STUDI PERBANDINGAN PRODUKTIVITAS PEKERJAAN PEMASANGAN PENUTUP LANTAI

dokumen-dokumen yang mirip
ANALISIS PRODUKTIVITAS PEKERJAAN PEMASANGAN RANGKA ATAP BAJA RINGAN

PENGARUH KUALITAS MANAJEMEN KOMUNIKASI ANTARA KONTRAKTOR DAN KONSULTAN TERHADAP KEBERHASILAN PROYEK JALAN DI LINGKUNGAN KOTA BARU PARAHYANGAN

ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PADA PEKERJAAN TIANG PANCANG

ANALISIS FAKTOR-FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN APARTEMEN X BANDUNG

SIMULASI ARUS KAS PADA PROYEK PEMBANGUNAN GEDUNG SEKOLAH SMP DAN SMA STRADA KRANJI

ANALISIS BIAYA BANK GARANSI TERHADAP ARUS KAS PROYEK

DiajukanKepadaUniversitas Islam Indonesia YogyakartaUntukMemenuhi PersyaratanMemperolehDerajatSarjana Strata SatuTeknikSipil

SIMULASI PERENCANAAN PENGGUNAAN ALAT BERAT PADA PEKERJAAN PENGGALIAN TANAH

ANALISIS KOMPETENSI DAN GAYA KEPEMIMPINAN PROJECT MANAGER PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG

ANALISIS HUBUNGAN PERILAKU KEPEMIMPINAN MANAJER PROYEK DENGAN KINERJA PROYEK KONSTRUKSI

ANALISIS PENGGUNAAN METODE CRITICAL PATH SEGMENT (CPS) PADA PENJADWALAN PEKERJAAN STRUKTUR PROYEK KONSTRUKSI GEDUNG

ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN SISTEM MANAJEMEN K3 PADA KONTRAKTOR BERSERTIFIKASI OHSAS 18001

ANALISIS PERBANDINGAN KOEFISIEN HARGA SATUAN UPAH PEKERJAAN BERDASARKAN HASIL PENGAMATAN DI LAPANGAN DAN STANDAR NASIONAL INDONESIA (SNI)

ANALISIS MANAJEMEN DAN KINERJA PEKERJAAN PEMBONGKARAN GEDUNG DENGAN METODE EARNED VALUE ANALYSIS PADA GEDUNG BANK PANIN BINTARO

TUGAS AKHIR. Disusun Oleh : SEPTIAJI PRATAMA

EFEK VARIASI TEGANGAN NORMAL TERHADAP FRIKSI TANAH-BETON DENGAN UJI GESER LANGSUNG

STUDI PERBANDINGAN PARAMETER KUAT GESER TANAH KOHESIF MENGGUNAKAN UJI MINI VANE SHEAR, UJI KUAT TEKAN BEBAS, DAN VANE SHEAR LAPANGAN

Jl. Perpustakaan, Kampus USU Medan INDONESIA

SIMULASI PENJADWALAN PROYEK KONSTRUKSI DENGAN PROGRAM KOMPUTER BERBASIS FUZZY LOGIC

SEKUENSIAL PENYEBAB SENGKETA KONSTRUKSI DENGAN MENGGUNAKAN METODE PATH ANALYSIS

PERNY AT AAN KEASLIAN KARYA TULIS TUGASAKHIR. Saya mahasiswa Jurusan Teknik Sipil, Fakultas Desain dan Teknik Perencanaan, Universitas Pelita Harapan,

ANALISIS JALUR PENGENDALIAN AKTIVITAS PROYEK KONSTRUKSI DENGAN LINEAR SCHEDULING METHOD

ANALISIS RISIKO PROSES PABRIKASI DAN PEMANCANGAN TIANG PANCANG BETON DENGAN METODE FAILURE MODE AND EFFECTS ANALYSIS

ANALISIS MATERIAL REQUIREMENT PLANNING (MRP) PROYEK JEMBATAN DI JAYAPURA

ANALISIS GREEN CONSTRUCTION PADA PROYEK X DI BANDUNG DENGAN METODE ASSESSMENT GREEN CONSTRUCTION SISTEM WULFRAM

APLIKASI METHOD PRODUCTIVITY DELAY MODELPADA ANALISA PENGARUH WASTEPEKERJA TERHADAP INDEKS KOEFISIEN PRODUKTIVITAS

Disusun sebagai salah satu syarat memperoleh gelar Sarjana. pada Program Studi Teknik Sipil Fakultas Teknik. Universitas Sebelas Maret Surakarta

STUDI POLA OPERASI WADUK WAY SEKAMPUNG MENGGUNAKAN HEC-RESSIM

KAJIAN PRODUKTIVITAS PADA PEKERJAAAN PENUTUP ATAP

PERPINDAHAN PENGGUNA MODA TRANSPORTASI JALAN KE MODA TRANSPORTASI KERETA API RUTE JAKARTA BANDAR UDARA SOEKARNO-HATTA

STUDI PERBANDINGAN BIAYA PENGGUNAAN BETON RINGAN AERASI DENGAN BATA MERAH BIASA

STUDI EKSPERIMENTAL KEKUATAN TEKAN SAMBUNGAN MORTISE-AND-TENON BERPENAMPANG LINGKARAN KAYU MERANTI

ANALISIS PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING: STUDI KASUS PROYEK TUNJUNGAN PLAZA 6

INVESTIGASI PENERAPAN KONSEP BUILDING INFORMATION MODELLING (BIM) PADA PROYEK KONSTRUKSI HIGH RISE BUILDING DI INDONESIA

ANALISIS FAKTOR-FAKTOR PENGHAMBAT YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK KONSTRUKSI BANGUNAN GEDUNG APARTEMEN DI KOTA BANDUNG

PERBANDINGAN PERHITUNGAN RENCANA ANGGARAN BIAYA LANJUTAN PEMBANGUNAN GEDUNG KULIAH FAKULTAS EKONOMI UNIVERSITAS SUMATERA UTARA

KEBUTUHAN TEKNOLOGI INFORMASI UNTUK MENINGKATKAN KUALITAS LAYANAN TERMINAL LEUWIPANJANG BANDUNG

KORELASI ANTARA PERANAN KONSULTAN PENGAWAS DENGAN MASALAH-MASALAH DOMINAN PADA PROYEK DI KOTA MEDAN TUGAS AKHIR

PERINGKAT FAKTOR KETERLAMBATAN BERDASARKAN COMPENSABLE DELAYS, EXCUSABLE DELAYS DAN NON-EXCUSABLE DELAYS PADA PROYEK GEDUNG DI KOTA BANDUNG

STUDI EKSPERIMENTAL KUAT TEKAN BETON DENGAN PLASTIK DAUR ULANG OLAHAN JENIS HDPE PENGGANTI SEBAGIAN AGREGAT HALUS

INVESTIGASI PENERAPAN KONSEP BUILDING INFORMATION MODELLING (BIM) PADA PROYEK KONSTRUKSI DI BIDANG MINYAK DAN GAS BUMI DI INDONESIA

OPTIMALISASI BIAYA DAN WAKTU PADA PELAKSANAAN PEKERJAAN PASANGAN DINDING BATA MERAH DENGAN METODE TIME STUDY

ESTIMASI BIAYA DAN PENJADWALAN PADA PROYEK JALAN AKSES GEDEBAGE MENGGUNAKAN SIMULASI MONTE CARLO

STUDI LABORATORIUM PENGARUH PENAMBAHAN KAPUR DAN BOTTOM ASH PADA TANAH EKSPANSIF TERHADAP NILAI CBR

STUDI LABORATORIUM PENGARUH VARIASI CAMPURAN KAPUR TERHADAP KUAT GESER TANAH PASIR LAUT

MANAJEMEN RISIKO PADA PROYEK KONSTRUKSI GEDUNG DI YOGYAKARTA DENGAN MENGGUNAKAN METODE HOUSE OF RISK

SKRIPSI UJI EKSPERIMENTAL BETON NORMAL DIBANDINGKAN BETON SELF COMPACTING DENGAN AGREGAT DAUR ULANG DAN LIMBAH GENTENG TANAH LIAT

SKRIPSI EVALUASI PENAMPANG WHITMORE PADA SAMBUNGAN BAUT DENGAN ANALISIS KERUNTUHAN MENGGUNAKAN PROGRAM ADINA

ANALISA PERBEDAAN HARGA RAB DENGAN RAP UNTUK PEKERJAAN BETON BERTULANG PADA PROYEK ITC POLONIA MEDAN

ANALISIS KEBERHASILAN PROYEK TERHADAP EFEKTIVITAS WAKTU, BIAYA, DAN MUTU DALAM PENERAPAN TEKNIK LEAN CONSTRUCTION PADA PROYEK KONSTRUKSI

TESIS PENGARUH KARAKTERISTIK TUKANG BATU LOKAL TERHADAP PRODUKTIVITAS

BAB 5 SIMPULAN DAN SARAN

ANALISIS SEBAB-DAMPAK DAN FAKTOR RISIKO DARI CHANGE ORDER PADA PROYEK KONSTRUKSI

Diajukan oleh : Rusdiansyah

PERBANDINGAN KOMPOSISI PEKERJA PASANGAN DINDING BATA ANTARA SNI 2008 DENGAN KENYATAAN DI LAPANGAN PADA PROYEK PERUMAHAN

STUDI LABORATORIUM PENGARUH VARIASI CAMPURAN KAPUR TERHADAP NILAI CBR TANAH PASIR LAUT

PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING PROYEK PERUMAHAN DI KOTA PEKANBARU

ANALISA PERBANDINGAN HARGA SATUAN UPAH METODE SNI DENGAN UPAH BERDASARKAN PRODUKTIVITAS

INSTITUT TEKNOLOGI BANDUNG

KAJIAN TERHADAP PRASARANA DAN SARANA EVAKUASI PADA PROYEK KONSTRUKSI

ABSTRACT. Keywords: labor, employees performance, educational level. Universitas Kristen Maranatha

EVALUASI DAYA DUKUNG PONDASI TIANG BOR PADA CLAY SHALE, STUDI KASUS PROYEK DI PALEMBANG

STUDI ANALISIS DENGAN MENGGUNAKAN METODA PENJADWALAN LINIER PADA PROYEK PERUMAHAN

ANALISIS FAKTOR KETERLAMBATAN PEMBANGUNAN GEDUNG DENGAN STRUCTURAL EQUATION MODELING (SEM)

Analisis Kinerja Konsultan Berdasarkan Standard Manajemen Mutu ISO 9001 : 2008

ANALISIS PERUBAHAN TEGANGAN DI DALAM TANAH AKIBAT TIMBUNAN MENGGUNAKAN METODE ELEMEN HINGGA

TUGAS AKHIR ANALISIS PERCEPATAN PELAKSANAAN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG

ABSTRAK Universitas Kristen Maranatha

SKRIPSI OPTIMASI BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN PENGGALIAN TANAH MENGGUNAKAN METODE PROGRAMA LINEAR INTEGER

STUDI KELAYAKAN INVESTASI THE CORAL HOTEL DI SURAKARTA

STUDI PERBANDINGAN PERHITUNGAN STABILITAS DINDING PENAHAN TANAH ANTARA METODE KONVENSIONAL DAN METODE ELEMEN HINGGA

ESTIMASI ANGGARAN BIAYA STRUKTUR PROYEK PEMBANGUNAN HOTEL QUAD MAKASSAR MENGGUNAKAN METODE SNI

TESIS OPTIMASI PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE PERT DAN CPM. Disusun Oleh : AMIRUDDIN HI. MUHAMMAD NPM : /MTS

KOMPETISI PEMILIHAN MODA ANGKUTAN PENUMPANG ANTAR KOTA ANTARA MODA KERETA API DAN BUS (Studi Kasus : Rute Bandung Jakarta) TESIS MAGISTER

David Sugihartana TESIS

EVALUASI KOMPETENSI PEKERJA PADA PROYEK JALAN LINGKAR SELATAN SUKABUMI ABSTRAK

STUDI LABORATORIUM FAKTOR PENGARUH UKURAN BUTIR KAPUR PADA STABILISASI TANAH LUNAK TERHADAP NILAI KOMPRESIBILITAS TANAH TERKOMPAKSI

KAJIAN PEMODELAN TARIKAN PERGERAKAN KE GEDUNG PERKANTORAN ( Studi Kasus Kota Surakarta )

STUDI BIAYA DAN TATA LAKSANA BAHAN PELAPIS KEDAP AIR (WATERPROOFING)

PEMODELAN PERAMALAN DEBIT SUNGAI JIANGWAN PROVINSI ZHEJIANG RRT DENGAN METODE ESIM

PENINGKATAN BIAYA PERJALANAN MELALUI JALAN TOL CIPULARANG AKIBAT KERUSAKAN JEMBATAN CISOMANG

PENGEMBANGAN SUMBER DAYA MANUSIA BAGIAN TI (TEKNOLOGI INFORMASI) PADA PTPN III (PERSERO) MEDAN

UNIVERSITAS INDONESIA PENGARUH PENERAPAN GREEN CONSTRUCTION PADA BANGUNAN GEDUNG TERHADAP KINERJA MUTU PROYEK DI LINGKUNGAN PT.

Tesis Magister. Oleh : Gama Putranto NIM : Pembimbing : DR. Ir. Krishna S. Pribadi

PRODUKTIVITAS PADA PROYEK KONSTRUKSI

INTERPRETASI PARAMETER TANAH MENGGUNAKAN UJI CPTU SEBAGAI EVALUASI DERAJAT KONSOLIDASI PADA PROYEK REKLAMASI PANTAI DI JAKARTA

ANALISIS DAN DESAIN STRUKTUR BAJA MENGGUNAKAN SISTEM RANGKA TERBREIS KONSENTRIS KHUSUS TIPE CHEVRON

ANATOMI SENGKETA KONSTRUKSI PADA PROYEK BANGUNAN GEDUNG DI INDONESIA

PERANCANGAN DAN REALISASI SISTEM PENGENDALI PENYARINGAN AIR BERDASARKAN TINGKAT KEKERUHAN AIR. Disusun Oleh : Nama : Rico Teja Nrp :

PERANAN PROGRAM PELATIHAN DAN PENGHARGAAN PADA OPERATOR PRODUKSI DALAM MENINGKATKAN PRODUKTIVITAS DI PT. X TESIS

ANALISIS PERBANDINGAN RENCANA ANGGARAN BIAYA STRUKTUR PELAT LANTAI SISTEM KONVENSIONAL DENGAN SISTEM FLOOR DECK

DOSEN PEMBIMBING. YURNALISDEL. Ir., MT :... SUHUDI, ST., MT :...

(Studi Kasus Proyek Pembangunan Gedung II Dan Bangunan Penghubung FISIP, Universitas Brawijaya Malang)

PERENCANAAN DAN STUDI KELAYAKAN INVESTASI PROYEK PERUMAHAN TAMAN SENTOSA TAHAP II BOYOLALI

ANALISIS PERBANDINGAN METODE S.N.I. DAN SOFTWARE MS. PROJECT DALAM PERHITUNGAN BIAYA PEKERJAAN LANGIT-LANGIT UNTUK KONSTRUKSI BANGUNAN

SKRIPSI VICTOR ANTONI NPM: PEMBIMBING: Prof. Wimpy Santosa, Ph.D.

DAFTAR ISI KATA PENGANTAR

ROADMAP PENELITIAN KOMUNITAS BIDANG ILMU MANAJEMEN DAN REKAYASA KONSTRUKSI TAHUN

Evaluasi Pola Operasi Waduk Jatiluhur

ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEMBANGUNAN 1 UNIT RUMAH TYPE 45 (STUDI KASUS : PROYEK PERUMAHAN CEMPAKA MAS DALUNG)

Transkripsi:

SKRIPSI STUDI PERBANDINGAN PRODUKTIVITAS PEKERJAAN PEMASANGAN PENUTUP LANTAI ARNOLDUS JANSSEN NPM : 2013410134 PEMBIMBING: Theresita Herni, Ir., M.T. UNIVERSITAS KATOLIK PARAHYANGAN FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL (Terakreditasi Berdasarkan SK BAN-PT Nomor: 227/SK/BAN-PT/Ak-XVI/S/XI/2013) BANDUNG JUNI 2017

SKRIPSI STUDI PERBANDINGAN PRODUKTIVITAS PEKERJAAN PEMASANGAN PENUTUP LANTAI ARNOLDUS JANSSEN NPM : 2013410134 PEMBIMBING: Theresita Herni, Ir., M.T. UNIVERSITAS KATOLIK PARAHYANGAN FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL (Terakreditasi Berdasarkan SK BAN-PT Nomor: 227/SK/BAN-PT/Ak-XVI/S/XI/2013) BANDUNG JUNI 2017

JUNI 2017

STUDI PERBANDINGAN PRODUKTIVITAS PEKERJAAN PEMASANGAN PENUTUP LANTAI Arnoldus Janssen NPM: 2013410134 Pembimbing: Theresita Herni, Ir., M.T. UNIVERSITAS KATOLIK PARAHYANGAN FAKULTAS TEKNIK PROGRAM STUDI TEKNIK SIPIL (Terakreditasi Berdasarkan SK BAN-PT Nomor: 227/SK/BAN-PT/Ak-XVI/S/XI/2013) BANDUNG JUNI 2017 ABSTRAK Di dalam duni konstruksi, terutama pada bagian sumber daya manusia, produktivitas merupakan salah satu faktor penting yang memegang peran besar terhadap keberhasilan dan kelancaran proyek. Produktivitas pekerja di lapangan harus dijaga konsistensinya demi kelancaran proyek konstruksi. Untuk menjaga konsistensi produktivitas pekerja, dapat dilakukan dengan mengetahui tingkat keberhasilannya. Karya tulis ilmiah ini membahas mengenai karakteristik kemungkinankemungkinan tingkat produktivitas secara ril yang terjadi di lapangan dengan mengacu pada dasar teori probabilitas distribusi normal. Probabilitas distribusi normal dipakai sebagai acuan karena dianggap sebagai salah satu bentuk distribusi yang paling mendekati dengan bentuk probabilitas distribusi kejadian alam. Dalam karya tulis ilmiah ini telah dilakukan analisis bentuk distribusi probabilitas produktivitas pemasangan Granite Tile ukruan 60x60 cm dan didapat bahwa tingkat kesuksesan pemasangan Granite Tile yang ditetapkan SNI 7395 tahun 2008 adalah sebesar 85,39 %. Selain mendapatkan tingkat keberhasilan dalam karya tulis ilmiah ini juga dilakukan penilaian terhadap utilisasi produktivitas pekerja yaitu perbandingan antara waktu efektif pekerja dengan waktu yang dihabiskan oleh pekerja. Nilai utilisasi ini menggambarkan seberapa sering aktivitas pekerja berhubungan langsung dengan hasil. Dalam karya tulis ilmiah ini didapat nilai utilisasi pekerja sebesar 0,714 atau 71,4 %. Utilisasi tersebut memiliki hubungan langsung dengan produktivitas itu sendiri, maka untuk menjaga tingkat produktivitas, perlu meningkatkan efisiensi pekerja. Dalam penelitian ini didapat efisiensi pekerja proyek adalah 286,8% dan dianggap sudah melebihi batas efisien. Kata Kunci: Produktivitas, Labor Utilization Rate, Productivity Rating, efisiensi, utilisasi, distribusi normaal, distribusi gaussian, tingkat keberhasilan, tingkat kesuksesan. i

COMPARATIVE STUDY OF THE PRODUCTIVITY OF FLOORING WORK Arnoldus Janssen NPM: 2013410134 Advisor: Theresita Herni, Ir., M.T. PARAHYANGAN CATHOLIC UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING (Accreditated by SK BAN-PT Number: 227/SK/BAN-PT/Ak-XVI/S/XI/2013) BANDUNG JUNE 2017 ABSTRACT In the world of construction, especially in the human resources sector, productivity is one of the important factors that plays a major role in the success and smoothness of the project. The consistency of the Productivity of workers in the field must be maintained in order to smooth construction of the project. To maintain the consistency of worker productivity, can be done by knowing the success rate. This paper discusses the characteristic possibilities of real productivity levels occurring in the field with reference to the basic probability theory of normal distribution. The probability of normal distribution is used as a reference because it is regarded as one of the most closely approximated forms of probability distribution of natural occurrences. In this scientific paper, the analysis of the probability distribution of 60x60 cm Granite Tile installation found that the success rate of installation of Granite Tile based on Indonesia s National Standrd No. 7395: 2008 was 85.39%. In addition to getting the success rate in this scientific papers, is also conducted an assessment of the utilization of worker productivity. The utilization is the comparison between the effective time and time spent by workers. This utilization value describes how often workers' activities directly relate to outcomes. In this scientific paper obtained the value of employee utilization of 0.714 or 71.4%. The utilization has a direct relationship to productivity itself, so to maintain the level of productivity, need to improve worker efficiency. In this research, the project worker's efficiency is 286,8% and considered to have exceeded the efficient limit. Keywords: Productivity, Labor Utilization Rate, Productivity Rating, efficiency, utilization, Normal distribution, gaussian distribution, success rate. ii

PRAKATA Puji syukur kepada Tuhan Yang Maha Esa atas berkat dan kebaikan-nya sehingga skripsi ini dapat diselesaikan dengan baik. Skripsi ini merupakan persyaratan untuk menyelesaikan program pendidikan sarjana di Fakultas Teknik Program Studi Teknik Sipil Universitas Katolik Parahyangan. Dalam skripsi ini, penulis menyadari bahwa masih banyak kekurangan. Penulis juga mengalami banyak hambatan terutama hambatan ide melangkah ketika menjalani skripsi ini. Hambatan tersebut berupa tidak jelasnya arah dan tujuan studi skripsi ini sejak awal penulisan. Namun hambatan-hambatan tersebut dapat terlalui berkat bantuan berbagai macam pihak. Penulis ingin mengucapkan terima kasih kepada: 1. Theresita Herni, Ir., M.T. selaku dosem pembimbing skripsi yang telah bersedia membimbing dan memberikan masukan dalam penyusunan skripsi ini. 2. Keluarga kecil penulis yaitu Orang Tua Harrys Kosasih dan Dewi Megawati Lukman, saudara perempuan Tiffany Kosasih yang telah memberikan dukungan moral dan materil. 3. Teman-teman skripsi yang telah bekerja sama dengan baik, memberikan dukungan, ide, serta dorongan moral terutama Dicky M. Prasetya yang telah banyak memberikan bantuan. 4. Yohanes Lim Dwi Adianto, Ir., M.T. sebagai penyedia jasa Proyek Pembangunan Batununggal Indah. 5. Pa Atang selaku kepala proyek Pembangunan Batununggal Indah, Pa Jono selaku mandor proyek. 6. Pa Hadi, Pa Sis, Pa Adi, Pa Mansyur selaku pekerja pemasang penutup lantai. iii

iv

DAFTAR ISI ABSTRAK... i ABSTRACT... ii PRAKATA... iii DAFTAR ISI... v DAFTAR NOTASI... vii DAFTAR GAMBAR... viii DAFTAR TABEL... ix DAFTAR LAMPIRAN... x BAB 1 PENDAHULUAN... 1-1 1.1 Latar Belakang Masalah... 1-1 1.2 Inti Permasalahan... 1-2 1.3 Tujuan Penelitian... 1-2 1.4 Pembatasan Masalah... 1-2 1.5 Metode Penelitian... 1-3 1.6 Sistematika Penulisan... 1-3 BAB 2 TINJAUAN PUSTAKA... 2-1 2.1 Produktivitas... 2-1 2.2 Jenis Data... 2-2 2.3 Produktivitas Per Jam... 2-1 2.4 Analisis Distribusi Normal... 2-2 2.5 Ukuran Sampel... 2-6 2.6 Standar Nasional Indonesia... 2-5 2.7 Granite Tile... 2-7 v

2.8 Labor Utilization Rate... 2-6 2.9 Hubungan Productivity Rate, Efisiensi, dan Utilisasi... 2-9 BAB 3 METODE PENELITIAN DAN DATA... 3-1 3.1 Metode Penelitian... 3-1 3.1.1 Metode Pengumpulan dan Pengambilan Data... 3-1 3.1.2 Tahapan Penelitian... 3-2 3.1.3 Jenis dan Macam Data... 3-5 3.2 Pemasangan Granit Lantai... 3-6 Bab 4 Analisis dan pembahasan... 4-1 4.1 Data Hasil Penelitian... 4-1 4.2 Data dan Perhitungan Produktivitas Pekerja... 4-1 4.3 Analisis Distribusi Normal Probabilitas Produktivitas... 4-1 4.4 Analisis Tingkat Kepercayaan Pemasangan Granite Tile SNI... 4-5 4.5 Analisis Efisiensi Pemasangan Granite Tile... 4-8 Bab 5 Kesimpulan dan Saran... 5-1 5.1 Kesimpulan... 5-1 5.2 Saran... 5-2 Daftar Pustaka... D-1 Lampiran... L-1 vi

DAFTAR NOTASI π : pi (3,14159...) e : bilangan exponensial (2,71828...) μ : rata-rata σ 2 σ OH SNI : variansi : deviasi standar : Orang Hari : Standar Nasional Indonesia LUR : Labor Utilization Rate vii

DAFTAR GAMBAR Gambar 2.1 Grafik distribusi normal... 2-4 Gambar 2.2 Luasan Grafik Distribusi Normal... 2-4 Gambar 3.1 Denah Luasan Lantai Granit yang Ditinjau... 3-2 Gambar 3.2 Pemasangan Granite Tile 60 x 60 cm... 3-8 Gambar 3.3 Pemasangan Granite Tile 60 x 60 cm... 3-9 Gambar 4.1 Grafik Distribusi Normal Produktivitas Pekerja... 4-4 viii

DAFTAR TABEL Tabel 4.1 Hasil Pengamatan Produktivitas 13 Februari 2017 (No.51C)... 4-1 Tabel 4.2 Perhitungan Standar Deviasi... 4-2 Tabel 4.3 Perhitungan nilai kerapatan f(x)... 4-3 Tabel 4.4 Perhitungan Durasi Efektif 8 Maret 2017 Pagi... 4-7 Tabel 4.5 Durasi Efektif Seluruh Pengamatan... 4-8 ix

DAFTAR LAMPIRAN Lampiran 1 Hasil Pengamatan Produktivitas 13 Februari 2017 (No.51C)... L-1 Lampiran 2 Hasil Pengamatan Produktivitas 13 Februari 2017 (No.53A)... L-1 Lampiran 3 Hasil Pengamatan Produktivitas 13 Februari 2017 (No.53A)... L-1 Lampiran 4 Hasil Pengamatan Produktivitas 14 Februari 2017 (No.51C)... L-2 Lampiran 5 Hasil Pengamatan Produktivitas 15 Februari 2017 (No.51C)... L-2 Lampiran 6 Hasil Pengamatan Produktivitas 16 Februari 2017 (No.53B)... L-2 Lampiran 7 Hasil Pengamatan Produktivitas 18 Februari 2017 (No.51D)... L-3 Lampiran 8 Hasil Pengamatan Produktivitas 20 Februari 2017 (No.53D)... L-3 Lampiran 9 Hasil Pengamatan Produktivitas 22 Februari 2017 (No.53D)... L-3 Lampiran 10 Hasil Pengamatan Produktivitas 23 Februari 2017 (No.53D)... L-4 Lampiran 11 Hasil Pengamatan Produktivitas 1 Maret 2017 (No.51H)... L-4 Lampiran 12 Hasil Pengamatan Produktivitas 8 Maret 2017 (No.51H)... L-4 Lampiran 13 Hasil Pengamatan Produktivitas 9 Maret 2017 (No.51H)... L-5 Lampiran 14 Hasil Pengamatan Produktivitas 10 Maret 2017 (No.51H)... L-5 Lampiran 15 Hasil Pengamatan Produktivitas 13 Maret 2017 (No.53F)... L-6 Lampiran 16 Hasil Pengamatan Produktivitas 14 Maret 2017 (No.53F)... L-6 Lampiran 17 Hasil Pengamatan Produktivitas 15 Maret 2017 (No.53G)... L-7 Lampiran 18 Hasil Pengamatan Produktivitas 18 Maret 2017 (No.53G)... L-7 Lampiran 19 Perhitungan Standar Deviasi... L-8 Lampiran 20 Perhitungan nilai kerapatan f(x)... L-11 Lampiran 21 Perhitungan Durasi Efektif 8 Maret 2017 Pagi... L-14 Lampiran 22 Perhitungan Durasi Efektif 9 Maret 2017 Pagi... L-18 Lampiran 23 Perhitungan Durasi Efektif 9 Maret 2017 Sore... L-25 Lampiran 24 Perhitungan Durasi Efektif 15 Maret 2017 Pagi... L-29 Lampiran 25 Perhitungan Durasi Efektif 15 Maret 2017 Sore... L-32 Lampiran 26 Perhitungan Durasi Efektif 18 Maret 2017 Pagi... L-35 Lampiran 27 Lembar Pengukuran Waktu Efektif... L-41 Lampiran 28 Lembar Pencatatan Lokasi Pemasangan Granit... L-42 x

BAB 1 PENDAHULUAN 1.1 Latar Belakang Masalah Dewasa ini perkembangan zaman merupakan suatu hal yang dapat dianggap tantangan atau kesempatan bagi suatu kemajuan negara. Seiring dengan berkembangnya zaman, ilmu teknik sipil memiliki peran penting untuk kemajuan pembangunan konstruksi. Maju atau tidaknya suatu negara dapat dilihat dari kemajuan ilmu dan teknologi konstruksinya. Penggunaan sumber daya secara tepat dapat menjadi faktor penentu hasil akhir pekerjaan konstruksi. Penggunaan sumber daya yang tepat memiliki pengaruh terhadap biaya, mutu, serta waktu. Maka dari itu, perlu dilakukan pengawasan yang tepat terhadap penggunaan sumber daya. Salah satu jenis pengawasan penggunaan sumber daya yang tepat adalah dengan melakukan sebuah penilaian. Dengan melakukan suatu penilaian terhadap sumber daya, maka dapat dilakukan evaluasi agar sumber daya yang digunakan menjadi lebih efektif dan efisien. Penggunaan sumber daya yang efektif dan efisien akan berpengaruh baik terhadap biaya, mutu, dan waktu. Dalam dunia Teknik Sipil, sumber daya utama yang menjadi penentu suatu keberhasilan proyek adalah sumber daya manusia. Kualitas sumber daya manusia menjadi faktor penentu dalam efektivitas dan efisiensi pekerjaan konstruksi. Untuk dapat mengukur kualitas sumber daya manusia dalam proyek konstruksi, maka digunakan tingkat produktivitas pekerja sebagai hal yang ditinjau. Tingkat produktivitas dianggap mewakili kualitas pekerja konstruksi. Dengan kedinamisan kondisi lapangan, maka tingkat produktivitas pekerja pun tidak selalu tepat. Untuk mendapatkan suatu tingkat produktivitas pekerja, maka dilakukan pendekatan secara statistik. Dengan pendekatan statistik tersebut, maka dapat juga diketahui tingkat kepercayaan atau tingkat keberhasilan suatu niali produktivitas. Standar satuan pekerjaan yang digunakan di lapangan pun berbeda-beda pada setiap jenis proyek, maka perlu dilakukan penilaian yang 1-1

1-2 cermat terhadap kondisi lapangan sesungguhnya. Dalam skripsi ini, dilakukan penilaian produktivitas dengan acuan standar dari Standar Nasional Indonesia. Jenis pekerjaan yang ditinjau pada skripsi ini adalah pekerjaan pemasangan Granite Tile Ukuran 60x60 cm dengan alasan tingkat kesulitan pengamatan yang masih dapat ditangani. 1.2 Inti Permasalahan 1. Tidak diketahuinya tingkat produktivitas rata-rata yang sesungguhnya terjadi di lapangan. 2. Dibutuhkannya metode penilaian produktivitas yang dapat mewakili kedinamisan kondisi pembangunan di lapangan. 3. Dibutuhkannya hasil penilaian produktivitas yang bersifat universal agar secara mudah dimengerti oleh penyedia jasa/owner. 4. Tidak diketahuinya Nilai Utilisasi Waktu yang terjadi untuk jenis pekerjaan Pemasangan Penutup Lantai. 5. Tidak diketahuinya Efisiensi Waktu yang terjadi di lapangan. 1.3 Tujuan Penelitian Dalam karya tulis ilmiah ini hal yang ingin dicapai adalah 1. Tingkat Produktivitas rata-rata yang sesungguhnya terjadi di lapangan. 2. Distribusi Probabilitas Produktivitas Pekerjaan Pemasangan Lantai yang terjadi adalah distribusi normal. 3. Besarnya tingkat keberhasilan angka produktivitas proyek konstruksi antara acuan Badan Standar Nasional Indonesia dengan yang terjadi sesungguhnya di lapangan. 4. Nilai Utilisasi Proyek untuk mengetahui sering atau tidaknya jenis pekerjaan pemasangan lantai granit berhubungan langsung dengan hasil. 5. Tingkat efisiensi pekerjaan pemsangan Granite Tile pada proyek 1.4 Pembatasan Masalah 1. Proyek yang menjadi tinjauan dalam karya tulis ilimiah ini adalah Proyek Pembangunan Perumahan Townhouse yang terletak di Kompleks Perumahan Batununggal, kota Bandung.

1-3 2. Data yang diambil disesuaikan dengan jenis pekerjaan yang sedang dikerjakan di proyek. 3. Metode pengambilan data dilakukan dengan mengukur volume pekerjaan yang diselesaikan setiap jam. 4. Data koefisien produktivitas yang didapat per jam kemudian diolah dengan menggunakan dasar teori metode distribusi normal. 5. Jenis pekerjaan yang ditinjau adalah pemasangan Granite Tile ukuran 60x60 cm 6. Koefisien Produktivitas acuan dasar yang ditinjau merupakan koefisien produktivitas dari SNI 7395 tahun 2008 mengenai tata cara perhitungan harga satuan pekerjaan penutup lantai dan dinding untuk konstruksi bangunan gedung dan perumahan. 1.5 Metode Penelitian 1. Studi Literatur Studi literatur digunakan sebagai acuan teori dasar untuk mengolah data hasil pengukuran di lapangan. Studi literatur meliputi penggunaan koefisien produktivitas, analisis harga satuan, statistik data distribusi normal, dan hubungan tingkat produktivitas, efisiensi, dan utilisasi. 2. Studi Lapangan Studi lapangan dilakukan dengan mengukur volume pekerjaan yang dilakukan oleh pekerja di lapangan setiap satu jam dan mengukur waktu efektif. Dari hasil pengukuran tersebut kemudian didapatkan produktivitas per jam dari pekerjaan tersebut dan tingkat utilisasinya. Hasil analisis distribusi normal data produktivitas tersebut kemudian dibandingkan dengan produktivitas yang ditetapkan oleh Badan Standar Nasional Indonesia. Hasil analisis berupa angka keykinan dan angka tersebut merupakan penilaian akurasi angka produktivitas yang ditetapkan oleh Badan Standar Nasional Indoensia. Hasil analisis lain yang didapat juga berupa tingkat utilisasi pekerjaan pemasangan lantai jenis granit. 1.6 Sistematika Penulisan Bab I: Pendahuluan

1-4 Bab ini mencangkup latar belakang, inti permasalahan, tujuan penelitian, pembatasan masalah, metode pembahasan, dan sistematika penulisan. Bab II: Tinjauan Pustaka Bab ini akan membahas dasar teori yang menjadi acuan penyusunan skripsi, seperti penggunaan Harga Satuan dalam Proyek Konstruksi, Pembuatan Grafik Distribusi Normal, Koefisien Produktivitas, serta rumus-rumus yang akan digunakan. Bab III: Metode Penelitian dan Data Bab ini menjelaskan metode pengambilan data produktivitas pekerja proyek konstruksi di lapangan. Bab IV: Analisis dan Pembahasan Bab ini berisi pembahasan dan analisis hasil pengukuran produktivitas pekerja proyek konstruksi dan penilaian terhadap koefisien produktivitas yang telah dibuat oleh Badan Standar Nasional Indonesia. Bab V: Keimpulan dan Saran Bab ini berisi kesimpulan yang didapat dari dari hasil penelitian serta saran.