Jurusan Teknik Sipil,

Lebih terperinci

Misal dgn andalan 90% diperoleh debit andalan 100 m 3 /det. Berarti akan dihadapi adanya debit-debit yg sama atau lebih besar dari 100 m 3 /det

Misal dgn andalan 90% diperoleh debit andalan 100 m 3 /det. Berarti akan dihadapi adanya debit-debit yg sama atau lebih besar dari 100 m 3 /det DEBIT ANDALAN Debit Andalan (dependable discharge) : debit yang berhubungan dgn probabilitas atau nilai kemungkinan terjadinya. Merupakan debit yg kemungkinan terjadinya sama atau melampaui dari yg diharapkan.

Lebih terperinci

PERENCANAAN BENDUNG PROGOPISTAN DI KABUPATEN TEMANGGUNG, JAWA TENGAH. Herdi Janitra, Irzal Lathanza, Suharyanto *), Hary Budieny *)

PERENCANAAN BENDUNG PROGOPISTAN DI KABUPATEN TEMANGGUNG, JAWA TENGAH. Herdi Janitra, Irzal Lathanza, Suharyanto *), Hary Budieny *) JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 1, Tahun 2014, Halaman 302 JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 1, Tahun 2014, Halaman 302 311 Online di: http://ejournal-s1.undip.ac.id/index.php/jkts

Lebih terperinci

ANALISA CURAH HUJAN DALAM MEBUAT KURVA INTENSITY DURATION FREQUENCY (IDF) PADA DAS BEKASI. Elma Yulius 1)

ANALISA CURAH HUJAN DALAM MEBUAT KURVA INTENSITY DURATION FREQUENCY (IDF) PADA DAS BEKASI. Elma Yulius 1) 1 ANALISA CURAH HUJAN DALAM MEBUAT KURVA INTENSITY DURATION FREQUENCY (IDF) PADA DAS BEKASI Elma Yulius 1) 1) Program Studi Teknik Sipil, Universitas Islam 45 Bekasi E-mail: elmayulius@gmail.com ABSTRAK

Lebih terperinci

Studi Kasus Penggunaan Sumber Daya Air di Daerah Aliran Sungai (DAS) Way Ketibung Kabupaten Lampung Selatan

Studi Kasus Penggunaan Sumber Daya Air di Daerah Aliran Sungai (DAS) Way Ketibung Kabupaten Lampung Selatan Studi Kasus Penggunaan Sumber Daya Air di Daerah Aliran Sungai (DAS) Way Ketibung Kabupaten Lampung Selatan Sumiharni 1) Amril M. Siregar 2) Karina H. Ananta 3) Abstract The location of the watershed that

Lebih terperinci

ANALISA KETERSEDIAAN AIR DAERAH ALIRAN SUNGAI BARITO HULU DENGAN MENGGUNAKAN DEBIT HASIL PERHITUNGAN METODE NRECA

ANALISA KETERSEDIAAN AIR DAERAH ALIRAN SUNGAI BARITO HULU DENGAN MENGGUNAKAN DEBIT HASIL PERHITUNGAN METODE NRECA ANALISA KETERSEDIAAN AIR DAERAH ALIRAN SUNGAI BARITO HULU DENGAN MENGGUNAKAN DEBIT HASIL PERHITUNGAN METODE NRECA Salmani (1), Fakhrurrazi (1), dan M. Wahyudi (2) (1) Staf Pengajar Jurusan Teknik Sipil

Lebih terperinci

ANALISIS DEBIT BANJIR SUNGAI MOLOMPAR KABUPATEN MINAHASA TENGGARA

ANALISIS DEBIT BANJIR SUNGAI MOLOMPAR KABUPATEN MINAHASA TENGGARA ANALISIS DEBIT BANJIR SUNGAI MOLOMPAR KABUPATEN MINAHASA TENGGARA Dewi Sartika Ka u Soekarno, Isri R. Mangangka Fakultas Teknik Jurusan Teknik Sipil Universitas Sam Ratulangi Manado email : ddweeska@gmail.com

Lebih terperinci

PERENCANAAN EMBUNG TAMANREJO KECAMATAN SUKOREJO, KABUPATEN KENDAL. Bachtiar Khoironi Wibowo, Arvie Narayana, Abdul Kadir *), Dwi Kurniani *)

PERENCANAAN EMBUNG TAMANREJO KECAMATAN SUKOREJO, KABUPATEN KENDAL. Bachtiar Khoironi Wibowo, Arvie Narayana, Abdul Kadir *), Dwi Kurniani *) JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 3, Tahun 2014, Halaman 736 JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 3, Tahun 2014, Halaman 736 746 Online di: http://ejournal-s1.undip.ac.id/index.php/jkts

Lebih terperinci

DEBIT SUNGAI PROGO RUAS BANJARSARI KALIJOSO KABUPATEN MAGELANG

DEBIT SUNGAI PROGO RUAS BANJARSARI KALIJOSO KABUPATEN MAGELANG DEBIT SUNGAI PROGO RUAS BANJARSARI KALIJOSO KABUPATEN MAGELANG DWI SAT AGUS YUWONO Staff Pengajar Fakultas Teknik Universitas Tidar Magelang ABSTRACT Hydrology data are very important to determine discharge

Lebih terperinci

Analisis Ketersediaan Air Sungai Talawaan Untuk Kebutuhan Irigasi Di Daerah Irigasi Talawaan Meras Dan Talawaan Atas

Analisis Ketersediaan Air Sungai Talawaan Untuk Kebutuhan Irigasi Di Daerah Irigasi Talawaan Meras Dan Talawaan Atas Analisis Ketersediaan Air Sungai Talawaan Untuk Kebutuhan Irigasi Di Daerah Irigasi Talawaan Meras Dan Talawaan Atas Viralsia Ivana Kundimang Liany A. Hendratta, Eveline M. Wuisan Fakultas Teknik, Jurusan

Lebih terperinci

BAB IV ANALISIS HIDROLOGI

BAB IV ANALISIS HIDROLOGI BAB IV ANALISIS HIDROLOGI 4.1 Tinjauan Umum Dalam merencanakan Waduk Ciniru ini, sebagai langkah awal dilakukan pengumpulan data-data. Data tersebut digunakan sebagai dasar perhitungan stabilitas maupun

Lebih terperinci

BAB I PENDAHULUAN 1.1. Latar Belakang

BAB I PENDAHULUAN 1.1. Latar Belakang BAB I PENDAHULUAN 1.1. Latar Belakang Daerah Aliran Sungai (DAS) (catchment, basin, watershed) merupakan daerah dimana seluruh airnya mengalir ke dalam suatu sungai yang dimaksudkan. Daerah ini umumnya

Lebih terperinci

PERHITUNGAN DEBIT ANDALAN SEBAGAI SUMBER AIR BERSIH PDAM JAYAPURA CALCULATION OF DEPENDABLE FLOW AS WATER SOURCE IN PDAM JAYAPURA

PERHITUNGAN DEBIT ANDALAN SEBAGAI SUMBER AIR BERSIH PDAM JAYAPURA CALCULATION OF DEPENDABLE FLOW AS WATER SOURCE IN PDAM JAYAPURA PERHITUNGAN DEBIT ANDALAN SEBAGAI SUMBER AIR BERSIH PDAM JAYAPURA CALCULATION OF DEPENDABLE FLOW AS WATER SOURCE IN PDAM JAYAPURA Nohanamian Tambun Jurusan Teknik Lingkungan, FTSP-ITS email : papedapanas@ymail.com

Lebih terperinci

PENGARUH PERUBAHAN PENGGUNAAN LAHAN TERHADAP KOEFISIEN RUNOFF

PENGARUH PERUBAHAN PENGGUNAAN LAHAN TERHADAP KOEFISIEN RUNOFF PENGARUH PERUBAHAN PENGGUNAAN LAHAN TERHADAP KOEFISIEN RUNOFF DI DAS KEMONING KABUPATEN SAMPANG Agus Eko Kurniawan (1), Suripin (2), Hartuti Purnaweni (3) (1) Mahasiswa Magister Ilmu Lingkungan, UNDIP,

Lebih terperinci

PENGOPERASIAN WADUK MELALUI MODEL OPTIMASI LINEAR PROGRAMMING (Studi Kasus Waduk Keuliling Aceh Besar)

PENGOPERASIAN WADUK MELALUI MODEL OPTIMASI LINEAR PROGRAMMING (Studi Kasus Waduk Keuliling Aceh Besar) PENGOPERASIAN WADUK MELALUI MODEL OPTIMASI LINEAR PROGRAMMING (Studi Kasus Waduk Keuliling Aceh Besar) Wesli Jurusan Teknik Sipil, Fakultas Teknik, Universitas Malikussaleh Email: ir_wesli@yahoo.co.id

Lebih terperinci

PENGENDALIAN OVERLAND FLOW SEBAGAI SALAH SATU KOMPONEN PENGELOLAAN DAS. Oleh: Suryana*)

PENGENDALIAN OVERLAND FLOW SEBAGAI SALAH SATU KOMPONEN PENGELOLAAN DAS. Oleh: Suryana*) PENGENDALIAN OVERLAND FLOW SEBAGAI SALAH SATU KOMPONEN PENGELOLAAN DAS Oleh: Suryana*) Abstrak Pengelolaan Daerah Aliran Sungai (DAS) dilakukan secara integratif dari komponen biofisik dan sosial budaya

Lebih terperinci

Kampus Bina Widya J. HR Soebrantas KM 12,5 Pekanbaru, Kode Pos Abstract

Kampus Bina Widya J. HR Soebrantas KM 12,5 Pekanbaru, Kode Pos Abstract KESESUAIN MODEL HIDROGRAF SATUAN SINTETIK STUDI KASUS SUB DAERAH ALIRAN SUNGAI SIAK BAGIAN HULU Nurhasanah Junia 1), Manyuk Fauzi 2), Imam Suprayogi ) 1) Mahasiswa Jurusan Teknik Sipil, Fakultas Teknik,

Lebih terperinci

Teknik Pengolahan Data

Teknik Pengolahan Data Universitas Gadjah Mada Jurusan Teknik Sipil dan Lingkungan Prodi Magister Teknik Pengelolaan Bencana Alam Teknik Pengolahan Data Tabel dan Grafik Organisasi Data Koleksi data sta;s;k perlu disusun (diorganisir)

Lebih terperinci

Magister Pengelolaan Air dan Air Limbah Universitas Gadjah Mada. 18-Aug-17. Statistika Teknik.

Magister Pengelolaan Air dan Air Limbah Universitas Gadjah Mada. 18-Aug-17.  Statistika Teknik. Magister Pengelolaan Air dan Air Limbah Universitas Gadjah Mada Statistika Teknik Tabel dan Grafik Organisasi Data Koleksi data statistik perlu disusun (diorganisir) sedemikian hingga dapat dibaca dengan

Lebih terperinci

BAB III METODOLOGI. dan terorganisasi untuk menyelidiki masalah tertentu yang memerlukan jawaban.

BAB III METODOLOGI. dan terorganisasi untuk menyelidiki masalah tertentu yang memerlukan jawaban. BAB III METODOLOGI 3.1 Umum Metodologi merupakan suatu penyelidikan yang sistematis untuk meningkatkan sejumlah pengetahuan, juga merupakan suatu usaha yang sistematis dan terorganisasi untuk menyelidiki

Lebih terperinci

Analisis Neraca Air di Kecamatan Sambutan - Samarinda

Analisis Neraca Air di Kecamatan Sambutan - Samarinda Jurnal AGRIFOR Volume XII Nomor 1, Maret 2013 ISSN : 1412 6885 Analisis Neraca Air di Kecamatan Sambutan - Samarinda (Water Balance Analysis at Kecamatan Sambutan - Samarinda) 1 Program Studi Teknik Sipil,

Lebih terperinci

Optimasi Penataan Jaringan Drainase Kota Tebas Dalam Upaya Mengantisipasi Banjir Tahunan

Optimasi Penataan Jaringan Drainase Kota Tebas Dalam Upaya Mengantisipasi Banjir Tahunan Jurnal okasi 2011, ol.7. No.2 179-186 Optimasi Penataan Jaringan Drainase Kota Tebas Dalam Upaa Mengantisipasi Banjir Tahunan AZWA NIRMALA Jurusan Teknik Sipil Fakultas Teknik, Universitas Tanjungpura,

Lebih terperinci

TUGAS AKHIR ANALISIS ROUTING ALIRAN MELALUI RESERVOIR STUDI KASUS WADUK KEDUNG OMBO

TUGAS AKHIR ANALISIS ROUTING ALIRAN MELALUI RESERVOIR STUDI KASUS WADUK KEDUNG OMBO TUGAS AKHIR ANALISIS ROUTING ALIRAN MELALUI RESERVOIR STUDI KASUS WADUK KEDUNG OMBO Oleh : J. ADITYO IRVIANY P. NIM : O3. 12. 0032 NIM : 03. 12. 0041 FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL UNIVERSITAS

Lebih terperinci

SIPIL MESIN ARSITEKTUR ELEKTRO OPTIMASI PARAMETER MODEL MOCK UNTUK MENGHITUNG DEBIT ANDALAN SUNGAI MIU. I Gede Tunas *

SIPIL MESIN ARSITEKTUR ELEKTRO OPTIMASI PARAMETER MODEL MOCK UNTUK MENGHITUNG DEBIT ANDALAN SUNGAI MIU. I Gede Tunas * ek SIPIL MESIN ARSITEKTUR ELEKTRO OPTIMASI PARAMETER MODEL MOCK UNTUK MENGHITUNG DEBIT ANDALAN SUNGAI MIU I Gede Tunas * Abstract Mock Model is an hydrology model for use in analyzing a watershed system

Lebih terperinci

KAJIAN EFEKTIFITAS DAN EFISIENSI SALURAN SEKUNDER DAERAH IRIGASI BEGASING

KAJIAN EFEKTIFITAS DAN EFISIENSI SALURAN SEKUNDER DAERAH IRIGASI BEGASING KAJIAN EFEKTIFITAS DAN EFISIENSI SALURAN SEKUNDER DAERAH IRIGASI BEGASING Ivony Alamanda 1) Kartini 2)., Azwa Nirmala 2) Abstrak Daerah Irigasi Begasing terletak di desa Sedahan Jaya kecamatan Sukadana

Lebih terperinci

PENERAPAN SISTEM SEMI POLDER SEBAGAI UPAYA MANAJEMEN LIMPASAN PERMUKAAN DI KOTA BANDUNG

PENERAPAN SISTEM SEMI POLDER SEBAGAI UPAYA MANAJEMEN LIMPASAN PERMUKAAN DI KOTA BANDUNG PENERAPAN SISTEM SEMI POLDER SEBAGAI UPAYA MANAJEMEN LIMPASAN PERMUKAAN DI KOTA BANDUNG ALBERT WICAKSONO*, DODDI YUDIANTO 1 DAN JEFFRY GANDWINATAN 2 1 Staf pengajar Universitas Katolik Parahyangan 2 Alumni

Lebih terperinci

ANALISA DEBIT BANJIR SUNGAI RANOYAPO DI DESA LINDANGAN, KEC.TOMPASO BARU, KAB. MINAHASA SELATAN

ANALISA DEBIT BANJIR SUNGAI RANOYAPO DI DESA LINDANGAN, KEC.TOMPASO BARU, KAB. MINAHASA SELATAN ANALISA DEBIT BANJIR SUNGAI RANOYAPO DI DESA LINDANGAN, KEC.TOMPASO BARU, KAB. MINAHASA SELATAN Anugerah A. J. Surentu Isri R. Mangangka, E. M. Wuisan Fakultas Teknik Jurusan Sipil Universitas Sam Ratulangi

Lebih terperinci

PERENCANAAN BENDUNG DAMAR KABUPATEN KENDAL, JAWA TENGAH

PERENCANAAN BENDUNG DAMAR KABUPATEN KENDAL, JAWA TENGAH JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 4, Tahun 2014, Halaman 974 JURNAL KARYA TEKNIK SIPIL, Volume 3, Nomor 4, Tahun 2014, Halaman 974 795 Online di: http://ejournal-s1.undip.ac.id/index.php/jkts

Lebih terperinci

BAB II TINJAUAN PUSTAKA

BAB II TINJAUAN PUSTAKA BAB II TINJAUAN PUSTAKA 2.1 Analisis Hidrologi Hidrologi didefinisikan sebagai ilmu yang mempelajari sistem kejadian air di atas pada permukaan dan di dalam tanah. Definisi tersebut terbatas pada hidrologi

Lebih terperinci

REKAYASA HIDROLOGI SELASA SABTU

REKAYASA HIDROLOGI SELASA SABTU SELASA 11.20 13.00 SABTU 12.00 13.30 MATERI 2 PENGENALAN HIDROLOGI DATA METEOROLOGI PRESIPITASI (HUJAN) EVAPORASI DAN TRANSPIRASI INFILTRASI DAN PERKOLASI AIR TANAH (GROUND WATER) HIDROMETRI ALIRAN PERMUKAAN

Lebih terperinci

DAFTAR ISI. Halaman HALAMAN JUDUL HALAMAN PENGESAHAN PERNYATAAN BEBAS PLAGIASI DEDIKASI KATA PENGANTAR

DAFTAR ISI. Halaman HALAMAN JUDUL HALAMAN PENGESAHAN PERNYATAAN BEBAS PLAGIASI DEDIKASI KATA PENGANTAR DAFTAR ISI Halaman HALAMAN JUDUL i HALAMAN PENGESAHAN ii PERNYATAAN BEBAS PLAGIASI iii MOTTO iv DEDIKASI v KATA PENGANTAR vi DAFTAR ISI viii DAFTAR TABEL xi DAFTAR GAMBAR xii DAFTAR LAMPIRAN xiv DAFTAR

Lebih terperinci

BAB III METODOLOGI PENELITIAN. Diagram Alir pola perhitungan dimensi hidrolis spillway serbaguna

BAB III METODOLOGI PENELITIAN. Diagram Alir pola perhitungan dimensi hidrolis spillway serbaguna BAB III METODOLOGI PENELITIAN 3.1 Diagram Alur Diagram Alir pola perhitungan dimensi hidrolis spillway serbaguna Bendungan Selorejo : III-1 3.2 Lokasi Penelitian Lokasi yang menjadi tempat penelitian ini

Lebih terperinci

Dr. Ir. Robert J. Kodoatie, M. Eng 2012 BAB 3 PERHITUNGAN KEBUTUHAN AIR DAN KETERSEDIAAN AIR

Dr. Ir. Robert J. Kodoatie, M. Eng 2012 BAB 3 PERHITUNGAN KEBUTUHAN AIR DAN KETERSEDIAAN AIR 3.1. Kebutuhan Air Untuk Irigasi BAB 3 PERHITUNGAN KEBUTUHAN AIR DAN KETERSEDIAAN AIR Kebutuhan air irigasi adalah jumlah volume air yang diperlukan untuk memenuhi kebutuhan evapotranspirasi, kehilangan

Lebih terperinci

BAB II STUDI PUSTAKA. disumber air agar dapat dipakai sewaktu-waktu terjadi kekurangan air, sehingga

BAB II STUDI PUSTAKA. disumber air agar dapat dipakai sewaktu-waktu terjadi kekurangan air, sehingga 5 BAB II STUDI PUSTAKA 2.1 Waduk Waduk adalah bangunan untuk menampung air pada waktu terjadi surplus disumber air agar dapat dipakai sewaktu-waktu terjadi kekurangan air, sehingga fungsi utama waduk adalah

Lebih terperinci

SATUAN ACARA PERKULIAHAN (SAP)

SATUAN ACARA PERKULIAHAN (SAP) SATUAN ACARA PERKULIAHAN (SAP) Mata Kuliah : Hidrologi Kode : GG 309 Jumlah sks : 2 sks Semester : 2 Kelompok mata kuliah : MKK Program Studi Jurusan/Program : Pendidikan Geografi/S1 Status mata kuliah

Lebih terperinci

PERENCANAAN EMBUNG TAMBAKROMO UNTUK MEMENUHI KEBUTUHAN AIR BAKU. Mushafa Fahmi, Fandy Halim Pranoto Samto Atmojo, Sriyana

PERENCANAAN EMBUNG TAMBAKROMO UNTUK MEMENUHI KEBUTUHAN AIR BAKU. Mushafa Fahmi, Fandy Halim Pranoto Samto Atmojo, Sriyana ABSTRAK PERENCANAAN EMBUNG TAMBAKROMO UNTUK MEMENUHI KEBUTUHAN AIR BAKU Mushafa Fahmi, Fandy Halim Pranoto Samto Atmojo, Sriyana Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro Jl. Prof Soedarto,

Lebih terperinci

BAB VI PENUTUP. untuk menjawab rumusan masalah antara lain: Penelitian tugas akhir ini meninjau debit andalan (Q 80) dan debit andalan (Q 90)

BAB VI PENUTUP. untuk menjawab rumusan masalah antara lain: Penelitian tugas akhir ini meninjau debit andalan (Q 80) dan debit andalan (Q 90) BAB VI PENUTUP 6.1. Kesimpulan Penelitian tugas akhir ini meninjau potensi Bendung Sapon sebagai PLTMH berdasarkan besarnya daya listrik yang mampu dihasilkan PLTMH, pemanfaatan PLTMH dan analisis kajian

Lebih terperinci

EVALUASI DAN SIMULASI POLA OPERASI WADUK TILONG DI KABUPATEN KUPANG

EVALUASI DAN SIMULASI POLA OPERASI WADUK TILONG DI KABUPATEN KUPANG EVALUASI DAN SIMULASI POLA OPERASI WADUK TILONG DI KABUPATEN KUPANG Yan P. S. Tampani 1, Widandi Soetopo 2, Donny Harisuseno 2 1 Staf Balai Wilayah Sungai Nusa, Kementerian PUPR, Kupang Indonesia 2 Dosen

Lebih terperinci

EVALUASI PERHITUNGAN DEBIT BANJIR RENCANA DENGAN HIDROGRAF METODE ITB, NAKAYASU, SNYDER PADA SUB CATCHEMENT SUNGAI CIUJUNG SERANG

EVALUASI PERHITUNGAN DEBIT BANJIR RENCANA DENGAN HIDROGRAF METODE ITB, NAKAYASU, SNYDER PADA SUB CATCHEMENT SUNGAI CIUJUNG SERANG EVALUASI PERHITUNGAN DEBIT BANJIR RENCANA DENGAN HIDROGRAF METODE ITB, NAKAYASU, SNYDER PADA SUB CATCHEMENT SUNGAI CIUJUNG SERANG Muhammad Reza Aditya Ready Fakultas Teknik, Universitas Mercu Buana Jl.

Lebih terperinci

BAB V ANALISIS DATA. ada. diatas pada periode ulang T tahun. dipakai untuk keperluan irigasi.

BAB V ANALISIS DATA. ada. diatas pada periode ulang T tahun. dipakai untuk keperluan irigasi. ANALISIS DATA V- 1 BAB V ANALISIS DATA 5.1 ANALISIS HIDROLOGI Dalam merencanakan bangunan air, analisis yang perlu ditinjau adalah analisis hidrologi. Analisis hidrologi diperlukan untuk menentukan besarnya

Lebih terperinci

Keywords: water supply, water demand, water balance,cropping

Keywords: water supply, water demand, water balance,cropping Prosiding Kolokium Program Studi Teknik Sipil (KPSTS) FTSP UII 2016, EVALUASI KETERSEDIAAN DAN KEBUTUHAN AIR UNTUK DAERAH IRIGASI SOROPADAN DI DAS HULU SUNGAI ELO Khafidz Rahmawan 1 Dr.Ir.Lalu Makrup,

Lebih terperinci

PERENCANAAN JARINGAN IRIGASI BATANG ASAI KABUPATEN SAROLANGUN

PERENCANAAN JARINGAN IRIGASI BATANG ASAI KABUPATEN SAROLANGUN Jurnal Talenta Sipil, Vol.1 No.1, Februari 2018 e-issn 2615-1634 PERENCANAAN JARINGAN IRIGASI BATANG ASAI KABUPATEN SAROLANGUN Fransiska Febby N. P, Azwarman Program Studi Teknik Sipil Universitas Batanghari

Lebih terperinci

STUDI SIMULASI POLA OPERASI WADUK UNTUK AIR BAKU DAN AIR IRIGASI PADA WADUK DARMA KABUPATEN KUNINGAN JAWA BARAT (221A)

STUDI SIMULASI POLA OPERASI WADUK UNTUK AIR BAKU DAN AIR IRIGASI PADA WADUK DARMA KABUPATEN KUNINGAN JAWA BARAT (221A) STUDI SIMULASI POLA OPERASI WADUK UNTUK AIR BAKU DAN AIR IRIGASI PADA WADUK DARMA KABUPATEN KUNINGAN JAWA BARAT (221A) Yedida Yosananto 1, Rini Ratnayanti 2 1 Jurusan Teknik Sipil, Institut Teknologi Nasional,

Lebih terperinci

TINJAUAN SISI OPERASI WADUK DALAM MENUNJANG INTENSITAS TANAM

TINJAUAN SISI OPERASI WADUK DALAM MENUNJANG INTENSITAS TANAM JURNAL TUGAS AKHIR TINJAUAN SISI OPERASI WADUK DALAM MENUNJANG INTENSITAS TANAM Oleh : MOCHAMMAD YUSUF KRISHNA SATRIA D 111 12 283 JURUSAN SIPIL FAKULTAS TEKNIK UNIVERSITAS HASANUDDIN GOWA 2017 TINJAUAN

Lebih terperinci

NERACA AIR METEOROLOGIS DI KAWASAN HUTAN TANAMAN JATI DI CEPU. Oleh: Agung B. Supangat & Pamungkas B. Putra

NERACA AIR METEOROLOGIS DI KAWASAN HUTAN TANAMAN JATI DI CEPU. Oleh: Agung B. Supangat & Pamungkas B. Putra NERACA AIR METEOROLOGIS DI KAWASAN HUTAN TANAMAN JATI DI CEPU Oleh: Agung B. Supangat & Pamungkas B. Putra Ekspose Hasil Penelitian dan Pengembangan Kehutanan BPTKPDAS 212 Solo, 5 September 212 Pendahuluan

Lebih terperinci

Optimalisasi Pemanfaatan Sungai Polimaan Untuk Pemenuhan Kebutuhan Air Irigasi

Optimalisasi Pemanfaatan Sungai Polimaan Untuk Pemenuhan Kebutuhan Air Irigasi Optimalisasi Pemanfaatan Sungai Polimaan Untuk Pemenuhan Kebutuhan Air Irigasi Dave Steve Kandey Liany A. Hendratta, Jeffry S. F. Sumarauw Fakultas Teknik Jurusan Teknik Sipil Universitas Sam Ratulangi

Lebih terperinci

5. Evaluasi UTS, UAS, partisipasi field trip, Design Project

5. Evaluasi UTS, UAS, partisipasi field trip, Design Project KODE MATA KULIAH NAMA MATA KULIAH JENJANG JUMLAH SKS SEMESTER DESKRIPSI : CE409 : TEKNIK BENDUNGAN : S1 : 2 sks : Ganjil/Genap Dalam menempuh perkuliahan Teknik Bendungan mahasiswa mengenal persfektif

Lebih terperinci