R I N C I A N SATUAN A

dokumen-dokumen yang mirip
Belanja Bahan Baku Bangunan R I N C I A N SATUAN A B C D E F G H I J K F01

G. DAFTAR HARGA SATUAN BAHAN BANGUNAN NO URAIAN SATUAN HARGA KETERANGAN

DINAS PEKERJAAN UMUM PERUMAHAN DAN KAWASAN PERMUKIMAN REKAPITULASI HASIL SURVAI BAHAN / MATERIAL TAHUN 2017

DAFTAR HARGA TENAGA KERJA DAN BAHAN

NO URAIAN SATUAN HARGA KETERANGAN

DAFTAR ANALISA SNI HARGA SATUAN PEKERJAAN

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH

No. Nama dan Jenis Barang Satuan

- Batu Bulat M3 202, Batu Pecah Besar M3 227, Batu Pecah 5-7 Cm M3 221, Batu Pecah 3-5 Cm M3 215, Batu Pecah 2-3 Cm M3 227,700

DAFTAR ANALISA PEKERJAAN

DAFTAR SATUAN UPAH DAN BAHAN

URAIAN. Tenaga Oh Tukang 90, Oh Kepala Tukang 110, Oh Pekerja 75, Oh Mandor 120,000.

NO. JENIS / URAIAN SATUAN SAB BATANG 2015 SAB BATANG 2015 MINUS PPN 10% HARGA PERENCANAAN DIPAKAI

LAMPIRAN RENCANA ANGGARAN BIAYA PENAWARAN DAN ANGGARAN BIAYA PELAKSANAAN

BUPATI BANTUL DAERAH ISTIMEWA YOGYAKARTA PERATURAN BUPATI BANTUL NOMOR 30 TAHUN 2017 TENTANG DENGAN RAHMAT TUHAN YANG MAHA ESA BUPATI BANTUL,

HASIL SURVEY HARGA BAHAN BANGUNAN (2017)

PEMERINTA KABUPATEN MAROS SEKRETARIAT DAERAH

REKAPITULASI BILL OF QUANTITY (BOQ)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Keterangan ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

Barang Satuan Dasar on Site Project Ket. ( Rp. ) (Tanpa PPN)

OWNERS ESTIMATE. : Pembangunan Saran Pendidikan Islam pada Madrasah : Pembangunan Pagar Sekolah MIN Koya Barat. Tahun Anggaran : 2015

BAB III. KONSTRUKSI. Harga (Rp.) Mudah Sedang Sulit

RENCANA ANGGARAN BIAYA

DAFTAR UPAH DAN BAHAN

BUPATI PURBALINGGA PROVINSI JAWA TENGAH PERATURAN BUPATI PURBALINGGA NOMOR 12 TAHUN 2017 TENTANG

DAFTAR ANALISA B A H A N D A N U P A H

ANALISA HARGA SATUAN

ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI

BAB IV HASIL & ANALISIS. Pada proyek pembangunan rusunawa 4 lantai ini penulis memiliki beberapa. Bangunan berupa bangunan bertingkat 4 lantai

REKAPITULASI RENCANA ANGGARA BIAYA (RAB)

BILL OF QUANTITY ( BQ )

R E K A P I T U L A S I BILL OF QUANTITY (BOQ)

BAB 8 RENCANA ANGGARAN BIAYA

DAFTAR ANALISA SNI DINAS PU CIPTA KARYA DAN TATA RUANG KABUPATEN JEMBER TAHUN ANGGARAN 2012

DAFTAR UPAH DAN BAHAN UNTUK PEKERJAAN SIPIL BANGUNAN DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PADANG PANJANG TAHUN ANGGARAN 2017

BAB III. KONSTRUKSI A. HARGA SATUAN KOMPONEN BAHAN BANGUNAN/ KONTRUKSI. Harga Termasuk Pajak Harga (Rp.) Sulit. No Uraian Sat.

DAFTAR HARGA SATUAN ANALISA PEKERJAAN

BILL OF QUANTITY (BQ)

REKAPITULASI RENCANA ANGGARAN BIAYA

DAFTAR ANALISA DINAS PEKERJAAN UMUM KOTA PANGKALPINANG TAHUN 2011

ANALISA HARGA SATUAN PEKERJAAN

BAB III. KONSTRUKSI A. HARGA SATUAN KOMPONEN BAHAN BANGUNAN/ KONTRUKSI. Harga Termasuk Pajak Harga (Rp.) No Uraian Sat.

PT / CV. Alamat :. LOGO PT / CV. Kegiatan Pekerjaan Lokasi Sumber Dana

ANALISA HARGA SATUAN RENOVASI TOILET KHUSUS WANITA DAN MEMBUAT TOILET BARU KHUSUS PRIA STASIUN SUDIRMAN

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

KEMENTRIAN KEBUDAYAAN DAN PARIWISATA REKAPITULASI PERKIRAAN HARGA PEKERJAAN. Jumlah Harga No. Divisi Uraian Pekerjaan (Rupiah)

DAFTAR HARGA SATUAN BAHAN DAN UPAH PEKERJA

BILL OF QUANTITY ( B O Q )

REKAPITULASI RENCANA ANGGARAN BIAYA

Perubahan Aktivitas. Aktivitas 1. Pengukuran (Sama dengan aktivitas awal)

Lampiran RKS : 2190/ LL/KCJ/RKS/IX/2015

RENCANA ANGGARAN BIAYA (RAB) REKAPITULASI AKHIR

III. KONSTRUKSI A. HARGA SATUAN KOMPONEN BAHAN BANGUNAN/ KONSTRUKSI. Harga Termasuk Pajak Harga (Rp.) Mudah Sedang. No Uraian Sat.

RENCANA ANGGARAN BIAYA ( RAB ) REDESAIN GEDUNG PENGADILAN AGAMA MUNGKID MAGELANG TAHUN 2012

DAFTAR HARGA SATUAN PEKERJAAN BANGUNAN GEDUNG DAN PERMUKIMAN PEMERINTAH KOTA SEMARANG SEMESTER I TAHUN 2015 (Belum termasuk PPN)

Permulaan Hikmat adalah takut akan Tuhan, Dan Mengenal Yang Mahakudus adalah Pengertian ( Amsal 9:10 )

PEMERINTAH KABUPATEN BIMA UNIT LAYANAN PENGADAAN (ULP)

PSD III Desain Ars Undip TA 31

ANALISA HARGA SATUAN BAHAN DAN UPAH TAHUN 2009 NO. URAIAN KEGIATAN KOEFISIEN SATUAN HARGA SATUAN HARGA

DAFTAR KUANTITAS DAN HARGA

KOP PERUSAHAAN R E K A P I T U L A S I

33 Bubungan seng M¹ 34 Buis beton Ø 0 cm 3 Buis beton Ø 0 cm 36 Buis beton Ø 30 cm 37 Buis tanah Ø 0 cm 38 Buis tanah Ø 0 cm NO NAMA JENIS BARANG SATU

PEMERINTAH KABUPATEN BIMA UNIT LAYANAN PENGADAAN (ULP)

ANALISA HARGA SATUAN PENGADAAN PEKERJAAN RENOVASI LOKET ST. LENTENG AGUNG UNTUK MENDUKUNG PELAYANAN PENUMPANG 1 MEMBUAT GUDANG ALAT KERJA/M2

Addendum dokumen pengadaan dapat diambil dalam aplikasi SPSE melalui website Addendum dokumen berupa Gambar Rencana.

Bill Of Quantity ( BoQ )

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

BAB 8 RENCANA ANGGARAN BIAYA

DAFTAR ANALISA PEKERJAAN

DIDALAM FILE INI SAYA MASUKAN HARGA BAHAN BANGUNAN DENGAN DEFAULT RP ,-.

HARGA BAHAN/ MATERIAL KABUPATEN TUBAN TAHUN 2011

BAB 8 RENCANA ANGGARAN BIAYA

DAFTAR HARGA BARANG BANGUNAN Nama Toko :TB CAKRAWALA Alamat :JL. PALAGAN TENTARA PELAJAR JENIS / MERK UKURAN SATUAN Harga NAMA BAHAN

REKAPITULASI RENCANA ANGGARAN BIAYA

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

ADDENDUM DOKUMEN PENGADAAN PEKERJAAN PEKERJAAN LANJUTAN PEMBANGUNAN FASILITAS PELABUHAN LAUT SEPO/SAGEA Nomor : PL.106/2/3.1/ULP/KSOP.

DAFTAR HARGA SATUAN BAHAN KOTA CIMAHI TAHUN 2012

PEMERINTAH PROVINSI SUMATERA UTARA SEKRETARIAT DAERAH PROVINSI Jalan P. Diponegoro Nomor 30 Telephone MEDAN

BADAN PENGENDALIAN DAMPAK LINGKUNGAN, KEBERSIHAN DAN PERTAMANAN ADDENDUM BILL OF QUANTITY (BQ)

DAFTAR HARGA BARANG BANGUNAN

REKAPITULASI BILL OF QUANTITY (BQ)

DAFTAR HARGA BARANG BANGUNAN SURVEY PIP2B DIY 2015

DAFTAR HARGA BARANG BANGUNAN

BILL OF QUANTITY NO URAIAN PEKERJAAN ANALISA VOL SAT HARGA SATUAN JUMLAH HARGA

K O N T R U K S I. Pekerjaan jalan tebal 20 cm + 10 cm penetrasi 4 cm / m2 (Tidak termasuk urugan

DAFTAR HARGA BARANG BANGUNAN Nama Toko :TB HENI JAYA Alamat :JL. MAGELANG KM 16.5

DAFTAR HARGA BARANG BANGUNAN Nama Toko :TB MEKAR AGUNG Alamat :JL. GODEAN KM 17

BILL OF QUANTITY ( BQ )

DAFTAR HARGA BARANG BANGUNAN

Transkripsi:

F01 Tanah Urug m3 78.700 88.200 75.600 81.900 75.600 75.600 80.000 75.600 75.600 75.600 75.600 Tanah Biasa m3 78.700 88.200 75.600 81.900 75.600 75.600 80.000 75.600 75.600 75.600 75.600 Tanah Liat m3 85.300 95.500 81.900 88.700 81.900 81.900 86.600 81.900 81.900 81.900 81.900 Tanah Cadas m3 91.800 102.900 88.200 95.500 88.200 88.200 93.300 88.200 88.200 88.200 88.200 Pasir Urug m3 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Pasir Pasang m3 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Pasir Beton m3 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Pasir Batu (Sirtu) m3 131.200 147.000 134.400 136.500 132.300 133.300 133.300 141.700 136.500 136.500 136.500 Batu Bulat m3 131.200 147.000 134.400 136.500 132.300 133.300 133.300 141.700 136.500 136.500 136.500 Batu Kali m3 144.300 161.700 147.800 150.100 145.500 146.600 146.600 155.900 150.100 150.100 150.100 Batu Gunung m3 144.300 161.700 147.800 150.100 145.500 146.600 146.600 155.900 150.100 150.100 150.100 Batu Pecah 10-15cm m3 183.700 205.800 188.100 191.100 185.200 186.600 186.600 198.400 191.100 191.100 191.100 Batu Pecah 5-7cm m3 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 Batu Pecah 3-5cm m3 216.500 242.500 221.700 225.200 218.200 220.000 220.000 233.800 225.200 225.200 225.200 Batu Pecah 2-3cm m3 249.300 279.300 255.300 259.300 251.300 253.300 253.300 269.300 259.300 259.300 259.300 Batu Pecah 1-2cm m3 262.500 294.000 268.800 273.000 264.600 266.700 266.700 283.500 273.000 273.000 273.000 Batu Pecah 0,5-1cm m3 262.500 294.000 268.800 273.000 264.600 266.700 266.700 283.500 273.000 273.000 273.000 Batu Pecah 0-0,5cm m3 229.600 257.200 235.200 238.800 231.500 233.300 233.300 248.000 238.800 238.800 238.800 Batu Merah buah 580 660 590 600 580 590 590 630 600 600 600 Batu Abu Bersih m3 216.500 242.500 221.700 225.200 218.200 220.000 220.000 233.800 225.200 225.200 225.200 Batu Krikil Sungai m3 144.100 161.400 147.500 149.800 145.200 146.400 146.400 155.600 149.800 149.800 149.800 Royalti Batu Candi Polos m2 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Batu Candi Motif m2 164.000 183.700 168.000 170.600 165.300 166.600 166.600 177.100 170.600 170.600 170.600 Batu Cetak Serit m2 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Batu Apung (Batu kg 19.600 22.000 20.100 20.400 19.800 20.000 20.000 21.200 20.400 20.400 20.400 Gosok) Batako 15 x 20 buah 6.500 7.300 6.700 6.800 6.600 6.600 6.600 7.000 6.800 6.800 6.800 Batako 20 x 45 buah 7.800 8.800 8.000 8.100 7.900 8.000 8.000 8.500 8.100 8.100 8.100 Profil Cetak Serit m2 192.100 215.200 196.700 199.800 193.600 195.200 195.200 207.500 199.800 199.800 199.800 Krosok Cor / Jagung m3 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Urugan Plihan m3 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Kapur Padam (Pasang) m3 328.100 367.500 336.000 341.200 330.700 333.300 333.300 354.300 341.200 341.200 341.200 Alat Kerja set 111.500 124.900 114.200 116.000 112.400 113.300 113.300 120.400 116.000 116.000 116.000 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 1

F02 Portland Cement @ 40kg zak 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Portland Cement @ 50kg zak 82.600 92.600 84.600 85.900 83.300 84.000 84.000 89.300 85.900 85.900 85.900 Portland Cement Putih @ 40kg Portland Cement Warna @ 50kg zak 86.600 97.000 88.700 90.000 87.300 88.000 88.000 93.500 90.000 90.000 90.000 zak 108.200 121.200 110.800 112.600 109.100 110.000 110.000 116.900 112.600 112.600 112.600 F03 - - - - - - - - - - - Aspal Curah Pen 60-70 kg Sesuai dengan harga yang ditetapkan oleh Pemerintah / Pertamina Aspal Curah Pen 70-80 kg Sesuai dengan harga yang ditetapkan oleh Pemerintah / Pertamina Aspal Segel Pen 60-70 kg Sesuai dengan harga yang ditetapkan oleh Pemerintah / Pertamina Aspal Emulsi (Aspal kg Sesuai dengan harga yang ditetapkan oleh Pemerintah / Pertamina Dingin) F04 Minyak Tanah ltr Sesuai ketentuan dari Pemerintah Solar ltr Sesuai ketentuan dari Pemerintah Premium ltr Sesuai ketentuan dari Pemerintah Pertamax ltr Sesuai ketentuan dari Pemerintah Olie / Pelumas ltr 37.000 37.000 37.000 37.000 37.000 37.000 37.000 37.000 37.000 37.000 37.000 F05 Besi Beton Polos kg 12.400 13.900 12.700 12.900 12.500 12.600 12.600 13.400 12.900 12.900 12.900 Besi Beton ulir kg 13.100 14.700 13.400 13.600 13.200 13.300 13.300 14.100 13.600 13.600 13.600 Kawat Bendrat kg 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Kawat Bronjong kg 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Baja Struktur kg 21.000 23.500 21.500 21.800 21.100 21.300 21.300 22.600 21.800 21.800 21.800 Paku Usuk kg 21.000 23.500 21.500 21.800 21.100 21.300 21.300 22.600 21.800 21.800 21.800 Paku Reng kg 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Paku Eternit kg 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Paku Payung kg 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Paku Seng kg 300 400 300 400 300 300 300 400 400 400 400 Paku Asbes buah 500 500 500 500 500 500 500 500 500 500 500 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 2

Paku Kait buah 500 500 500 500 500 500 500 500 500 500 500 Paku Sekrup buah 600 700 600 600 600 600 600 700 600 600 600 Besi Baugel (Baut) Kudakuda kg 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Besi Siku 30.30.3/6m' batang 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Besi Siku 40.40.4. 6m' batang 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Besi Siku 50.50.5/6m' batang 85.300 95.500 87.300 88.700 85.900 86.600 86.600 92.100 88.700 88.700 88.700 Besi Siku 60.60.6/6m batang 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Besi Siku 70.70.7/6m' batang 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Besi Siku 80.80.8/8m' batang 210.000 235.200 215.000 218.400 211.600 213.300 213.300 226.800 218.400 218.400 218.400 Expantion Joint buah 18.300 20.500 18.800 19.100 18.500 18.600 18.600 19.800 19.100 19.100 19.100 Kawat Nyamuk m2 22.900 25.700 23.500 23.800 23.100 23.300 23.300 24.800 23.800 23.800 23.800 Kawat Kasa m2 26.200 29.400 26.800 27.300 26.400 26.600 26.600 28.300 27.300 27.300 27.300 Kawat bronjong unit 393.700 441.000 403.200 409.500 396.900 400.000 400.000 425.200 409.500 409.500 409.500 pabrikasi 2x1x05mdiameter kawat 2,70 F06 Genteng Flam Sokka buah 2.100 2.300 2.100 2.100 2.100 2.100 2.100 2.200 2.100 2.100 2.100 Genteng Plentong Kecil buah 1.900 2.200 2.000 2.000 1.900 1.900 1.900 2.100 2.000 2.000 2.000 Genteng Plentong Besar buah 2.600 2.900 2.600 2.700 2.600 2.600 2.600 2.800 2.700 2.700 2.700 Genteng Press Beton buah 7.800 8.800 8.000 8.100 7.900 8.000 8.000 8.500 8.100 8.100 8.100 Genteng Keramik buah 11.100 12.400 11.400 11.600 11.200 11.300 11.300 12.000 11.600 11.600 11.600 Genteng Kodok buah 2.600 2.900 2.600 2.700 2.600 2.600 2.600 2.800 2.700 2.700 2.700 Genteng Kaca buah 9.800 11.000 10.000 10.200 9.900 9.900 9.900 10.600 10.200 10.200 10.200 Genteng Multi Roof m2 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Standar Genteng Multi Roof m2 170.600 191.100 174.700 177.400 171.900 173.300 173.300 184.200 177.400 177.400 177.400 Lapis Kerpus Genteng buah 3.900 4.400 4.000 4.000 3.900 4.000 4.000 4.200 4.000 4.000 4.000 Kerpus Genteng beton buah 7.800 8.800 8.000 8.100 7.900 8.000 8.000 8.500 8.100 8.100 8.100 Kerpus keramik Genteng buah 11.800 13.200 12.000 12.200 11.900 12.000 12.000 12.700 12.200 12.200 12.200 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 3

Kerpus Multi Roof buah 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Standar Kerpus Multi Roof Lapis buah 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Kerpus Asbes m' 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Gelombang Kecil Kerpus Asbes m' 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Gelombang Besar Seng Gelombang 6 Kaki lembar 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Seng Gelombang 9 Kaki lembar 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Seng Talang BJLS 28 meter 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Seng Talang BJLS 30 meter 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Asbes Gelombang 6 lembar 47.200 52.900 48.300 49.100 47.600 48.000 48.000 51.000 49.100 49.100 49.100 Kaki 105 Asbes Gelombang 9 lembar 70.800 79.300 72.500 73.700 71.400 72.000 72.000 76.500 73.700 73.700 73.700 Kaki 105 Atap Aluminium m2 393.700 441.000 403.200 409.500 396.900 400.000 400.000 425.200 409.500 409.500 409.500 (Owning) Atap Policarbonat m2 459.300 514.500 470.400 477.700 463.000 466.700 466.700 496.100 477.700 477.700 477.700 Rangka Atap Baja m2 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 Ringan (bentang 6-9m) Rangka Atap Baja m2 236.200 264.600 241.900 245.700 238.100 240.000 240.000 255.100 245.700 245.700 245.700 Ringan (bentang 18-24m) Talang PVC U-15 meter 26.200 29.400 26.800 27.300 26.400 26.600 26.600 28.300 27.300 27.300 27.300 Talang PVC U-20 meter 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Water Profing Kg 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 Water Tor Fiber buah 1.837.500 2.058.000 1.881.600 1.911.000 1.852.200 1.866.900 1.866.900 1.984.500 1.911.000 1.911.000 1.911.000 1000Liter F07 Kusen Aluminium m' 98.400 110.200 100.800 102.300 99.200 100.000 100.000 106.300 102.300 102.300 102.300 Standar Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 4

Kusen Allumunium m' 105.000 117.600 107.500 109.200 105.800 106.600 106.600 113.400 109.200 109.200 109.200 Warna Jendela Kaca m2 393.700 441.000 403.200 409.500 396.900 400.000 400.000 425.200 409.500 409.500 409.500 Aluminium Pintu Fiberglass buah 393.700 441.000 403.200 409.500 396.900 400.000 400.000 425.200 409.500 409.500 409.500 Pintu Aluminium m2 525.000 588.000 537.600 546.000 529.200 533.400 533.400 567.000 546.000 546.000 546.000 Railling Door m2 525.000 588.000 537.600 546.000 529.200 533.400 533.400 567.000 546.000 546.000 546.000 Folding Gate m2 787.500 882.000 806.400 819.000 793.800 800.100 800.100 850.500 819.000 819.000 819.000 Fiberglass Plat m2 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Fiberglass Gelombang lembar 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Pagar Railling Stainlees Steel kg 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Pagar Railling Besi kg 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Tempa Pagar Railling Stainlees Steel m2 918.700 1.029.000 940.800 955.500 926.100 933.400 933.400 992.200 955.500 955.500 955.500 Pagar Railling Besi m2 787.500 882.000 806.400 819.000 793.800 800.100 800.100 850.500 819.000 819.000 819.000 Tempa Teralis kg 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Kawat Duri kg 19.600 22.000 20.100 20.400 19.800 20.000 20.000 21.200 20.400 20.400 20.400 F08 Formika lembar 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 Formika Ukuran Pintu lembar 164.000 183.700 168.000 170.600 165.300 166.600 166.600 177.100 170.600 170.600 170.600 Triplek 3 lembar 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Triplek 4 lembar 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Triplek 6 lembar 98.400 110.200 100.800 102.300 99.200 100.000 100.000 106.300 102.300 102.300 102.300 Triplek 9 lembar 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Teakwood Motif Serat lembar 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Jati Harplek 5 (90x180) lembar 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Harplek 5 (120x240) lembar 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Multiplek 5 lembar 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Multiplek 12 lembar 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 5

F09 Eternit Polos lembar 15.700 17.600 16.100 16.300 15.800 16.000 16.000 17.000 16.300 16.300 16.300 Eternit Kembang lembar 17.000 19.100 17.400 17.700 17.100 17.300 17.300 18.400 17.700 17.700 17.700 Eternit Super Rata lembar 19.600 22.000 20.100 20.400 19.800 20.000 20.000 21.200 20.400 20.400 20.400 Kalsiboad (120x240x9) lembar 157.500 176.400 161.200 163.800 158.700 160.000 160.000 170.100 163.800 163.800 163.800 Gypsum Board lembar 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 (120x240x9) List Gypsum Profil meter 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Profil Beton Cetak m2 26.200 29.400 26.800 27.300 26.400 26.600 26.600 28.300 27.300 27.300 27.300 F10 Stop Kontak + Instalasi buah 183.700 205.800 188.100 191.100 185.200 186.600 186.600 198.400 191.100 191.100 191.100 Titik Lampu + Instalasi buah 183.700 205.800 188.100 191.100 185.200 186.600 186.600 198.400 191.100 191.100 191.100 Stop Kontak buah 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Sakelar buah 32.800 36.700 33.600 34.100 33.000 33.300 33.300 35.400 34.100 34.100 34.100 Lampu SL 18 Watt buah 36.700 41.100 37.600 38.200 37.000 37.300 37.300 39.600 38.200 38.200 38.200 Essensial Lampu SL 60 Watt buah 98.400 110.200 100.800 102.300 99.200 100.000 100.000 106.300 102.300 102.300 102.300 Essensial Lampu Bambu 40 Watt buah 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 Lampu RM 2x40 Watt buah 656.200 735.000 672.000 682.500 661.500 666.700 666.700 708.700 682.500 682.500 682.500 Lampu Down Ligh 18 buah 45.900 51.400 47.000 47.700 46.300 46.600 46.600 49.600 47.700 47.700 47.700 Watt Zekering kast lokal 1 buah 164.000 183.700 168.000 170.600 165.300 166.600 166.600 177.100 170.600 170.600 170.600 grup Zekering kast lokal 2 buah 183.700 205.800 188.100 191.100 185.200 186.600 186.600 198.400 191.100 191.100 191.100 grup Zekering kast lokal 3 buah 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 grup Seal Tape buah 3.600 4.100 3.700 3.800 3.600 3.700 3.700 3.900 3.800 3.800 3.800 F11 Kaca Warna 5 m2 131.200 147.000 134.400 136.500 132.300 133.300 133.300 141.700 136.500 136.500 136.500 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 6

Kaca Bening 3 m2 105.000 117.600 107.500 109.200 105.800 106.600 106.600 113.400 109.200 109.200 109.200 Kaca Bening 5 m2 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Kaca Buram 3 m2 111.500 124.900 114.200 116.000 112.400 113.300 113.300 120.400 116.000 116.000 116.000 Kaca Buram 5 m2 131.200 147.000 134.400 136.500 132.300 133.300 133.300 141.700 136.500 136.500 136.500 Kaca Reiben 3 m2 111.500 124.900 114.200 116.000 112.400 113.300 113.300 120.400 116.000 116.000 116.000 Kaca Reiben 5 m2 118.100 132.300 120.900 122.800 119.000 120.000 120.000 127.500 122.800 122.800 122.800 Kaca Cermin 5 m2 131.200 147.000 134.400 136.500 132.300 133.300 133.300 141.700 136.500 136.500 136.500 Kaca Patri m2 328.100 367.500 336.000 341.200 330.700 333.300 333.300 354.300 341.200 341.200 341.200 Kaca Etsa, Grafir m2 262.500 294.000 268.800 273.000 264.600 266.700 266.700 283.500 273.000 273.000 273.000 Motif Kaca Film m2 45.900 51.400 47.000 47.700 46.300 46.600 46.600 49.600 47.700 47.700 47.700 Glass Block 20/20 buah 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Nako (Kerangka & buah 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 Daun) Rooster buah 10.500 11.700 10.700 10.900 10.500 10.600 10.600 11.300 10.900 10.900 10.900 F12 Keramik 20/20 m2 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Keramik 20/25 m2 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Keramik 30/30 (KW I) m2 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 Keramik 30/30 (KW II) m2 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 Keramik 40/40 (KW I) m2 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Keramik 40/40 (KW II) m2 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 Keramik 45/45 Motif m2 105.000 117.600 107.500 109.200 105.800 106.600 106.600 113.400 109.200 109.200 109.200 Keramik 45/45 Motif m2 91.800 102.900 94.000 95.500 92.600 93.300 93.300 99.200 95.500 95.500 95.500 Kasar Tekstur Keramik Plin Lantai m' 15.700 17.600 16.100 16.300 15.800 16.000 16.000 17.000 16.300 16.300 16.300 Keramik Nosing (Kuku m' 10.500 11.700 10.700 10.900 10.500 10.600 10.600 11.300 10.900 10.900 10.900 Macan) Granit m2 393.700 441.000 403.200 409.500 396.900 400.000 400.000 425.200 409.500 409.500 409.500 Marmer m2 656.200 735.000 672.000 682.500 661.500 666.700 666.700 708.700 682.500 682.500 682.500 Tegel Polos 20/20 bh 1.900 2.200 2.000 2.000 1.900 1.900 1.900 2.100 2.000 2.000 2.000 Tegel Polos 30/30 bh 4.500 5.100 4.700 4.700 4.600 4.600 4.600 4.900 4.700 4.700 4.700 Tegel Warna 20/20 bh 2.600 2.900 2.600 2.700 2.600 2.600 2.600 2.800 2.700 2.700 2.700 Tegel Warna 30/30 bh 5.200 5.800 5.300 5.400 5.200 5.300 5.300 5.600 5.400 5.400 5.400 F13 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 7

Buis Beton U 20cm buah 26.200 29.400 26.800 27.300 26.400 26.600 26.600 28.300 27.300 27.300 27.300 Buis Beton U 30cm buah 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 Buis Beton U 40cm buah 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 Buis Beton U 50cm buah 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 Buis Beton U 60cm buah 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Paving Blok Natural m2 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 6cm Paving Blok Natural m2 47.200 52.900 48.300 49.100 47.600 48.000 48.000 51.000 49.100 49.100 49.100 8cm Paving Blok Berwarna m2 45.900 51.400 47.000 47.700 46.300 46.600 46.600 49.600 47.700 47.700 47.700 6cm Paving Blok Berwarna m2 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 8cm Paving Blok Natural m2 39.300 44.100 40.300 40.900 39.600 40.000 40.000 42.500 40.900 40.900 40.900 10/20 Paving Blok Berwarna m2 47.200 52.900 48.300 49.100 47.600 48.000 48.000 51.000 49.100 49.100 49.100 10/20 Paving Blok Natural m2 52.500 58.800 53.700 54.600 52.900 53.300 53.300 56.700 54.600 54.600 54.600 6cm K300 Paving Blok Natural m2 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 8cm K300 Paving Blok Warna 6cm m2 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 K300 Paving Blok Warna 8cm m2 65.600 73.500 67.200 68.200 66.100 66.600 66.600 70.800 68.200 68.200 68.200 K300 Karpet Lantai Biasa m2 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Karpet Lantai Bludru m2 196.800 220.500 201.600 204.700 198.400 200.000 200.000 212.600 204.700 204.700 204.700 Karpet Lantai Woll m2 328.100 367.500 336.000 341.200 330.700 333.300 333.300 354.300 341.200 341.200 341.200 Wallpaper Motif m2 78.700 88.200 80.600 81.900 79.300 80.000 80.000 85.000 81.900 81.900 81.900 Wallpaper Polos m2 59.000 66.100 60.400 61.400 59.500 60.000 60.000 63.700 61.400 61.400 61.400 F14 Pipa Galvanis 1/2" batang 91.800 115.500 105.000 105.000 105.000 115.500 105.000 115.500 105.000 105.000 105.000 Pipa Galvanis 3/4" batang 111.500 144.900 134.400 134.400 134.400 144.900 134.400 144.900 134.400 134.400 134.400 Pipa Galvanis 1" batang 157.500 178.500 168.000 168.000 168.000 178.500 168.000 178.500 168.000 168.000 168.000 Pipa Galvanis 1 1/2" batang 236.200 236.200 225.700 225.700 225.700 236.200 225.700 236.200 225.700 225.700 225.700 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 8

Pipa Galvanis 2" batang 288.700 325.500 315.000 315.000 315.000 325.500 315.000 325.500 315.000 315.000 31.500 Pipa Galvanis 2 1/2" batang 525.000 488.200 477.700 477.700 477.700 488.200 477.700 488.200 477.700 477.700 477.700 Pipa Galvanis 3" batang 721.800 693.000 682.500 682.500 682.500 693.000 682.500 693.000 682.500 682.500 682.500 Pipa Galvanis 4" batang 853.100 871.500 859.900 859.900 859.900 871.500 859.900 871.500 859.900 859.900 859.900 F15 Pipa PVC 1/2" batang 29.900 29.900 29.900 29.900 29.900 29.900 29.900 29.900 29.900 29.900 29.900 Pipa PVC 3/4" batang 46.700 46.700 46.700 46.700 46.700 46.700 46.700 46.700 46.700 46.700 46.700 Pipa PVC 1" batang 64.000 64.000 64.000 64.000 64.000 64.000 64.000 64.000 64.000 64.000 64.000 Pipa PVC 1.1/4" batang 94.500 94.500 94.500 94.500 94.500 94.500 94.500 94.500 94.500 94.500 94.500 Pipa PVC 1 1/2" batang 107.100 107.100 107.100 107.100 107.100 107.100 107.100 107.100 107.100 107.100 107.100 Pipa PVC 2" batang 168.000 168.000 168.000 168.000 168.000 168.000 168.000 168.000 168.000 168.000 168.000 Pipa PVC 2 1/2" batang 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 Pipa PVC 3" batang 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 336.000 Pipa PVC 4" batang 506.100 506.100 506.100 506.100 506.100 506.100 506.100 506.100 506.100 506.100 506.100 Pipa PVC 1.1/4" m' 16.650 16.650 16.650 16.650 16.650 16.650 16.650 16.650 16.650 16.650 16.650 Pipa PVC 1 1/2" m' 25.700 25.700 25.700 25.700 25.700 25.700 25.700 25.700 25.700 25.700 25.700 Pipa PVC 2" m' 37.700 37.700 37.700 37.700 37.700 37.700 37.700 37.700 37.700 37.700 37.700 Pipa PVC 2 1/2" m' 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 Pipa PVC 3" m' 78.300 78.300 78.300 78.300 78.300 78.300 78.300 78.300 78.300 78.300 78.300 Pipa PVC 4" m' 115.700 115.700 115.700 115.700 115.700 115.700 115.700 115.700 115.700 115.700 115.700 (Pipe + RR) Pipa PVC 2" m' 41.250 41.250 41.250 41.250 41.250 41.250 41.250 41.250 41.250 41.250 41.250 Pipa PVC 2 1/2" m' 58.500 58.500 58.500 58.500 58.500 58.500 58.500 58.500 58.500 58.500 58.500 Pipa PVC 3" m' 82.700 82.700 82.700 82.700 82.700 82.700 82.700 82.700 82.700 82.700 82.700 Pipa PVC 4" m' 121.450 121.450 121.450 121.450 121.450 121.450 121.450 121.450 121.450 121.450 121.450 Pipa HDPE - PE (PN 12.5) Pipa PE 1/2" m' 10.300 10.300 10.300 10.300 10.300 10.300 10.300 10.300 10.300 10.300 10.300 Pipa PE 3/4" m' 14.950 14.950 14.950 14.950 14.950 14.950 14.950 14.950 14.950 14.950 14.950 Pipa PE 1" m' 21.450 21.450 21.450 21.450 21.450 21.450 21.450 21.450 21.450 21.450 21.450 Pipa PE 1.1/4" m' 33.250 33.250 33.250 33.250 33.250 33.250 33.250 33.250 33.250 33.250 33.250 Pipa PE 1 1/2" m' 52.000 52.000 52.000 52.000 52.000 52.000 52.000 52.000 52.000 52.000 52.000 Pipa PE 2" m' 82.150 82.150 82.150 82.150 82.150 82.150 82.150 82.150 82.150 82.150 82.150 Pipa PE 2 1/2" m' 116.500 116.500 116.500 116.500 116.500 116.500 116.500 116.500 116.500 116.500 116.500 Pipa PE 3" m' 167.250 167.250 167.250 167.250 167.250 167.250 167.250 167.250 167.250 167.250 167.250 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 9

Pipa PE 4" m' 247.450 247.450 247.450 247.450 247.450 247.450 247.450 247.450 247.450 247.450 247.450 Pipa PE 5" m' 319.250 319.250 319.250 319.250 319.250 319.250 319.250 319.250 319.250 319.250 319.250 F16 All Soc Tee Ø 40x40 buah 80.300 80.300 80.300 80.300 80.300 80.300 80.300 80.300 80.300 80.300 80.300 All Soc Tee Ø 50x50 buah 99.300 99.300 99.300 99.300 99.300 99.300 99.300 99.300 99.300 99.300 99.300 All Soc Tee Ø 50x25 buah 59.900 59.900 59.900 59.900 59.900 59.900 59.900 59.900 59.900 59.900 59.900 All Soc Tee Ø 75x75 buah 274.700 274.700 274.700 274.700 274.700 274.700 274.700 274.700 274.700 274.700 274.700 All Soc Tee Ø 75x50 buah 259.900 259.900 259.900 259.900 259.900 259.900 259.900 259.900 259.900 259.900 259.900 All Soc Tee Ø 100x100 buah 477.700 477.700 477.700 477.700 477.700 477.700 477.700 477.700 477.700 477.700 477.700 All Soc Tee Ø 100x75 buah 445.600 445.600 445.600 445.600 445.600 445.600 445.600 445.600 445.600 445.600 445.600 All Soc Tee Ø 100x50 buah 575.600 575.600 575.600 575.600 575.600 575.600 575.600 575.600 575.600 575.600 575.600 All Soc Tee Ø 150x150 buah 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 1.282.700 All Soc Tee Ø 150x100 buah 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 1.198.000 All Socket : S-12.5 All Socket Ø 2" (90 ) Buah 161.300 161.300 161.300 161.300 161.300 161.300 161.300 161.300 161.300 161.300 161.300 All Socket Ø 21/2" (90 ) Buah 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 All Socket Ø 3" (90 ) Buah 249.550 249.550 249.550 249.550 249.550 249.550 249.550 249.550 249.550 249.550 249.550 All Socket Ø 4" (90 ) Buah 345.150 345.150 345.150 345.150 345.150 345.150 345.150 345.150 345.150 345.150 345.150 All Socket Ø 2" (45 ) Buah 151.000 151.000 151.000 151.000 151.000 151.000 151.000 151.000 151.000 151.000 151.000 All Socket Ø 21/2" (45 ) Buah 181.300 181.300 181.300 181.300 181.300 181.300 181.300 181.300 181.300 181.300 181.300 All Socket Ø 3" (45 ) Buah 215.850 215.850 215.850 215.850 215.850 215.850 215.850 215.850 215.850 215.850 215.850 All Socket Ø 4" (45 ) Buah 315.000 315.000 315.000 315.000 315.000 315.000 315.000 315.000 315.000 315.000 315.000 All Socket Ø 2" (22.5 ) Buah 140.150 140.150 140.150 140.150 140.150 140.150 140.150 140.150 140.150 140.150 140.150 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 10

All Socket Ø 21/2" Buah 168.550 168.550 168.550 168.550 168.550 168.550 168.550 168.550 168.550 168.550 168.550 (22.5 ) All Socket Ø 3" (22.5 ) Buah 207.200 207.200 207.200 207.200 207.200 207.200 207.200 207.200 207.200 207.200 207.200 All Socket Ø 4" (22.5 ) Buah 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 2.890.000 All Socket Ø 2" (11.25 ) Buah 125.350 125.350 125.350 125.350 125.350 125.350 125.350 125.350 125.350 125.350 125.350 All Socket Ø 21/2" Buah 154.000 154.000 154.000 154.000 154.000 154.000 154.000 154.000 154.000 154.000 154.000 (11.25 ) All Socket Ø 3" (11.25 ) Buah 191.500 191.500 191.500 191.500 191.500 191.500 191.500 191.500 191.500 191.500 191.500 All Socket Ø 4" (11.25 ) Buah 267.200 267.200 267.200 267.200 267.200 267.200 267.200 267.200 267.200 267.200 267.200 Socket/Spigot : S-12.5 - - - - - - - - - - - Socket/Spigot Ø 2" (90 ) Buah 109.370 109.370 109.370 109.370 109.370 109.370 109.370 109.370 109.370 109.370 109.370 Socket/Spigot Ø Buah 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 21/2"(90 ) Socket/Spigot Ø 3" (90 ) Buah 181.850 181.850 181.850 181.850 181.850 181.850 181.850 181.850 181.850 181.850 181.850 Socket/Spigot Ø 4" (90 ) Buah 257.150 257.150 257.150 257.150 257.150 257.150 257.150 257.150 257.150 257.150 257.150 Socket/Spigot Ø 2" (45 ) Buah 95.500 95.500 95.500 95.500 95.500 95.500 95.500 95.500 95.500 95.500 95.500 Socket/Spigot Ø 21/2 Buah 123.600 123.600 123.600 123.600 123.600 123.600 123.600 123.600 123.600 123.600 123.600 (45 ) Socket/Spigot Ø 3" (45 ) Buah 156.300 156.300 156.300 156.300 156.300 156.300 156.300 156.300 156.300 156.300 156.300 Socket/Spigot Ø 4" (45 ) Buah 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 231.000 Socket/Spigot Ø 2" (22.5 ) Socket/Spigot Ø 21/2"(22.5 ) Socket/Spigot Ø 3" (22.5 ) Buah 84.400 84.400 84.400 84.400 84.400 84.400 84.400 84.400 84.400 84.400 84.400 Buah 112.000 112.000 112.000 112.000 112.000 112.000 112.000 112.000 112.000 112.000 112.000 Buah 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 135.250 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 11

Socket/Spigot Ø 4" Buah 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 200.900 (22.5 ) Socket/Spigot Ø 2" Buah 72.550 72.550 72.550 72.550 72.550 72.550 72.550 72.550 72.550 72.550 72.550 (11.25 ) Socket/Spigot Ø 21/2" Buah 107.650 107.650 107.650 107.650 107.650 107.650 107.650 107.650 107.650 107.650 107.650 (11.25 ) Socket/Spigot Ø 3" Buah 128.350 128.350 128.350 128.350 128.350 128.350 128.350 128.350 128.350 128.350 128.350 (11.25 ) Socket/Spigot Ø 4" Buah 195.700 195.700 195.700 195.700 195.700 195.700 195.700 195.700 195.700 195.700 195.700 (11.25 ) Fitting PVC - - - - - - - - - - - Flange Socket (PVC) Ø Buah 215.200 215.200 215.200 215.200 215.200 215.200 215.200 215.200 215.200 215.200 215.200 2" Flange Socket (PVC) Ø Buah 239.850 239.850 239.850 239.850 239.850 239.850 239.850 239.850 239.850 239.850 239.850 21/2" Flange Socket (PVC) Ø Buah 286.400 286.400 286.400 286.400 286.400 286.400 286.400 286.400 286.400 286.400 286.400 3" Flange Socket (PVC) Ø Buah 383.600 383.600 383.600 383.600 383.600 383.600 383.600 383.600 383.600 383.600 383.600 4" Flange Socket (Besi) Ø Buah 469.000 469.000 469.000 469.000 469.000 469.000 469.000 469.000 469.000 469.000 469.000 2" Flange Socket (Besi) Ø Buah 599.450 599.450 599.450 599.450 599.450 599.450 599.450 599.450 599.450 599.450 599.450 3" Flange Socket (Besi) Ø Buah 814.600 814.600 814.600 814.600 814.600 814.600 814.600 814.600 814.600 814.600 814.600 4" Flange Spigot (PVC) Ø 2" Buah 178.550 178.550 178.550 178.550 178.550 178.550 178.550 178.550 178.550 178.550 178.550 Flange Spigot (PVC) Ø Buah 203.200 203.200 203.200 203.200 203.200 203.200 203.200 203.200 203.200 203.200 203.200 21/2" Flange Spigot (PVC) Ø 3" Buah 240.450 240.450 240.450 240.450 240.450 240.450 240.450 240.450 240.450 240.450 240.450 Flange Spigot (PVC) Ø 4" Buah 303.700 303.700 303.700 303.700 303.700 303.700 303.700 303.700 303.700 303.700 303.700 Flange Spigot (Besi) Ø 2" Buah 434.700 434.700 434.700 434.700 434.700 434.700 434.700 434.700 434.700 434.700 434.700 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 12

Flange Spigot (Besi) Ø 3" Buah 537.800 537.800 537.800 537.800 537.800 537.800 537.800 537.800 537.800 537.800 537.800 Flange Spigot (Besi) Ø 4" Buah 686.450 686.450 686.450 686.450 686.450 686.450 686.450 686.450 686.450 686.450 686.450 END CAP/DOP Ø 2" Buah 25.850 25.850 25.850 25.850 25.850 25.850 25.850 25.850 25.850 25.850 25.850 END CAP/DOP Ø 21/2" Buah 29.850 29.850 29.850 29.850 29.850 29.850 29.850 29.850 29.850 29.850 29.850 END CAP/DOP Ø 3" Buah 41.000 41.000 41.000 41.000 41.000 41.000 41.000 41.000 41.000 41.000 41.000 END CAP/DOP Ø 4" Buah 68.950 68.950 68.950 68.950 68.950 68.950 68.950 68.950 68.950 68.950 68.950 REPAIR COLLAR Ø 2" Buah 99.150 99.150 99.150 99.150 99.150 99.150 99.150 99.150 99.150 99.150 99.150 REPAIR COLLAR Ø Buah 112.650 112.650 112.650 112.650 112.650 112.650 112.650 112.650 112.650 112.650 112.650 21/2" REPAIR COLLAR Ø 3" Buah 149.350 149.350 149.350 149.350 149.350 149.350 149.350 149.350 149.350 149.350 149.350 REPAIR COLLAR Ø 4" Buah 261.700 261.700 261.700 261.700 261.700 261.700 261.700 261.700 261.700 261.700 261.700 F17 All Flange Tee Ø 75x50 All Flange Tee Ø 75x75 All Flange Tee Ø 100x50 All Flange Tee Ø 100x100 All Flange Tee Ø 75x50 buah 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 buah 264.400 264.400 264.400 264.400 264.400 264.400 264.400 264.400 264.400 264.400 264.400 buah 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 buah 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 buah 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 F18 Flange Spigot Ø 50 buah 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 13

Flange Spigot Ø 75 buah 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 Flange Spigot Ø 100 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 F19 All Flange Reduser Ø 50x40 All Flange Reduser Ø 75x25 All Flange Reduser Ø 75x50 All Flange Reduser Ø 100x50 F20 All Socket Reduser Ø 50x25 All Socket Reduser Ø 50x40 All Socket Reduser Ø 75x50 All Socket Reduser Ø 100x50 buah 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 buah 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 buah 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 buah 20.300 20.300 20.300 20.300 20.300 20.300 20.300 20.300 20.300 20.300 20.300 buah 36.500 36.500 36.500 36.500 36.500 36.500 36.500 36.500 36.500 36.500 36.500 buah 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 buah 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 F21 Dop / End Cup Ø 15 buah 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 14

Dop / End Cup Ø 20 Dop / End Cup Ø 25 Dop / End Cup Ø 40 Dop / End Cup Ø 50 Dop / End Cup Ø 75 Dop / End Cup Ø 100 buah 2.800 2.800 2.800 2.800 2.800 2.800 2.800 2.800 2.800 2.800 2.800 buah 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 4.400 buah 5.700 5.700 5.700 5.700 5.700 5.700 5.700 5.700 5.700 5.700 5.700 buah 80.000 80.000 80.000 80.000 80.000 80.000 80.000 80.000 80.000 80.000 80.000 buah 172.700 172.700 172.700 172.700 172.700 172.700 172.700 172.700 172.700 172.700 172.700 buah 217.200 217.200 217.200 217.200 217.200 217.200 217.200 217.200 217.200 217.200 217.200 F22 Giboult joint CI For PVC Ø 50 Giboult joint CI For PVC Ø 75 Giboult joint CI For PVC Ø 100 Giboult joint CI For Gip To ACP Ø 50 Giboult joint CI For Gip To ACP Ø 50 Giboult joint CI For Gip To ACP Ø 50 Giboult joint CI For ACP Ø 50 Giboult joint CI For ACP Ø 75 Giboult joint CI For ACP Ø 100 F23 Elbow 90 ( 5kg/cm ) Ø 25 buah 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 buah 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 buah 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 96.300 buah 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 115.300 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 buah 228.600 228.600 228.600 228.600 228.600 228.600 228.600 228.600 228.600 228.600 228.600 buah 266.800 266.800 266.800 266.800 266.800 266.800 266.800 266.800 266.800 266.800 266.800 buah 321.400 321.400 321.400 321.400 321.400 321.400 321.400 321.400 321.400 321.400 321.400 buah 9.100 9.100 9.100 9.100 9.100 9.100 9.100 9.100 9.100 9.100 9.100 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 15

Elbow 90 ( 5kg/cm ) Ø 50 Elbow 90 ( 5kg/cm ) Ø 75 buah 28.800 28.800 28.800 28.800 28.800 28.800 28.800 28.800 28.800 28.800 28.800 buah 47.400 47.400 47.400 47.400 47.400 47.400 47.400 47.400 47.400 47.400 47.400 F24 All Socket Bend - Long *900 Ø 50x90 All Socket Bend - Long *900 Ø 75x90 All Socket Bend - Long *900 Ø 100x90 All Socket Bend - Long *450 Ø 50x45 All Socket Bend - Long *450 Ø 75x45 All Socket Bend - Long *450 Ø 100x45 F25 All Flange Bend *900 Ø 50x90 All Flange Bend *900 Ø 75x90 All Flange Bend *900 Ø 100x90 All Flange Bend *450 Ø 50x45 All Flange Bend *450 Ø 75x45 All Flange Bend *450 Ø 100x45 buah 30.600 30.600 30.600 30.600 30.600 30.600 30.600 30.600 30.600 30.600 30.600 buah 74.500 74.500 74.500 74.500 74.500 74.500 74.500 74.500 74.500 74.500 74.500 buah 232.300 232.300 232.300 232.300 232.300 232.300 232.300 232.300 232.300 232.300 232.300 buah 27.700 27.700 27.700 27.700 27.700 27.700 27.700 27.700 27.700 27.700 27.700 buah 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 62.700 buah 113.900 113.900 113.900 113.900 113.900 113.900 113.900 113.900 113.900 113.900 113.900 buah 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 buah 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 buah 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 144.600 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 buah 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 F26 Flange Socket Ø 50 buah 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 194.300 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 16

Flange Socket Ø 75 buah 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 242.400 Flange Socket Ø 100 F27 Flange Steel Las Ø 50 Flange Steel Las Ø 75 Flange Steel Las Ø 100 buah 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 290.700 buah 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 57.000 buah 67.200 67.200 67.200 67.200 67.200 67.200 67.200 67.200 67.200 67.200 67.200 buah 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 86.200 F28 Stop Kran Kitz Ø 15 buah 181.100 181.100 181.100 181.100 181.100 181.100 181.100 181.100 181.100 181.100 181.100 Stop Kran Kitz Ø 20 buah 268.800 268.800 268.800 268.800 268.800 268.800 268.800 268.800 268.800 268.800 268.800 Stop Kran Kitz Ø 25 buah 333.000 333.000 333.000 333.000 333.000 333.000 333.000 333.000 333.000 333.000 333.000 Stop Kran Kitz Ø 40 buah 897.000 897.000 897.000 897.000 897.000 897.000 897.000 897.000 897.000 897.000 897.000 Stop Kran Kitz Ø 50 buah 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 1.196.400 F29 All Flange Gate Valve "Siam" Ø 50 All Flange Gate Valve "Siam" Ø 75 All Flange Gate Valve "Siam" Ø 100 buah 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 1.766.400 buah 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 2.537.800 buah 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 3.398.400 F30 Air Valve Ø 25 buah 165.200 165.200 165.200 165.200 165.200 165.200 165.200 165.200 165.200 165.200 165.200 Air Valve Ø 40 buah 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 388.600 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 17

Air Valve Ø 50 buah 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 484.900 Air Valve Ø 75 buah 777.200 777.200 777.200 777.200 777.200 777.200 777.200 777.200 777.200 777.200 777.200 Air Valve Ø 100 buah 971.600 971.600 971.600 971.600 971.600 971.600 971.600 971.600 971.600 971.600 971.600 F31 Check Valve Ø 40 buah 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 2.305.900 Check Valve Ø 50 buah 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 2.634.900 Check Valve Ø 75 buah 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 4.324.700 Check Valve Ø 100 buah 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 5.682.900 Check Valve Ø 150 buah 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 10.171.500 F32 Street Box Ø 150 buah 161.200 161.200 161.200 161.200 161.200 161.200 161.200 161.200 161.200 161.200 161.200 Strainer Ø 150 buah 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 2.915.700 Strainer Ø 200 buah 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 5.832.800 F33 Water meter "Hydrometer" Ø 50 Water meter "Hydrometer" Ø 100 Water meter "Hydrometer" Ø 150 buah 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 8.749.800 buah 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 10.165.200 buah 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 20.330.500 Water meter buah 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 22.097.700 F34 Fleksible Joit Single Ø 150 Batterfly Valve Ø 300 buah 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 5.340.000 buah 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 7.770.000 F35 Murbaut 15/60 buah 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 3.400 Murbaut 20/70 buah 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 18

F36 Karet Packing tebal 5 Ø 50 Karet Packing tebal 5 Ø 75 Karet Packing tebal 5 Ø 100 Karet Packing tebal 5 Ø 150 lbr 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 lbr 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 4.600 lbr 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 6.900 lbr 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 F37 Hidran Umum Polyethylene (PE) 0,5 m3 Hidran Umum Polyethylene (PE) 1 m3 Hidran Umum Polyethylene (PE) 2 m3 Hidran Umum Polyethylene (PE) 3 m3 Hidran Umum Polyethylene (PE) 4 m3 Hidran Umum Polyethylene (PE) 5 m3 Hidran Umum Fiberglas (FRP) 1 m3 Hidran Umum Fiberglas (FRP) 2 m3 Hidran Umum Fiberglas (FRP) 3 m3 buah 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 1.837.500 buah 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 3.412.500 buah 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 7.003.500 buah 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 8.032.500 buah 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 13.860.000 buah 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 21.420.000 buah 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 2.262.700 buah 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 4.672.500 buah 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 7.087.500 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 19

Hidran Umum Fiberglas (FRP) 4 m3 Hidran Umum Fiberglas (FRP) 5 m3 buah 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 11.130.000 buah 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 18.900.000 F38 Cat Meni Kayu kg 21.500 27.300 22.700 18.500 16.800 22.100 27.800 18.400 15.200 18.400 15.200 Cat Meni Besi kg 21.500 27.300 22.700 18.500 16.000 51.900 27.800 18.400 15.200 18.400 15.200 Cat Minyak Kayu kg 60.700 67.700 58.600 43.700 56.200 57.900 74.800 62.100 57.900 57.900 49.400 Cat Minyak Besi kg 60.700 68.000 56.000 57.900 58.400 58.500 71.500 66.100 59.300 59.300 47.200 Cat Pilok kaleng 37.200 42.500 25.700 43.600 43.600 30.700 31.500 43.000 29.400 29.400 29.400 Plamir Kayu kg 21.500 30.700 18.400 24.500 12.200 18.400 20.800 13.600 13.600 13.600 13.600 Plamir Tembok kg 30.700 19.900 19.700 24.500 16.300 16.300 26.900 30.700 11.500 12.200 11.500 Minyak Cat Kayu liter 13.500 18.300 16.500 21.500 8.400 8.400 18.500 27.600 11.000 11.000 11.000 (Therpentin) Minyak Cat Besi liter 14.100 20.800 14.100 18.300 16.000 12.200 22.300 11.000 11.000 11.000 21.500 (Tinner) Cat Marka Jalan kg 55.300 54.600 54.600 54.600 54.600 65.100 54.600 81.000 54.600 98.200 85.900 Cat Tembok kg 26.900 28.700 26.900 26.900 26.900 28.700 26.900 28.700 26.900 26.900 26.900 Cat Tembok Luar kg 161.900 167.300 161.900 161.900 161.900 167.300 161.900 167.300 161.900 161.900 161.900 Cat Kayu kg 60.700 68.700 60.700 60.700 60.700 68.700 60.700 68.700 60.700 60.700 60.700 Cat Besi kg 60.700 68.700 60.700 60.700 60.700 68.700 60.700 68.700 60.700 60.700 60.700 F39 Roll Cat buah 16.800 18.900 9.200 33.400 13.500 18.400 27.800 27.800 29.400 30.700 23.100 Kuas 1" buah 2.500 7.800 3.100 2.100 1.800 1.500 2.100 2.400 2.400 2.400 2.400 Kuas 1 1/5" buah 3.100 3.700 4.300 3.100 3.100 3.100 2.600 3.000 3.600 3.600 3.600 Kuas 2" buah 7.800 8.400 7.800 7.800 7.800 8.400 7.800 8.400 7.800 7.800 7.800 Kuas 3" buah 8.900 9.400 8.900 8.900 8.900 9.400 8.900 9.400 8.900 8.900 8.900 Amplas Kayu lembar 3.900 5.200 3.900 3.900 3.900 5.200 3.900 3.600 3.900 3.900 3.900 Amplas Besi lembar 3.900 5.200 3.900 3.900 3.900 5.200 3.900 3.600 3.900 3.900 3.900 Dempul kg 21.500 26.700 28.300 28.300 13.000 18.400 24.500 18.500 22.000 12.200 18.400 Blasbit kg 47.700 47.700 47.700 47.700 47.700 61.400 47.700 47.700 47.700 47.700 47.700 Lem putih (Fox) kg 13.900 24.500 11.200 11.200 9.800 55.300 12.000 13.000 12.800 12.000 7.400 Spirtus liter 9.200 9.200 11.100 11.200 7.400 11.600 9.300 18.500 10.200 13.000 11.200 Lem Aibon bh 43.600 49.100 27.900 27.900 30.700 61.400 37.100 37.100 40.800 46.400 27.800 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 20

F40 Wastafel Teraso buah 245.700 232.000 371.200 371.200 232.000 232.000 213.400 224.700 230.200 184.200 215.000 Wastafel Keramik buah 787.500 892.500 787.500 787.500 787.500 892.500 787.500 892.500 787.500 787.500 787.500 Kloset Jongkok Teraso buah 184.200 189.000 184.200 183.700 183.700 189.000 184.200 189.000 184.200 184.200 184.200 Kloset Jongkok Keramik buah 367.500 420.000 367.500 367.500 367.500 367.500 367.500 367.500 367.500 367.500 367.500 Kloset Duduk Teraso buah 257.900 257.900 232.000 232.000 139.200 139.200 352.800 204.200 389.800 171.900 552.800 Kloset Duduk Keramik buah 1.575.000 1.585.500 1.522.500 1.575.000 1.575.000 1.575.000 1.575.000 1.575.000 1.575.000 1.575.000 1.575.000 Urinoir Biasa buah 250.600 245.700 294.800 282.500 307.100 282.500 282.500 282.500 282.500 282.500 282.500 Urinoir Keramik buah 787.500 840.000 787.500 787.500 787.500 787.500 787.500 7.875.000 787.500 787.500 787.500 Bak Cuci Piring Teraso buah 208.800 210.000 278.400 278.400 241.300 264.100 270.200 243.200 307.100 352.500 92.800 Bak Cuci Piring Logam buah 241.200 278.700 259.800 259.800 232.000 241.200 278.700 278.700 282.200 196.500 245.700 Bak Cuci Piring buah 343.900 221.100 257.900 257.900 233.400 221.100 331.600 184.200 343.900 196.500 245.700 Stainless Steel Bak Mandi Fiber Glass buah 337.800 159.700 278.400 278.400 215.000 159.700 152.200 184.200 161.500 167.100 221.100 Bak Mandi Teraso buah 319.400 92.800 278.400 278.400 239.600 239.600 269.200 259.800 282.200 152.200 129.900 Bak Mandi Porselin buah 313.300 215.600 278.400 232.000 270.200 239.600 313.300 241.200 313.300 371.200 222.800 Floor Drain Stainless buah 61.400 55.300 67.600 66.300 55.300 61.400 65.100 103.200 61.400 67.600 55.300 Steel Shower Tiang + Kran buah 460.700 423.800 455.800 466.800 466.800 429.900 444.600 442.200 454.500 454.500 429.900 Kran Air 1/2" buah 34.100 38.300 31.500 39.500 46.400 39.500 40.900 43.600 37.800 37.800 37.800 Stop Kran 1/2" buah 37.200 39.900 33.000 40.900 40.900 40.900 47.700 51.200 47.700 47.700 47.700 Stop Kran 1" buah 61.400 71.400 58.800 70.900 70.900 70.900 79.900 81.900 75.000 75.000 75.000 F41 Buis Beton / Goronggorong 20cm Buis Beton / Goronggorong 30cm Buis Beton / Goronggorong 40cm Buis Beton / Goronggorong 50cm Buis Beton / Goronggorong 60cm m 34.100 43.000 41.700 45.000 49.100 61.400 61.400 67.600 61.400 61.400 61.400 m 47.700 55.900 57.700 58.600 73.700 92.100 92.100 85.900 79.100 79.100 79.100 m 81.900 79.900 105.700 102.300 106.400 122.800 122.800 110.200 113.200 113.200 113.200 m 88.700 92.800 113.000 105.800 122.800 153.600 153.600 153.600 126.900 126.900 126.900 m 116.000 117.300 137.600 126.300 147.400 184.200 184.200 184.200 163.800 163.800 163.800 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 21

Buis Beton / Goronggorong 80cm Buis Beton / Goronggorong 100cm m 184.200 165.900 201.400 184.200 187.000 215.000 215.000 218.400 204.700 204.700 204.700 m 245.700 215.600 249.400 232.000 307.100 245.700 245.700 307.100 273.000 273.000 331.600 F42 Grendel Kecil buah 2.600 3.100 2.600 3.100 2.900 4.700 4.700 5.200 4.700 10.300 4.700 Grendel Besar buah 4.800 8.000 6.100 12.200 5.500 9.200 8.600 18.400 7.800 14.700 7.800 Grendel Lokal buah 2.700 5.600 4.300 3.800 5.600 5.600 3.800 6.100 4.800 5.000 5.000 Grendel Luar buah 25.000 26.200 25.200 25.200 25.200 25.200 25.200 25.200 25.200 25.200 25.200 Engsel Pintu / Jendela buah 47.200 58.800 42.700 42.700 42.700 47.200 55.300 88.400 55.300 55.300 55.300 Engsel Pintu / Jendela buah 42.000 98.200 53.100 47.200 49.300 51.400 98.200 102.400 94.500 94.500 94.500 Kuningan Engsel Lokal buah 24.300 85.200 41.200 41.200 85.200 85.200 20.800 45.100 21.900 36.200 19.200 Engsel Luar buah 48.600 64.200 43.800 43.800 42.500 42.500 48.600 45.000 53.400 32.100 19.600 Kait Angin buah 10.500 12.600 10.500 10.500 10.500 10.500 10.500 11.000 10.500 10.500 10.500 Tangan Gareng buah 10.500 9.400 14.800 21.500 9.200 10.300 13.400 24.500 13.100 13.100 13.100 Hanslot Pintu 2 x Putar buah 153.600 152.200 147.400 152.800 186.900 186.700 187.400 199.300 186.900 186.900 186.900 Kunci Lokal buah 121.400 126.000 103.100 103.100 103.100 103.100 104.200 109.500 126.000 126.000 126.000 Kunci Luar buah 257.200 301.300 285.900 285.900 285.900 285.900 234.100 224.900 285.900 184.100 184.400 F43 Bambu Apus batang 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 Bambu Petung batang 34.100 40.200 34.100 34.100 34.100 34.100 34.100 34.100 34.100 34.100 34.100 Bambu Anyam m2 14.800 14.800 14.800 14.800 17.200 15.300 14.700 15.900 15.300 15.900 14.700 (Kepangan) Bambu Dia. 6-8 / batang 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 13.400 600cm Kayu Bakar m3 73.700 121.200 92.800 78.700 73.700 94.500 99.700 99.700 99.700 99.700 99.700 Ijuk kg 15.700 17.800 15.700 15.700 15.700 15.700 15.700 15.700 15.700 15.700 15.700 Politur ltr 57.700 63.100 57.700 57.700 57.700 57.700 64.400 65.700 64.400 64.400 64.400 Teer kaleng 58.300 63.000 57.700 57.700 57.700 57.700 57.700 57.700 57.700 57.700 57.700 Gebalan Rumput m2 20.800 20.800 20.800 22.000 21.500 20.600 21.500 22.100 20.200 19.600 20.800 Standar Satuan Harga Pemerintah Kabupaten Cilacap Tahun 2015 B 22