1 OPTIMALISASI SISTEM ANTRIAN BONGKAR MUAT DI KADE TERMINAL OPERASI II PT. PELABUHAN INDONESIA II (PERSERO) CABANG TANJUNG PRIOK Getsha Nagista Program Sarjana Teknik Industri, Universitas Bina Nusantara, Jakarta, Dosen Pembimbing : Januar Nasution, B.Sc., M.Sc. ABSTRACT The purpose of this study is to get a minimum truck waiting times and cargo waiting times at the service of stevedoring in kade Terminal Operations II and get a reduction in waiting time and the number of waiting ships on the stevedoring service queueing system in Terminal Operations II kade The method of research is done by queueing theory approach through simulation Arena. The waiting time to a minimum truck waiting times and cargo waiting times at the services of stevedoring in kade Terminal Operations II was obtained with 75 % direct trucking and direct indirect trucking 25 %. Optimal results decrease wait time of % on-time arrival of trucks unloading and % at the time of arrival of cargo with minimum total cost incurred during the 6 months of User Services at Rp. 41,249,397,291. With the improvement recommendation, obtained by reduction in waiting time for loading and unloading of % and a decrease in number of waiting by 54.1 %. Terminal Operations II requires stacking facility with an area of 3,598 m2. (GN). Key word : queueing, stevedoring, waiting time, simulation Arena ABSTRAK Tujuan penelitian ini ialah mendapatkan waktu tunggu truck dan muatan minimal pada pelayanan bongkar muat di kade Terminal Operasi II dan mendapatkan penurunan waiting time dan number of waiting kapal pada sistem antrian pelayanan bongkar muat di kade Terminal Operasi II. Metode penelitian dilakukan dengan pendekatan queueing theory melalui simulasi Arena. Waktu tunggu truck dan muatan minimal pada pelayanan bongkar muat di kade Terminal Operasi II diperoleh dengan direct trucking 75% dan direct-indirect trucking 25%. Hasil optimal penurunan wait time sebesar 43,753% pada waktu kedatangan truck bongkar dan 38,385% pada waktu kedatangan muatan dengan biaya total minimum yang dikeluarkan Pengguna Jasa selama 6 bulan sebesar Rp Dengan rekomendasi perbaikan tersebut, diperoleh penurunan waiting time bongkar muat sebesar 54,47% dan penurunan number of waiting sebesar 54,1%. Terminal Operasi II memerlukan fasilitas penumpukan dengan luas m2.(gn). Kata Kunci : antrian, bongkar muat, waktu tunggu, simulasi Arena
2 Pendahuluan PT. Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok adalah perusahaan yang bergerak dalam bidang jasa kepelabuhanan. Pelabuhan ini terletak di Jakarta Utara, Propinsi DKI Jakarta. Menurut General Manager Cabang Tanjung Priok pada Tanjung Priok Port Directory (212, p. I), Pertumbuhan arus kapal dan barang di Pelabuhan Tanjung Priok sangat signifikan, terlebih arus petikemas. Menurut data, arus petikemas international dan domestik di Pelabuhan Tanjung Priok tumbuh 24,5 persen dari tahun 29 hingga tahun 21. Sedangkan periode tumbuh hingga 27,6 persen. Seiring meningkatnya pertumbuhan arus kapal dan barang, maka tuntutan untuk optimalisasi pelayanan bongkar muat terus diupayakan untuk memposisikan diri sebagai pelabuhan yang handal. Salah satu tuntutan optimalisasi yaitu sistem antrian pelayanan bongkar muat yang dilakukan di Terminal Operasi II. Pada kenyataannya, pelayanan bongkar muat di Terminal Operasi II masih terdapat beberapa penyebab idle. Idle time tersebut menyebabkan waktu bongkar muat menjadi lebih lama karena adanya jam yang terbuang pada kegiatan bongkar muat, hal ini tentunya berpengaruh terhadap waktu tambat (berthing time) kapal dan antrian kapal. Antrian kapal terjadi pada saat kapal mulai tiba di pelabuhan, tambat di melakukan kegiatan bongkar muat kemudian selesai bongkar muat dan keluar dari pelabuhan, sehingga adanya antrian kapal yang menunggu untuk melakukan kegiatan bongkar muat. Dari data kegiatan bongkar muat periode Bulan Januari sampai Juni 213 di kade Terminal Operasi II, diketahui bahwa penyebab idle time paling dominan dikarenakan menunggu truck (35%) dan menunggu muatan (33%). Sedangkan penyebab idle time sebesar 32% dikarenakan dokumen (3%), trouble alat (18%), trouble wire (%) dan hujan (11%). Jika waktu tunggu truck dan tunggu muatan sebagai penyebab idle time paling dominan dapat diminimalkan, maka berthing time kapal semakin cepat, peluang kapal yang melakukan kegiatan bongkar muat akan bertambah, serta dapat meningkatkan pendapatan bagi perusahaan. Sehingga dilakukan analisis mengenai upaya meminimalkan waktu tunggu truck dan muatan untuk optimalisasi sistem antrian yang terjadi di Terminal Operasi II kade Terdapat beberapa pendekatan queueing theory, salah satunya dengan simulasi arena. Menurut Dragovic et al. (25, p. 319), Model simulasi dapat ditulis dengan bahasa algoritma (seperti Pascal, C, C++ dan lain sebagainya) dan simulasi sistem (seperti AweSim, EXTEND, SIMAN, SLAM, ARENA, Witness software, GPSS/H, Taylor II). Adapun rumusan masalah yang diambil mengenai apa penyebab adanya waktu tunggu truck dan muatan pada kegiatan bongkar muat di kade 13-15, bagaimana perbaikan yang dapat dilakukan agar idle time menurun dan bagaimana penurunan waiting time dan number of waiting kapal melalui simulasi Arena. Tujuan dan manfaat penelitian untuk mendapatkan waktu tunggu truck dan waktu tunggu muatan minimal, serta penurunan waiting time dan number of waiting pada sistem antrian pelayanan bongkar muat di kade Terminal Operasi II, sehingga dapat memberikan masukan dan pertimbangan bagi pihak manajemen dalam optimalisasi pelayanan. Metode Penelitian Tahapan penelitian yaitu identifikasi masalah, tinjauan pustaka, tujuan penelitian, pengumpulan data, pengolahan dan analisa data, pembahasan hasil analisis dan penulisan laporan. Dalam menentukan identifikasi masalah, dilakukan studi terlebih dahulu untuk mengetahui masalah yang akan diangkat. Studi dilakukan di PT. Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok. Tinjauan pustaka penelitian berisikan mengenai teori yang berhubungan dengan penelitian, yaitu teori antrian, bongkar muat dan simulasi Arena. Adapun data yang dikumpulkan berupa data kondisi kegiatan bongkar muat (panjang dermaga, arus container, performansi bongkar muat dan jumlah kapal yang dapat tambat di dermaga), kondisi sistem antrian di kade (model antrian, input, proses, output dalam antrian, jumlah idle time dan pengaruhnya terhadap antrian), data kegiatan bongkar muat (delay menunggu muatan, delay menunggu truck, waktu rute truck, waktu bongkar muat, waktu interval kedatangan kapal, realisasi tambat di dermaga dan waktu rute kapal ke dermaga) dan biaya bongkar muat. Pengolahan dan analisa data dilakukan dengan analisis permasalahan, pemecahan masalah dan pendekatan queueing theory dengan simulasi Arena. Simulasi dilakukan dengan dua tahap yaitu, simulasi truck dan simulasi bongkar muat. Simulasi truck dilakukan untuk mengetahui penurunan waktu tunggu muatan dan waktu tunggu truck jika dilakukan rekomendasi perbaikan, sedangkan simulasi bongkar muat dilakukan untuk mengetahui penurunan waktu menunggu kapal dan jumlah kapal yang menunggu jika dilakukan rekomendasi perbaikan.
3 Hasil dan Bahasan Analisis dan bahasan yang dilakukan mengenai kondisi kegiatan bongkar muat, kondisi sistem antrian bongkar muat kade 13-15, rekomendasi perbaikan dan hasil perbaikan. Kondisi Kegiatan Bongkar Muat Tabel 1 Panjang Dermaga Yang Tersedia di Terminal Operasi II Kade Panjang Dermaga Yang Tersedia Pada Bulan (meter) Januari Februari Maret April Mei Juni Rata-rata ,5 54,5 54,5 382,5 382,5 382,5 446, ,7 314, 314, 314, 464, 464, 349, ,5 32, 32, 32, 32, 32, 317, ,3 495, 495, 495, 334,5 334,5 449, ,7 296,5 296,5 296,5 448, 448, 345, ,1 495, 495, 328, 495, 495, 46,2 Tabel 2 Jumlah Kapal Pada Pelayanan Bongkar Muat Periode Bulan Januari Juni Tahun 213 Jenis Kemasan Kade Bag cargo Liquid cargo Dry bulk General cargo Container Unitized /TP Jumlah Kapal Tabel 3 Rata-Rata Performansi Pelayanan Bongkar Muat di Kade Jenis kapal Rata-rata LOA (m) Rata-rata Performansi (jam) ET IT NOT BT s/d 3.5 GT 94,96 27,77 3,46 4,46 35, s/d 8. GT 118,82 26,89 3,32 4,32 34, s/d 14. GT 153,84 33,69 4,45 5,45 43, s/d 18. GT 117,71 21,83 2,86 3,53 28,22 Rata-rata Total 121,33 27,55 3,52 4,44 35,51 Dari Tabel 3 diatas dapat disimpulkan bahwa idle time rata-rata ialah 3,52 jam/ kapal. Sedangkan jumlah kapal yang terlayani bongkar muat di kade sebanyak 223 kapal, itu berarti terdapat 5,45 hari terbuang setiap bulannya. Untuk Jumlah kapal yang dapat tambat di kade dapat dihitung dengan : Panjang Dermaga = n.loa + (n-1) 15 m + 5 m Sesuai Tabel 1, rata-rata panjang dermaga yang tersedia di kade ialah 349,6 m sedangkan rata-rata LOA pada Tabel 3 ialah 121,33 m. Sehingga n dapat dihitung : 349,6 = n. 121,33 + (n-1) ,6 = 121,33 n + 15 n -15 n = 2,38 2 kapal Maka tambat yang dapat dilakukan di kade ialah sebanyak 2 kapal untuk melakukan kegiatan bongkar muat.
4 Kondisi Sistem Antrian Bongkar Muat Kade Pada kegiatan bongkar muat, sistem antrian yang dimaksud ialah antrian kapal yang memasuki melakukan kegiatan bongkar muat barang. Sistem antrian yang terjadi ialah first come first serve sesuai dengan kesesuaian tersedianya panjang dermaga dengan panjang kapal (LOA). Input dalam antrian ialah kapal datang, proses ialah kegiatan bongkar muat dan output ialah kapal keluar. Sistem antrian ialah model multi kanal fase tunggal. Dari data kegiatan bongkar muat periode Bulan Januari sampai Juni 213, terdapat idle time dikarenakan dokumen 29,517 jam, trouble alat 155,267 jam, menunggu muatan 289,1 jam, menunggu truck 39,133 jam, trouble wire,3 jam dan hujan 99,75 jam. Rekomendasi Perbaikan Analisis permasalahan yang diperoleh diuraikan pada Tabel 4. Tabel 4 Analisis Permasalahan Waktu Tunggu Muatan dan Truck Analisa Permasalahan 1. Sistem truck lossing (direct trucking) ke 2. Proses distribusi container dari dermaga ke pengguna jasa membutuhkan waktu yang lama 3. Terjadinya menunggu truck dan menunggu muatan yang menambah besar jumlah idle time Detail Permasalahan Jumlah biaya truck lossing (direct trucking) dianggap lebih minimum oleh. Resiko delay kapal dikarenakan menunggu muatan dan truck mengakibatkan biaya tunggu besar bagi. Lokasi yang jauh antara dermaga dengan. Gudang banyak yang berada di wilayah jalan yang macet. Trucking Company tidak memiliki jumlah truck yang memadai untuk melayani kegiatan bongkar muat. Hambatan transportasi darat (jalan yang macet). Pemecahan Masalah Dilakukan perhitungan biaya minimum bongkar muat Dilakukan pemanfaatan penumpukan Mengurangi waktu tunggu truck dan muatan dengan sistem direct indirect trucking. Dari Tabel 4, Pemecahan masalah yang dapat dilakukan ialah dengan direct-indirect trucking. Hal ini dikarenakan untuk mengantisipasi truck yang terkena kemacetan. Seperti kita ketahui, kemacetan Jakarta tidak bisa diprediksi dan diluar kontrol dari manajemen. Oleh karenanya, dengan sistem direct-indirect trucking dapat mengantisipasi kegiatan bongkar muat tetap berjalan. Gambaran mengenai direct trucking dan direct-indirect trucking ialah sebagai berikut. Kapal masuk Kapal masuk Bongkar muat Gambar 1 Direct Trucking Bongkar muat Trucking ke/dari penumpukan Trucking ke/dari Gudang Pengguna Jasa Trucking ke Gudang Pengguna Jasa Gambar 2 Direct-Indirect Trucking
5 Untuk pengoptimalan antrian bongkar muat dengan direct-indirect trucking, dibutuhkan kapasitas optimum untuk mengantisipasi jumlah bongkar muat di kade Terminal Operasi II. Pengoptimalan antrian tersebut dilakukan dengan pendekatan teori antrian menggunakan simulasi arena Pendekatan Queueing Theory Dengan Simulasi Rekomendasi perbaikan ditunjukkan dengan simulasi antrian dengan menggunakan arena Hasil simulasi yang ditunjukkan yaitu jumlah kapal yang menunggu (number waiting) dan waktu menunggu dalam sistem (waiting time). Simulasi dimulai dengan menentukan variabel yang didasari dari diagram alir kegiatan bongkar muat. Diagram alir kegiatan bongkar muat yang akan dibuat dalam model ditunjukkan pada Gambar 3. Kapal datang Menunggu tambat Kesiapan dermaga? Kapal menuju tambat Bongkar Muat Kapal selesai tambat menuju keluar dermaga Kapal keluar Gambar 3 Diagram Alir Kegiatan Bongkar Muat Dengan mengetahui diagram alir pada Gambar 3, dapat dibuat skenario dalam simulasi, yaitu kapal datang ke perairan pelabuhan di luar break water dan menunggu untuk pelayanan bongkar muat. Setelah itu kapal melaju ke dalam perairan pelabuhan melalui rute yang dipandu oleh pandu menuju dermaga. Kapal tambat pada tambatan yang telah tersedia dan melakukan kegiatan bongkar muat. Jika tambatan di dermaga belum tersedia, maka kapal yang datang mengantri dan menunggu di luar break water. Kapal yang telah selesai melakukan kegiatan bongkar muat, kemudian di pandu oleh pandu untuk keluar dari perairan pelabuhan. Setelah tambatan di dermaga kosong, maka kapal selanjutnya tambat untuk melakukan kegiatan bongkar muat. Hal itu dilakukan seterusnya selama jangka waktu simulasi 6 bulan. Skenario Pemodelan Skenario dibuat dalam 2 tahap : 1. Tahap 1, simulasi truck. Simulasi ini terdiri dari 4 kondisi, yaitu : o Skenario 1 = Simulasi truck bongkar dengan direct trucking
6 bongkar Delay truck Bongkar Bongkar dermaga bongkar 2 kembali Gambar 4 Simulasi Truck Bongkar Dengan Direct Trucking o Skenario 2 = Simulasi truck bongkar dengan direct-indirect trucking bongkar Kesiapan truck? False True Delay truck Bongkar 75% true direct 5% true direct 25% true direct Bongkar 2 penumpukan penumpukan Bongkar Bongkar dermaga dari dermaga dari bongkar 2 kembali Gambar 5 Simulasi Truck Bongkar Dengan Direct-Indirect Trucking o Skenario 3 = Simulasi truck muat dengan direct trucking Delay muat Muat dermaga dermaga untuk muat Muat untuk muat 2 kembali Gambar 6 Simulasi Truck Muat Dengan Direct Trucking
7 o Skenario 4 = Simulasi truck muat dengan direct-indirect trucking Kesiapan muatan? False True Delay muat Muat 75% true direct 5% true direct 25% true direct penumpukan Muat dermaga dari dermaga dari muat 1 Muat muat 2 Muat 2 untuk muat 2 penumpukan untuk muat 2 kembali Gambar 7 Simulasi truck muat dengan direct-indirect trucking 2. Tahap 2, simulasi bongkar muat. Simulasi ini terdiri dari 2 kondisi, yaitu : o Skenario 5 = Simulasi bongkar muat dengan direct trucking o Skenario 6 = Simulasi bongkar muat dengan direct-indirect trucking Kapal D atang Kedatangan Seize menunggu tambat Kesiapan Dermaga 1? True Release 1 D ermaga 1 s ibuk dermaga 1 Fals e Delay Tambat Kesiapan Dermaga 2? True Release 2 Dermaga 2 s ibuk Fals e dermaga 2 Bongkar 1 Bongk ar muat 1 D ermaga 1 s iap keluar dermaga 1 Bongkar 2 Bongkar muat 2 D ermaga 2 s iap keluar dermaga 2 Keberangkatan Kapal Keluar Gambar 8 Simulasi Bongkar Muat
8 Pada tahap 2, dilakukan simulasi pada kegiatan bongkar muat dengan skenario 5 keadaan eksisting, sedangkan skenario 6 pada keadaan setelah rekomendasi perbaikan. Skenario 6 menggunakan datadata yang telah ada namun waktu tunggu truck dan tunggu muatan dilakukan penurunan sesuai dengan hasil pada tahap 1. Simulasi ini dilakukan dalam waktu simulasi 6 bulan (4.344 jam) dimulai dari tanggal 1 Januari 213. Hasil Perbaikan Hasil pada tahap 1 ialah perbandingan waktu proses skenario 1 dengan skenario 2 mengenai waktu tunggu bongkar dan perbandingan skenario 3 dengan skenario 4 mengenai waktu tunggu muat. Gambaran hasil tersebut terlihat pada Gambar 9 dan Gambar 1 berikut ini. Gambar 9 Perbandingan Waktu Skenario 1 Dengan Skenario 2 Gambar 1 Perbandingan Waktu Skenario 3 Dengan Skenario 4 Pada Gambar 9 dan Gambar 1, diketahui bahwa penurunan maksimal wait time pada tunggu truck dan tunggu muatan pada 25% true direct trucking. Namun ketika membandingkan dengan beban biaya yang ditimbulkan dalam 6 bulan maka biaya minimum dilakukan dengan 75% true direct trucking. Hal ini digambarkan pada Gambar 11 di bawah ini. Gambar 11 Perbandingan Biaya
9 Maka, jika rekomendasi perbaikan pola operasi bongkar dan muat dilakukan, penurunan wait time yang didapatkan ialah 43,753% pada waktu kedatangan truck bongkar dan 38,385% pada waktu kedatangan muatan. Hasil pada tahap 2 ialah perbandingan perhitungan waktu tunggu (waiting time) dan jumlah kapal menunggu (number waiting) dalam jangka waktu 6 bulan. Gambaran hasil tersebut terlihat pada Gambar 12 dan Gambar 13. Penurunan waiting time sebesar 54,47% dan penurunan number waiting sebesar 54,1%. Gambar 12 Penurunan Waiting Time Dari Hasil Perbaikan Gambar 13 Penurunan Number Waiting Dari Hasil Perbaikan Perhitungan Luas Lapangan Penumpukan Luas penumpukan dihitung berdasarkan kapasitas, periode, tinggi penumpukan, luas petikemas dan jumlah waktu petikemas di. Jika diketahui dari hasil usulan perbaikan : 1. Kapasitas, kapasitas ialah jumlah container yang akan ditumpuk di penumpukan. Kapasitas ditulis dalam satuan Teus/periode. 1 Teus ialah 1 container 2 ft, sedangkan container 4 ft dihitung sebagai 2 Teus. Jumlah bongkar dalam periode 6 bulan = box Jumlah muat dalam periode 6 bulan = 11,728 box Maka, jumlah bongkar dan muat = 21,14 box Diketahui dari data : Jumlah container 2 ft full = 58% Jumlah container 4 ft full = 24% Jumlah container 2 ft empty = 18% Maka, Jumlah container 2 ft full = box = Teus Jumlah container 4 ft full = 5.41 box = 1.83 Teus Jumlah container 2 ft empty = box = Teus Jumlah total = 21,14 box = Teus/6 bulan 2. Periode, jumlah periode 6 bulan (Januari-Juni 213) = 181 hari 3. Tinggi penumpukan Dari hasil pengamatan dan observasi = 3 tumpukan 4. Luas petikemas Luas = 6,58 m x 2,438 m = 14,77 m 2 =15 m 2 5. Jumlah waktu petikemas di, jumlah waktu yang diharapkan ialah 3 hari Kapasitas = luas efektif x periode x tinggi tumpukan. luas petikemas x jumlah waktu petikemas di
10 Luas efektif = Teus/6 bulan x 15 m 2 x 3 = m hari x 3 Teus Luas = m 2 x 1/6 = m 2 Simpulan dan Saran Berdasarkan pembahasan yang telah diuraikan pada bab-bab sebelumnya, beberapa kesimpulan yang dirumuskan pada bab ini antara lain : 1. Waktu tunggu truck dan muatan minimal pada pelayanan bongkar muat di kade Terminal Operasi II diperoleh dengan direct trucking 75% dari jumlah box yang dibongkar atau dimuat dan direct-indirect trucking 25% dari jumlah box yang dibongkar atau dimuat, dengan biaya total minimum yang dikeluarkan oleh selama 6 bulan yaitu sebesar Rp Adapun penurunan wait time yang didapatkan ialah 43,753% pada waktu kedatangan truck bongkar dan 38,385% pada waktu kedatangan muatan. 2. Dengan melakukan perbaikan seperti diatas menggunakan simulasi arena, maka diperoleh penurunan waiting time pada pelayanan bongkar muat selama 6 bulan yaitu sebesar 54,47% dan penurunan number of waiting sebesar 54,1%. 3. Dengan dilakukan sistem direct-indirect trucking 25% dari jumlah box yang dibongkar atau dimuat, maka Terminal Operasi II memerlukan fasilitas penumpukan dengan luas m 2. Untuk meningkatkan produktifitas kegiatan bongkar di Terminal Operasi II, berikut ini beberapa saran untuk peningkatan berkelanjutan : 1. Pihak Terminal Operasi II mensosialisasikan rekomendasi perbaikan kepada Perusahaan Bongkar Muat (PBM) yang terkait pada kegiatan operasional di kade Untuk selanjutnya, pihak Terminal Operasi II dapat menambahkan peralatan bongkar muat, mengingat terdapat juga idle time dikarenakan trouble alat. 3. Pembuatan prosedur mengenai seleksi dan evaluasi perusahaan bongkar muat (PBM) agar dapat terevaluasi dengan baik dan mempertahankan performansi yang sudah ada. Referensi Binus University. (213). Arena 14. Simulation Software Training. Jakarta : Integrated Industrial Engineering Laboratory Dragovic, B., Park, N., Radmilovic, Z. dan Maras, V. (25). simulation modelling of ship-berth link with priority service. Maritime Economics & Logistics. 7 (4) : Diakses 18 November 213 Herjanto, E. (29). Sains Manajemen Analisis Kuantitatif Untuk Pengambilan Keputusan. Jakarta: Grasindo Kelton, W. (22). Simulation with Arena Second Edition. : McGraw-Hill Misliah, Samang, L., Adisasmita, R. dan Sitepu, G. (212). analisa kapasitas optimal penumpukan petikemas pelabuhan samarinda berdasarkan operator dan pengguna pelabuhan. Seminar Nasional Teknik Sipil UMS 212. : 1-8. Diakses 23 Desember 213 Munisamy, Susila. (21). timber terminal capacity planning through queueing theory. Maritime Economics & Logistics : Diakses 3 Desember 213 Peraturan Pemerintah Republik Indonesia Nomor 61 Tahun 29. Kepelabuhanan PT. Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok. (212). Tanjung Priok Port Directory 212. Jakarta : Dwitama Wukirindo. Rachman, A., Jauhari, A. dan Martinus. (213). Strategi optimalisasi tambat labuh di pelabuhan perikanan pantai (PPP) Pondokdadap Kabupaten Malang Jawa Timur. PSPK Student Journal. 1 (1) : Diakses 8 Oktober 213 Siswanto. (27). Operations Research Jilid 2. Jakarta : Erlangga Taha, H. (27). Operations Research an Introduction Eight Edition. University of Arkansas, Fayetteville : Pearson Education International Riwayat Penulis Getsha Nagista, lahir di kota Bandung pada tanggal 1 April Penulis menamatkan pendidikan D3 di Politeknik Negeri Bandung dalam bidang Teknik Kimia pada tahun 29. Kemudian menamatkan pendidikan S1 di Universitas Bina Nusantara dalam bidang Teknik Industri pada tahun 214. Saat ini bekerja sebagai Staff Teknik di PT. Pelabuhan Indonesia II (Persero) Cabang Tanjung Priok.
BAB 1 PENDAHULUAN 1.1 Latar Belakang Masalah
BAB 1 PENDAHULUAN 1.1 Latar Belakang Masalah Di negara Indonesia, jasa kepelabuhanan merupakan hal strategis untuk kebutuhan logistik berbagai industri dan perpindahan masyarakat dari satu tempat ke tempat
Lebih terperinciDAFTAR ISI... HALAMAN JUDUL... LEMBAR PENGESAHAN... LEMBAR PERNYATAAN... LEMBAR PERSEMBAHAN... KATA PENGANTAR... DAFTAR TABEL... DAFTAR GAMBAR...
DAFTAR ISI Halaman HALAMAN JUDUL... i LEMBAR PENGESAHAN... ii LEMBAR PERNYATAAN... iii LEMBAR PERSEMBAHAN... iv KATA PENGANTAR... v DAFTAR ISI... viii DAFTAR TABEL... xiii DAFTAR GAMBAR... xv DAFTAR LAMPIRAN...
Lebih terperinciREPUBLIK INDONESIA BADAN PUSAT STATISTIK SURVEI DWELLING TIME 2016
RAHASIA SDT16 - PELABUHAN Triwulan - 2016 REPUBLIK INDONESIA BADAN PUSAT STATISTIK SURVEI DWELLING TIME 2016 Tujuan Survei : Memperoleh informasi tentang perkembangan waktu lamanya petikemas / barang berada
Lebih terperinci6 PORT PERFORMANCE INDICATORS PELABUHAN TANJUNG PRIOK DAN PELABUHAN SINGAPURA
62 6 PORT PERFORMANCE INDICATORS PELABUHAN TANJUNG PRIOK DAN PELABUHAN SINGAPURA Pendahuluan Bila dilihat dari segi lingkup pelayaran yang dilayani, Pelabuhan Tanjung Priok dan Pelabuhan Singapura merupakan
Lebih terperinciBAB 2 LANDASAN TEORI
BAB 2 LANDASAN TEORI 2.1 Teori Antrian Menurut Herjanto (2009, p. 7), Teori antrian ialah suatu metode analisis yang digunakan untuk mengevaluasi biaya dan keefektifan suatu sistem antrian. Teori antrian
Lebih terperinciArif Mulyasyah NRP Dosen Pembimbing Ir. Sudiyono Kromodihardjo Msc. PhD
MENINGKATKAN KINERJA PELAYANAN BONGKAR MUAT DENGAN PENAMBAHAN UNIT HARBOUR MOBILE CRANE (HMC) MELALUI METODE SIMULASI (STUDY KASUS PT. BERLIAN JASA TERMINAL INDONESIA) Arif Mulyasyah NRP. 2107.100.097
Lebih terperinciRAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017 CABANG SIBOLGA
RAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017 CABANG SIBOLGA Medan, 29 September 2016 1 PELABUHAN SIBOLGA 1. Dermaga Umum : 03,5 x 15,5 m 2. Dermaga Ferry : 35 x 10,2 m & 35,7 x 6 m 3. Trestel : 127,2 x
Lebih terperinciBAB I PENDAHULUAN. Kebutuhan akan jasa angkutan laut semakin lama semakin meningkat, baik
BAB I PENDAHULUAN A. LATAR BELAKANG Kebutuhan akan jasa angkutan laut semakin lama semakin meningkat, baik jumlahnya maupun macamnya. Usaha-usaha dalam pembangunan sarana angkutan laut yang dilakukan sampai
Lebih terperinciBAB I PENDAHULUAN. mengakibatkan tumbuh pesatnya persaingan pada industri jasa kepelabuhanan.
BAB I PENDAHULUAN 1.1 Latar Belakang Sejalan dengan diberlakukannya UU No. 17/2008 tentang Pelayaran yang mengatur tentang penghapusan monopoli dalam penyelenggaraan pelabuhan mengakibatkan tumbuh pesatnya
Lebih terperinciMODEL PENGAMBILAN KEPUTUSAN PERENCANAAN SANDARAN KAPAL INTEGRASI DENGAN LAYANAN KERETA API BARANG. (STUDI KASUS: PT.TERMINAL TELUK LAMONG SURABAYA)
MODEL PENGAMBILAN KEPUTUSAN PERENCANAAN SANDARAN KAPAL INTEGRASI DENGAN LAYANAN KERETA API BARANG. (STUDI KASUS: PT.TERMINAL TELUK LAMONG SURABAYA) Ivan Akhmad 1) dan Ahmad Rusdiansyah 2) 1) Program Studi
Lebih terperinciSTUDI PENGURANGAN DWELLING TIME PETIKEMAS IMPOR DENGAN PENDEKATAN SIMULASI (STUDI KASUS : TERMINAL PETIKEMAS SURABAYA)
STUDI PENGURANGAN DWELLING TIME PETIKEMAS IMPOR DENGAN PENDEKATAN SIMULASI (STUDI KASUS : TERMINAL PETIKEMAS SURABAYA) Fajar Prasetya Rizkikurniadi, Murdjito Program Studi Transportasi Laut Jurusan Teknik
Lebih terperinciAnalisa Waste pada Perusahaan Pelayaran : Studi Kasus
Analisa Waste pada Perusahaan Pelayaran : Studi Kasus Fendi Pramono 1 Abstract: This research was conducted a voyage company in Surabaya. The aim of this research is to find the waste in shipping service
Lebih terperinciANALISA KAPASITAS OPTIMAL LAPANGAN PENUMPUKAN TERMINAL PETIKEMAS MAKASSAR BERDASAR OPERATOR DAN PENGGUNA PELABUHAN
Jurnal Riset dan Teknologi Kelautan (JRTK) Volume 11, Nomor 1, Januari - Juni 2013 ANALISA KAPASITAS OPTIMAL LAPANGAN PENUMPUKAN TERMINAL PETIKEMAS MAKASSAR BERDASAR OPERATOR DAN PENGGUNA PELABUHAN Misliah
Lebih terperinciSEMINAR NASIONAL-1 BMPTTSSI - KoNTekS 5 Universitas Sumatera Utara, Medan - 14 Oktober 2011
SEMINAR NASIONAL-1 BMPTTSSI - KoNTekS 5 Universitas Sumatera Utara, Medan - 14 Oktober 2011 ANALISIS KAPASITAS PELAYANAN TERMINAL PETI KEMAS SEMARANG Bambang Triatmodjo 1 1 Dosen Jurusan Teknik Sipil dan
Lebih terperinciPENDAHULUAN Latar Belakang
1 1 PENDAHULUAN Latar Belakang Transportasi melalui laut memainkan peran penting dalam sistem perdagangan. Berbagai jenis barang di seluruh dunia bergerak dari tempat satu ke tempat lainnya melalui laut.
Lebih terperinciPRESENTASI TUGAS AKHIR EVALUASI LOKASI PENGEMBANGAN PELABUHAN TANJUNG PERAK
PRESENTASI TUGAS AKHIR EVALUASI LOKASI PENGEMBANGAN PELABUHAN TANJUNG PERAK Oleh: Tettuko W. Adhiyakso (4106100 020) A. LATAR BELAKANG I. Pendahuluan Pelabuhan Tanjung Perak Surabaya sebagai pelabuhan
Lebih terperinciBAB I PENDAHULUAN. A. Latar Belakang. Laju pertumbuhan ekonomi di beberapa propinsi di Indonesia menunjukkan
BAB I PENDAHULUAN A. Latar Belakang Laju pertumbuhan ekonomi di beberapa propinsi di Indonesia menunjukkan peningkatan yang significan tiap tahunnya, hal ini nyata dilihat sejak digulirnya konsep otonomi
Lebih terperinciAnalisis Sistem Antrian Pada Proses Pelayanan Konsumen di Rumah Makan
Analisis Sistem Antrian Pada Proses Pelayanan Konsumen di Rumah Makan Hendra Nurjaya Al-Kholis 1, Ellysa Nursanti 2, Thomas Priyasmanu 3 1,3 Program Studi Teknik Industri S1, Institut Teknologi Nasional
Lebih terperinciBAB I PENDAHULUAN 1.1 Latar Belakang
BAB I PENDAHULUAN 1.1 Latar Belakang Indonesia merupakan negara kepulauan, yang terdiri dari beribu-ribu pulau besar maupun kecil. Kondisi tersebut menyebabkan sektor transportasi memiliki peranan yang
Lebih terperinciPENENTUAN KAPASITAS TERMINAL KAPAL PENGANGKUT CURAH KERING DI PT. XYZ
e-jurnal Teknik Industri FT USU Vol 8, No., Desember 3 pp. 6-3 ISSN 443-579 online / ISSN 443-56 print PENENTUAN KAPASITAS TERMINAL KAPAL PENGANGKUT CURAH KERING DI PT. XYZ AIDIL KURNIAWAN, ABADI GINTING
Lebih terperinciEvaluasi Kinerja Operasional Pelabuhan Manado
Evaluasi Kinerja Operasional Pelabuhan Manado Clinton Yan Uguy T. K. Sendouw, A. L. E. Rumayar Fakultas Teknik, Jurusan Teknik Sipil, Universitas Sam Ratulangi Email: clinton.uguy@gmail.com ABSTRAK Pelabuhan
Lebih terperinciANALISA KAPASITAS OPTIMAL LAPANGAN PENUMPUKAN PETIKEMAS PELABUHAN SAMARINDA BERDASAR OPERATOR DAN PENGGUNA PELABUHAN
ANALISA KAPASITAS OPTIMAL LAPANGAN PENUMPUKAN PETIKEMAS PELABUHAN SAMARINDA BERDASAR OPERATOR DAN PENGGUNA PELABUHAN Misliah 1, Lawalenna Samang 2, Raharjo Adisasmita 3, Ganding Sitepu 4 ABSTRAK Salah
Lebih terperinciBAB I PENDAHULUAN. Terminal Peti Kemas (TPK) Koja merupakan salah satu pelabuhan yang memberikan
1 BAB I PENDAHULUAN 1.1. Latar Belakang Terminal Peti Kemas (TPK) Koja merupakan salah satu pelabuhan yang memberikan jasa pelayanan bongkar dan muat peti kemas yang terletak di wilayah Pelabuhan Tanjung
Lebih terperinciStudi Master Plan Pelabuhan Bungkutoko di Kendari KATA PENGANTAR
KATA PENGANTAR Buku Laporan ini disusun oleh Konsultan PT. Kreasi Pola Utama untuk pekerjaan Studi Penyusunan Master Plan Pelabuhan Bungkutoko di Kendari Provinsi Sulawesi Tenggara. Laporan ini adalah
Lebih terperinciBAB I PENDAHULUAN. Troughput. Gambar 1.1. Troughput di TPKS (TPKS,2013)
Troughput BAB I PENDAHULUAN 1.1. Latar Belakang Terminal Peti Kemas Semarang (TPKS) merupakan tempat berlabuhnya kapal yang akan melakukan kegiatan bongkar muat peti kemas. Aktivitas bongkar muat yang
Lebih terperinciBAB I PENDAHULUAN. terletak pada lokasi yang strategis karena berada di persilangan rute perdagangan
1 BAB I PENDAHULUAN 1.1. Latar Belakang Indonesia merupakan negara kepulauan terbesar di dunia yang memiliki lebih dari 17.000 pulau dengan dua pertiga wilayahnya adalah perairan dan terletak pada lokasi
Lebih terperinci2 METODOLOGI PENELITIAN
11 2 METODOLOGI PENELITIAN Waktu dan Tempat Penelitian Penelitian ini dilaksanakan pada bulan Juli sampai Desember 2013 di Pelabuhan Tanjung Priok Jakarta dan Pelabuhan Singapura (Port of Singapore Authority).
Lebih terperinciKata kunci: penentuan jumlah operator, simulasi, waktu tunggu
Penentuan Jumlah Operator OPTIMAL dengan Metode Simulasi Satya Sudaningtyas Jurusan Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Malang Laman: satya.sudaningtyas@gmail.com Abstrak Penelitian
Lebih terperinciRingkasan : ANALISIS KINERJA TERMINAL PETIKEMAS DI PELABUHAN TANJUNG PERAK SURABAYA (Studi Kasus Di PT.Terminal Petikemas Surabaya) Oleh : SUPRIYONO
Ringkasan : ANALISIS KINERJA TERMINAL PETIKEMAS DI PELABUHAN TANJUNG PERAK SURABAYA (Studi Kasus Di PT.Terminal Petikemas Surabaya) Oleh : SUPRIYONO Kinerja Terminal Petikemas Surabaya Hasil pengolahan
Lebih terperinciIDENTIFIKASI FAKTOR-FAKTOR YANG MEMPENGARUHI NILAI IDLE TIME (IT) DI PELABUHAN DUMAI (DERMAG A)
IDENTIFIKASI FAKTOR-FAKTOR YANG MEMPENGARUHI NILAI IDLE TIME (IT) DI PELABUHAN DUMAI (DERMAG A) Feri Setiawan 1), Trimaijon 2), Ferry Fatnanta 3) 1) Mahasiswa Jurusan Teknik Sipil, 2)3) Dosen Jurusan Teknik
Lebih terperinciANALISIS HUBUNGAN FASILITAS DAN PERALATAN PELABUHAN DENGAN DAYA LALU (THROUGHPUT), STUDI KASUS: PELABUHAN TANJUNG PERAK, SURABAYA.
ANALISIS HUBUNGAN FASILITAS DAN PERALATAN PELABUHAN DENGAN DAYA LALU (THROUGHPUT), STUDI KASUS: PELABUHAN TANJUNG PERAK, SURABAYA. PRESENTASI UJIAN TUGAS AKHIR Kamis, 10 Juli 2014 Nina Oktaviani 4110100005
Lebih terperinciBAB I PENDAHULUAN. barang dari satu tempat ketempat lainnya yang diangkut melalui jalur transportasi
BAB I PENDAHULUAN 1.1 LATAR BELAKANG Pelabuhan merupakan tempat untuk melaksanakan kegiatan pemindahan barang dari satu tempat ketempat lainnya yang diangkut melalui jalur transportasi laut yang prosesnya
Lebih terperinciFitri Indriastiwi Puslitbang Perhubungan Laut, Badan Litbang Perhubungan Jl. Merdeka Timur No.5, Jakarta Pusat
Pengaruh Peningkatan Produktifitas...FITRI INDRIASTIWI Pengaruh Peningkatan Produktivitas Bongkar Muat Barang Terhadap Turn Round Time (TRT) Kapal di Pelabuhan Gresik Influence of loading and unloading
Lebih terperinciBAB III DESKRIPSI OBJEK PENELITIAN
BAB III DESKRIPSI OBJEK PENELITIAN A. Sejarah Perusahaan PT. Pelabuhan Indonesia IV (Persero) selanjutnya disingkat Pelindo IV merupakan bagian dari transformasi sebuah perusahaan yang dimiliki pemerintah,
Lebih terperinciBAB 1 PENDAHULUAN. 1.1 Latar Belakang
BAB 1 PENDAHULUAN 1.1 Latar Belakang Penggunaan transportasi laut menjadi sektor utama yang berpengaruh dalam laju distribusi perdagangan dunia. Hal ini ditunjukkan dengan peningkatan volume lalu lintas
Lebih terperinciMODEL PENENTUAN UKURAN KAPAL OPTIMUM KORIDOR PENDULUM NUSANTARA
MODEL PENENTUAN UKURAN KAPAL OPTIMUM KORIDOR PENDULUM NUSANTARA Hasan Iqbal Nur 1) dan Tri Achmadi 2) 1) Program Studi Teknik Transportasi Kelautan Fakultas Teknologi Kelautan, Institut Teknologi Sepuluh
Lebih terperinciBAB I PENDAHULUAN. akan menempatkan eksploitasi laut sebagai primadona industri, baik dari segi
BAB I PENDAHULUAN I.1 Latar Belakang Indonesia memiliki sumber daya alam yang sangat kaya. Hal ini berarti akan menempatkan eksploitasi laut sebagai primadona industri, baik dari segi kekayaan alam maupun
Lebih terperinciAnalisis Dampak Pengerukan Alur Pelayaran pada Daya Saing Pelabuhan. Studi Kasus : Pelabuhan Tanjung Perak Surabaya
Judul Tugas Akhir Analisis Dampak Pengerukan Alur Pelayaran pada Daya Saing Pelabuhan. Studi Kasus : Pelabuhan Tanjung Perak Surabaya Dosen Pembimbing Ir. Tri Achmadi Ph.D Ni Luh Putu Pratidinatri, S.T.,
Lebih terperinciEVALUASI KINERJA OPERASIONAL PELABUHAN BITUNG
EVALUASI KINERJA OPERASIONAL PELABUHAN BITUNG Cherryl Clinda Rumambi T. K. Sendouw, Mecky R. E. Manoppo Jurusan Teknik Sipil Fakultas Teknik Universitas Sam Ratulangi Manado ABSTRAK Pelabuhan Laut Bitung
Lebih terperinciPRESENTASI TUGAS AKHIR ANALISIS KONDISI HAULAGE PETI KEMAS DI AREA PELABUHAN (STUDI KASUS: PELABUHAN TANJUNG PERAK SURABAYA) Disusun oleh:
2010 PRESENTASI TUGAS AKHIR COMPANY (MN 091482) NAME ANALISIS KONDISI HAULAGE PETI KEMAS DI AREA PELABUHAN (STUDI KASUS: PELABUHAN TANJUNG PERAK SURABAYA) Disusun oleh: M. Imam Wahyudi N.R.P. 4105 100
Lebih terperinciBAB I PENDAHULUAN A. Latar Belakang Masalah
BAB I PENDAHULUAN A. Latar Belakang Masalah Indonesia merupakan Negara kepulauan terbesar dan satu-satunya yang dua per tiga atau 63 persen wilayah tutorialnya berupa parairan. Indonesia juga memiliki
Lebih terperinciKEY PERFORMANCE INDICATORS (KPI) CABANG/UPP TAHUN 2016 PT PELABUHAN INDONESIA III (PERSERO)
KEY PERFORMANCE INDICATORS (KPI) CABANG/UPP TAHUN 2016 PT PELABUHAN INDONESIA III (PERSERO) No. I.1 Sumber Data Return On Capital Employed (ROCE) 1. ROCE adalah laba sebelum pajak dibagi capital employed;
Lebih terperinciANALISIS KINERJA PELABUHAN TANJUNG PERAK SURABAYA
ANALISIS KINERJA PELABUHAN TANJUNG PERAK SURABAYA Noor Mahmudah 1, David Rusadi 1 1 Prodi Teknik Sipil, Fakultas Teknik, Universitas Muhammadiyah Yogyakarta E-mail: noor.mahmudah@umy.ac.id Abstrak. Pelabuhan
Lebih terperinciBAB VII KESIMPULAN DAN REKOMENDASI. diprediksi kebutuhan Lapangan penumpukan Peti Kemas pada tahun 2014
BAB VII KESIMPULAN DAN REKOMENDASI 7.1 Kesimpulan Setelah melakukan analisis dan evaluasi masterplan pelabuhan maumere, maka dapat diambil kesimpulan berikut ini. 1. Berdasarkan hasil analisis kebutuhan
Lebih terperinciPENENTUAN INVESTASI SARANA TAMBATDI PELABUHAN X DENGAN MENGGUNAKAN METODE SIMULASI DISKRIT DAN ANALISIS KELAYAKAN INVESTASI
PENENTUAN INVESTASI SARANA TAMBATDI PELABUHAN X DENGAN MENGGUNAKAN METODE SIMULASI DISKRIT DAN ANALISIS KELAYAKAN INVESTASI Risa Rininta 1), Nurhadi Siswanto 2), dan Bobby O. P. Soepangkat 3) 1) Program
Lebih terperinciBAB II TINJAUAN PUSTAKA DAN KERANGKA PEMIKIRAN. daratan dan perairan disekitarnya dengan batas-batas tertentu sebagai tempat
BAB II TINJAUAN PUSTAKA DAN KERANGKA PEMIKIRAN 2.1. Landasan Teori 2.1.1. Tata Kelola Pelabuhan Berdasarkan Keputusan Menteri Perhubungan No. KM 55 Tahun 2002 tentang Pengelolaan Pelabuhan, pelabuhan merupakan
Lebih terperinciRAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017
RAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017 CABANG TANJUNG BALAI ASAHAN Medan, September 2016 1. OVERVIEW PELABUHAN a. KONDISI EKSISTING PELABUHAN TELUK NIBUNG 2 a. KONDISI EKSISTING PELABUHAN TELUK NIBUNG
Lebih terperinciPelabuhan Tanjung Priok
Pelabuhan Tanjung Priok Alamat : Jalan Raya Pelabuhan Nomor 9, Jakarta Utara, DKI Jakarta. Kode Pos : 14310 Telepon : 62-21-4367305 62-21-4301080 Faximile : 62-21-4372933 Peta Lokasi: Sumber: maps.google.com
Lebih terperinciEVALUASI SISTEM OPERASI DRY PORT GEDEBAGE
EVALUASI SISTEM OPERASI DRY PORT GEDEBAGE TUGAS AKHIR SEBAGAI SALAH SATU SYARAT UNTUK MENYELESAIKAN PENDIDIKAN SARJANA TEKNIK DI PROGRAM STUDI TEKNIK SIPIL oleh ANDY FERDIAN NIM : 15098105 PEMBIMBING Dr.Ir.Ade
Lebih terperinciHAMBATAN BONGKAR MUATSCRAP WAKTU SANDAR KAPAL DI DERMAGA TERMINAL MULTIPURPOSE TANJUNG PRIOK
HAMBATAN BONGKAR MUATSCRAP WAKTU SANDAR KAPAL DI DERMAGA TERMINAL MULTIPURPOSE TANJUNG PRIOK Capt. Berlian Badarusman STMT Trisakti stmt@indosat.net.id Gartika Eryana STMT Trisakti stmt@indosat.net.id
Lebih terperinciBAB VIII KESIMPULAN DAN REKOMENDASI. A. Kesimpulan. Berdasarkan hasil penelitian yang diperoleh, maka dari analisa tersebut
BAB VIII KESIMPULAN DAN REKOMENDASI A. Kesimpulan Berdasarkan hasil penelitian yang diperoleh, maka dari analisa tersebut dapat ditarik kesimpulan sebagai berikut. 1. Performance Pelabuhan Bitung ditinjau
Lebih terperinciBAB II TINJAUAN PUSTAKA. gelombang, yang dilengkapi dengan fasilitas terminal laut meliputi dermaga
BAB II TINJAUAN PUSTAKA II.1.1 Pengertian Pelabuhan Pelabuhan (port) adalah daerah perairan yang terlindungi terhadap gelombang, yang dilengkapi dengan fasilitas terminal laut meliputi dermaga dimana kapal
Lebih terperinciOPTIMASI PENGATURAN SANDAR KAPAL PADA TERMINAL PETIKEMAS KOJA
1 OPTIMASI PENGATURAN SANDAR KAPAL PADA TERMINAL PETIKEMAS KOJA Richson Lamron P Dosen Pembimbing : Sunaryo dan Riko Butarbutar Program Sarjana Teknik Perkapalan Departemen Teknik Mesin, Fakultas Teknik,
Lebih terperinciAnalisis Hubungan Antara Fasilitas dan Peralatan Pelabuhan dengan Daya Lalu (Throughput), Studi Kasus: Pelabuhan Tanjung Perak, Surabaya
1 Analisis Hubungan Antara Fasilitas dan Peralatan Pelabuhan dengan Daya Lalu (Throughput), Studi Kasus: Pelabuhan Tanjung Perak, Surabaya Nina Oktaviani,Tri Achmadi, Irwan Tri Yunianto Jurusan Teknik
Lebih terperinciMEMPELAJARI PERENCANAAN BANYAKNYA BONGKAR MUAT PETIKEMAS BERJENIS DRY (FULL DAN HIGH CUBE) DAN OVER DIMENTION PADA TERMINAL PETIKEMAS KOJA
MEMPELAJARI PERENCANAAN BANYAKNYA BONGKAR MUAT PETIKEMAS BERJENIS DRY (FULL DAN HIGH CUBE) DAN OVER DIMENTION PADA TERMINAL PETIKEMAS KOJA Disusun oleh: Femila Gita Ferninda 32411806 JURUSAN TEKNIK INDUSTRI
Lebih terperinciBAB I PENDAHULUAN. tenaga kerja (manusia) yang diatur dalam urutan fungsi-fungsinya, agar efektif dan
BAB I PENDAHULUAN 1.1. Latar Belakang Fokus kajian Manajemen Sumber Daya Manusia (MSDM) adalah masalah tenaga kerja (manusia) yang diatur dalam urutan fungsi-fungsinya, agar efektif dan efisien dalam mewujudkan
Lebih terperinci3 Kondisi Fisik Lokasi Studi
Bab 3 3 Kondisi Fisik Lokasi Studi Sebelum pemodelan dilakukan, diperlukan data-data rinci mengenai kondisi fisik dari lokasi yang akan dimodelkan. Ketersediaan dan keakuratan data fisik yang digunakan
Lebih terperinciANALISIS KINERJA TERMINAL MULTIPURPOSE TELUK LAMONG
ANALISIS KINERJA TERMINAL MULTIPURPOSE TELUK LAMONG Roni Yudha Pranata Mahasiswa Jurusan Teknik Sistem Perkapalan Fakultas Teknologi Kelautan, Institut Teknologi Sepuluh Nopember Surabaya Abstrak Untuk
Lebih terperinciBAB 1 BAB 1 PENDAHULUAN
BAB 1 PENDAHULUAN BAB 1 1.1 Latar Belakang Sistem transportasi merupakan salah satu bagian penting bagi suatu pembangunan negara. Transportasi menjadi salah satu sektor pendukung kemajuan sistem logistik
Lebih terperinciANALISIS KONDISI HAULAGE PETI KEMAS DI AREA PELABUHAN (STUDI KASUS: PELABUHAN TANJUNG PERAK SURABAYA)
ANALISIS KONDISI HAULAGE PETI KEMAS DI AREA PELABUHAN (STUDI KASUS: PELABUHAN TANJUNG PERAK SURABAYA) *Muhammad Imam Wahyudi,**Setyo Nugroho. *Mahasiswa Jurusan Teknik Perkapalan *Staf Pengajar Jurusan
Lebih terperinciANALISA WAKTU BONGKAR MUAT KAPAL PETI KEMAS PADA TERMINAL III PELABUHAN TANJUNG PRIOK JAKARTA
ANALISA WAKTU BONGKAR MUAT KAPAL PETI KEMAS PADA TERMINAL III PELABUHAN TANJUNG PRIOK JAKARTA Wildan Adi Nugraha 1, Untung Budiarto 1, Wilma Amiruddin 1 1) Teknik Perkapalan, Fakultas Teknik, Universitas
Lebih terperinciPERANCANGAN SISTEM OPTIMASI BERBASIS DATABASE PADA PENJADWALAN PENAMBATAN KAPAL UNTUK MENDUKUNG TERCAPAINYA ZERO WAITING TIME
PERANCANGAN SISTEM OPTIMASI BERBASIS DATABASE PADA PENJADWALAN PENAMBATAN KAPAL UNTUK MENDUKUNG TERCAPAINYA ZERO WAITING TIME DI PELABUHAN TANJUNG PERAK SURABAYA Disusun Oleh : Tita Sarilia Ramadhani NRP.
Lebih terperinciBAB V KESIMPULAN DAN SARAN. A. Kesimpulan
BAB V KESIMPULAN DAN SARAN A. Kesimpulan Berdasarkan pembahasan hasil pengamatan yang dilakukan penulis tentang prosedur pelaksanaan administrasi bongkar dan muat petikemas dengan sistem alih kapal (transshipment)
Lebih terperinciANALISA KINERJA FASILITAS PELABUHAN AMAHAI DALAM RANGKA MEMENUHI KEBUTUHAN KAWASAN PENGEMBANGAN EKONOMI TERPADU (KAPET) PULAU SERAM
ANALISA KINERJA FASILITAS PELABUHAN AMAHAI DALAM RANGKA MEMENUHI KEBUTUHAN KAWASAN PENGEMBANGAN EKONOMI TERPADU (KAPET) PULAU SERAM Tebiary LEPINUS 1 *, Setijo PRAJUDO 2 dan Edwin MATATULLA 1 1 Program
Lebih terperinciKompetensi Sumber Daya Manusia untuk Logistik Pelabuhan di PT Pelindo II Cabang Teluk Bayur. Rika Ampuh Hadiguna, Regina Yulinda Sari
Kompetensi Sumber Daya Manusia untuk Logistik Pelabuhan di PT Pelindo II Cabang Teluk Bayur Rika Ampuh Hadiguna, Regina Yulinda Sari Jurusan Teknik Industri Fakultas Teknik Universitas Andalas Universitas
Lebih terperinciBAB I PENDAHULUAN. otonomi daerah akan memicu peningkatan ekonomi serta mengembangkan
BAB I PENDAHULUAN 1.1. Latar Belakang Globalisasi/liberalisasi khususnya sektor perdagangan serta pelaksanaan otonomi daerah akan memicu peningkatan ekonomi serta mengembangkan potensi yang dimiliki daerah.
Lebih terperinciPERENCANAAN PENGEMBANGAN PELABUHAN LAUT SERUI DI KOTA SERUI PAPUA
PERENCANAAN PENGEMBANGAN PELABUHAN LAUT SERUI DI KOTA SERUI PAPUA Jori George Kherel Kastanya L. F. Kereh, M. R. E. Manoppo, T. K. Sendow Fakultas Teknik, Jurusan Teknik Sipil, Universitas Sam Ratulangi
Lebih terperinciPERENCANAAN LAYOUT TERMINAL PETI KEMAS KALIBARU
PERENCANAAN LAYOUT TERMINAL PETI KEMAS KALIBARU Octareza Siahaan dan Prof. Hang Tuah Salim Program Studi Teknik Kelautan Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung, Jl. Ganesha 10
Lebih terperinciBAB I PENDAHULUAN. besar dengan biaya rendah merupakan keungggulannya. selayaknya memiliki keunggulan di sektor maritim. Salah satu bagian penting
BAB I PENDAHULUAN 1.1. Latar Belakang Pelayaran memiliki peran penting dalam perdagangan antar negara saat ini. Kemampuan kapal-kapal besar yang mampu mengangkut barang dalam jumlah besar dengan biaya
Lebih terperinciPRESENTASI PT. TERMINAL PETIKEMAS INDONESIA DISAMPAIKAN PADA RAPAT KERJA RKAP 2018 PELINDO I
IIndooneessiia Majju PRESENTASI PT. TERMINAL PETIKEMAS INDONESIA DISAMPAIKAN PADA RAPAT KERJA RKAP 2018 PELINDO I Member of Pelindo I, II, III, IV Medan, 02-03 Oktober 2017 RENCANA BISNIS 2018 RENCANA
Lebih terperinciANALISA KEGIATAN BONGKAR MUAT PADA PT. TERMINAL PETIKEMAS SURABAYA UNTUK MEMPERCEPAT PROSES BONGKAR MUAT
ANALISA KEGIATAN BONGKAR MUAT PADA PT. TERMINAL PETIKEMAS SURABAYA UNTUK MEMPERCEPAT PROSES BONGKAR MUAT Moses Laksono Singgih Jurusan Teknik Industri Institut Teknologi Sepuluh Nopember (ITS) Surabaya
Lebih terperinciBAB 1 PENDAHULUAN. Identifikasi persepsi..., Ayiful Ramadhan Asit, FE UI, Universitas Indonesia
1 BAB 1 PENDAHULUAN 1.1 Latar Belakang Pelabuhan menjadi simpul penting dalam arus perdagangan dan distribusi barang di Indonesia maupun di dunia. Delapan puluh lima persen (85%) perdagangan dunia melalui
Lebih terperinciBAB 1 PENDAHULUAN. Belawan International Container Terminal (BICT) sebagai unit usaha PT.
BAB 1 PENDAHULUAN 1.1. Latar Belakang Jalur transportasi air/laut merupakan salah satu jalur transportasi yang paling sering digunakan untuk pengiriman barang dalam skala kecil sampai dengan skala besar,
Lebih terperinciAnalisis Kinerja Terminal Nilam Dalam Melayani Komoditi Curah Cair Di Pelabuhan Tanjung Perak
120 Simposium I Jaringan Perguruan Tinggi untuk Pembangunan Infrastruktur Indonesia, 2016 Analisis Kinerja Dalam Melayani Komoditi Curah Cair Di Pelabuhan Tanjung Perak Aries Prabowo a, Achmad Wicaksono
Lebih terperinciSTUDI PENGEMBANGAN DERMAGA MUARAJATI PELABUHAN CIREBON
STUDI PENGEMBANGAN DERMAGA MUARAJATI PELABUHAN CIREBON TESIS Karya tulis sebagai salah satu syarat untuk memperoleh gelar Magister dari Institut Teknologi Bandung Oleh: DJOKO SANTOSO NIM : 25002017 Program
Lebih terperinciRANCANGAN KRITERIA KLASIFIKASI PELAYANAN PELABUHAN
RANCANGAN KRITERIA KLASIFIKASI PELAYANAN PELABUHAN LAMPIRAN 1 i DAFTAR ISI 1. Ruang Lingkup 2. Acuan 3. Istilah dan Definisi 4. Persyaratan 4.1. Kriteria dan Variabel Penilaian Pelabuhan 4.2. Pengelompokan
Lebih terperinciMenentukan Jumlah Pelayanan yang Optimal pada Sistem Pengangkutan Sampah di Tempat Pembuangan Sementara Kobana Kota Bandung
Statistika, Vol. 7 No. 1, 7 12 Mei 2007 Menentukan Jumlah Pelayanan yang Optimal pada Sistem Pengangkutan di Tempat Pembuangan Sementara Kobana Kota Bandung Denta Anggakusuma, Septiadi Padmadisastra, Bernik
Lebih terperinciRAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017 CABANG TERMINAL PETIKEMAS DOMESTIK BELAWAN
RAPAT KERJA PENYUSUNAN RKAP TAHUN BUKU 2017 CABANG TERMINAL PETIKEMAS DOMESTIK BELAWAN Medan, September 1 1. Overview Cabang 2 2 2. Pertumbuhan selama 3 Tahun dan Usulan RKAP 2017 A. TRAFIK KAPAL 3 3 2.
Lebih terperinciANALISIS KAPASITAS TERMINAL PETI KEMAS PELABUHAN BOOM BARU PALEMBANG
ANALISIS KAPASITAS TERMINAL PETI KEMAS PELABUHAN BOOM BARU PALEMBANG Ari Maulana Muhammad Situmorang Erika Buchari Mahasiswa Program Studi Teknik Sipil Guru Besar Jurusan Teknik Sipil Fakultas Teknik Universitas
Lebih terperinciBAB I PENDAHULUAN. terdiri dari ribuan pulau, maka untuk menghubungkan pulau-pulau tersebut
BAB I PENDAHULUAN 1.1 Latar Belakang Negara kesatuan Republik Indonesia sebagai Negara kepulauan yang terdiri dari ribuan pulau, maka untuk menghubungkan pulau-pulau tersebut mutlak diperlukan sarana dan
Lebih terperinci1 Pendahuluan. 1.1 Latar Belakang. Bab
Bab 1 1 Pendahuluan Penanganan Kerusakan Dermaga Studi Kasus Dermaga A I Pelabuhan Palembang 1.1 Latar Belakang Pekerjaan terkait dengan bidang kepelabuhanan merupakan salah satu bidang kajian dalam Teknik
Lebih terperinciBAB 1 PENDAHULUAN 1.1 Latar Belakang
BAB 1 PENDAHULUAN 1.1 Latar Belakang Pada era globalisasi saat ini berbagai individu, kelompok maupun Negara dapat melakukan transaksi perdagangan dengan negara lain tanpa mengenal batasanbatasan yang
Lebih terperinciIndonesia Logistics Community Services
M A N A G E D B Y Indonesia Logistics Community Services PT. INTEGRASI LOGISTIK CIPTA SOLUSI Customercare@ilcs.co.id Info@ilcs.co.id Phone 021.500.950 Fax 021.4393.3377 Website : www.ilcs.co.id VER. 1.0.0-2014
Lebih terperinciDAFTAR ISTILAH. Kapal peti kemas (containership) : kapal yang khusus digunakan untuk mengangkut peti kemas yang standar.
DAFTAR ISI Halaman HALAMAN JUDUL... i HALAMAN PENGESAHAN...ii KATA PENGANTAR... iii HALAMAN PERSEMBAHAN... v DAFTAR ISI... vi DAFTAR ISTILAH... ix DAFTAR TABEL... xi DAFTAR GAMBAR... xii DAFTAR LAMPIRAN...
Lebih terperinciANALISIS ANTRIAN MENGGUNAKAN METODE SIMULASI MONTE CARLO. Fajar Etri Lianti ABSTRACT
ANALISIS ANTRIAN MENGGUNAKAN METODE SIMULASI MONTE CARLO Fajar Etri Lianti Mahasiswa Program Studi S1 Matematika Jurusan Matematika Fakultas Matematika dan Ilmu Pengetahuan Alam, Universitas Riau Kampus
Lebih terperinciOPTIMASI PELAYANAN BONGKAR MUAT BARANG PADA SISTEM ANTRIAN PT HONDA PROSPECT MOTOR DENGAN SINGLE AND MULTI CHANNEL QUEUEING ANALYSIS
OPTIMASI PELAYANAN BONGKAR MUAT BARANG PADA SISTEM ANTRIAN PT HONDA PROSPECT MOTOR DENGAN SINGLE AND MULTI CHANNEL QUEUEING ANALYSIS Heldy Juliana, Dr. Naniek Utami H., S.Si,MT.*) heldyjuli@gmail.com Program
Lebih terperinciMemprediksi Kebutuhan Alat Bongkar Muat dan Truk Melalui Metode Simulasi (Studi Kasus : Terminal Peti Kemas Semarang)
JURNAL TEKNIK POMITS Vol. 1, No. 2, (212) ISSN: 231-9271 1 Memprediksi Kebutuhan Alat Bongkar Muat dan Truk Melalui Metode Simulasi (Studi Kasus : Terminal Peti Kemas Semarang) Alby Diantono dan Sudiyono
Lebih terperinciA. ARUS KAPAL. Unit GT
A. ARUS KAPAL I. PELAYARAN DAN DISTRIBUSI 1. Dermaga Umum b. Tramper Unit 9 13 9 GT 36.346 40.462 18.747 c. Tamu Negara/Non Niaga Unit b. Tramper Unit 1 GT 1.017 B. Angkutan Laut Dalam Negeri a. Liner
Lebih terperinciANALISIS PENGUKURAN KINERJA TERMINAL PETIKEMAS
ANALISIS PENGUKURAN KINERJA TERMINAL PETIKEMAS Andri Maulana N. (1), I.G.N. Sumanta Buana (2) Jurusan Teknik Perkapalan Fakultas Teknologi Kelautan ITS Surabaya e-mail : andri_bonek@yahoo.com 1 Mahasiswa
Lebih terperinciANALISIS PENGUKURAN KINERJA TERMINAL PETIKEMAS
ANALISIS PENGUKURAN KINERJA TERMINAL PETIKEMAS ANALISIS PENGUKURAN KINERJA TERMINAL PETIKEMAS Andri Maulana N.(1), I.G.N. Sumanta Buana(2) Jurusan Teknik Perkapalan Fakultas Teknologi Kelautan ITS Surabaya
Lebih terperinci