CONTRACT AMENDMENT NO. 7

dokumen-dokumen yang mirip
CONTRACT AMENDMENT NO. 7 I REMUNERATION ( SUB TOTAL I ) 4,397,025,000

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Total Remuneration (I.1 + I.2 + Fee)

REMUNERATION I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.2])

I.1 INDIVIDUAL CONSULTANT & ASSISTANT I.2 SUPPORTING STAFF II.1 TRAVEL COST II.2 OFFICE EXPENSES

REMUNERATION I.1 INDIVIDUAL CONSULTANT SUB PROFF & ASSISTANT I.2 SUPPORTING STAFF Fee (...% x [I.1 + I.

DAFTAR ALAMAT MADRASAH TSANAWIYAH NEGERI TAHUN 2008/2009

RUMAH KHUSUS TARGET ANGGARAN TARGET ANGGARAN TARGET ANGGARAN TARGET ANGGARAN TARGET ANGGARAN TARGET ANGGARAN

Populasi Ternak Menurut Provinsi dan Jenis Ternak (Ribu Ekor),

DIRECT REIMBURSABLE COST FOR BOP TIM KOORDINATOR KOTA #REF!

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Kementerian Pekerjaan Umum

Tabel Lampiran 1. Produksi, Luas Panen dan Produktivitas Padi Per Propinsi

PANDUAN. Aplikasi Database Tanah, Bangunan/Gedung, dan Rumah Negara Gol. 2

UM Ca/33 Reviu Modul Pelatihan Fasilitator Pamsimas TA Januari 2018

2016, No Indonesia Tahun 2014 Nomor 244, Tambahan Lembaran Negara Republik Indonesia Nomor 5587) sebagaimana telah beberapa kali diubah terakh

TABEL 1 GAMBARAN UMUM TAMAN BACAAN MASYARAKAT (TBM) KURUN WAKTU 1 JANUARI - 31 DESEMBER 2011

Nusa Tenggara Timur Luar Negeri Banten Kepulauan Riau Sumatera Selatan Jambi. Nusa Tenggara Barat Jawa Tengah Sumatera Utara.

BERITA NEGARA REPUBLIK INDONESIA BPKP. Pembinaan. Pengawasan. Perubahan.

2 menetapkan Peraturan Menteri Keuangan tentang Perubahan atas Peraturan Menteri Keuangan Nomor 154/PMK.05/2014 tentang Pelaksanaan Sistem Perbendahar

MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA

2016, No c. bahwa berdasarkan pertimbangan sebagaimana dimaksud dalam huruf a dan huruf b, perlu menetapkan Peraturan Kepala Arsip Nasional Re

KEPUTUSAN MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA NOMOR 041/P/2017 TENTANG

BPS PROVINSI SUMATERA SELATAN

MEKANISME PENGELOLAAN KEUANGAN PASCA OPTIMALISASI DAN PENGHENTIAN KEGIATAN DEKONSENTRASI URUSAN PEMERINTAHAN UMUM DAN FORKOPIMDA TAHUN ANGGARAN 2016

2

PT. KOGAS DRIYAP KONSULTAN in JV with PT. PERENTJANA DJAJA

DENGAN RAHMAT TUHAN YANG MAHA ESA KEPALA ARSIP NASIONAL REPUBLIK INDONESIA,

2017, No telah beberapa kali diubah, terakhir dengan Undang- Undang Nomor 9 Tahun 2015 tentang Perubahan Kedua atas Undang-Undang Nomor 23 Tahu

Rekapitulasi Luas Penutupan Lahan Di Dalam Dan Di Luar Kawasan Hutan Per Provinsi Tahun 2014 (ribu ha)

Pertumbuhan Simpanan BPR Dan BPRS

RAPAT KOORDINASI PELAKSANAAN PROGRAM SLUM ALLEVIATION

Jumlah Akomodasi, Kamar, dan Tempat Tidur yang Tersedia pada Hotel Bintang Menurut Provinsi,

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK SULAWESI TENGGARA MARET 2017 MENURUN TERHADAP MARET 2016

Historical cakupan lokasi sasaran PNPM Mandiri Perkotaan

Pembimbing : PRIHANDOKO, S.Kom., MIT, Ph.D.

BKN. Kantor Regional. XIII. XIV. Pembentukan. Pencabutan. PERATURAN KEPALA BADAN KEPEGAWAIAN NEGARA

Fungsi, Sub Fungsi, Program, Satuan Kerja, dan Kegiatan Anggaran Tahun 2012 Kode Provinsi : DKI Jakarta 484,909,154

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK PROVINSI BENGKULU MARET 2016 MULAI MENURUN

Jumlah Akomodasi, Kamar, dan Tempat Tidur yang Tersedia pada Hotel Bintang Menurut Provinsi,

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA,

Pertumbuhan Simpanan BPR Dan BPRS

DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA,

KERANGKA ACUAN KEGIATAN TOT/TM UNTUK PELATIHAN FASILITATOR KEBERLANJUTAN (FK) DAN FASILITATOR MASYARAKAT (FM) REGULER PROGRAM PAMSIMAS II TA 2015

. Keberhasilan manajemen data dan informasi kependudukan yang memadai, akurat, lengkap, dan selalu termutakhirkan.

MENTERI PERUMAHAN RAKYAT REPUBLIK INDONESIA

QS PENGENDALIAN PENCAIRAN DANA BLM PENGEMBANGAN KAPASITAS MASYARAKAT TA 2015 Update 3 Maret 2016

Pertumbuhan Simpanan BPR/BPRS. Semester I Tahun 2013

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

BERITA NEGARA REPUBLIK INDONESIA BAPPENAS. Pelimpahan Urusan Pemerintahan. Gubernur. Dekonsetrasi. Perubahan.

DIREKTORAT JENDERAL PRASARANA DAN SARANA PERTANIAN REALISASI KEGIATAN DIREKTORAT PENGELOLAAN AIR IRIGASI

QS PENGENDALIAN PENCAIRAN DANA BLM PENGEMBANGAN KAPASITAS MASYARAKAT TA 2015 Update 21 Januari 2016

KEPUTUSAN SEKRETARIS JENDERAL KEMENTERIAN KESEHATAN REPUBLIK INDONESIA, NOMOR HK.03.01/VI/432/2010 TENTANG

QS PENGENDALIAN PENCAIRAN DANA BLM PENGEMBANGAN KAPASITAS MASYARAKAT TA 2015 Update 25 Februari 2016

PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 59 TAHUN 2009 TENTANG

SURAT PENGESAHAN DAFTAR ISIAN PELAKSANAAN ANGGARAN (SP-DIPA) INDUK TAHUN ANGGARAN 2016 NOMOR : SP DIPA /2016

JUMLAH PENEMPATAN TENAGA KERJA INDONESIA ASAL PROVINSI BERDASARKAN JENIS KELAMIN PERIODE 1 JANUARI S.D 31 OKTOBER 2015

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK MALUKU UTARA SEPTEMBER 2016

- 1 - KEPUTUSAN MENTERI SOSIAL REPUBLIK INDONESIA NOMOR 5/HUK/2018 TENTANG PENETAPAN PENERIMA BANTUAN IURAN JAMINAN KESEHATAN TAHUN 2018

: OVERSIGHT SERVICE PROVIDER 10 (OSP IN ACEH) Periode Kontrak : 16 September 2013 sd 31 Desember 2014 NO KOMPOSISI BIAYA CONTRACT AMANDEMENT 1

PROFIL PEMANFAATAN TEKNOLOGI INFORMASI OLEH MASYARAKAT

Pertumbuhan Simpanan BPR dan BPRS

PERATURAN MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA NOMOR 42 TAHUN 2013 TENTANG

Laporan Keuangan UAPPA-E1 Ditjen Penyelenggaraan Haji dan Umrah Tahun 2014 (Unaudited) No Uraian Estimasi Pendapatan

DENGAN RAHMAT TUHAN YANG MAHA ESA KEPALA BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN,

Pertumbuhan Simpanan BPR dan BPRS

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK SUMATERA BARAT MARET 2016 MULAI MENURUN

U r a i a n. Dukungan Manajemen dan Pelaksanaan Tugas Teknis Lainnya Pendidikan Nonformal dan Informal

Tabel Lampiran 39. Produksi, Luas Panen dan Produktivitas Bawang Merah Menurut Propinsi

- 1 - DENGAN RAHMAT TUHAN YANG MAHA ESA MENTERI PERENCANAAN PEMBANGUNAN NASIONAL/ KEPALA BADAN PERENCANAAN PEMBANGUNAN NASIONAL REPUBLIK INDONESIA,

PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM

UANG PENGINAPAN, UANG REPRESENTASI DAN UANG HARIAN PERJALANAN DINAS KELUAR DAERAH DAN DALAM DAERAH

PNPM- Mandiri Perkotaan Ditjen Cipta Karya Departemen Pekerjaan Umum

KEMENTERIAN KEUANGAN REPUBLIK INDONESIA DIREKTORAT JENDERAL PAJAK LAMPIRAN SURAT EDARAN DIREKTUR JENDERAL PAJAK NOMOR : SE-07/PJ/2016 TENTANG

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK MALUKU SEPTEMBER 2016 MENURUN

Buku ini bertujuan untuk memberikan gambaran kinerja Direktorat Jenderal Pencegahan dan Pengendalian Penyakit sepanjang tahun 2016.

DENGAN RAHMAT TUHAN YANG MAHA ESA KEPALA BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN,

PERATURAN MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA NOMOR 3 TAHUN 2015 TENTANG

PERATURAN MENTERI PENDIDIKAN NASIONAL REPUBLIK INDONESIA NOMOR 65 TAHUN 2008 TENTANG

MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA

B. SUMBER PENDANAAN (10) PROGRAM PENGEMBANGAN DAN PEMBERDAYAAN SUMBER DAYA MANUSIA KESEHATAN (PPSDMK) (Juta Rupiah) Prakiraan Kebutuhan

AMENDMENT NO. 1 TO THE CONTRACT (Dated : October 17 th, 2014) NON-CONSULTING SERVICES TIME BASED

Capaian Kegiatan Pencairan Dana BLM Pengembangan Kapasitas Masyarakat. Pembentuk an Panitia Pelaksana (Jml Desa/Kel) Berkas Pencairan (Jml Desa/Kel)

Jumlah Ternak yang dipotong di rumah potong hewan (RPH) menurut Provinsi dan Jenis Ternak (ekor),

Estimasi Kesalahan Sampling Riskesdas 2013 (Sampling errors estimation, Riskesdas 2013)

BERITA NEGARA REPUBLIK INDONESIA BPKP. Pembinaan. Pengawasan. Pencabutan.

PERATURAN MENTERI PENDIDIKAN DAN KEBUDAYAAN REPUBLIK INDONESIA NOMOR 7 TAHUN 2015 TENTANG PERUBAHAN ATAS

SURVEI NASIONAL LITERASI DAN INKLUSI KEUANGAN 2016

DENGAN RAHMAT TUHAN YANG MAHA ESA KEPALA BADAN PENGAWASAN KEUANGAN DAN PEMBANGUNAN REPUBLIK INDONESIA,

PREVALENSI BALITA GIZI KURANG BERDASARKAN BERAT BADAN MENURUT UMUR (BB/U) DI BERBAGAI PROVINSI DI INDONESIA TAHUN Status Gizi Provinsi

BERITA NEGARA REPUBLIK INDONESIA

Tabel V.1.1. REKAPITULASI PRODUKSI KAYU BULAT BERDASARKAN SUMBER PRODUKSI TAHUN 2004 S/D 2008

CONTRACT AMANDEMENT 8 I REMUNERATION ( SUB TOTAL I ) 12,007,950,000 11,073,250, ,900,000 11,375,150, ,800,000

PERATURAN MENTERI PENDIDIKAN NASIONAL REPUBLIK INDONESIA NOMOR 28 TAHUN 2007 TENTANG

FORMULIR 3 RENCANA KERJA KEMENTRIAN/LEMBAGA (RENJA-KL) TAHUN ANGGARAN 2016

BERITA NEGARA REPUBLIK INDONESIA

2016, No c. bahwa berdasarkan pertimbangan sebagaimana dimaksud dalam huruf a dan huruf b, perlu menetapkan Peraturan Kepala Badan Pengawasan

PANDUAN PENGGUNAAN Aplikasi SIM Persampahan

KEPUTUSAN BADAN AKREDITASI NASIONAL ( BAN PAUD DAN PNF ) NOMOR: 024/BAN PAUD DAN PNF/AK/2017

PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR 45 TAHUN 2014 TENTANG

TINGKAT KETIMPANGAN PENGELUARAN PENDUDUK INDONESIA MARET 2017 MENURUN

Transkripsi:

PROGRAM KOTA TANPA KUMUH (KOTAKU) SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2016 PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT mor & Periode Invoice :. 14 Periode (Juli sd September 2016) Realisasi Invoice : Desember 2016 mor Loan : IBRD Ln. 8213-IND Nama Konsultan : PT. Royalindo Expoduta Paket Pekerjaan : Contract n Consultant Service for Operational Support for Indivicual Consultant mor & Tanggal Kontrak : HK.02.03/INDV/IBRD/SATKER-PKP/017/2014, Tanggal 19 Agustus 2014 Periode Kontrak : 19 Agustus 2014 s/d 30 September 2016 NO KOMPOSISI BIAYA CONTRACT AMENDMENT NO. 7 I REMUNERATION ( SUB TOTAL I ) 4.397.025.000 3.634.605.000 173.775.000 3.808.380.000 588.645.000 1.1 OSP CB TEAM 4.327.500.000 3.585.330.000 173.775.000 3.759.105.000 568.395.000 1.2 REGIONAL LEVEL 49.275.000 49.275.000-49.275.000-1,3 CITY/DISTRICT LEVEL 20.250.000 - - - 20.250.000 II DIRECT REIMBURSABLE COST ( SUB TOTAL I I ) 20.232.020.625 9.492.900.725 2.801.884.375 12.294.785.100 7.937.235.525 2,1 DUTY TRAVEL EXPENSES 14.489.736.500 6.135.040.580 2.200.907.500 8.335.948.080 6.153.788.420 2,2 OFFICE OPERATIONAL EXPENSES (a+b+c) 375.000.000 310.500.000 15.000.000 325.500.000 49.500.000 a Office Running Cost 125.000.000 103.500.000 5.000.000 108.500.000 16.500.000 b Office Supply and Consumable 125.000.000 103.500.000 5.000.000 108.500.000 16.500.000 c Communication Cost 125.000.000 103.500.000 5.000.000 108.500.000 16.500.000 2,3 OFFICE EQUIPMENT EXPENSES 395.700.000 328.500.000 15.000.000 343.500.000 52.200.000 a Desktop Computer (Rent) 96.350.000 79.625.000 3.750.000 83.375.000 12.975.000 b Laptop/tebook 158.400.000 131.700.000 6.000.000 137.700.000 20.700.000 c Printer Laser Jet 18.750.000 15.525.000 750.000 16.275.000 2.475.000 d Printer Desk Jet 13.475.000 11.100.000 500.000 11.600.000 1.875.000 e Digital Camera 26.300.000 21.700.000 1.000.000 22.700.000 3.600.000 f LCD Projector 43.950.000 37.050.000 1.500.000 38.550.000 5.400.000 g Scanner 13.475.000 11.100.000 500.000 11.600.000 1.875.000 h Handy Camera 25.000.000 20.700.000 1.000.000 21.700.000 3.300.000 2,4 RENTAL EXPENSES (a+b) 1.305.400.000 1.167.100.000 20.000.000 1.187.100.000 118.300.000 a Office Space 605.000.000 605.000.000-605.000.000 -

b Vehicle 700.400.000 562.100.000 20.000.000 582.100.000 118.300.000 2,5 REPORT 43.750.000 18.000.000 750.000 18.750.000 25.000.000 a Reguler Report 33.750.000 16.500.000 750.000 17.250.000 16.500.000 b Special Report 10.000.000 1.500.000-1.500.000 8.500.000 Fee [...% x [ 2.1]] III TRAINING ACTIVITY EXPENSES [ Sub Total III ] 14.991.177.750 6.739.276.350 1.250.286.844 7.989.563.194 7.001.614.556 3.1 Training Activity 11.992.942.200 5.391.421.080 1.000.229.475 6.391.650.555 5.601.291.645 Fee (...%) IV SOCIALIZATION ACTIVITY EXPENSES [ Sub Total IV ] 13.343.481.800 7.637.266.142-7.637.266.142 5.706.215.658 4.1 Socilization Activity 12.130.438.000 6.942.969.220-6.942.969.220 5.187.468.780 Fee (...%) V TOTAL V ( I + II + III + IV ) 52.963.705.175 27.504.048.217 4.225.946.219 31.729.994.436 21.233.710.739 VI PROVISIONAL SUM 2.117.875 - - - - VII TOTAL BID PRICE [ V + VI ] 52.965.823.050 27.504.048.217 4.225.946.219 31.729.994.436 21.233.710.739 VIII LOCAL TAX / VAT [ 10% x VII ] 5.296.582.305 2.750.404.822 422.594.622 3.172.999.444 2.123.371.074 IX GRAND TOTAL [ VII + VIII ] 58.262.405.355 30.254.453.039 4.648.540.841 34.902.993.879 23.357.081.813

I. BREAKDOWN OF REMUNERATION Number of Person INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK Vol THP Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) I. 1 OSP CB TEAM 4.327.500.000 3.585.330.000 173.775.000 3.759.105.000 568.395.000 A Core/Profesional Team 3.461.250.000 2.868.075.000 139.125.000 3.007.200.000 454.050.000 1 Capacity Building Manager 1 MM 17,00 17,00 0,00 17,00 0,00 - Muhammad Reza Abdullah 8,00 3,70 1,00 4,70 3,30 2 Event Organizer for Training Activities 1 MM 17,00 17,00 0,00 17,00 0,00 Muhammad Razi Abdullah 8,00 3,70 1,00 4,70 3,30 3 Event Organizer for Socialization Activities 1 MM 17,00 17,00 0,00 17,00 0,00 Amelia 8,00 3,70 1,00 4,70 3,30 4 Event Coordinator (1 person/event) Ami Deltiyati 1 MM 0,00 Alita M. Ismayanti 16,00 16,00 0,00 16,00 0,00 8,00 4,00 1,00 5,00 3,00 5 Treasurer (1 person/event) 1 MM 17,00 17,00 0,00 17,00 0,00 Inkky Maurica Haswan 8,00 3,70 1,00 4,70 3,30 6 Runner (4 person/event/room) a M. Arief Djauhari 1 MM 17,00 17,00 0,00 17,00 0,00 8,00 3,70 1,00 4,70 3,30 b Sengkut Binantoro 1 MM 17,00 17,00 0,00 17,00 0,00 8,00 3,70 1,00 4,70 3,30 c Haryo Bimo Ariyawan 1 MM 17,00 17,00 0,00 17,00 0,00 8,00 3,70 1,00 4,70 3,30 d Ali Razak 1 MM 16,00 16,00 0,00 16,00 0,00 Yoga Haskara PP 9,00 4,70 1,00 5,70 3,30 7 tulen (1 person/event) Herlin Widyawati 1 MM 3,00 2,70 0,00-2,70 0,30 Ibrahim 14,00 14,00 0,00-14,00 0,00 8,00 4,00 1,00 5,00 3,00 B Supporting Staff 866.250.000 717.255.000 34.650.000 751.905.000 114.345.000 1 Office Manager Erdi Setiadi 1 MM 3,00 2,70 0,00 2,70 0,30 Supriatna 14,00 14,00 0,00 14,00 0,00 8,00 4,00 1,00 5,00 3,00 2 Secretary 1 MM 15,00 14,70 0,00 14,70 0,30 Tiesya Assmiah Nabila 10,00 6,00 1,00 7,00 3,00 3 Computer Operator (3 person) a Fari Rama Wijaya 1 MM 17,00 17,00 0,00 17,00 0,00 8,00 3,70 1,00 4,70 3,30 b Bakri 1 MM 17,00 17,00 0,00 17,00 0,00 8,00 3,70 1,00 4,70 3,30 c Feriyadi 1 MM 5,00 4,70 0,00 4,70 0,30 Tyas Octaviani / M. Saepul 20,00 16,00 1,00 17,00 3,00 4 Office Boy 1 MM 17,00 17,00 0,00 17,00 0,00 Muhammad Iha 8,00 3,70 1,00 4,70 3,30 5 Security a Angga Prasetyo 1 MM 5,00 4,70 0,00 4,70 0,30 Saefudin / M. Sodikin 20,00 16,00 1,00 17,00 3,00 b Erwandi Rahman 1 MM 5,00 4,70 0,00 4,70 0,30 Ramdani 20,00 16,00 1,00 17,00 3,00 I. 2 REGIONAL LEVEL 100,00 49.275.000 100,00 49.275.000 0,00-100,00 49.275.000 0,00 1 Event Coordinator (1 person/regional) 2 MD 10,00 10,00 0,00-10,00 0,00 2 Treasurer (1 person/regional) 2 MD 10,00 10,00 0,00-10,00 0,00 3 Runner (1 person/event/room) 8 MD 40,00 40,00 0,00-40,00 0,00 4 tulen (1 person/event/room) 8 MD 40,00 40,00 0,00-40,00 0,00 - I. 3 CITY/DISTRICT LEVEL 48,00 20.250.000 0,00-0,00-0,00-48,00 20.250.000 1 Event Coordinator (1 person/event) 1 MD 12,00 0,00-0,00-0,00-12,00 2 Treasurer (1 person/event) 1 MD 12,00 0,00-0,00-0,00-12,00 3 Runner (1 person/event/room) 1 MD 12,00 0,00-0,00-0,00-12,00 4 tulen (1 person/event/room) 1 MD 12,00 0,00-0,00-0,00-12,00 TOTAL REMUNERATION 4.397.025.000 3.634.605.000 173.775.000 3.808.380.000 588.645.000

II DIRECT REEIMBURSABLE COST 2.1. DUTY TRAVEL EXPENSES Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) 2.1.1. Pengembangan Kapasitas Personil ke Program/Lembaga Lain LS 1,0 500.000.000 500.000.000 - - - - - - 1 500.000.000 2.1.2. Preparatory Meeting (Konsinyering) for BPKP pers time days 208.557.000 - - - 208.557.000 Air Fare from location to Jakarta : NANGGROE ACEH DARUSSALAM 1 1 trip 1 4.492.000 4.492.000 - - 1 4.492.000 SUMATERA UTARA 1 1 trip 1 3.808.000 3.808.000 - - 1 3.808.000 SUMATERA BARAT 1 1 trip 1 2.952.000 2.952.000 - - 1 2.952.000 RIAU 1 1 trip 1 3.016.000 3.016.000 - - 1 3.016.000 JAMBI 1 1 trip 1 2.460.000 2.460.000 - - 1 2.460.000 SUMATERA SELATAN 1 1 trip 1 2.268.000 2.268.000 - - 1 2.268.000 BENGKULU 1 1 trip 1 2.621.000 2.621.000 - - 1 2.621.000 RIAU KEPULAUAN 1 1 trip 1 2.888.000 2.888.000 - - 1 2.888.000 DKI JAKARTA 1 1 trip 1 - - - - 1 - JAWA BARAT 1 1 trip 1 500.000 500.000 - - 1 500.000 LAMPUNG 1 1 trip 1 1.583.000 1.583.000 - - 1 1.583.000 BANGKA BELITUNG 1 1 trip 1 2.139.000 2.139.000 - - 1 2.139.000 BANTEN 1 1 trip 1 500.000 500.000 - - 1 500.000 KALIMANTAN BARAT 1 1 trip 1 2.781.000 2.781.000 - - 1 2.781.000 Yoga Haskara PP 1 1 trip 1 2.182.000 2.182.000 - - 1 2.182.000 D.I. YOGYAKARTA 1 1 trip 1 2.268.000 2.268.000 - - 1 2.268.000 JAWA TIMUR 1 1 trip 1 2.674.000 2.674.000 - - 1 2.674.000 BALI 1 1 trip 1 3.262.000 3.262.000 - - 1 3.262.000 NUSA TENGGARA TIMUR 1 1 trip 1 5.081.000 5.081.000 - - 1 5.081.000 KALIMANTAN SELATAN 1 1 trip 1 2.995.000 2.995.000 - - 1 2.995.000 KALIMANTAN TIMUR 1 1 trip 1 3.797.000 3.797.000 - - 1 3.797.000 KALIMANTAN TENGAH 1 1 trip 1 2.984.000 2.984.000 - - 1 2.984.000 KALIMANTAN UTARA 1 1 trip 1 3.797.000 3.797.000 - - 1 3.797.000 SULAWESI UTARA 1 1 trip 1 5.102.000 5.102.000 - - 1 5.102.000 GORONTALO 1 1 trip 1 4.824.000 4.824.000 - - 1 4.824.000 SULAWESI TENGAH 1 1 trip 1 5.113.000 5.113.000 - - 1 5.113.000 NUSA TENGGARA BARAT 1 1 trip 1 3.230.000 3.230.000 - - 1 3.230.000 SULAWESI SELATAN 1 1 trip 1 3.829.000 3.829.000 - - 1 3.829.000 SULAWESI TENGGARA 1 1 trip 1 4.182.000 4.182.000 - - 1 4.182.000 SULAWESI BARAT 1 1 trip 1 4.867.000 4.867.000 - - 1 4.867.000 MALUKU 1 1 trip 1 7.081.000 7.081.000 - - 1 7.081.000 MALUKU UTARA 1 1 trip 1 6.664.000 6.664.000 - - 1 6.664.000 PAPUA 1 1 trip 1 8.193.000 8.193.000 - - 1 8.193.000 PAPUA BARAT 1 1 trip 1 10.824.000 10.824.000 - - 1 10.824.000 Inland Transport 34 1 trip 34 500.000 17.000.000 - - 34 17.000.000 OSA 34 1 6 m/d 204 300.000 61.200.000 - - 204 61.200.000 OSA 6 1 6 m/d 36 150.000 5.400.000 - - 36 5.400.000 2.1.3 ToT PEMANDU NASIONAL KORKOT/ASKORKOT MANDIRI pers time days 1.034.055.100 737.814.500-737.814.500 296.240.600 Air Fare from location to Jakarta : NANGGROE ACEH DARUSSALAM 12 1 trip 12 4.492.000 53.904.000 12 50.769.600 12 50.769.600-3.134.400 JAWA TENGAH 35 1 trip 35 2.182.000 76.370.000 35 56.960.500 35 56.960.500-19.409.500 D.I. YOGYAKARTA 4 1 trip 5 2.268.000 11.340.000 4 7.245.800 4 7.245.800 1 4.094.200 JAWA TIMUR 36 1 trip 36 2.674.000 96.264.000 36 80.749.800 36 80.749.800-15.514.200 BALI 5 1 trip 14 3.262.000 45.668.000 6 19.051.800 6 19.051.800 8 26.616.200

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NUSA TENGGARA TIMUR 9 1 trip 9 5.081.000 45.729.000 9 36.220.500 9 36.220.500-9.508.500 KALIMANTAN SELATAN 10 1 trip 12 2.995.000 35.940.000 10 23.080.000 10 23.080.000 2 12.860.000 KALIMANTAN TIMUR 6 1 trip 12 3.797.000 45.564.000 6 16.665.900 6 16.665.900 6 28.898.100 KALIMANTAN TENGAH 2 1 trip 3 2.984.000 8.952.000 3 5.155.200 3 5.155.200-3.796.800 KALIMANTAN UTARA 4 1 trip 4 3.797.000 15.188.000 4 13.240.000 4 13.240.000-1.948.000 SULAWESI UTARA 7 1 trip 8 5.102.000 40.816.000 7 26.141.200 7 26.141.200 1 14.674.800 GORONTALO 2 1 trip 3 4.824.000 14.472.000 3 6.671.000 3 6.671.000-7.801.000 SULAWESI TENGAH 3 1 trip 4 5.113.000 20.452.000 4 13.651.800 4 13.651.800-6.800.200 NUSA TENGGARA BARAT 6 1 trip 6 3.230.000 19.380.000 6 16.796.200 6 16.796.200-2.583.800 SULAWESI SELATAN 14 1 trip 19 3.829.000 72.751.000 19 49.149.400 19 49.149.400-23.601.600 SULAWESI TENGGARA 4 1 trip 7 4.182.000 29.274.000 5 9.901.000 5 9.901.000 2 19.373.000 SULAWESI BARAT 2 1 trip 3 4.867.000 14.601.000 3 7.865.000 3 7.865.000-6.736.000 MALUKU 3 1 trip 3 7.081.000 21.243.000 3 11.189.400 3 11.189.400-10.053.600 MALUKU UTARA 2 1 trip 2 6.664.000 13.328.000 2 8.822.300 2 8.822.300-4.505.700 PAPUA 2 1 trip 2 8.193.000 16.386.000 1 6.525.000 1 6.525.000 1 9.861.000 PAPUA BARAT 1 1 trip 2 10.824.000 21.648.000 2 10.928.000 2 10.928.000-10.720.000 From other province to Jakarta (Pemandu, Narasumber) 4 1 trip 4 5.000.000 20.000.000 - - - - 4 20.000.000 Add Acommodation (transit) 1 LS 1 3.282.000 3.282.000 1 3.282.000 1 3.282.000 - - Inland Transport 169 1 trip 207 200.000 41.400.000 180 36.000.000 180 36.000.000 27 5.400.000 Various Transport (for remote area) 1 LS 1 24.353.100 24.353.100 1 24.353.100 1 24.353.100 - - OSA 169 1 7 m/d 1.449 150.000 217.350.000 1.260 189.000.000 1.260 189.000.000 189 28.350.000 OSA 6 1 7 m/d 56 150.000 8.400.000 56 8.400.000 56 8.400.000 - - 2.1.4 ToT Pelatihan Program-program Lanjutan untuk konsultan pers time days - - - - - Air Fare from location to Jakarta : NANGGROE ACEH DARUSSALAM 5 1 trip - 4.492.000 - - - - - - - - - JAWA TENGAH 5 1 trip - 2.182.000 - - - - - - - - - D.I. YOGYAKARTA 5 1 trip - 2.268.000 - - - - - - - - - JAWA TIMUR 5 1 trip - 2.674.000 - - - - - - - - - BALI 5 1 trip - 3.262.000 - - - - - - - - - NUSA TENGGARA TIMUR 5 1 trip - 5.081.000 - - - - - - - - - KALIMANTAN SELATAN 5 1 trip - 2.995.000 - - - - - - - - - KALIMANTAN TIMUR 5 1 trip - 3.797.000 - - - - - - - - - KALIMANTAN TENGAH 5 1 trip - 2.984.000 - - - - - - - - - KALIMANTAN UTARA 5 1 trip - 3.797.000 - - - - - - - - - SULAWESI UTARA 5 1 trip - 5.102.000 - - - - - - - - - GORONTALO 4 1 trip - 4.824.000 - - - - - - - - - SULAWESI TENGAH 5 1 trip - 5.113.000 - - - - - - - - - NUSA TENGGARA BARAT 5 1 trip - 3.230.000 - - - - - - - - - SULAWESI SELATAN 5 1 trip - 3.829.000 - - - - - - - - - SULAWESI TENGGARA 5 1 trip - 4.182.000 - - - - - - - - - SULAWESI BARAT 5 1 trip - 4.867.000 - - - - - - - - - MALUKU 5 1 trip - 7.081.000 - - - - - - - - - MALUKU UTARA 4 1 trip - 6.664.000 - - - - - - - - - PAPUA 4 1 trip - 8.193.000 - - - - - - - - - PAPUA BARAT 4 1 trip - 10.824.000 - - - - - - - - - - Inland Transport 101 1 trip - 200.000 - - - - - - - - - OSA 101 1 5 m/d - 150.000 - - - - - - - - -

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) OSA 6 1 5 m/d - 150.000 - - - - - - - - - 2.1.5 Pelatihan Inspektorat Daerah (Batam & Denpasar) pers time days 2.200.345.000 1.419.042.656-1.419.042.656 781.302.344 Air Fare from location to Batam: NANGGROE ACEH DARUSSALAM 10 1 trip 12 5.936.000 71.232.000 12 24.011.400 12 24.011.400-47.220.600 SUMATERA UTARA 18 1 trip 18 5.316.000 95.688.000 14 28.567.756 14 28.567.756 4 67.120.244 SUMATERA BARAT 8 1 trip 8 4.546.000 36.368.000 8 8.149.800 8 8.149.800-28.218.200 RIAU 4 1 trip 4 4.599.000 18.396.000 4 3.993.200 4 3.993.200-14.402.800 JAMBI 2 1 trip 2 5.348.000 10.696.000 1 3.316.200 1 3.316.200 1 7.379.800 SUMATERA SELATAN 10 1 trip 10 3.936.000 39.360.000 10 12.154.100 10 12.154.100-27.205.900 BENGKULU 4 1 trip 4 5.509.000 22.036.000 4 5.958.500 4 5.958.500-16.077.500 RIAU KEPULAUAN 2 1 trip 2 2.500.000 5.000.000 2-2 - - 5.000.000 DKI JAKARTA 10 1 trip 12 2.888.000 34.656.000 12 14.965.200 12 14.965.200-19.690.800 JAWA BARAT 46 1 trip 46 2.888.000 132.848.000 34 69.460.800 34 69.460.800 12 63.387.200 LAMPUNG 6 1 trip 6 3.316.000 19.896.000 6 16.625.200 6 16.625.200-3.270.800 BANGKA BELITUNG 0 1 trip 2 3.818.000 7.636.000 2 3.041.200 2 3.041.200-4.594.800 BANTEN 10 1 trip 10 2.888.000 28.880.000 9 21.344.800 9 21.344.800 1 7.535.200 KALIMANTAN BARAT 0 1 trip 2 4.396.000 8.792.000 2 8.042.600 2 8.042.600-749.400 KALIMANTAN TENGAH 2 1 trip 2 4.578.000 9.156.000 2 8.199.600 2 8.199.600-956.400 KALIMANTAN SELATAN 2 1 trip 2 4.578.000 9.156.000 2 7.828.000 2 7.828.000-1.328.000 KALIMANTAN TIMUR 4 1 trip 4 5.305.000 21.220.000 2 9.320.800 2 9.320.800 2 11.899.200 KALIMANTAN UTARA 2 1 trip 2 6.305.000 12.610.000 - - - - 2 12.610.000 D.I. YOGYAKARTA 6 1 trip 6 3.936.000 23.616.000 6 13.332.800 6 13.332.800-10.283.200 From other province to Batam (Pemandu, Narasumber) 20 1 trip 25 5.000.000 125.000.000 21 59.698.600 21 59.698.600 4 65.301.400 Inland Transport 166 1 trip 179 500.000 89.500.000 153 76.500.000 153 76.500.000 26 13.000.000 OSA 166 1 5 m/d 895 300.000 268.500.000 761 228.300.000 761 228.300.000 134 40.200.000 Air fare to Batam 6 1 trip 8 2.888.000 23.104.000 8 18.949.200 8 18.949.200-4.154.800 Inland Tranport 6 1 trip 8 300.000 2.400.000 8 2.400.000 8 2.400.000 - - OSA 6 1 5 m/d 40 300.000 12.000.000 40 12.000.000 40 12.000.000 - - Air Fare from location to Denpasar: JAWA TENGAH 54 1 trip 59 3.479.000 205.261.000 59 108.886.400 59 108.886.400-96.374.600 JAWA TIMUR 44 1 trip 44 1.979.000 87.076.000 43 61.418.200 43 61.418.200 1 25.657.800 BALI 0 1 trip - - - - - - - - - NUSA TENGGARA TIMUR 4 1 trip 4 2.952.000 11.808.000 4 11.484.700 4 11.484.700-323.300 NUSA TENGGARA BARAT 12 1 trip 12 1.390.000 16.680.000 10 10.974.300 10 10.974.300 2 5.705.700 SULAWESI UTARA 10 1 trip 10 4.278.000 42.780.000 6 18.141.700 6 18.141.700 4 24.638.300 SULAWESI TENGAH 2 1 trip 2 5.209.000 10.418.000 2 10.098.000 2 10.098.000-320.000 SULAWESI SELATAN 6 1 trip 8 2.631.000 21.048.000 8 16.074.800 8 16.074.800-4.973.200 SULAWESI TENGGARA 4 1 trip 4 3.273.000 13.092.000 4 11.563.300 4 11.563.300-1.528.700 GORONTALO 4 1 trip 4 4.313.000 17.252.000 2 7.413.200 2 7.413.200 2 9.838.800 SULAWESI BARAT 0 1 trip 2 4.313.000 8.626.000 2 3.563.400 2 3.563.400-5.062.600 MALUKU 4 1 trip 4 4.471.000 17.884.000 4 16.499.900 4 16.499.900-1.384.100 MALUKU UTARA 4 1 trip 4 6.920.000 27.680.000 4 23.718.800 4 23.718.800-3.961.200 PAPUA BARAT 4 1 trip 4 7.631.000 30.524.000 2 9.425.800 2 9.425.800 2 21.098.200 PAPUA 2 1 trip 2 5.787.000 11.574.000 - - - - 2 11.574.000 From other province to Denpasar (Pemandu, Narasumber) 20 1 trip 27 5.000.000 135.000.000 23 65.068.000 23 65.068.000 4 69.932.000 - Inland Transport 174 1 trip 194 500.000 97.000.000 176 88.000.000 176 88.000.000 18 9.000.000 OSA 174 1 5 m/d 928 300.000 278.400.000 890 267.000.000 890 267.000.000 38 11.400.000

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Air fare to Denpasar 6 1 trip 8 3.262.000 26.096.000 8 19.152.400 8 19.152.400-6.943.600 Inland Tranport 6 1 trip 8 300.000 2.400.000 8 2.400.000 8 2.400.000 - - OSA 6 1 5 m/d 40 300.000 12.000.000 40 12.000.000 40 12.000.000 - - 2.1.6 WORKSHOP PROGRAM (Thematic Program) pers time days - - - - - Air Fare from location to Jakarta : NANGGROE ACEH DARUSSALAM 24 1 trip - - - - - - - - - - - SUMATERA UTARA 28 1 trip - - - - - - - - - - - SUMATERA BARAT 22 1 trip - - - - - - - - - - - RIAU 10 1 trip - - - - - - - - - - - JAMBI 4 1 trip - - - - - - - - - - - SUMATERA SELATAN 14 1 trip - - - - - - - - - - - BENGKULU 6 1 trip - - - - - - - - - - - RIAU KEPULAUAN 8 1 trip - - - - - - - - - - - DKI JAKARTA 12 1 trip - - - - - - - - - - - JAWA BARAT 54 1 trip - - - - - - - - - - - LAMPUNG 8 1 trip - - - - - - - - - - - BANGKA BELITUNG 10 1 trip - - - - - - - - - - - BANTEN 14 1 trip - - - - - - - - - - - KALIMANTAN BARAT 10 1 trip - - - - - - - - - - - JAWA TENGAH 70 1 trip - - - - - - - - - - - D.I. YOGYAKARTA 8 1 trip - - - - - - - - - - - JAWA TIMUR 72 1 trip - - - - - - - - - - - BALI 10 1 trip - - - - - - - - - - - NUSA TENGGARA TIMUR 18 1 trip - - - - - - - - - - - KALIMANTAN SELATAN 20 1 trip - - - - - - - - - - - KALIMANTAN TIMUR 12 1 trip - - - - - - - - - - - KALIMANTAN TENGAH 4 1 trip - - - - - - - - - - - KALIMANTAN UTARA 14 1 trip - - - - - - - - - - - SULAWESI UTARA 6 1 trip - - - - - - - - - - - GORONTALO 4 1 trip - - - - - - - - - - - SULAWESI TENGAH 6 1 trip - - - - - - - - - - - NUSA TENGGARA BARAT 12 1 trip - - - - - - - - - - - SULAWESI SELATAN 28 1 trip - - - - - - - - - - - SULAWESI TENGGARA 8 1 trip - - - - - - - - - - - SULAWESI BARAT 6 1 trip - - - - - - - - - - - MALUKU 6 1 trip - - - - - - - - - - - MALUKU UTARA 4 1 trip - - - - - - - - - - - PAPUA 2 1 trip - - - - - - - - - - - PAPUA BARAT 4 1 trip - - - - - - - - - - - Add Acommodation (transit flight) 1 1 1 LS - - - - - - - - - - - Inland Transport 538 1 trip - - - - - - - - - - - Various Transport (for remote area) 1 1 1 LS - - - - - - - - - - - OSA 538 1 6 m/d - - - - - - - - - - - OSA 6 1 5 m/d - - - - - - - - - - - 2.1.7 NATIONAL WORKSHOP LS - 500.000.000 - - - - - - - - - 2.1.8 WORKSHOP PERSIAPAN PENANGANAN KUMUH pers time days 618.655.800 513.402.399-513.402.399 105.253.401 Air Fare from location to Denpasar:

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) NANGGROE ACEH DARUSSALAM 7 1 trip 7 6.279.000 43.953.000 7 37.356.500 - - 7 37.356.500-6.596.500 SUMATERA UTARA 3 1 trip 3 5.658.000 16.974.000 3 15.877.500 - - 3 15.877.500-1.096.500 SUMATERA BARAT 4 1 trip 4 4.888.000 19.552.000 4 16.968.399 - - 4 16.968.399-2.583.601 RIAU 1 1 trip 1 4.942.000 4.942.000 1 4.690.700 - - 1 4.690.700-251.300 JAMBI 1 1 trip 1 4.439.000 4.439.000 1 3.611.000 - - 1 3.611.000-828.000 SUMATERA SELATAN 2 1 trip 2 4.278.000 8.556.000 2 7.576.000 - - 2 7.576.000-980.000 BENGKULU 2 1 trip 2 5.883.000 11.766.000 2 5.580.800 - - 2 5.580.800-6.185.200 RIAU KEPULAUAN 3 1 trip 3 4.942.000 14.826.000 3 14.299.500 - - 3 14.299.500-526.500 DKI JAKARTA - 1 trip - 3.262.000 - - - - - - - - - JAWA BARAT 5 1 trip 5 3.262.000 16.310.000 5 13.622.300 - - 5 13.622.300-2.687.700 LAMPUNG 3 1 trip 3 3.647.000 10.941.000 3 9.536.100 - - 3 9.536.100-1.404.900 BANGKA BELITUNG 2 1 trip 2 5.401.000 10.802.000 2 7.499.200 - - 2 7.499.200-3.302.800 BANTEN 3 1 trip 3 3.262.000 9.786.000 3 8.555.700 - - 3 8.555.700-1.230.300 KALIMANTAN BARAT 2 1 trip 2 4.738.000 9.476.000 2 7.407.400 - - 2 7.407.400-2.068.600 JAWA TENGAH 18 1 trip 18 3.479.000 62.622.000 18 33.673.600 - - 18 33.673.600-28.948.400 D.I. YOGYAKARTA 3 1 trip 3 2.481.000 7.443.000 3 6.531.000 - - 3 6.531.000-912.000 JAWA TIMUR 10 1 trip 10 1.979.000 19.790.000 10 15.064.000 - - 10 15.064.000-4.726.000 BALI 3 1 trip 3 - - 3 - - - 3 - - - NUSA TENGGARA TIMUR 2 1 trip 2 2.952.000 5.904.000 2 4.583.600 - - 2 4.583.600-1.320.400 KALIMANTAN SELATAN 2 1 trip 2 4.920.000 9.840.000 2 5.575.000 - - 2 5.575.000-4.265.000 KALIMANTAN TIMUR 3 1 trip 3 5.648.000 16.944.000 3 11.330.700 - - 3 11.330.700-5.613.300 KALIMANTAN TENGAH 2 1 trip 2 4.909.000 9.818.000 2 5.007.200 - - 2 5.007.200-4.810.800 KALIMANTAN UTARA - 1 trip - 5.648.000 - - - - - - - - - SULAWESI UTARA 2 1 trip 2 4.278.000 8.556.000 2 6.675.200 - - 2 6.675.200-1.880.800 GORONTALO 1 1 trip 1 4.313.000 4.313.000 1 3.966.500 - - 1 3.966.500-346.500 SULAWESI TENGAH 1 1 trip 1 5.209.000 5.209.000 1 4.929.100 - - 1 4.929.100-279.900 NUSA TENGGARA BARAT 3 1 trip 5 1.390.000 6.950.000 3 2.736.300 - - 3 2.736.300 2 4.213.700 SULAWESI SELATAN 8 1 trip 8 2.631.000 21.048.000 8 17.934.200 - - 8 17.934.200-3.113.800 SULAWESI TENGGARA 3 1 trip 3 3.273.000 9.819.000 3 8.398.500 - - 3 8.398.500-1.420.500 SULAWESI BARAT 2 1 trip 2 4.313.000 8.626.000 1 3.293.700 - - 1 3.293.700 1 5.332.300 MALUKU 2 1 trip 2 4.471.000 8.942.000 2 8.746.200 - - 2 8.746.200-195.800 MALUKU UTARA 1 1 trip 1 6.920.000 6.920.000 1 5.988.300 - - 1 5.988.300-931.700 PAPUA 1 1 trip 1 7.631.000 7.631.000 1 5.640.400 - - 1 5.640.400-1.990.600 PAPUA BARAT 2 1 trip 2 5.787.000 11.574.000 2 11.574.000 - - 2 11.574.000 - - Add Acommodation (transit flight) 1 1 1 LS 1 1.220.000 1.220.000 1 1.220.000 - - 1 1.220.000 - - Inland Transport 107 1 1 trip 109 500.000 54.500.000 106 53.000.000 - - 106 53.000.000 3 1.500.000 Various Transport (for remote area) 1 1 1 LS 1 2.943.800 2.943.800 1 2.943.800 - - 1 2.943.800 - - OSA 107 1 3 m/d 327 300.000 98.100.000 318 95.400.000 - - 318 95.400.000 9 2.700.000 Air fare to Denpasar 10 1 1 trip 10 3.262.000 32.620.000 10 31.610.000 - - 10 31.610.000-1.010.000 Inland Tranport 10 1 1 trip 10 300.000 3.000.000 10 3.000.000 - - 10 3.000.000 - - OSA 10 1 4 m/d 40 300.000 12.000.000 40 12.000.000 - - 40 12.000.000 - - 2.1.9 PELATIHAN PENGUATAN PRBBK (Pengurangan Risiko Bencana Berbasis Komunitas) pers time days 569.003.000 568.661.400-568.661.400 341.600 Air Fare from location to Jakarta : SUMATERA BARAT 28 1 1 trip 28 2.952.000 78.556.000 28 78.517.600 - - 28 78.517.600-38.400 LAMPUNG 29 1 1 trip 29 1.583.000 34.007.000 29 33.912.600 - - 29 33.912.600-94.400 SULAWESI UTARA 34 1 1 trip 34 5.102.000 140.268.000 34 140.168.400 - - 34 140.168.400-99.600 JAWA TIMUR 28 1 1 trip 28 2.674.000 61.072.000 28 61.014.800 - - 28 61.014.800-57.200 From other province to Jakarta (Pemandu, Narasumber) 3 1 1 trip 3 5.000.000 1.200.000 1 1.148.000 - - 1 1.148.000 2 52.000

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Inland Transport 122 1 1 trip 122 500.000 61.000.000 122 61.000.000 - - 122 61.000.000 - - OSA 122 1 5 m/d 595 300.000 178.500.000 595 178.500.000 - - 595 178.500.000 - - OSA 8 1 6 m/d 48 300.000 14.400.000 48 14.400.000 - - 48 14.400.000 - - 2.1.10 TOT DASAR PEMANDU NASIONAL pers time days 80.800.000 49.200.000-49.200.000 31.600.000 Peserta, Pemandu, Narasumber: Inland Transport 95 1 1 m/d 95 200.000 19.000.000 - - - - - - 95 19.000.000 OSA 95 1 4 m/d 380 150.000 57.000.000 296 44.400.000 - - 296 44.400.000 84 12.600.000 OSA 8 1 4 m/d 32 150.000 4.800.000 32 4.800.000 - - 32 4.800.000 - - 2.1.11 TOT PEMANDU NASIONAL (PRBBK) pers time days 48.750.000 48.750.000-48.750.000 - Peserta, Pemandu, Narasumber: OSA 409 1 1 m/d 317 150.000 47.550.000 317 47.550.000 - - 317 47.550.000 - - OSA 8 1 1 m/d 8 150.000 1.200.000 8 1.200.000 - - 8 1.200.000 - - 2.1.12 PELATIHAN PRBBK LOKASI PLPBK pers time days 1.116.521.700 1.072.464.600-1.072.464.600 44.057.100 Air Fare from location to Jakarta: SUMATERA UTARA 21 1 trip 21 3.808.000 25.768.000 9 25.677.000 - - 9 25.677.000 12 91.000 SUMATERA BARAT 23 1 trip 23 2.952.000 33.696.000 15 33.615.000 - - 15 33.615.000 8 81.000 RIAU 2 1 trip 3 3.016.000 6.748.000 3 6.723.000 - - 3 6.723.000-25.000 KEPULAUAN RIAU 4 1 trip 4 3.016.000 64.000 - - - - - - 4 64.000 JAMBI 5 1 trip 5 2.460.000 6.100.000 3 6.040.800 - - 3 6.040.800 2 59.200 SUMATERA SELATAN 16 1 trip 16 2.268.000 17.688.000 10 17.636.000 - - 10 17.636.000 6 52.000 BENGKULU 9 1 trip 9 2.621.000 12.089.000 7 11.990.300 - - 7 11.990.300 2 98.700 BANGKA BELITUNG 6 1 trip 6 2.139.000 10.434.000 6 10.397.100 - - 6 10.397.100-36.900 LAMPUNG 8 1 trip 8 1.583.000 3.364.000 3 3.297.300 - - 3 3.297.300 5 66.700 DKI JAKARTA 12 1 trip 12 - - - - - - - - 12 - JAWA BARAT 95 1 trip - 500.000 - - - - - - - - - BANTEN 13 1 trip - 500.000 - - - - - - - - - KALIMANTAN BARAT 7 1 trip 7 2.781.000 7.267.000 4 7.184.000 - - 4 7.184.000 3 83.000 ACEH 24 1 trip 24 4.492.000 8.000 - - - - - - 24 8.000 JAWA TENGAH 94 1 trip 94 2.182.000 60.508.000 63 60.492.000 - - 63 60.492.000 31 16.000 D.I. YOGYAKARTA 21 1 trip 21 2.268.000 22.528.000 12 22.483.200 - - 12 22.483.200 9 44.800 JAWA TIMUR 64 1 trip 64 2.674.000 100.136.000 49 100.131.000 - - 49 100.131.000 15 5.000 BALI 0 1 trip - 3.262.000 - - - - - - - - - NUSA TENGGARA TIMUR 13 1 trip 13 5.081.000 46.753.000 13 46.670.000 - - 13 46.670.000-83.000 KALIMANTAN SELATAN 10 1 trip 10 2.995.000 16.450.000 8 16.440.000 - - 8 16.440.000 2 10.000 KALIMANTAN TIMUR 14 1 trip 14 3.797.000 27.258.000 10 27.210.000 - - 10 27.210.000 4 48.000 KALIMANTAN TENGAH 9 1 trip 9 2.984.000 6.256.000 3 6.165.000 - - 3 6.165.000 6 91.000 SULAWESI UTARA 7 1 trip 7 5.102.000 26.914.000 7 26.871.600 - - 7 26.871.600-42.400 GORONTALO 2 1 trip 2 4.824.000 48.000 - - - - - - 2 48.000 SULAWESI TENGAH 7 1 trip 7 5.113.000 12.991.000 4 12.941.200 - - 4 12.941.200 3 49.800 NUSA TENGGARA BARAT 22 1 trip 22 3.230.000 36.760.000 16 36.720.000 - - 16 36.720.000 6 40.000 SULAWESI SELATAN 18 1 trip 18 3.829.000 20.722.000 8 20.652.800 - - 8 20.652.800 10 69.200 SULAWESI TENGGARA 10 1 trip 10 4.182.000 25.420.000 7 25.393.000 - - 7 25.393.000 3 27.000 SULAWESI BARAT 4 1 trip 6 4.867.000 29.202.000 6 30.408.000 - - 6 30.408.000 - (1.206.000) MALUKU UTARA 5 1 trip 5 6.064.000 14.620.000 3 14.556.900 - - 3 14.556.900 2 63.100 MALUKU 9 1 trip 9 7.081.000 23.229.000 4 23.144.500 - - 4 23.144.500 5 84.500

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) PAPUA 4 1 trip 4 8.193.000 20.372.000 3 20.334.000 - - 3 20.334.000 1 38.000 PAPUA BARAT 4 1 trip 4 10.824.000 43.296.000 - - - - - - 4 43.296.000 From other province to Jakarta (Pemandu, Narasumber) 6 1 6 5.000.000 9.600.000 5 9.558.200 - - 5 9.558.200 1 41.800 Add Acommodation (transit flight) 1 1 1 LS 1 50.000.000 2.562.500 1 2.562.500 - - 1 2.562.500 - - Inland Transport 562 1 1 trip 384 500.000 192.000.000 380 191.500.000 - - 380 191.500.000 4 500.000 Various Transport (for remote area) 1 1 1 LS 1 100.000.000 20.320.200 1 20.320.200 - - 1 20.320.200 - - OSA 562 1 4 m/d 1.509 150.000 226.350.000 1.509 226.350.000 - - 1.509 226.350.000 - - OSA 8 1 5 m/d 60 150.000 9.000.000 60 9.000.000 - - 60 9.000.000 - - 2.1.13 PELATIHAN PRBBK UNTUK PEMDA LOKASI PLPBK pers time days 972.689.900 964.651.625-964.651.625 8.038.275 Air Fare from location to Jakarta: SUMATERA UTARA 21 1 trip 17 3.808.000 23.936.000 17 23.906.250 - - 17 23.906.250-29.750 SUMATERA BARAT 23 1 trip 12 2.952.000 24.124.000 12 24.026.700 - - 12 24.026.700-97.300 RIAU 2 1 trip 4 3.016.000 6.064.000 4 6.010.500 - - 4 6.010.500-53.500 KEPULAUAN RIAU 4 1 trip 7 3.016.000 11.712.000 7 11.706.400 - - 7 11.706.400-5.600 JAMBI 5 1 trip 4 2.460.000 6.040.000 4 6.039.000 - - 4 6.039.000-1.000 SUMATERA SELATAN 16 1 trip 16 2.268.000 19.488.000 16 19.475.856 - - 16 19.475.856-12.144 BENGKULU 9 1 trip 7 2.621.000 8.147.000 7 8.127.250 - - 7 8.127.250-19.750 BANGKA BELITUNG 6 1 trip 3 2.139.000 1.517.000 2 1.489.800 - - 2 1.489.800 1 27.200 LAMPUNG 8 1 trip 7 1.583.000 5.481.000 7 5.408.700 - - 7 5.408.700-72.300 DKI JAKARTA 12 1 trip 10 - - 10 - - - 10 - - - JAWA BARAT 95 1 trip 41 500.000-41 - - - 41 - - - BANTEN 13 1 trip 9 500.000-9 - - - 9 - - - KALIMANTAN BARAT 7 1 trip 6 2.781.000 9.286.000 6 9.235.000 - - 6 9.235.000-51.000 ACEH 24 1 trip - 4.492.000 - - - - - - - - - JAWA TENGAH 94 1 trip 65 2.182.000 51.430.000 65 51.417.319 - - 65 51.417.319-12.681 D.I. YOGYAKARTA 21 1 trip 7 2.268.000 9.176.000 7 9.095.700 - - 7 9.095.700-80.300 JAWA TIMUR 64 1 trip 19 2.674.000 31.906.000 19 31.810.800 - - 19 31.810.800-95.200 BALI 0 1 trip - 3.262.000 - - - - - - - - - NUSA TENGGARA TIMUR 13 1 trip 4 5.081.000 17.024.000 4 16.994.700 - - 4 16.994.700-29.300 KALIMANTAN SELATAN 10 1 trip 7 2.995.000 12.765.000 7 12.692.500 - - 7 12.692.500-72.500 KALIMANTAN TIMUR 14 1 trip 7 3.797.000 18.379.000 7 18.373.600 - - 7 18.373.600-5.400 KALIMANTAN TENGAH 9 1 trip 2 2.984.000 5.968.000 2 4.110.000 - - 2 4.110.000-1.858.000 SULAWESI UTARA 7 1 trip 4 5.102.000 13.708.000 4 13.609.500 - - 4 13.609.500-98.500 GORONTALO 2 1 trip - 4.824.000 - - - - - - - - - SULAWESI TENGAH 7 1 trip 4 5.113.000 13.652.000 4 13.634.200 - - 4 13.634.200-17.800 NUSA TENGGARA BARAT 22 1 trip 14 3.230.000 30.820.000 14 30.809.150 - - 14 30.809.150-10.850 SULAWESI SELATAN 18 1 trip - 3.829.000 - - - - - - - - - SULAWESI TENGGARA 10 1 trip 6 4.182.000 19.492.000 6 19.410.100 - - 6 19.410.100-81.900 SULAWESI BARAT 4 1 trip - 4.867.000 - - - - - - - - - MALUKU UTARA 5 1 trip 4 6.064.000 24.256.000 4 23.740.000 - - 4 23.740.000-516.000 MALUKU 9 1 trip - 7.081.000 - - - - - - - - - PAPUA 4 1 trip 4 8.193.000 32.772.000 4 27.991.100 - - 4 27.991.100-4.780.900 PAPUA BARAT 4 1 trip - 10.824.000 - - - - - - - - - From other province to Jakarta (Pemandu, Narasumber) 6 1 8 5.000.000 17.000.000 8 16.990.600 - - 8 16.990.600-9.400 Add Acommodation (transit flight) 1 1 1 LS 1 50.000.000 4.097.500 1 4.097.500 - - 1 4.097.500 - - Inland Transport 568 1 1 trip 333 500.000 166.500.000 332 166.500.000 - - 332 166.500.000 1 - Various Transport (for remote area) 1 1 1 LS 1 100.000.000 9.049.400 1 9.049.400 - - 1 9.049.400 - - OSA 568 1 4 m/d 1.239 300.000 371.700.000 1.239 371.700.000 - - 1.239 371.700.000 - -

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) OSA 8 1 5 m/d 48 150.000 7.200.000 48 7.200.000 - - 48 7.200.000 - - 2.1.14 Workshop Pilot PRBBK (Lesson Learned BNPB Tangguh) pers time days 373.392.000 373.083.500-373.083.500 308.500 Air Fare from location to Yogyakarta: Sumatera Barat 30 1 1 trip 22 2.952.000 60.460.000 22 60.403.100 - - 22 60.403.100-56.900 Lampung 30 1 1 trip 22 2.760.000 60.600.000 22 60.505.800 - - 22 60.505.800-94.200 Jawa Timur 30 1 1 trip 22 1.500.000 23.500.000 22 23.468.000 - - 22 23.468.000-32.000 Sulawesi Utara 30 1 1 trip 20 5.722.000 79.560.000 20 79.547.400 - - 20 79.547.400-12.600 From other province to Yogyakarta (Pemandu, Narasumber) 6 1 1 trip 4 5.000.000 10.000.000 4 9.946.000 - - 4 9.946.000-54.000 Inland Transport 126 1 1 trip 90 500.000 45.000.000 90 45.000.000 - - 90 45.000.000 - - OSA 126 1 3 m/d 270 300.000 81.000.000 270 81.000.000 - - 270 81.000.000 - - Air Fare to Yogyakarta 4 1 1 trip 4 2.268.000 7.672.000 4 7.613.200 - - 4 7.613.200-58.800 Inland Transport 4 1 1 trip 4 500.000 2.000.000 4 2.000.000 - - 4 2.000.000 - - OSA 4 1 3 m/d 12 300.000 3.600.000 12 3.600.000 - - 12 3.600.000 - - 2.1.15 Pelatihan PRBBK Lokasi Pilot Kebakaran pers time days 70.044.000 70.007.000-70.007.000 37.000 Air Fare from location: From other province to Surabaya (Pemandu, Narasumber) 8 1 1 trip - 5.000.000 - - - - - - - - - Inland Transport (pemandu, narasumber, peserta) 88 1 1 trip 79 500.000 39.500.000 79 39.500.000 - - 79 39.500.000 - - Air Fare to Surabaya 6 1 1 trip 6 2.674.000 14.944.000 6 14.907.000 - - 6 14.907.000-37.000 Inland Transport 6 1 1 trip 6 500.000 3.000.000 6 3.000.000 - - 6 3.000.000 - - OSA 6 1 7 m/d 42 300.000 12.600.000 42 12.600.000 - - 42 12.600.000 - - 2.1.16 Workshop PRBBK Kota/Kabupaten pers time days 312.114.000 308.212.900-308.212.900 3.901.100 Air Fare from location: From other province to Location (Pemandu, Narasumber) 8 1 1 trip 8 5.000.000 14.400.000 4 14.351.900 - - 4 14.351.900 4 48.100 Inland Transport (pemandu, narasumber, peserta) 88 1 1 trip 459 500.000 229.300.000 459 229.250.000 - - 459 229.250.000-50.000 - - Air Fare to Padang 2 1 1 trip 2 2.952.000 5.904.000 2 5.758.000 - - 2 5.758.000-146.000 Air Fare to Lampung 2 1 1 trip 2 1.583.000 3.166.000 2 2.504.000 - - 2 2.504.000-662.000 Air Fare to Surabaya 6 1 1 trip 10 2.674.000 26.740.000 10 23.745.000 - - 10 23.745.000-2.995.000 Air Fare to Manado 2 1 1 trip 2 5.102.000 10.204.000 2 10.204.000 - - 2 10.204.000 - - Inland Transport 12 1 1 trip 16 500.000 8.000.000 16 8.000.000 - - 16 8.000.000 - - OSA 12 1 3 m/d 48 300.000 14.400.000 48 14.400.000 - - 48 14.400.000 - - 2.1.17 Workshop penyusunan Kurikulum dan Strakom Penanganan Kumuh pers time days 291.844.000 - - - 291.844.000 Air Fare from location to Jakarta : ACEH 1 1 trip 1 4.492.000 4.492.000 - - - - - - 1 4.492.000 JAWA TENGAH 1 1 trip 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 D.I. YOGYAKARTA 1 1 trip 1 2.268.000 2.268.000 - - - - - - 1 2.268.000 JAWA TIMUR 1 1 trip 1 2.674.000 2.674.000 - - - - - - 1 2.674.000 BALI 1 1 trip 1 3.262.000 3.262.000 - - - - - - 1 3.262.000 NUSA TENGGARA TIMUR 1 1 trip 1 5.081.000 5.081.000 - - - - - - 1 5.081.000 KALIMANTAN SELATAN 1 1 trip 1 2.995.000 2.995.000 - - - - - - 1 2.995.000 KALIMANTAN TIMUR 1 1 trip 1 3.797.000 3.797.000 - - - - - - 1 3.797.000 KALIMANTAN TENGAH 1 1 trip 1 2.984.000 2.984.000 - - - - - - 1 2.984.000

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) SULAWESI UTARA 1 1 trip 1 5.102.000 5.102.000 - - - - - - 1 5.102.000 GORONTALO 1 1 trip 1 4.824.000 4.824.000 - - - - - - 1 4.824.000 SULAWESI TENGAH 1 1 trip 1 5.113.000 5.113.000 - - - - - - 1 5.113.000 NUSA TENGGARA BARAT 1 1 trip 1 3.230.000 3.230.000 - - - - - - 1 3.230.000 SULAWESI SELATAN 1 1 trip 1 3.829.000 3.829.000 - - - - - - 1 3.829.000 SULAWESI TENGGARA 1 1 trip 1 4.182.000 4.182.000 - - - - - - 1 4.182.000 SULAWESI BARAT 1 1 trip 1 4.867.000 4.867.000 - - - - - - 1 4.867.000 MALUKU UTARA 1 1 trip 1 6.664.000 6.664.000 - - - - - - 1 6.664.000 MALUKU 1 1 trip 1 7.081.000 7.081.000 - - - - - - 1 7.081.000 PAPUA 1 1 trip 1 8.193.000 8.193.000 - - - - - - 1 8.193.000 PAPUA BARAT 1 1 trip 1 10.824.000 10.824.000 - - - - - - 1 10.824.000 From other province to Jakarta (Pemandu, Narasumber) 15 1 trip 15 3.500.000 52.500.000 - - - - - - 15 52.500.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - - - - - 1 10.000.000 Inland Transport 61 1 trip 61 500.000 30.500.000 - - - - - - 61 30.500.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - - - - - 1 20.000.000 OSA 61 1 4 m/d 244 300.000 73.200.000 - - - - - - 244 73.200.000 Inland Transport 6 1 trip 6 500.000 3.000.000 - - - - - - 6 3.000.000 OSA 6 1 5 m/d 30 300.000 9.000.000 - - - - - - 30 9.000.000 2.1.18 Pelatihan OSP/OC pers time days 1.286.396.000-698.025.350 698.025.350 588.370.650 Air Fare from location to Jakarta : ACEH 12 1 trip 12 4.492.000 53.904.000 - - 9 35.986.600 9 35.986.600 3 17.917.400 JAWA TENGAH 11 1 trip 11 2.182.000 24.002.000 - - 7 13.520.500 7 13.520.500 4 10.481.500 D.I. YOGYAKARTA 9 1 trip 9 2.268.000 20.412.000 - - 6 12.404.400 6 12.404.400 3 8.007.600 JAWA TIMUR 11 1 trip 11 2.674.000 29.414.000 - - 8 19.886.400 8 19.886.400 3 9.527.600 BALI 11 1 trip 11 3.262.000 35.882.000 - - 6 17.673.600 6 17.673.600 5 18.208.400 NUSA TENGGARA TIMUR 9 1 trip 9 5.081.000 45.729.000 - - 7 34.099.700 7 34.099.700 2 11.629.300 KALIMANTAN SELATAN 9 1 trip 9 2.995.000 26.955.000 - - 7 19.576.200 7 19.576.200 2 7.378.800 KALIMANTAN TIMUR 9 1 trip 9 3.797.000 34.173.000 - - 7 22.592.600 7 22.592.600 2 11.580.400 KALIMANTAN TENGAH 8 1 trip 8 2.984.000 23.872.000 - - 4 9.734.400 4 9.734.400 4 14.137.600 SULAWESI UTARA 9 1 trip 9 5.102.000 45.918.000 - - 6 28.716.600 6 28.716.600 3 17.201.400 GORONTALO 8 1 trip 8 4.824.000 38.592.000 - - 3 11.867.600 3 11.867.600 5 26.724.400 SULAWESI TENGAH 9 1 trip 9 5.113.000 46.017.000 - - 4 19.689.600 4 19.689.600 5 26.327.400 NUSA TENGGARA BARAT 9 1 trip 9 3.230.000 29.070.000 - - 6 17.935.800 6 17.935.800 3 11.134.200 SULAWESI SELATAN 11 1 trip 11 3.829.000 42.119.000 - - 8 30.088.000 8 30.088.000 3 12.031.000 SULAWESI TENGGARA 9 1 trip 9 4.182.000 37.638.000 - - 5 20.600.000 5 20.600.000 4 17.038.000 SULAWESI BARAT 8 1 trip 8 4.867.000 38.936.000 - - 3 10.010.600 3 10.010.600 5 28.925.400 MALUKU UTARA 8 1 trip 8 6.664.000 53.312.000 - - 7 33.926.500 7 33.926.500 1 19.385.500 MALUKU 11 1 trip 11 7.081.000 77.891.000 - - 5 32.475.400 5 32.475.400 6 45.415.600 PAPUA 8 1 trip 8 8.193.000 65.544.000 - - 3 17.927.700 3 17.927.700 5 47.616.300 PAPUA BARAT 9 1 trip 9 10.824.000 97.416.000 - - 3 12.272.550 3 12.272.550 6 85.143.450 From other province to Jakarta (Pemandu, Narasumber) 0 1 trip 1 3.500.000 3.500.000 - - - - - - 1 3.500.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - 1 1.540.600 1 1.540.600-8.459.400 Inland Transport 188 1 trip 188 500.000 94.000.000 - - 114 57.000.000 114 57.000.000 74 37.000.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - - - - - 1 20.000.000 OSA 188 1 4 m/d 752 300.000 225.600.000 - - 675 202.500.000 675 202.500.000 77 23.100.000 Pemandu, Narasumber Inland Transport 29 1 trip 29 500.000 14.500.000 - - - - - - 29 14.500.000 OSA 24 1 5 m/d 120 300.000 36.000.000 - - - - - - 120 36.000.000 Inland Transport 8 1 trip 8 500.000 4.000.000 - - 8 4.000.000 8 4.000.000 - -

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) OSA 8 1 5 m/d 40 300.000 12.000.000 - - 40 12.000.000 40 12.000.000 - - 2.1.19 ToT Pemandu Nasional pers time days 1.435.089.000-929.405.800 929.405.800 505.683.200 Air Fare from location to Jakarta : ACEH 10 1 trip 10 4.492.000 44.920.000 - - 7 28.307.600 7 28.307.600 3 16.612.400 JAWA TENGAH 35 1 trip 35 2.182.000 76.370.000 - - 34 60.001.900 34 60.001.900 1 16.368.100 D.I. YOGYAKARTA 6 1 trip 6 2.268.000 13.608.000 - - 1 2.067.400 1 2.067.400 5 11.540.600 JAWA TIMUR 36 1 trip 36 2.674.000 96.264.000 - - 33 81.991.800 33 81.991.800 3 14.272.200 BALI 5 1 trip 5 3.262.000 16.310.000 - - 2 6.087.000 2 6.087.000 3 10.223.000 NUSA TENGGARA TIMUR 9 1 trip 9 5.081.000 45.729.000 - - 5 23.632.500 5 23.632.500 4 22.096.500 KALIMANTAN SELATAN 10 1 trip 10 2.995.000 29.950.000 - - 3 8.389.800 3 8.389.800 7 21.560.200 KALIMANTAN TIMUR 10 1 trip 10 3.797.000 37.970.000 - - 3 9.840.300 3 9.840.300 7 28.129.700 KALIMANTAN TENGAH 2 1 trip 2 2.984.000 5.968.000 - - 2 5.613.000 2 5.613.000-355.000 SULAWESI UTARA 6 1 trip 6 5.102.000 30.612.000 - - 4 18.948.600 4 18.948.600 2 11.663.400 GORONTALO 4 1 trip 4 4.824.000 19.296.000 - - 2 9.028.600 2 9.028.600 2 10.267.400 SULAWESI TENGAH 4 1 trip 4 5.113.000 20.452.000 - - 1 4.545.600 1 4.545.600 3 15.906.400 NUSA TENGGARA BARAT 6 1 trip 6 3.230.000 19.380.000 - - 3 8.967.900 3 8.967.900 3 10.412.100 SULAWESI SELATAN 12 1 trip 12 3.829.000 45.948.000 - - 8 24.313.000 8 24.313.000 4 21.635.000 SULAWESI TENGGARA 4 1 trip 4 4.182.000 16.728.000 - - 1 1.923.300 1 1.923.300 3 14.804.700 SULAWESI BARAT 2 1 trip 2 4.867.000 9.734.000 - - 1 3.703.900 1 3.703.900 1 6.030.100 MALUKU UTARA 3 1 trip 3 6.664.000 19.992.000 - - 3 15.156.300 3 15.156.300-4.835.700 MALUKU 4 1 trip 4 7.081.000 28.324.000 - - 1 6.580.100 1 6.580.100 3 21.743.900 PAPUA 2 1 trip 2 8.193.000 16.386.000 - - 1 7.713.200 1 7.713.200 1 8.672.800 PAPUA BARAT 2 1 trip 2 10.824.000 21.648.000 - - 1 3.801.300 1 3.801.300 1 17.846.700 From other province to Jakarta (Pemandu, Narasumber) 8 1 trip 8 3.500.000 28.000.000 - - - - - - 8 28.000.000 Add Acommodation (transit) 8 1 LS 8 10.000.000 80.000.000 - - - - - - 8 80.000.000 Inland Transport 180 1 trip 180 500.000 90.000.000 - - 116 58.000.000 116 58.000.000 64 32.000.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - 1 2.692.700 1 2.692.700-17.307.300 OSA 180 1 9 m/d 1.620 300.000 486.000.000 - - 1.609 482.700.000 1.609 482.700.000 11 3.300.000 Pemandu, Narasumber Inland Transport 31 1 trip 31 500.000 15.500.000 - - 25 12.500.000 25 12.500.000 6 3.000.000 OSA 24 1 10 m/d 240 300.000 72.000.000 - - 103 30.900.000 103 30.900.000 137 41.100.000 Inland Transport 8 1 trip 8 500.000 4.000.000 - - - - - - 8 4.000.000 OSA 8 1 10 m/d 80 300.000 24.000.000 - - 40 12.000.000 40 12.000.000 40 12.000.000 2.1.20 ToT Pemandu Nasional untuk pelatihan khusus pers time days 658.990.000 - - - 658.990.000 Air Fare from location to Jakarta : ACEH 4 1 trip 4 4.492.000 17.968.000 - - - - - - 4 17.968.000 JAWA TENGAH 18 1 trip 18 2.182.000 39.276.000 - - - - - - 18 39.276.000 D.I. YOGYAKARTA 4 1 trip 4 2.268.000 9.072.000 - - - - - - 4 9.072.000 JAWA TIMUR 24 1 trip 24 2.674.000 64.176.000 - - - - - - 24 64.176.000 BALI 1 trip - 3.262.000 - - - - - - - - - NUSA TENGGARA TIMUR 4 1 trip 4 5.081.000 20.324.000 - - - - - - 4 20.324.000 KALIMANTAN SELATAN 4 1 trip 4 2.995.000 11.980.000 - - - - - - 4 11.980.000 KALIMANTAN TIMUR 4 1 trip 4 3.797.000 15.188.000 - - - - - - 4 15.188.000 KALIMANTAN TENGAH 1 trip - 2.984.000 - - - - - - - - - SULAWESI UTARA 4 1 trip 4 5.102.000 20.408.000 - - - - - - 4 20.408.000 GORONTALO 1 trip - 4.824.000 - - - - - - - - - SULAWESI TENGAH 1 trip - 5.113.000 - - - - - - - - - NUSA TENGGARA BARAT 2 1 trip 2 3.230.000 6.460.000 - - - - - - 2 6.460.000 SULAWESI SELATAN 10 1 trip 10 3.829.000 38.290.000 - - - - - - 10 38.290.000 SULAWESI TENGGARA 4 1 trip 4 4.182.000 16.728.000 - - - - - - 4 16.728.000

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) SULAWESI BARAT 1 trip - 4.867.000 - - - - - - - - - MALUKU UTARA 1 trip - 6.664.000 - - - - - - - - - MALUKU 4 1 trip 4 7.081.000 28.324.000 - - - - - - 4 28.324.000 PAPUA 1 trip - 8.193.000 - - - - - - - - - PAPUA BARAT 4 1 trip 4 10.824.000 43.296.000 - - - - - - 4 43.296.000 From other province to Jakarta (Pemandu, Narasumber) 1 trip 1 3.500.000 3.500.000 - - - - - - 1 3.500.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - - - - - 1 10.000.000 Inland Transport 90 1 trip 90 500.000 45.000.000 - - - - - - 90 45.000.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - - - - - 1 20.000.000 OSA 90 1 7 m/d 630 300.000 189.000.000 - - - - - - 630 189.000.000 Pemandu, Narasumber Inland Transport 18 1 trip 18 500.000 9.000.000 - - - - - - 18 9.000.000 OSA 14 1 8 m/d 112 300.000 33.600.000 - - - - - - 112 33.600.000 Inland Transport 6 1 trip 6 500.000 3.000.000 - - - - - - 6 3.000.000 OSA 6 1 8 m/d 48 300.000 14.400.000 - - - - - - 48 14.400.000 2.1.21 Pelatihan Koordinator Kota pers time days 1.146.398.000-573.476.350 573.476.350 572.921.650 Air Fare from location to Jakarta : ACEH 12 1 trip 12 4.492.000 53.904.000 - - 7 27.831.300 7 27.831.300 5 26.072.700 JAWA TENGAH 35 1 trip 35 2.182.000 76.370.000 - - 5 8.761.050 5 8.761.050 30 67.608.950 D.I. YOGYAKARTA 4 1 trip 4 2.268.000 9.072.000 - - 4 9.072.000 4 9.072.000 - - JAWA TIMUR 36 1 trip 36 2.674.000 96.264.000 - - 7 18.102.400 7 18.102.400 29 78.161.600 BALI 5 1 trip 5 3.262.000 16.310.000 - - - - - - 5 16.310.000 NUSA TENGGARA TIMUR 9 1 trip 9 5.081.000 45.729.000 - - 6 28.359.000 6 28.359.000 3 17.370.000 KALIMANTAN SELATAN 10 1 trip 10 2.995.000 29.950.000 - - 9 25.041.800 9 25.041.800 1 4.908.200 KALIMANTAN TIMUR 10 1 trip 10 3.797.000 37.970.000 - - 8 26.900.900 8 26.900.900 2 11.069.100 KALIMANTAN TENGAH 2 1 trip 2 2.984.000 5.968.000 - - 2 4.867.200 2 4.867.200-1.100.800 SULAWESI UTARA 7 1 trip 7 5.102.000 35.714.000 - - 3 13.966.700 3 13.966.700 4 21.747.300 GORONTALO 2 1 trip 2 4.824.000 9.648.000 - - - - - - 2 9.648.000 SULAWESI TENGAH 3 1 trip 3 5.113.000 15.339.000 - - - - - - 3 15.339.000 NUSA TENGGARA BARAT 6 1 trip 6 3.230.000 19.380.000 - - 5 14.610.300 5 14.610.300 1 4.769.700 SULAWESI SELATAN 14 1 trip 14 3.829.000 53.606.000 - - 8 28.209.200 8 28.209.200 6 25.396.800 SULAWESI TENGGARA 4 1 trip 4 4.182.000 16.728.000 - - - - - - 4 16.728.000 SULAWESI BARAT 2 1 trip 2 4.867.000 9.734.000 - - - - - - 2 9.734.000 MALUKU UTARA 2 1 trip 2 6.664.000 13.328.000 - - 1 5.052.100 1 5.052.100 1 8.275.900 MALUKU 3 1 trip 3 7.081.000 21.243.000 - - - - - - 3 21.243.000 PAPUA 1 1 trip 1 8.193.000 8.193.000 - - - - - - 1 8.193.000 PAPUA BARAT 2 1 trip 2 10.824.000 21.648.000 - - - - - - 2 21.648.000 From other province to Jakarta (Pemandu, Narasumber) 1 trip 1 3.500.000 3.500.000 - - - - - - 1 3.500.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - 1 2.640.000 1 2.640.000-7.360.000 Inland Transport 169 1 trip 169 500.000 84.500.000 - - 109 54.500.000 109 54.500.000 60 30.000.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - 1 9.562.400 1 9.562.400-10.437.600 OSA 169 1 7 m/d 1.183 300.000 354.900.000 - - 763 228.900.000 763 228.900.000 420 126.000.000 Pemandu, Narasumber Inland Transport 24 1 trip 24 500.000 12.000.000 - - 7 3.500.000 7 3.500.000 17 8.500.000 OSA 20 1 8 m/d 160 300.000 48.000.000 - - 160 48.000.000 160 48.000.000 - - Inland Transport 6 1 trip 6 500.000 3.000.000 - - 6 3.000.000 6 3.000.000 - - OSA 6 1 8 m/d 48 300.000 14.400.000 - - 42 12.600.000 42 12.600.000 6 1.800.000 2.1.22 Workshop E-Learning CB pers time days 248.744.000 - - - 248.744.000 Air Fare from location to Jakarta :

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) ACEH 0 1 trip 1 4.492.000 4.492.000 - - - - - - 1 4.492.000 JAWA TENGAH 0 1 trip 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 D.I. YOGYAKARTA 0 1 trip 1 2.268.000 2.268.000 - - - - - - 1 2.268.000 JAWA TIMUR 0 1 trip 1 2.674.000 2.674.000 - - - - - - 1 2.674.000 BALI 0 1 trip 1 3.262.000 3.262.000 - - - - - - 1 3.262.000 NUSA TENGGARA TIMUR 0 1 trip 1 5.081.000 5.081.000 - - - - - - 1 5.081.000 KALIMANTAN SELATAN 0 1 trip 1 2.995.000 2.995.000 - - - - - - 1 2.995.000 KALIMANTAN TIMUR 0 1 trip 1 3.797.000 3.797.000 - - - - - - 1 3.797.000 KALIMANTAN TENGAH 0 1 trip 1 2.984.000 2.984.000 - - - - - - 1 2.984.000 SULAWESI UTARA 0 1 trip 1 5.102.000 5.102.000 - - - - - - 1 5.102.000 GORONTALO 0 1 trip 1 4.824.000 4.824.000 - - - - - - 1 4.824.000 SULAWESI TENGAH 0 1 trip 1 5.113.000 5.113.000 - - - - - - 1 5.113.000 NUSA TENGGARA BARAT 0 1 trip 1 3.230.000 3.230.000 - - - - - - 1 3.230.000 SULAWESI SELATAN 0 1 trip 1 3.829.000 3.829.000 - - - - - - 1 3.829.000 SULAWESI TENGGARA 0 1 trip 1 4.182.000 4.182.000 - - - - - - 1 4.182.000 SULAWESI BARAT 0 1 trip 1 4.867.000 4.867.000 - - - - - - 1 4.867.000 MALUKU UTARA 0 1 trip 1 6.664.000 6.664.000 - - - - - - 1 6.664.000 MALUKU 0 1 trip 1 7.081.000 7.081.000 - - - - - - 1 7.081.000 PAPUA 0 1 trip 1 8.193.000 8.193.000 - - - - - - 1 8.193.000 PAPUA BARAT 0 1 trip 1 10.824.000 10.824.000 - - - - - - 1 10.824.000 From other province to Jakarta (Pemandu, Narasumber) 10 1 trip 10 3.500.000 35.000.000 - - - - - - 10 35.000.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - - - - - 1 10.000.000 Inland Transport 48 1 trip 48 500.000 24.000.000 - - - - - - 48 24.000.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - - - - - 1 20.000.000 OSA 48 1 4 m/d 192 300.000 57.600.000 - - - - - - 192 57.600.000 Pemandu, Narasumber Inland Transport 0 1 trip - 500.000 - - - - - - - - - OSA 0 1 4 m/d - 300.000 - - - - - - - - - Inland Transport 5 1 trip 5 500.000 2.500.000 - - - - - - 5 2.500.000 OSA 5 1 4 m/d 20 300.000 6.000.000 - - - - - - 20 6.000.000 2.1.23 ToT Pemandu Pemda dan City Changer pers time days 1.179.698.000 - - - 1.179.698.000 Air Fare from location to Jakarta : ACEH 12 1 trip 12 4.492.000 53.904.000 - - - - - - 12 53.904.000 JAWA TENGAH 35 1 trip 35 2.182.000 76.370.000 - - - - - - 35 76.370.000 D.I. YOGYAKARTA 4 1 trip 4 2.268.000 9.072.000 - - - - - - 4 9.072.000 JAWA TIMUR 36 1 trip 36 2.674.000 96.264.000 - - - - - - 36 96.264.000 BALI 5 1 trip 5 3.262.000 16.310.000 - - - - - - 5 16.310.000 NUSA TENGGARA TIMUR 9 1 trip 9 5.081.000 45.729.000 - - - - - - 9 45.729.000 KALIMANTAN SELATAN 10 1 trip 10 2.995.000 29.950.000 - - - - - - 10 29.950.000 KALIMANTAN TIMUR 10 1 trip 10 3.797.000 37.970.000 - - - - - - 10 37.970.000 KALIMANTAN TENGAH 2 1 trip 2 2.984.000 5.968.000 - - - - - - 2 5.968.000 SULAWESI UTARA 7 1 trip 7 5.102.000 35.714.000 - - - - - - 7 35.714.000 GORONTALO 2 1 trip 2 4.824.000 9.648.000 - - - - - - 2 9.648.000 SULAWESI TENGAH 3 1 trip 3 5.113.000 15.339.000 - - - - - - 3 15.339.000 NUSA TENGGARA BARAT 6 1 trip 6 3.230.000 19.380.000 - - - - - - 6 19.380.000 SULAWESI SELATAN 14 1 trip 14 3.829.000 53.606.000 - - - - - - 14 53.606.000 SULAWESI TENGGARA 4 1 trip 4 4.182.000 16.728.000 - - - - - - 4 16.728.000 SULAWESI BARAT 2 1 trip 2 4.867.000 9.734.000 - - - - - - 2 9.734.000 MALUKU UTARA 2 1 trip 2 6.664.000 13.328.000 - - - - - - 2 13.328.000 MALUKU 3 1 trip 3 7.081.000 21.243.000 - - - - - - 3 21.243.000 PAPUA 1 1 trip 1 8.193.000 8.193.000 - - - - - - 1 8.193.000

Rate Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) Vol Amount (IDR) PAPUA BARAT 2 1 trip 2 10.824.000 21.648.000 - - - - - - 2 21.648.000 From other province to Jakarta (Pemandu, Narasumber) 25 1 trip 25 3.500.000 87.500.000 - - - - - - 25 87.500.000 Add Acommodation (transit) 1 LS 1 10.000.000 10.000.000 - - - - - - 1 10.000.000 Inland Transport 194 1 trip 195 500.000 97.500.000 - - - - - - 195 97.500.000 Various Transport (for remote area) 1 LS 1 20.000.000 20.000.000 - - - - - - 1 20.000.000 OSA 194 1 5 m/d 970 300.000 291.000.000 - - - - - - 970 291.000.000 Pemandu, Narasumber Inland Transport 30 1 trip 31 500.000 15.500.000 - - - - - - 31 15.500.000 OSA 24 1 6 m/d 144 300.000 43.200.000 - - - - - - 144 43.200.000 Inland Transport 8 1 trip 9 500.000 4.500.000 - - - - - - 9 4.500.000 OSA 8 1 6 m/d 48 300.000 14.400.000 - - - - - - 48 14.400.000 2.1.24 Pelatihan Pemerintah Daerah pers time days 90.400.000 - - - 90.400.000 Air Fare from location to Jakarta : - - ACEH 0 1 trip - 4.492.000 - - - - - - - - - JAWA TENGAH 0 1 trip - 2.182.000 - - - - - - - - - D.I. YOGYAKARTA 0 1 trip - 2.268.000 - - - - - - - - - JAWA TIMUR 0 1 trip - 2.674.000 - - - - - - - - - BALI 0 1 trip - 3.262.000 - - - - - - - - - NUSA TENGGARA TIMUR 0 1 trip - 5.081.000 - - - - - - - - - KALIMANTAN SELATAN 0 1 trip - 2.995.000 - - - - - - - - - KALIMANTAN TIMUR 0 1 trip - 3.797.000 - - - - - - - - - KALIMANTAN TENGAH 0 1 trip - 2.984.000 - - - - - - - - - SULAWESI UTARA 0 1 trip - 5.102.000 - - - - - - - - - GORONTALO 0 1 trip - 4.824.000 - - - - - - - - - SULAWESI TENGAH 0 1 trip - 5.113.000 - - - - - - - - - NUSA TENGGARA BARAT 0 1 trip - 3.230.000 - - - - - - - - - SULAWESI SELATAN 0 1 trip - 3.829.000 - - - - - - - - - SULAWESI TENGGARA 0 1 trip - 4.182.000 - - - - - - - - - SULAWESI BARAT 0 1 trip - 4.867.000 - - - - - - - - - MALUKU UTARA 0 1 trip - 6.664.000 - - - - - - - - - MALUKU 0 1 trip - 7.081.000 - - - - - - - - - PAPUA 0 1 trip - 8.193.000 - - - - - - - - - PAPUA BARAT 0 1 trip - 10.824.000 - - - - - - - - - From other province to Jakarta (Pemandu, Narasumber) 0 1 trip - 3.500.000 - - - - - - - - - Add Acommodation (transit) 0 LS - - - - - - - - - - - Inland Transport 0 0 trip - 500.000 - - - - - - - - - Various Transport (for remote area) 0 LS - - - - - - - - - - - OSA 0 0 0 m/d - 300.000 - - - - - - - - - Pemandu, Narasumber Inland Transport 36 1 trip 36 500.000 18.000.000 - - - - - - 36 18.000.000 OSA 30 1 6 m/d 180 300.000 54.000.000 - - - - - - 180 54.000.000 Inland Transport 8 1 trip 8 500.000 4.000.000 - - - - - - 8 4.000.000 OSA 8 1 6 m/d 48 300.000 14.400.000 - - - - - - 48 14.400.000 2.1.25 Pelatihan Pemerintah Daerah Lokasi Khusus pers time days 37.500.000 - - - 37.500.000 Air Fare from location to Jakarta : ACEH 0 1 trip - 4.492.000 - - - - - - - - - JAWA TENGAH 0 1 trip - 2.182.000 - - - - - - - - - D.I. YOGYAKARTA 0 1 trip - 2.268.000 - - - - - - - - - JAWA TIMUR 0 1 trip - 2.674.000 - - - - - - - - -