KOMPOSISI BIAYA I REMUNERATION II DIRECT REIMBURSABLE COST TOTAL

dokumen-dokumen yang mirip
NO DESCRIPTION AMANDEMENT NO PROFFESIONAL STAFF (EXPERTS) SUPPORTING STAFF TOTAL I

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

TOTAL I

TOTAL I 17,681,446,000 16,759,395, ,000,000 17,053,395, ,051,000

1.1.1 PROFFESIONAL STAFF (EXPERTS) Sub-PROFFESIONAL STAFF (EXPERTS) STUDY TEAM

Nomor & Periode Invoice : No. 26 Periode (April s/d Mei 2017) Realisasi Invoice : Juni 2017

B. Sekretaris Daerah Kabupaten/Kota Wilayah Indonesia Barat

Lampiran 1 Nomor : 7570 /D.3.2/07/2017 Tanggal : 26 Juli Daftar Undangan

INFORMASI DATA PINJAMAN BERGULIR NASIONAL TAHUN 2011 LOKASI WILAYAH I ( IDB )

DIREKTORAT JENDRAL CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : JANUARI 2015

RINCIAN ALOKASI TRANSFER KE DAERAH DAN DANA DESA PROVINSI/KABUPATEN/KOTA DALAM APBN T.A. 2018

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Total Remuneration (I.1 + I.2 + Fee)

KEPUTUSAN MENTERI KESEHATAN REPUBLIK INDONESIA NOMOR HK.02.02/MENKES/241/2016 TENTANG DATA PUSAT KESEHATAN MASYARAKAT PER AKHIR DESEMBER TAHUN 2015

DIREKTORAT JENDRAL CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : NOVEMBER 2014

TRIWULAN IV (Oktober-Desember 2014)

LAMPIRAN XVII PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 137 TAHUN 2015 TENTANG RINCIAN ANGGARAN PENDAPATAN DAN BELANJA NEGARA TAHUN ANGGARAN 2016

EVALUASI KINERJA KOTA/KABUPATENI TRIWULAN-II 2014 PERIODE : APRIL-JUNI 2014

DIREKTORAT JENDRAL CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : AGUSTUS 2014

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF II.1 TRAVEL COST II.2 OFFICE EXPENSES

EVALUASI KINERJA KOTA/KABUPATEN TRIWULAN-II 2014 KINERJA FASILITASI PROGRAM PERIODE : APRIL-JUNI 2014

DIREKTORAT JENDRAL CIPTA KARYA DEPARTEMEN PEKERJAAN UMUM. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SEPTEMBER 2014

Nama Penyedia Alamat Penyedia Lokasi Pabrik (Provinsi) Merk : PT. LAMBANG JAYA : JL. RAYA HAJIMENA KM 14 NO. 165 NATAR - LAMPUNG SELATAN - LAMPUNG

EVALUASI KINERJA KOTA/KABUPATEN TRIWULAN-II 2014 KINERJA OUTPUT PROGRAM PERIODE : APRIL-JUNI 2014

DAFTAR KUOTA PELATIHAN KURIKULUM 2013 PAI PADA MGMP PAI SMK KABUPATEN/KOTA

REMUNERATION I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.2])

Kementerian Pekerjaan Umum dan Perumahan Rakyat. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK NOPEMBER 2016

Kementerian Pekerjaan Umum dan Perumahan Rakyat. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK AGUSTUS 2016

Kementerian Pekerjaan Umum dan Perumahan Rakyat. PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK JULI 2016

DATA DASAR PUSKESMAS

LAMPIRAN XV PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 137 TAHUN 2015 TENTANG RINCIAN ANGGARAN PENDAPATAN DAN BELANJA NEGARA TAHUN ANGGARAN 2016

KEPUTUSAN DIREKTUR JENDERAL PERHUBUNGAN DARAT NOMOR : SK.1361/AJ.106/DRJD/2003

NO. JUMLAH PENCA BERAT NO. JUMLAH PENCA BERAT PROVINSI/KABUPATEN/KOTA POPULASI PENCA PROVINSI/KABUPATEN/KOTA POPULASI PENCA

Lampiran 1 : Daftar Sampel Penelitian

JUMLAH DAN LOKASI BADAN NARKOTIKA NASIONAL PROVINSI DAN BADAN NARKOTIKA NASIONAL KABUPATEN/KOTA BADAN NARKOTIKA NASIONAL PROVINSI DAN LOKASI

PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK DESEMBER 2015

2,347, ,904, ,363, ,156,

PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK JANUARI 2016

PERATURAN KEPALA BADAN NARKOTIKA NASIONAL REPUBLIK INDONESIA NOMOR 7 TAHUN 2017

KAB/KOTA PRIORITAS SASARAN DIKLAT GURU PENGEMBANG MATEMATIKA JENJANG SMK TAHUN 2012

REMUNERATION I.1 INDIVIDUAL CONSULTANT SUB PROFF & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.

JUMLAH DAN LOKASI BADAN NARKOTIKA NASIONAL PROVINSI DAN BADAN NARKOTIKA NASIONAL KABUPATEN/KOTA

JUMLAH DAN LOKASI BADAN NARKOTIKA NASIONAL PROVINSI DAN BADAN NARKOTIKA NASIONAL KABUPATEN/KOTA

Perihal : Daftar Rincian Lokasi dan Alokasi Dana Bantuan Langsung Masyarakat PNPM Mandiri Perkotaan T.A. 2012

C. REKOMENDASI PUPUK N, P, DAN K PADA LAHAN SAWAH SPESIFIK LOKASI (PER KECAMATAN)

REKAPITULASI SK PPID KOTA SE INDONESIA PUSAT PENERANGAN SEKRETARIAT JENDERAL KEMENTERIAN DALAM NEGERI TAHUN 2013

Tabel A. Hasil verifikasi lapangan sekolah Adiwiyata Nasional (SD, SMP, SMA 151 Sekolah)

INDEKS KOTA TOLERAN (IKT) 2015

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

IDENTIFIKASI AWAL SISTEM DI DAERAH. Oleh DJPK Berdasarkan Kehadiran pada Inhouse SIKD 2014 dan Kemampuan Mengirimkan IKD melalui SIKD

INFORMASI DATA PINJAMAN BERGULIR NASIONAL

IDENTIFIKASI AWAL SISTEM DI DAERAH. Oleh DJPK Berdasarkan Kehadiran pada Inhouse SIKD 2014 dan Kemampuan Mengirimkan IKD melalui SIKD

Pariwisata. Sentra DAK REGULER. dan Pertanian. dan. Kawasan. Kedaulatan Berencana Pariwisata Pariwisata. Pariwisata.

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Kementerian Pekerjaan Umum

DAFTAR KUOTA PELATIHAN KURIKULUM 2013 PAI PADA MGMP PAI SMA KABUPATEN/KOTA TAHUN 2013 JML. PESERTA PROVINSI

DAFTAR KUOTA PELATIHAN KURIKULUM 2013 PAI KKG PAI KABUPATEN/KOTA TAHUN 2013

KEMENITERIAN PE KERJAAN

Kode Lap. Tanggal Halaman Prog.Id. : 09 Maret 2015 KEMENTERIAN NEGARA/LEMBAGA : 018 KEMENTERIAN PERTANIAN ESELON I : 04 DITJEN HORTIKULTURA

Nomor Propinsi/Kabupaten/Kota Jumlah T-15 T-17 T-19 Jumlah biaya

LAMPIRAN I. Daftar Pemerintah daerah yang menjadi sampel


Daftar Daerah yang Melaksanakan Pilkada Serentak Tahun 2018 (Masa Jabatan Kepala Daerah & Wakil Kepala Daerah Berakhir Tahun 2018 dan Tahun 2019)

KEGIATAN SOSIALISASI SESUAI KONTRAK REGULER DAN WILAYAH BARU PNPM

RINCIAN PERKIRAAN ALOKASI DANA BAG! HASIL SUMBER DAYA ALAM PERTAMBANGAN PANAS BUM! TAHUN ANGGARAN 2013

PROGRES PINJAMAN DANA BERGULIR (PDB) WILAYAH 1 Status data : SIM MK MARET 2016

KEMENTERIAN NEGARA/LEMBAGA

ALOKASI BLM KABUPATEN/KOTA TA.2010

KODE KANTOR WILAYAH DIREKTORAT JENDERAL PAJAK DAN KANTOR PELAYANAN PAJAK NO UNIT KANTOR KODE 1.

PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA TAHUN ANGGARAN 2009 STATUS : 31 AGUSTUS 2010, JAM WIB

2011, No Undang-Undang Nomor 10 Tahun 2010 tentang Anggaran Pendapatan dan Belanja Negara Tahun Anggaran 2011 (Lembaran Negara Republik Indone

KABUPATEN - KOTA YANG MENGIRIM BUKU SLHD 2011 SESUAI JADWAL PENGIRIMAN 6 APRIL REGIONAL PROVINSI KABUPATEN/KOTA JUMLAH Bali Nusa Tenggara

No Daerah Bagi Rata Insentif PBB Jumlah

DAFTAR KUOTA PELATIHAN KURIKULUM 2013 PAI MGMP PAI SMP KABUPATEN/KOTA TAHUN NO Kabupaten/Kota Propinsi Kuota

Badan Pusat Statistik

Catatan : 26 Mei 2017

LAMPIRAN II KEPUTUSAN MENTERI ENERGI DAN SUMBER DAYA MINERAL NOMOR : 517 K/81/MEM/2003 TANGGAL : 14 April 2003

Sifat : dilaksanakan pada. Nomor 4r5/K7u/Yljr/2an. NPHD paling lambat. NPHD pa.ling lambat. Jakarta, I {guatus 20 1?

LAMPIRAN 1 DATA KABUPATEN/KOTA PENERIMA PENGALIHAN PENGELOLAAN PBB-P2 SEBAGAI SAMPEL PENELITIAN

ALOKASI DEFINITIF DANA BAGI HASIL PAJAK PENGHASILAN PASAL 21 TAHUN ANGGARAN 2012

Kode Lap. Tanggal Halaman Prog.Id. : 09 Maret 2015 KEMENTERIAN NEGARA/LEMBAGA : 018 KEMENTERIAN PERTANIAN ESELON I : 04 DITJEN HORTIKULTURA

PETA DISTRIBUSI PEDOMAN PELAKSANAAN PNPM MANDIRI PERKOTAAN 2009 : PER 23 November 2009

PENGUMUMAN Tanggal : 10 Februari2014

RINCIAN ALOKASI DEFINITIF PAJAK BUMI DAN BANGUNAN BAGIAN PEMERINTAH PUSAT YANG DIBAGIKAN KEPADA SELURUH KABUPATEN DAN KOTA TAHUN ANGGARAN 2013

PENETAPAN PERKIRAAN ALOKASI DANA BAGI HASIL SUMBER DAYA ALAM MINYAK BUMI DAN GAS BUMI TAHUN ANGGARAN 2007

Jml Jml UPK Yg Kelurahan Melaporkan

DAERAH PENGHASIL DAN RENCANA PENERIMAAN SEKTOR PERTAMBANGAN UMUM TAHUN ANGGARAN 2003

PROPINSI KOTAMADYA/KABUPATEN TARIF KABUPATEN/KOTAMADYA HARGA REGULER. SUMATERA BARAT Kota Solok Arosuka

2017, Perubahan Kelima atas Peraturan Kepala Badan Narkotika Nasional mor 3 Tahun 2015 tentang Organisasi dan Tata Kerja Badan Narkotika Nasio

Code Propinsi/Kabupaten/Kota (Province/Regency/Municipality) Code Propinsi/Kabupaten/Kota (Province/Regency/Municipality)

LAMPIRAN XIX PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 137 TAHUN 2015 TENTANG RINCIAN ANGGARAN PENDAPATAN DAN BELANJA NEGARA TAHUN ANGGARAN 2016

Laporan Realisasi Penyerapan Anggaran Belanja Modal Berdasarkan data SPAN per tanggal 7 September 2017

KABUPATEN KOTA YANG SUDAH MENGIRIM BUKU SLHD 2011 PER 20 APRIL 2012

MENTERI KEUANGAN REPUBLIK INDONESIA NAMA DAN KODE KANTOR PELAYANAN PAJAK NO. N A M A KODE KANWIL/KPP KANWIL DJP NANGGROE ACEH 010

sekretariat Tim Nasional Percepatan Penanggulangan Kemiskinan Kantor Wakil Presiden Republik Indonesia Jl. Kebon Sirih No. 35 Jakarta Pusat 10110

Universitas Sumatera Utara

, WIB

Daflal Kelurchan Sasarcn. lnfrcsltuklur Petmukiman IPqlPl Peftolaan. Progrum Petcepalan dan Peiluasan Pembangunan. APBN-P Tahun e0 I3

KEPUTUSAN MENTERI KEUANGAN REPUBLIK INDONESIA NOMOR : 275/KMK

DAFTAR PENERIMA SURAT Kelompok II

Prof. Ganefri, Ph.D. Tembusan: NIP Ketua PSG Rayon 106 UNP

KANWIL I/ MEDAN KANWIL II/ PALEMBANG

Transkripsi:

PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT-MANDIRI PERKOTAAN (PNPM-MP) PROYEK PENANGGULANGAN KEMISKINAN DI PERKOTAAN (P2KP) DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM Nomor Loan : Integrated Community Driven Development (ICDD) Project - Phase II Nama Konsultan : PT. Ciriajasa Engineering Consultant In Join Venture With PT. Prismaitama Cipta Kreasi Alamat Konsultan : Jl. Raya Pasar Minggu No.36D, RT.005 RW.003, Duren Tiga Nomor & Tanggal Kontrak : HK.02.03/MEC/ICDD-IDB/SATKER-PKP/021/2013, Tanggal 18 April 2013 Periode Kontrak : 18 April 2013 s.d April 2014 NO KOMPOSISI BIAYA BUDGET I REMUNERATION 4.219.010.000 II DIRECT REIMBURSABLE COST 5.309.748.000 TOTAL 9.528.758.000

NO : PT. Ciriajasa Engineering Consultant NAME Unit Quantity Rate I REMUNERATION 4.219.010.000 : HK.02.03/MEC/ICDD-IDB/SATKER-PKP/021/2013, Tanggal 18 April 2013 1,1 : 18 April 2013 s.d April 2014 3.873.000.000 Team Leader/ Evaluation Expert Ir. SigitIndarto, M.Si. Prs-Month 12 Quantitative Evaluation Expert Wahid Sulaiman, S.Si.,M.Si. Prs-Month 12 Qualitative Evaluation Expert Drs. Asep Ahmad Satori Prs-Month 12 Sampling Specialist/Statistician Ir. Budi HariPriyanto Prs-Month 6 Econometric Specialist Nurkholis, SE., M.S.E Prs-Month 6 Field Supervisor (14 persons x 6 months) To be name Prs-Month 84 Enumerator (45 Persons x 3 months) To be name Prs-Month 135 Computer Programmer (1 Persons x 12 months) Yoyok Riyanto, S.Kom Prs-Month 12 Junior Researchers/Editor (14 Persons x 6 months) To be name Prs-Month 84 Data Cleaning Specialist (2 Persons x 3 months) 1. Danang Sektiawan, S.Kom. Prs-Month 6 2. Surya Armi, S.Sos. 1,2 Supporting staff 346.010.000 Office Manager Prs-Month 12 Administrator/Secretary Prs-Month 12 Computer Operator (1 Persons) Prs-Month 12 Data Entry and tabulation sample 11.201 Office Boy Prs-Month 12 Security 2 persons Prs-Month 24

II DIRECT REIMBURSABLE COST 5.309.748.000 2,1 Duty Travel 1.159.800.000 2.1.1 Duty Travel For Expert Transport (at cost) 2 Persons x 3 Times 1 Jakarta - Banda Aceh Round Trip 6 4.000.000 24.000.000 2 Jakarta - Medan Round Trip 6 3.800.000 22.800.000 3 Jakarta - Pekanbaru Round Trip 6 2.500.000 15.000.000 4 Jakarta - Tanjung Pinang Round Trip 6 2.500.000 15.000.000 5 Jakarta - Padang Round Trip 6 3.000.000 18.000.000 6 Jakarta - Bengkulu Round Trip 6 2.000.000 12.000.000 7 Jakarta - Jambi Round Trip 6 2.000.000 12.000.000 8 Jakarta - Palembang Round Trip 6 2.000.000 12.000.000 9 Jakarta - Pangkal Pinang Round Trip 6 2.000.000 12.000.000 10 Jakarta - Bandar Lampung Round Trip 6 1.500.000 9.000.000 11 Jakarta - Bandung Round Trip 6 500.000 3.000.000 12 Jakarta - Serang Round Trip 6 500.000 3.000.000 13 Jakarta Round Trip 0 - - 14 Jakarta - Pontianak Round Trip 6 2.000.000 12.000.000 Airport Tax - - Taxi Airport - - OSA 14 Loc 6 ptimes 5 days Prs/days 420 400.000 168.000.000 Hotel Accommodation 13 Loc 6 ptimes 4 days Prs/days 312 500.000 156.000.000 Tranport local 13 Loc 3 time 5 days Days 195 700.000 136.500.000 Pretest Instrument 2 Loc 5 person 3 days Prs/days 30 400.000 12.000.000 2.1.2 Duty Travel For Field Supervisor Transport (at cost) 1 Persons x 3 Times 1 Jakarta - Banda Aceh Round Trip 3 4.000.000 12.000.000 2 Jakarta - Medan Round Trip 3 3.800.000 11.400.000 3 Jakarta - Pekanbaru Round Trip 3 2.500.000 7.500.000 4 Jakarta - Tanjung Pinang Round Trip 3 2.500.000 7.500.000 5 Jakarta - Padang Round Trip 3 3.000.000 9.000.000 6 Jakarta - Bengkulu Round Trip 3 2.000.000 6.000.000 7 Jakarta - Jambi Round Trip 3 2.000.000 6.000.000 8 Jakarta - Palembang Round Trip 3 2.000.000 6.000.000 9 Jakarta - Pangkal Pinang Round Trip 3 2.000.000 6.000.000 10 Jakarta - Bandar Lampung Round Trip 3 1.500.000 4.500.000 11 Jakarta - Bandung Round Trip 3 500.000 1.500.000 12 Jakarta - Serang Round Trip 3 500.000 1.500.000 13 Jakarta Round Trip 0 - - 14 Jakarta - Pontianak Round Trip 3 2.000.000 6.000.000 Airport Tax - - Taxi Airport - -

2.1.3 Transport for Supervisor (province to Kab. Kota) A. From Banda Aceh to: 1 Kota Subulussalam (from Medan) trip 3 500.000 1.500.000 2 Kab Aceh Besar trip 3 200.000 600.000 3 Kota Lhokseumawe (from Medan) trip 3 500.000 1.500.000 4 Kab Aceh Tengggara (from Medan) trip 3 600.000 1.800.000 5 Kab Aceh Barat trip 3 500.000 1.500.000 6 Kota Banda Aceh trip 3 250.000 750.000 7 Kab Aceh Selatan trip 3 600.000 1.800.000 8 Kota Langsa (from Medan) trip 3 300.000 900.000 9 Kab Pidie trip 3 300.000 900.000 B. From Medan to: 1 Labuhan Batu trip 3 300.000 900.000 2 Asahan trip 3 300.000 900.000 3 Dairi trip 3 250.000 750.000 4 Simalungun trip 3 200.000 600.000 5 Karo trip 3 200.000 600.000 6 Langkat trip 3 100.000 300.000 7 Deli Serdang trip 3 100.000 300.000 8 Tebing Tinggi trip 3 100.000 300.000 9 Tanjung Balai trip 3 400.000 1.200.000 10 Sibolga trip 3 400.000 1.200.000 11 Medan trip 3 100.000 300.000 12 Pematang Siantar trip 3 100.000 300.000 13 Binjai trip 3 100.000 300.000 14 Padang Sidempuan trip 3 400.000 1.200.000 C. From Padang to: 1 Kota Padang trip 3 200.000 600.000 2 Kota Pariaman trip 3 200.000 600.000 3 Kota Sawahlunto trip 3 400.000 1.200.000 4 Kota Bukittinggi trip 3 200.000 600.000 5 Kota Padang Panjang trip 3 400.000 1.200.000 6 Kota Payakumbuh trip 3 500.000 1.500.000 7 Kota Solok trip 3 300.000 900.000 8 Kab Sijunjung trip 3 500.000 1.500.000 9 Kab Limapuluh Kota trip 3 600.000 1.800.000 10 Kab Padang Pariaman trip 3 350.000 1.050.000 11 Kab Agam trip 3 600.000 1.800.000 D. From Tanjung Pinang to: 1 Batam trip 3 500.000 1.500.000 2 Bintan trip 3 500.000 1.500.000 3 Karimun trip 3 500.000 1.500.000 4 Tanjung Pinang trip 3 300.000 900.000

E. From Pekanbaru to: 1 Kuantan Singingi trip 3 300.000 900.000 2 Dumai trip 3 300.000 900.000 3 Indragiri Hilir trip 3 200.000 600.000 4 Bengkalis trip 3 500.000 1.500.000 5 Pekanbaru trip 3 150.000 450.000 F. From Bengkulu to: 1 Kota Bengkulu trip 3 150.000 450.000 2 Kota Curup trip 3 300.000 900.000 3 Kab Rejang Lebong trip 3 300.000 900.000 4 Kab Manna trip 3 300.000 900.000 G. From Jambi to: 1 Jambi trip 3 150.000 450.000 2 Sungai Penuh trip 3 400.000 1.200.000 H. From Palembang to: 1 Kota Palembang trip 3 150.000 450.000 2 Kab Prabumulih trip 3 300.000 900.000 3 Kab Lubuk Linggau trip 3 300.000 900.000 4 Kab Muara Enim trip 3 300.000 900.000 5 Kab Ogan Komering Ilir trip 3 200.000 600.000 6 Kab Ogan Komiring Ulu trip 3 300.000 900.000 7 Kota Pagar Alam trip 3 300.000 900.000 I. From Pangkalpinang to: 1 Pangkalpinang trip 3 150.000 450.000 2 Belitung trip 3 600.000 1.800.000 3 Belitung Timur trip 3 700.000 2.100.000 4 Bangka trip 3 200.000 600.000 5 Bangka Barat trip 3 300.000 900.000 J. From Bandar Lampung to: 1 Metro trip 3 200.000 600.000 2 Bandar Lampung trip 3 150.000 450.000 3 Lampung Utara trip 3 300.000 900.000 4 Pringsewu trip 3 200.000 600.000 K. From Serang to: 1 Kota Serang trip 3 150.000 450.000 2 Kota Cilegon trip 3 150.000 450.000 3 Kota Tangerang Selatan (from Jakarta) trip 3 150.000 450.000 4 Kota Tangerang (from Jakarta) trip 3 150.000 450.000 5 Kab Tangerang (from Jakarta) trip 3 150.000 450.000 6 Kab Pandeglang trip 3 200.000 600.000 7 Kab Lebak trip 3 200.000 600.000

L. From Jakarta to: 1 Jakarta Pusat trip 3 150.000 450.000 2 Jakarta Selatan trip 3 150.000 450.000 3 Jakarta Timur trip 3 150.000 450.000 4 Jakarta Utara trip 3 150.000 450.000 5 Jakarta Barat trip 3 150.000 450.000 6 Kepualuan Seribu trip 3 300.000 900.000 M. From Pontianak to: 1 Bangkayang trip 3 300.000 900.000 2 Sambas trip 3 300.000 900.000 3 Singkawang trip 3 400.000 1.200.000 4 Pontianak trip 3 200.000 600.000 5 Ketapang trip 3 400.000 1.200.000 N. From Bandung to: 1 Kab Cirebon trip 3 200.000 600.000 2 Kota Cirebon trip 3 200.000 600.000 3 Kab Bekasi (from Jakarta) trip 3 150.000 450.000 4 Kota Bekasi (from Jakarta) trip 3 150.000 450.000 5 Kab Bogor (from Jakarta) trip 3 150.000 450.000 6 Kota Bogor (dari Jakarta) trip 3 150.000 450.000 7 Kab Sukabumi trip 3 200.000 600.000 8 Kota Sukabumi trip 3 200.000 600.000 9 Kab Bandung trip 3 100.000 300.000 10 Kota Bandung trip 3 100.000 300.000 11 Kab Tasikmalaya trip 3 200.000 600.000 12 Kota Tasikmalaya trip 3 200.000 600.000 13 Kab Ciamis trip 3 200.000 600.000 14 Kota Banjar trip 3 200.000 600.000 15 Kab Kuningan trip 3 200.000 600.000 16 Kab Majalengka trip 3 200.000 600.000 17 Kab Sumedang trip 3 150.000 450.000 18 Kab Garut trip 3 150.000 450.000 19 Kab Indramayu trip 3 200.000 600.000 20 Kab Karawang (from Jakarta) trip 3 150.000 450.000 21 Kab Purwakarta trip 3 200.000 600.000 22 Kab Subang trip 3 200.000 600.000 23 Kab Cianjur trip 3 200.000 600.000 24 Kab Bandung Barat trip 3 100.000 300.000 25 Kab Cimahi trip 3 100.000 300.000 26 Kota Depok (from Jakarta) trip 3 100.000 300.000 Field Allowance 14 prs 3 times 30 days prs/months 1260 275.000 346.500.000 2,2 Car and Motorcyle Rental 240.000.000 Head Office/Jakarta (2 cars) Month 24 10.000.000 240.000.000 2,3 Office Rental and Furniture 164.440.000 Office Rental Month 1200 120.000 144.000.000 Rental Furniture + Ac ls 1 20.440.000 20.440.000

2,4 Communication 66.000.000 Telephone (1 line) Month 12 3.000.000 36.000.000 Faximile Month 12 1.000.000 12.000.000 Internet Month 12 1.500.000 18.000.000 2,5 Utilities Expenses 144.000.000 Office Supply Month 12 2.500.000 30.000.000 Office Consumable Month 12 3.000.000 36.000.000 Computer Supply Month 12 3.000.000 36.000.000 Photo Copy Supply Month 12 1.000.000 12.000.000 office utilities Month 12 2.500.000 30.000.000 2,6 Office Equipment 117.600.000 Computer Notebook (rental) for Experts Unit Month 60 500.000 30.000.000 Computer Desktop (rental) Unit Month 72 400.000 28.800.000 Printer Laser Jet 2 units (rental) Unit Month 24 300.000 7.200.000 Printer Color A3 (rental) Unit Month 12 300.000 3.600.000 Photo Copy Machine (rental) Unit Month 12 500.000 6.000.000 Computer Notebook (rental) for Editor Unit Month 84 500.000 42.000.000 2,7 Instrument 319.008.000 Instrument Production Survey 1 (3290 Sample RTM) Sheet 230300 200 46.060.000 Survey 2 (3290 Sample RTM) Sheet 230300 200 46.060.000 Survey 3 (4621 Sample RTM) Sheet 646940 200 129.388.000 Delivery Instrument (13 Prov x 3 Times) Prov 39 2.500.000 97.500.000 2,8 Recruitment for Enumerator 980.250.000 Recruitment for Local Enumerator 110% Persons 50 300.000 15.000.000 Transport Enumerator Province to Kabupaten (3 times) Times 135 750.000 101.250.000 Transport Enumerator in Kabupaten Times 135 500.000 67.500.000 Field Allowance Enumerator 45 prs 3 times 30 days prs/months 4050 150.000 607.500.000 Field Allowance Jr Research 14 prs 3 times 30 days prs/months 1260 150.000 189.000.000 2.9 Focus Group Discussion (FGD) 1.635.000.000 FGD in Village FGD Survey 1 = 150 Kelurahan Package 3000 125.000 375.000.000 FGD Survey 2 = 252 Kelurahan Package 5040 125.000 630.000.000 FGD Survey 3 = 252 Kelurahan Package 5040 125.000 630.000.000 2.10 Training, Workshop & Discussion 478.650.000 Training and Refresher for Local Enumerator 4 days Times 3 20.250.000 60.750.000 Training for Junior Researcher Times 3 6.300.000 18.900.000 Discusi and konsinyasi Times 5 15.000.000 75.000.000 Workshop Baseline Survey Times 1 81.000.000 81.000.000 Workshop Mid Term Evaluation Times 1 81.000.000 81.000.000 Workshop Preliminary Results (Final) Times 1 149.000.000 149.000.000 Pembahasan Final Report Times 1 13.000.000 13.000.000 2,11 Reporting 5.000.000 Inception Report Exemplar 10 100.000 1.000.000 Interim Report Exemplar 10 150.000 1.500.000 Final Report + CD Exemplar 10 250.000 2.500.000 9.528.758.000