1 Sistem Perpipaan Perancangan Alat Proses Abdul Wahid Surhim

2 PIPING SYSTEM Piping Fundamentals What is that? Concept Layout Development Piping Components & their access requirement. Straight length requirements. Orientation of various tapings, components, etc. Piping Drains & Vents Insulation. Material & Sizing Critical piping system consideration. Pipe Stress Analysis. Pipe Supports

3 Rujukan Noname. Piping Basics (PPS Form) Raswari Sistem Perpipaan. UI Press Escoe, A. Keith Piping and Pipeline Assessment Guide. Elsevier Inc. All rights reserved Ellenberger, J. Phillip Piping and Pipeline Calculations Manual. Second Edition. Elsevier Inc. All rights reserved Devki Energy Consultancy Pvt. Ltd BEST PRACTICE MANUAL: FLUID PIPING SYSTEMS

4 Piping Fundamentals Let us first Discuss about WHAT IS PIPE! It is a Tubular item made of metal, plastic, glass etc. meant for conveying Liquid, Gas or any thing that flows. It is a very important component for any industrial plant. And it s engineering plays a major part in overall engineering of a Plant. In next few pages we shall try to familiarize about pipe and it s components.

5 Piping dan Pipeline PIPING: in-plant piping ~ inside a plant facility process piping, utility piping, etc PIPELINE: a long pipe running over distances transporting liquids or gases often extend into process facilities

6 In any plant various fluids flow through pipes from one end to other. Now let us start with a plant where we see three tanks. Tank-1, Tank-2 and Tank-3 We have to transfer the content of Tank no. 1 to the other two tanks. We will need to connect pipes to transfer the fluids from Tank-1 to Tank-2 and Tank-3 LET US BRING THE PIPES.

7 To solve these problems we need the pipe components, which are called We have just brought the pipes, now we need to solve some more problems. Pipes are all straight pieces. PIPE FITTINGS We need some branch connections We need some bend connections

8 These are the pipe fittings, There are various types of fittings for various purposes, some common types are - Elbows/Bends, Tees/Branches, Reducers/Expanders, Couplings, Olets, etc. Anyway, the pipes and fittings are in place, but the ends are yet to be joined with the Tank nozzles. We now have to complete the end connections. These, in piping term, we call TERMINAL CONNECTIONS.

9 So far this is a nice arrangement. But there is no control over the flow from Tank-1 to other tanks. We need some arrangement to stop the flow if needed These are flanged joints This is a welded joint To control the flow in a pipe line we need to fit a special component. That is called - VALVE

10 There are many types of valves, categorized based on their construction and functionality, Those are - Gate, Globe, Check, Butterfly, etc. Other than valves another important line component of pipe line is a filter, which cleans out derbies from the flowing fluid. This is called a STRAINER

11 Valve (Katup) 1. Butterfly valve 2. Globe valve 3. Gate valve 4. Ball valve 5. Check valve 6. Diaphragm valve 7. Knife Gate valve 8. Plug valve 9. Spool Valve 10.Pressure Relief Valve 11.Pressure Safety Valve (PSV) 12.Control valve

12 Here we see a more or less functional piping system, with valves and strainer installed. Let us now investigate some aspects of pipe flexibility. If this tank nozzle expands, when the tank is hot. In such case we need to fit a flexible pipe component at that location, which is called an EXPANSION JOINT

13

14

15

16

17

18 When some fluid is flowing in a pipe we may also like know the parameters like, pressure, temperature, flow rate etc. of the fluid. Expansion Joint Manufacturers Association (EJMA) To know these information we need to install INSTRUMENTS in the pipeline.

19 Next we shall look into how to SUPPORT the pipe/and it s components. There are various types instruments to measure various parameters. Also there are specific criteria for installation of various pipe line instruments.

20 Here are some of the pipe supporting arrangements. There can be numerous variants. All depend on piping designer s preference and judgement. Let us see some OTHER types of supports

21

22

23

24 We have just completed a pipe line design. We shall rewind and check how it is really done in practice. First the flow scheme is planned, 1) What, 2) From what point, 3) To which point Pipe sizes are selected, pipe material and pipe wall thickness are selected. Types of Valves are planned Also the types of instruments required are planned We represent the whole thing in a drawing which is called Piping and Instrumentation Drawing, in short P&ID. For P&ID generation we use SPP&ID software. By this time you have already come to know that while we prepare P&IDs in SPP&ID, we enter all the pipe lines system information in the drawing. So the SPP&ID drawing is an Intelligent drawing which under it s surface carries all the information about a pipe like, Pipe size, Flowing Fluid, etc. Let us see a P&ID prepared in SPP&ID

25

26 This is screen picture of P&ID made by SPP&ID If we click on any line it will show the Data embedded.

27 After the P&ID is ready we start the layout work. Here we carryout pipe routing / layout in Virtual 3D environment. We use PDS 3D software to route piping in the Plant virtual 3D space. We call this as piping modeling or physical design. While development of piping layout we have to consider the following Piping from source to destination should be as short as possible with minimum change in direction. Should not hinder any normal passage way. Also should not encroach any equipment maintenance space. Not Preferable Preferable

28 While carrying out pipe routing we also need to consider the following Valves, strainers, instruments on the pipe should be easily accessible. If needed separate ACCESS PLATFORMS to be provided to facilitate these. Desired location and orientation of valves / instruments and other pipe components are to be checked and maintained, like some valves or strainers can only be installed in horizontal position. Specific requirements for instrument installation to be checked, like temperature gauge can not be installed in pipe which is less than 4 inch in size. Specific requirements of STRAIGHT LENGTH of pipe for some components to be maintained, like for flow orifice we need to provide 15 times diameter straight pipe length at upstream of orifice and 5 times diameter straight at down stream of orifice. Example of Straight length requirement for Flow Orifice

29 For Pipeline which shall carry liquid, we have to make sure that all air is allowed to vent out of the line when the line is filled with liquid. To achieve this a VENT connection with Valve is provided at the top most point of the pipeline. Also arrangement is kept in the pipeline so that liquid can be drained out if required. To achieve this a DRAIN connection with Valve is provided at the lowest point of the pipeline Pipes are also slopped towards low points. Let us look into typical Vent and Drain arrangement in a pipeline

30 This is a 3D model of Feed water line along with pumps and other accessories Let us have a look into a piping model done by PDS 3D

31 INSULATION - When hot fluid flows through pipe then generally pipe is insulated. There are two primary reasons for insulating the pipe carrying hot fluid. Containing the heat inside the pipe. Insulation preserves the heat of the fluid. It is called Hot Insulation Personnel safety, so that people do not get burn injury by touching hot surface of pipe. It is called Personnel Protection Insulation Cold pipes are also insulated Cold or chilled fluid carrying pipes are insulated to prevent heating of cold fluid from outside. It is called Cold Insulation. Some times cold pipes are insulated to prevent condensation of atmospheric water vapor on pipe surface. It is called Anti-Sweat Insulation. Other types of Insulation When gas flows through pipes at high velocity, it creates noise. In such cases pipes are insulated to reduce noise. It is called Acoustic Insulation. Some times pipe and it s content are heated from outside, by heat tracing element. In that case pipe along with heat tracing element are insulated to conserve the heat of the tracer. It is called Heat Tracing Insulation.

32 INSULATION MATERIAL - The insulating material should be bad conductor of heat. There are two basic categories 1) Fibrous Material, which has large voids full of air between fibers - Cork, Glass Wool, Mineral Wool, Organic Fibers. Note stagnant air is a bad conductor. 2) Cellular Material, which has closed void cells full or air - Calcium Silicate, Cellular Glass (Foam Glass), Polyurethane Foam (PUF), Polystyrene (Thermocol), etc. Some times Cast material like Cement Plaster or Plaster of Paris are also used. INSULATION CLADDING - Insulation materials are generally soft or fragile. So the outer surface of insulation are protected with Aluminum sheet or GI sheet cladding. Have a look at how pipes are insulated, and general components of insulation

33

34 H h. A. T T h a H = Heat loss, Watts h = Heat transfer coefficient, W/m 2 -K T a = Average ambient temperature, K T h = Hot surface temperature (for hot fluid piping), ºC & cold surface temperature for cold fluids piping) For horizontal pipes: h A T h T a For vertical pipes: h B T h T a

35 1 1 1 ln r t r t r E k k tk E tk = Equivalent thickness of insulation for pipe k = Thermal conductivity of insulation at mean temperature of T m, W/m-C t k = Thickness of insulation, mm r 1 = Actual outer radius of pipe, mm r 2 = (r 1 + t k ) T s = Desired/actual insulation surface temperature, ºC Rs= Surface thermal resistance = 1/h, ºC-m 2 /W R l = Thermal resistance of insulation = t k /k, ºC-m 2 /W k R t k t R h H T T R H T T R R R T T H l k k l a h s a h l s l a h. 1 2 s h m T T T

36

37 PIPE MATERIAL SELECTION - to select appropriate pipe material based on flowing fluid property. Find out type of Fluid flowing Find out Fluid Temp. & Pressure Check Pipe life Expectancy Select suitable Material per practice (Note-1) Check Mat. Listed in Design Code YES Pipe Material OK Note-1 : Material is selected per past experience with cost in mind and per material listed in design code. If material is not listed in code we may select next suitable material listed. NO See Note-1 PIPE SIZING CALCULATION - to select required pipe diameter based on velocity and pressure drop. Find out Flow volume per second Check Velocity Allowable per second Calc. flow area required and Pipe size Calc. Press. Drop for that Pipe size Check Press. Drop meets Press. Budget YES Pipe Size OK NO \ Increase Pipe Size PIPE THICKNESS SELECTION - to select appropriate pipe thickness based on flowing fluid property. Select Mat. & Diameter as above Find out Fluid Temp. & Pressure Decide on Corrosion allowance Calc. Pipe Thickness per Code

38 Batasan Operasi Ada dua batasan untuk penentuan DIAMETER PIPA: 1. Kecepatan gas fps (umumnya, rinciannya lihat API RP 14E) 2. Jatuh tekanan

39 Penentuan Kecepatan Gas MAKSIMUM Penentuan DIAMETER PIPA sangat dipengaruhi oleh KECEPATAN GAS Batas maksimum kecepatan gas: kecepatan yang menyebabkan terjadinya erosi pada pipa atau disebut EROSIONAL VELOCITY (v e ) menggunakan API RP 14E untuk layanan kontinyu: 100 v e 0.5 G Erosi pipa terjadi jika kecepatan gas melebihi v e Kecepatan gas yang direkomendasikan: 40 50% dari v e (Mohitpouret al., 2002)

40 Kecepatan Minimum Jika mungkin, kecepatan minimum pada jaringan dua fasa (gas-cair): 10 fps Tujuan: meminimisasi pembentukan lumpur pada peralatan separasi Hal ini penting khususnya pada jaringan pipa panjang dengan perubahan ketinggian (API RP 14E hlm. 23)

41 Contoh Berikut ini adalah data-data bagian pipa dari sebuah jaringan pipa transmisi gas: Q = 25.7 MMSCFD, T a = 90 o F, P 1 = 425 psia, P = 9 psia, L = 8280 ft, SG = 0.7, Z a = 0.925, MW udara = 28.96, R = , E = 1.0, viskositas gas diabaikan. a) Hitung tekanan rata-rata (P a ) menggunakan rumus Campbell: b) Pilihlah diameter pipa yang sesuai menggunakan rumus Panhandle A: T s EP P D Q SG P s T Z L c) Hitung erosional velocity (v e ) sebagai batas maksimum kecepatan gas melalui pipa menggunakan persamaan API RP 14E untuk layanan kontinyu: v e = 100/( G ) 0.5 (ingat rumus P a V G =nrt a Z a ) d) Hitung kecepatan gas (v G ) menggunakan laju alir aktual: a a 1 Apakah diameter pipa yang didapatkan memenuhi kriteria v e > v G? 2 G P a 2 3 Ps Ta Qa Q Z P a T s P 1P2 P 1 P2 a P1 P 2

42 Jawaban Q 25.7MMSCFD CFD Ta 90oF oR P1 425psia DP 9psia P2 416psia L 8280ft mil SG 0.7 Za MWudara R E 1 Pa 420.5psia Ts 15oC 59oF oR Ps 1atm 14.7psia D inch ==> PILIH NPS 12 SCH 40 ID INCH MWgas rho G = massa G/Vol G = Pa.Mwgas/(RTZ) 1.560lb/cft ve 80.1fps Qa cfd cfs vg =4Qa/(pi.D^2) 13.1fps < ve OK

43 Kode dan Standar Pipa (US) 1. ASME B31.1, Power Piping ~ governs piping in the power industries (e.g., power plants). 2. ASME B31.2, Fuel Gas Piping. 3. ASME B31.3, Chemical Plant and Petroleum Refinery Piping ~ governs piping systems used in the chemical and petroleum industry. 4. ASME B31.4, Liquid Petroleum Transportation Piping Systems ~ governs liquid hydrocarbons and other liquids in pipeline systems. 5. ASME B31.5, Refrigeration Piping and Heat Exchanger Components. 6. ASME B31.7, Nuclear Piping was withdrawn after two editions and the respon-sibility was assumed by ASME B&PV Code, Section III, Subsections NA, NB, NC, and ND

44 Kode dan Standar Pipa (US) 7. ASME B31.8, Gas Transmission and Distribution Systems ~ governs gas pipelines. 8. ASME B31.8S, Managing System Integrity of Gas Pipelines is a recently published book 9. ASME B31.9, Building Services Piping. 10.ASME B31.11, Slurry Piping Systems is another transportation pipeline code that mostly applies to buried piping systems that transport slurries 11.ASME B31.12, Hydrogen Piping System this is a new code. It is in the final stages of first development

45 BIAYA SISTEM PERPIPAAN 1. Bahan 30% 2. Fittings 10% 3. Installation labor 25% 4. Installation equipment 10% 5. Supports 10% 6. P&G 10% 7. Others 5% Miranda & Lopez, Piping Design: The Fundamentals. Presented at Short Course on Geothermal Drilling, Resource Development and Power Plants, organized by UNU-GTP and LaGeo, in Santa Tecla, El Salvador, January 16-22, 2011.

46 In Power plant there are some piping which carries steam at high pressure and temperature. And also there are piping which carries water at High pressure. These pipes carries the main cycle steam and water of the steam power plant. These pipelines are call the CRITICAL PIPING. Very special care are taken for design of these piping. First the pipe material selection for such piping is very important as it has to withstand the high pressure and may be also high temperature. As these pipes carry the main system fluid of the power plant, they are given the right of way, and routed at beginning of the overall plant layout. Steam pipes run at very high temperature and the hot pipes expand. We have to built in flexibility in the high temperature pipe routing so that the expansion force is absorbed within the piping. Also there should be enough flexibility in these pipe routing so that high loads are not transferred to the nozzles of Turbine or Pumps There are many recognized international codes which lay down guide lines and mandatory requirements for design of such piping. The most important codes used by power plant piping engineers are ASME ANSI B31.1- Power Piping Code & IBR - the Indian Boiler Regulation

47 Pipe Stress Analysis We have already seen that some of the pipes are subjected to high pressure and high temperature. Also pipes carry the load of the flowing fluid. We need to check and confirm the pipe is not going to fail with these loading. This process of checking the stress developed in the piping due to various loading is called Pipe Stress Analysis/Flexibility analysis. In the process of Analysis we apply various postulated loading on the pipe and find out the stress resulted from these loading. Then we check with governing codes if those stresses generated are acceptable or not. We check support load & movement for various loading condition. We also check out the terminal point loading generated from pipe to the equipment connected to the pipe. This loading are to be within acceptable limits of the equipment suggested by the vendors. We also find out the pipe growth due to change in temperature and need to keep the movement of pipe within acceptable limits. Pipe Stress Analysis is an Interactive and Iterative process. Each step is checked If a check fails we have to go back, modify the layout and restart the analysis.

48 Inputs Geometric layout of Pipe Pipe supporting configuration Pipe Diameter and Thickness Pressure inside Pipe Cold and Hot temperatures of Pipe Weight of Pipe and insulation Weight of carrying Fluid Pipe material Property (Young s Modulus, Thermal Expansion Coefficient) Thrust on pipe due to blowing wind. Thrust on pipe due to earthquake Load of Snow on pipe Any transient loading like Steam Hammer load Any other load on the piping PIPE STRESS ANALYSIS Tools we use PIPSYS - is an integrated pipe stress analysis module of PLADES 2000 CEASER - Commercial Piping analysis software There are many other commercial software available Outputs Stress of the pipe at various loading conditions Load at various supports and restrains. Movement of pipe at support locations Pipe terminal point loading. Codes and Standards In general Power Plant Piping have to comply stipulations of ASME ANSI B31.1 In India Power cycle Piping to comply IBR code requirements.

49 Rigid Hanger Rigid Support Types of Pipe Supports In the beginning of this discussion we talked about various types of pipe supports. Here is some elaboration Constant Load Spring There are three general types Rigid type (no flexibility in the direction of restrain) Variable Spring Spring type (Allows pipe movement in direction of loading) Dynamic Support (Degree of restrain depends on acceleration of load) There are two types of spring support Variable load type, here support load changes as the pipe moves. Constant load support, the load remains constant within some range of movement. Dynamic Support, Snubber Rigid Support

50 Some Special Considerations for Piping When pipes are routed UNDER GROUND (Buried) following points to be kept in mind: Minimum pipe size to be routed under ground shall be not less than1 inch. Avoid flange joint in U/G piping. Keep in mind if pipe leaks U/G, it will be difficult to detect, so avoid U/G routing of pipe carrying hazardous fluid. Pipe to be laid below Frost Zone at areas where ambient temperature goes below freezing. U/G, Buried piping should be properly protected from corrosion. Pipe may be properly wrapped and coated to prevent corrosion. Or U/G piping be protected by using Cathodic protection. Freeze Protection of outdoor Piping: In the areas where the ambient temperature goes below freezing there is a possibility that the liquid content of pipe may freeze while the plant is under shut down. For similar case pipes are wrapped with heat tracing elements to maintain the content temperature above freezing (around 4 deg. C) even when the ambient temp. is below freezing. Electric Heat tracing is done by wrapping electric coil around pipe, which turns on as the ambient temperature goes down. Pipes are insulated over the heat tracing coils. Heat tracing can also be done by winding Steam tubes around main pipes.

51 Jenis Pipa 1. Pipa tanpa sambungan (tanpa sambungan pengelasan) 2. Pipa denga sambungan

52 Bahan Pipa (Umum) 1. Carbon steel 2. Carbon moly 3. Galvanees 4. Ferro nikel 5. Stainless steel 6. PVC 7. Chromen moly

53 Bahan Pipa (Khusus) 1. Viber glass 2. Alumunium 3. Wrought iron (besi tanpa tempa) 4. Copper (tembaga) 5. Red brass (kuningan merah) 6. Nickel copper = monel (timah tembaga) 7. Nickel chrome iron = inconel (tembaga timah krom)

54 Jenis-jenis Pipa: Berdasarkan MATERIALnya 1. Pipa logam Pipa besi tuang Ductile cost iron pipe (DCIP) Galvanized iron pipe (GIP) Cast iron pipe (CIP) Pipa logam campuran (metal/alloy)

55 2. Pipa non logam Pipa beton (tanpa tulangan, dengan tulangan) Pipa PVC (poly vinyl chloride) Pipa fiber glass (GRP = Glass fiber reinforced pipe) Pipa asbes semen Jenis-jenis Pipa: Berdasarkan MATERIALnya Pipa PE (poly ethylene)

56 Jenis-jenis Pipa: Berdasarkan Bentuk Melintangnya Pipa bulat Digunakan untuk air minum Pipa bulat telur (elips) 0 Digunakan untuk air buangan

57 Flanged end pipe (pipa ujung flens) Terbuat dari baja dan memiliki diameter yang besar. Bell and plain pipe (pipa ujung bell dan spigot) Biasanya jenis PVC (poly vinyl chloride) atau DCIP (ductile cost iron pipe). Screwed end pipe (pipa ujung ulir) Biasanya jenis GIP (galvanized iron pipe) dan memiliki diameter yang kecil. Double plain end pipe (pipa ujung rata) Ujung rata biasa Ujung rata dengan lidah Ujung rata dengan takikan Jenis-jenis Pipa: Berdasarkan Bentuk Ujungnya

58 Seamless Drawing Steel Pipe Seamless Brown Pipe Lap Welded Steel Pipe Electric Resistence Welded Steel Pipe Pipa dari Timah Hitam Pipa Galvanis

59 Pemilihan Bahan Pipa Sesuai standar ASTM dan ANSI 1. Perpipaan untuk pembangkit tenaga 2. Perpipaan untuk industri bahan gas 3. Perpipaan untuk penyulingan minyak mentah 4. Perpipaan untuk pengangkutan minyak 5. Perpipaan untuk proses pendinginan 6. Perpipaan untuk tenaga nuklir 7. Perpipaan untuk transmisi dan distribusi gas

60 Tipe Sambungan Cabang Sambungan langsung (stub in) Sambungan dengan menggunakan fittings Sambungan dengan menggunakan flanges

61 Diameter Pipa Terdapat tiga istilah diameter untuk pipa bulat: Inside diameter (ID) Outside diameter (OD) Nominal diameter (ND) Dalam standar ISO, ukuran pipa dinyatakan dalam satuan millimeter (mm) Nominal diameter (ND) digunakan dalam istilah perdagangan atau sebagai petunjuk spesifikasi pipa Dimensional standards, materials of construction, and pressure ratings of pipiing for chemical plants and petroleum refineries are covered by ANSI Piping Code B31.3 which is published by the ASME, latest issue 1980.

62 Diameter, Ketebalan dan Schedule Schedule pipa dikelompokkan menjadi 1. Schedule : 5, 10, 20, 30, 40, 60, 80, 100, 120, Schedule standar 3. Schedule extra strong (XS) 4. Schedule double extra strong (XXS) 5. Schedule spesial

63 Manfaat Perbedaan Schedule Menahan tekanan dalam dari aliran Kekuatan dari meterial itu sendiri Mengatasi karat Mengatasi kegetasan pipa

64 Ketebalan Dinding Pipa

65 Ketebalan Dinding Pipa

66 Pemasangan Pipa Ada tiga kelompok: 1. Pipa di atas tanah Pipa kolom dan vessel, HE, pompa dan turbin, kompresor, utilitas 2. Pipa di bawah tanah Pipa proses dan utilitas 3. Pipa di dalam air

67 Pipa Transmisi dan Distribusi Gas Sistem Perpipaan Transmisi Pipa transmisi adalah pipa yang dipasang dengan tujuan untuk menyalurkan gas dari sebuah sumber suplai gas kepada satu atau lebih pusat distribusi dan konsumen dengan kebutuhan gas yang besar. Pada umumnya, pipa transmisi beroperasi pada tekanan lebih dari 16 bar. Sistem ini biasanya digunakan pada gas/steam power palnt atau industri besar

68 Pipa Transmisi dan Distribusi Gas Sistem Perpipaan Distribusi Pipa distribusi adalah pipa yang dipasang dengan tujuan untuk menyalurkan gas dari sumber suplai gas yang berasal dari pipa transmisi kepada konsumen. Pada sistem distribusi dikenal istilah pipa utama dan pipa sektor. Pipa utama adalah pipa yang digunakan untuk mengantarkan gas ke beberapa konsumen dalam suatu rute. Sedangkan pipa sektor adalah pipa dari percabangan pipa utama yang mengantarkan gas ke alat metering atau peralatan konsumen yang membutuhkan gas tersebut. Diameter pipa yang sering digunakan sebagai pipa utama adalah 40 mm 180 mm. Sedangkan untuk pipa sektor, pipa yang digunakan berdiameter 13 mm 20 mm. Pipa dengan diameter yang lebih besar biasanya digunakan untuk keutuhan komersial dan industri

69 Perbedaan Sistem Perpipaan Transmisi dan Distribusi

70

71 Kondisi Standar

72 Standar Teknis Standar teknis adalah spesifikasi teknis atau hal-hal yang terkait dengan aspek teknis dalam perancangan dan operasional kegiatan keteknikan yang disusun dan dibakukan berdasarkan konsensus semua pihak terkait dengan mempertimbangkan aspek keamanan, keselamatan, kesehatan, lingkungan, perkembangan ilmu pengetahuan dan teknologi, serta berdasarkan pengalaman, perkembangan masa kini dan masa yang akan datang untuk memperoleh manfaat yang sebesarbesarnya

73 Standar Teknis 1. ANSI B DNV OS F Pemasangan Pipa Baja 4. Perencanaan dan Pemasangan Pipa PE 5. Standard Lainnya

74 ANSI B 31.8 ANSI B 31.8 merupakan standar yang digunakan untuk sistem pipa transmisi dan distribusi gas bumi (Gas Transmission and Distribution Piping System) yang dikeluarkan oleh badan standar nasional Amerika (American National Standards Institute). Standar ini juga digunakan di Indonesia dan saat ini telah diadopsi menjadi Standar Pertambangan Migas SPM No , Sistem Perpipaan Transmisi dan Distribusi Gas

75 DNV OS F-101 DNV OS F-101 merupakan standar yang digunakan untuk Submarine Pipeline Systems, yang dikeluarkan oleh DNV (Del Norske Verilas), suatu badan sertifikasi dan verifikasi di Norwegia. Standar ini digunakan untuk perencanaan pipa minyak dan gas serta pipa fluida lain yang melintasi perairan dan laut, baik berupa pipa proses dan pipa transportasi serta struktur bangunan. Standar ini baru dikeluarkan pada tahun 2000, merupakan pengembangan dari standar DNV 1996, Rules for Submarine Pipeline Systems dan digunakan secara luas oleh perusahaan eksplorasi dan produksi migas di dunia terutama di Laut Utara

76 Pemasangan Pipa Baja Pemasangan pipa gas yang menggunakan material baja standar mengacu pada standar SPM 5D.54.0, Pengelasan Saluran Pipa dan Fasilitas yang terkait. Standar ini diadopsi dari standar API dari American Pipeline Institute

77 Perencanaan dan Pemasangan Pipa PE Perencanaan dan pemasangan pipa gas yang menggunakan material plastik polyethylene (PE) mengacu pada standar SNI Standar ini merupakan hasil adopsi standar Inggris BG/PS/Dis 5.3 Part A & B serta standar SNI

78 Standar Lain Standar lain yang merupakan pendukung dan referensi dalam perancangan teknis diantaranya adalah standar pipa (API 51), standar kerangan (API 6D), standar material (ASTM), standar pengujian (ASME) dan lain-lain

79 Persamaan Aliran Gas 1. Persamaan Panhandle A 2. Persamaan Panhandle B 3. Persamaan Weymouth 4. Persamaan Polyflow 5. Persamaan Poles 6. Persamaan Moody 7. Persamaan AGA 8. Persamaan IGT 9. Persamaan Darcy-Weisbach 10.Persamaan Beggs-Brill 11.Persamaan Eaton

80

81

82

83 Perhitungan Heat Loss (h f ) flu h f 2gd 2 Re ud f = faktor friksi dari grafik L = panjang pipa (m) u = kecepatan aliran melalui pipa (m/s) g = gravitasi, 9.81 m/s 2 d = diameter dalam pipa (m) Re = Reynold number = densitas fluida (kg/m 3 ) d = diameter dalam pipa (m) µ = Dynamic viscosity (Pa s)

84 Estimation of friction factor

85 The absolute roughness of pipes

86 Contoh 2 Pipa dengan diameter 4 (100 mm) mengalirkan alir dengan laju alir 50 m 3 /jam sepanjang 100 m. Bahan pipanya cast iron dengan kekasaran absolutnya 0.26 mm Hitung heat loss-nya

87 Jawaban u Q A / m/s Re ud Relative roughness Sesuai dengan grafik, maka f = h f flu 2gd absolute roughness internal diameter k d m per 100 m pipa

88 Minor Loss Coefficient h minorloss ku 2 2g

89 Pressure Drop

90 Tekanan Rata-rata P 1 tekanan gas masuk pipa P 2 tekanan gas keluar pipa P P P P P P P a

91 Pipa PE (Poly-Ethylene) Ketebalan pipa PE dihitung berdasarkan nilai SDR (Standard Dimension Ratio):

92 Tekanan Operasi PE MOP 2MRS SDR 1Hd MOP = Tekanan operasi maksimum atau Maximum Operating Pressure (Mpa) MRS = Minimum Required Strength (Mpa), dapat dilihat dari daftar physical properties dari material PE yang ditawarkan SDR = Standard Dimention Ratio (nominal diameter luar/nominal ketebalan dinding yang dispesifikasikan) Hd = Rasio menahan abrasi pipa PE terhadap pipabaja, nilainya sama dengan 4 (empat)

93 Simulator Sistem Perpipaan Pipesim Pipephase OLGA Pipe Flow Expert

94 Contoh 3 (PIPESIM) Jaringan A Jaringan B

95 Pipe Sizing Rules of Thumb NO Type of LIne Pressure Drop (psi/100 ft) Velocity (fps) Average Maximum

96

97 Pemodelan Pipa Distribusi dengan Pilih NEW Network PIPESIM

98 Setup: Unit dan Komposisi

99 Drag: Source, Junction dan Sink

100 Pipa Percabangan (Branch)

101 Setup Komposisi Blok komponen Klik

102 Setup SOURCE Suhu Tekanan Laju alir

103 Trial 1: Panjang dan ID Pipa

104 RUN (Harus Disimpan Dulu)

105 Hasil Simulasi Terlalu tinggi karena PIPA terlalu KECIL

106 Trial 2: Diameter Pipa OK

107 Trial 3: Panjang Pipa Maksimum Panjang Maks: 50 km (kecepatan < 60 fps)

108 Plot Penurunan Tekanan

109 TUGAS 2 Berdasarkan gambar jaringan pipa gas: 1. Hitung diameter pipa jaringan gas sesuai dengan tekanan operasinya: CS (menengah) 2. Jenis pipa PE dengan SDR berapa yang seharusnya digunakan? Kenapa? 3. Hitung panjang maksimum pipa 4. Hitung kapasitas maksimum pipa Gunakan ketiga software (Pipesim, Pipeline Toolbox dan Pipe Flow Expert) Data pipa PE dapat menggunakan hdpe-pipe-specifications

110 JARINGAN GAS 700m P = 2 Barg Jaringan A 500m Tapping Point (Titik Pasikan Gas) P = 10 Barg F = 3.25 MMSCFD P = 2 Barg Tapping Point (Titik Pasikan Gas) P = 6 Barg F = 2.37 MMSCFD Jaringan B

NAJA HIMAWAN

NAJA HIMAWAN NAJA HIMAWAN 4306 100 093 Ir. Imam Rochani, M.Sc. Ir. Hasan Ikhwani, M.Sc. ANALISIS PERBANDINGAN PERANCANGAN PADA ONSHORE PIPELINE MENGGUNAKAN MATERIAL GLASS-REINFORCED POLYMER (GRP) DAN CARBON STEEL BERBASIS

Lebih terperinci

PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR

PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR P3 PIPELINE STRESS ANALYSIS PADA ONSHORE DESIGN JALUR PIPA BARU DARI CENTRAL PROCESSING AREA(CPA) JOB -PPEJ KE PALANG STATION DENGAN PENDEKATAN CAESAR II P3 PIPELINE STRESS ANALYSIS ON THE ONSHORE DESIGN

Lebih terperinci

ANALISA RANCANGAN PIPE SUPPORT PADA SISTEM PERPIPAAN DARI POMPA MENUJU PRESSURE VESSE DAN HEAT EXCHANGER DENGAN PENDEKATAN CAESARR II

ANALISA RANCANGAN PIPE SUPPORT PADA SISTEM PERPIPAAN DARI POMPA MENUJU PRESSURE VESSE DAN HEAT EXCHANGER DENGAN PENDEKATAN CAESARR II ANALISA RANCANGAN PIPE SUPPORT PADA SISTEM PERPIPAAN DARI POMPA MENUJU PRESSURE VESSE DAN HEAT EXCHANGER DENGAN PENDEKATAN CAESARR II Asvin B. Saputra 2710 100 105 Dosen Pembimbing: Budi Agung Kurniawan,

Lebih terperinci

Ikatan Ahli Teknik Perminyakan Indonesia

Ikatan Ahli Teknik Perminyakan Indonesia Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional IATMI 2009 Bandung, 2-5 Desember 2009 Makalah Profesional IATMI 09 004 Simulasi Line Packing Sebagai Storage pada Pipa Transmisi Gas Studi Kasus:

Lebih terperinci

BAB IV ANALISA DAN PERHITUNGAN

BAB IV ANALISA DAN PERHITUNGAN BAB IV ANALISA DAN PERHITUNGAN 4.1 Perhitungan Ketebalan Minimum ( Minimum Wall Thickess) Dari persamaan 2.13 perhitungan ketebalan minimum dapat dihitung dan persamaan 2.15 dan 2.16 untuk pipa bending

Lebih terperinci

BAB III METODE PENELITIAN. Diagram alir studi perencanaan jalur perpipaan dari free water knock out. Mulai

BAB III METODE PENELITIAN. Diagram alir studi perencanaan jalur perpipaan dari free water knock out. Mulai BAB III METODE PENELITIAN 3.1. Diagram Alir ( Flow Chart ) Diagram alir studi perencanaan jalur perpipaan dari free water knock out (FWKO) ke pump suction diberikan pada Gambar 3.1 Mulai Perumusan Masalah

Lebih terperinci

Indonesia Regulation & Pipelines International Standardd &

Indonesia Regulation & Pipelines International Standardd & Indonesia Regulation & Pipelines International Standardd & Certification INDOPIPE The 5 th International IndoensiaGas Infrastructure Conference & Exhibition by Rudiyanto, Chairman of APITINDO Content 1.

Lebih terperinci

2.10 Caesar II. 5.10Pipe Strees Analysis

2.10 Caesar II. 5.10Pipe Strees Analysis 2.8 Pipe Support Karena pipa dipengaruhi oleh ekspansi termal. Mendukung dalam sebuah langkah sistem perpipaan termal dalam arah yang berbeda. Pipe support oleh dua jenis support-kaku (rigid support) dan

Lebih terperinci

4. HASIL DAN PEMBAHASAN

4. HASIL DAN PEMBAHASAN 3.3 Pemodelan pada Caesar 5.1 Pembuatan model dengan variasi tersebut langsung dibuat pada Caesar 5.1 mengingat bentuk yang ada adalah pipeline. 1. Pemodelan Hal-hal yang diperlukan dalam pemodelan pipeline

Lebih terperinci

Review Desain Condensate Piping System pada North Geragai Processing Plant Facilities 2 di Jambi Merang

Review Desain Condensate Piping System pada North Geragai Processing Plant Facilities 2 di Jambi Merang Review Desain Condensate Piping System pada North Geragai Processing Plant Facilities 2 di Jambi Merang Aulia Havidz 1, Warjito 2 1&2 Teknik Mesin, Departemen Teknik Mesin, Fakultas Teknik Universitas

Lebih terperinci

BAB III DATA DESAIN DAN HASIL INSPEKSI

BAB III DATA DESAIN DAN HASIL INSPEKSI BAB III DATA DESAIN DAN HASIL INSPEKSI III. 1 DATA DESAIN Data yang digunakan pada penelitian ini adalah merupakan data dari sebuah offshore platform yang terletak pada perairan Laut Jawa, di utara Propinsi

Lebih terperinci

MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA

MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA Read Online and Download Ebook MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA DOWNLOAD EBOOK : MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN Click link bellow and free register

Lebih terperinci

BAB III DATA PEMODELAN SISTEM PERPIPAAN

BAB III DATA PEMODELAN SISTEM PERPIPAAN BAB III DATA PEMODELAN SISTEM PERPIPAAN Dalam pemodelan sistem perpipaan diperlukan data-data pendukung sebagai input perangkat lunak dalam analisis. Data yang diperlukan untuk pemodelan suatu sistem perpipaan

Lebih terperinci

UNIVERSITAS SUMATERA UTARA

UNIVERSITAS SUMATERA UTARA 13. Job Description: 14. 15. PROJECT: OIL TANK PIPE 16. 17. CLIENT : 18. 19. ANALYST: M. FADHILLAH PUTRA 20. 21. NOTES : 22. 23. PIPE DATA 24. ------------------- 25. ------------------- 26. From 10 To

Lebih terperinci

BAB V METODOLOGI. Mulai

BAB V METODOLOGI. Mulai BAB V METODOLOGI 5.1. Diagram Alir Pemodelan dan Pemeriksaan Tegangan, Defleksi, Kebocoran pada Flange, dan Perbandingan Gaya dan Momen Langkah-langkah proses pemodelan sampai pemeriksaan tegangan pada

Lebih terperinci

Nama Alat : Drill Pipe Fungsi : - memberikan rangkaian panjang pipa bor, sehingga dapat menembus formasi yang lebih dalam.

Nama Alat : Drill Pipe Fungsi : - memberikan rangkaian panjang pipa bor, sehingga dapat menembus formasi yang lebih dalam. 4.2.1. Nama Alat : Drill Pipe Fungsi : - memberikan rangkaian panjang pipa bor, sehingga dapat menembus formasi yang lebih dalam. - memungkinkan naik-turunnya mata bor. - meneruskan putaran dari meja putaran

Lebih terperinci

Pipa air Pengertian Pipa PVC

Pipa air Pengertian Pipa PVC Pipa air ialah pipa atau tabung, kebanyakan terbuat dari polivinil klorida (PVC), saluran besi, polietilena, atau tembaga yang membawa air bersih yang diberi tekanan udara dan dibersihkan ke bangunan-bangunan

Lebih terperinci

Topi Anda akan membutuhkan untuk melakukan langkah-langkah ini adalah 1. A Windows 98 CD 2. A Komputer dengan CD-ROM akses

Topi Anda akan membutuhkan untuk melakukan langkah-langkah ini adalah 1. A Windows 98 CD 2. A Komputer dengan CD-ROM akses Topi Anda akan membutuhkan untuk melakukan langkah-langkah ini adalah 1. A Windows 98 CD 2. A Komputer dengan CD-ROM akses Untuk mulai menginstal Windows ini. Pertama, cek apakah perangkat boot pertama

Lebih terperinci

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA BAB IV PENGUMPULAN DAN PENGOLAHAN DATA 4.1. Data-Data Awal Analisa Tegangan Berikut ini data-data awal yang menjadi dasar dalam analisa tegangan ini baik untuk perhitungan secara manual maupun untuk data

Lebih terperinci

Informasi Data Pokok Kota Surabaya Tahun 2012 BAB I GEOGRAFIS CHAPTER I GEOGRAPHICAL CONDITIONS

Informasi Data Pokok Kota Surabaya Tahun 2012 BAB I GEOGRAFIS CHAPTER I GEOGRAPHICAL CONDITIONS BAB I GEOGRAFIS CHAPTER I GEOGRAPHICAL CONDITIONS Indonesia sebagai negara tropis, oleh karena itu kelembaban udara nya sangat tinggi yaitu sekitar 70 90% (tergantung lokasi - lokasi nya). Sedangkan, menurut

Lebih terperinci

BAB IV ANALISA DAN PEMBAHASAN. melakukan perancangan sistem perpipaan dengan menggunakan program Caesar

BAB IV ANALISA DAN PEMBAHASAN. melakukan perancangan sistem perpipaan dengan menggunakan program Caesar BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem perpipaan dengan menggunakan program Caesar

Lebih terperinci

SUKSES BERBISNIS DI INTERNET DALAM 29 HARI (INDONESIAN EDITION) BY SOKARTO SOKARTO

SUKSES BERBISNIS DI INTERNET DALAM 29 HARI (INDONESIAN EDITION) BY SOKARTO SOKARTO Read Online and Download Ebook SUKSES BERBISNIS DI INTERNET DALAM 29 HARI (INDONESIAN EDITION) BY SOKARTO SOKARTO DOWNLOAD EBOOK : SUKSES BERBISNIS DI INTERNET DALAM 29 HARI Click link bellow and free

Lebih terperinci

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA

BAB IV PENGUMPULAN DAN PENGOLAHAN DATA BAB IV PENGUMPULAN DAN PENGOLAHAN DATA 4.1. Data-data Awal ( input ) untuk Caesar II Adapun parameter-parameter yang menjadi data masukan (di input) ke dalam program Caesar II sebagai data yang akan diproses

Lebih terperinci

Exercise 1c Menghitung efisiensi

Exercise 1c Menghitung efisiensi Exercise 1 In a Rankine cycle, steam leaves the boiler 4 MPa and 400 C. The condenser pressure is 10 kpa. Determine the cycle efficiency & Simplified flow diagram for the following cases: a. Basic ideal

Lebih terperinci

ANALISIS KERUGIAN HEAD PADA SISTEM PERPIPAAN BAHAN BAKAR HSD PLTU SICANANG MENGGUNAKAN PROGRAM ANALISIS ALIRAN FLUIDA

ANALISIS KERUGIAN HEAD PADA SISTEM PERPIPAAN BAHAN BAKAR HSD PLTU SICANANG MENGGUNAKAN PROGRAM ANALISIS ALIRAN FLUIDA ANALISIS KERUGIAN HEAD PADA SISTEM PERPIPAAN BAHAN BAKAR HSD PLTU SICANANG MENGGUNAKAN PROGRAM ANALISIS ALIRAN FLUIDA Alexander Nico P Sihite, A. Halim Nasution Departemen Teknik Mesin, Fakultas Teknik,

Lebih terperinci

ANALISA KEKUATAN FLANGE PADA SISTEM PEMIPAAN PRIMER REAKTOR TRIGA 2000 BANDUNG

ANALISA KEKUATAN FLANGE PADA SISTEM PEMIPAAN PRIMER REAKTOR TRIGA 2000 BANDUNG ANALISA KEKUATAN FLANGE PADA SISTEM PEMIPAAN PRIMER REAKTOR TRIGA 2000 BANDUNG Hendra Prihatnadi, Budi Santoso Pusat Rekayasa Perangkat Nuklir BATAN, Kawasan Puspiptek Serpong,Gedung 71,Tangerang -15310

Lebih terperinci

PERANCANGAN ULANG FIRE PROTECTION SYSTEM

PERANCANGAN ULANG FIRE PROTECTION SYSTEM PERANCANGAN ULANG FIRE PROTECTION SYSTEM PADA FUEL SUPPLY SYSTEM UTILITY WORK MENGGUNAKAN SOFTWARE PIPE FLOW EXPERT (STUDY KASUS PT. PERTAMINA DPPU JUANDA) Bagus Faisal Darma Arif NRP. 2112 105 022 Dosen

Lebih terperinci

ANALISIS CAPAIAN OPTIMASI NILAI SUKU BUNGA BANK SENTRAL INDONESIA: SUATU PENGENALAN METODE BARU DALAM MENGANALISIS 47 VARIABEL EKONOMI UNTU

ANALISIS CAPAIAN OPTIMASI NILAI SUKU BUNGA BANK SENTRAL INDONESIA: SUATU PENGENALAN METODE BARU DALAM MENGANALISIS 47 VARIABEL EKONOMI UNTU ANALISIS CAPAIAN OPTIMASI NILAI SUKU BUNGA BANK SENTRAL INDONESIA: SUATU PENGENALAN METODE BARU DALAM MENGANALISIS 47 VARIABEL EKONOMI UNTU READ ONLINE AND DOWNLOAD EBOOK : ANALISIS CAPAIAN OPTIMASI NILAI

Lebih terperinci

PRIMA Volume 3, Nomor 6, November 2006 ISSN

PRIMA Volume 3, Nomor 6, November 2006 ISSN PRIMA Volume 3, Nomor 6, November 2006 ISSN 1411-0296 ABSTRAK RANCANG BANGUN SISTEM INSTRUMENTASI COLUMN SCANNING UNTUK INDUSTRI ARJONI AMIR, SYAMSURRIJAL R Pusat Rekayasa Perangkat Nuklir - BAT AN RANCANG

Lebih terperinci

ANALISA PRESSURE DROP DALAM INSTALASI PIPA PT.PERTAMINA DRILLING SERVICES INDONESIA DENGAN PENDEKATAN BINGHAM PLASTIC

ANALISA PRESSURE DROP DALAM INSTALASI PIPA PT.PERTAMINA DRILLING SERVICES INDONESIA DENGAN PENDEKATAN BINGHAM PLASTIC Available online at Website http://ejournal.undip.ac.id/index.php/rotasi ANALISA PRESSURE DROP DALAM INSTALASI PIPA PT.PERTAMINA DRILLING SERVICES INDONESIA DENGAN PENDEKATAN BINGHAM PLASTIC *Eflita Yohana,

Lebih terperinci

SISTEM TRANSPORTASI FLUIDA (Sistem Pemipaan)

SISTEM TRANSPORTASI FLUIDA (Sistem Pemipaan) SISTEM TRANSPORTASI FLUIDA (Sistem Pemipaan) Kode Mata Kuliah : 2035530 Bobot : 3 SKS Oleh MARYUDI, S.T., M.T., Ph.D Irma Atika Sari, S.T., M.Eng Highlights Pendahuluan Jenis jenis pipa Jenis jenis fitting

Lebih terperinci

ASME B31.3: Chapter 1

ASME B31.3: Chapter 1 ASME B31.3: Chapter 1 November 7, 2009 1 Comment ASME B31.3 adalah makanan wajib bagi Piping Stress Engineer dan Piping Engineer pada umumnya, terutama yang sedng mengerjakan project dibidang Petrokimia,

Lebih terperinci

SPRINKLER DI GUDANG PERSONAL WASH PT. UNILEVER INDONESIA TBK. Wisda Mulyasari ( )

SPRINKLER DI GUDANG PERSONAL WASH PT. UNILEVER INDONESIA TBK. Wisda Mulyasari ( ) PERANCANGAN FOAM WATER SPRINKLER DI GUDANG PERSONAL WASH PT. UNILEVER INDONESIA TBK Oleh : Wisda Mulyasari (6507 040 018) BAB I PENDAHULUAN LATAR BELAKANG Undang no 1 tahun 1970, pasal 3 ayat (1) huruf

Lebih terperinci

LAPORAN TUGAS AKHIR PEMBUATAN SISTEM SIRKULASI AIR PENDINGIN KONDENSOR PERALATAN PIROLISIS SAMPAH PLASTIK

LAPORAN TUGAS AKHIR PEMBUATAN SISTEM SIRKULASI AIR PENDINGIN KONDENSOR PERALATAN PIROLISIS SAMPAH PLASTIK LAPORAN TUGAS AKHIR PEMBUATAN SISTEM SIRKULASI AIR PENDINGIN KONDENSOR PERALATAN PIROLISIS SAMPAH PLASTIK Disusun oleh: SEFI YUDA YURI YUAN DANA I 8310055 SENO PRASETYO I 8310058 TANGGUH PERWIRA NEGARA

Lebih terperinci

BAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk

BAB I PENDAHULUAN. kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk BAB I PENDAHULUAN Sistem Perpipaan merupakan bagian yang selalu ada dalam industri masa kini, misalnya industri gas dan pengilangan minyak. Salah satu cara untuk mentransportasikan fluida adalah dengan

Lebih terperinci

Analisa Laju Erosi dan Perhitungan Lifetime Terhadap Material Stainless Steel 304, 310, dan 321

Analisa Laju Erosi dan Perhitungan Lifetime Terhadap Material Stainless Steel 304, 310, dan 321 Analisa Laju Erosi dan Perhitungan Lifetime Terhadap Stainless Steel, 310, dan 321 pada Aliran Reject 1st Cleaner to 2nd Cleaner OCC Line Voith Unit SP 3-5 di PT. PAKERIN (Pabrik Kertas Indonesia) Budi

Lebih terperinci

BAB IV ANALISA DAN PEMBAHASAN. dalam tugas akhir ini adalah sebagai berikut : Document/Drawing Number. 2. TEP-TMP-SPE-001 Piping Desain Spec

BAB IV ANALISA DAN PEMBAHASAN. dalam tugas akhir ini adalah sebagai berikut : Document/Drawing Number. 2. TEP-TMP-SPE-001 Piping Desain Spec BAB IV ANALISA DAN PEMBAHASAN 4.1 Data dan Sistem Pemodelan Sumber (referensi) data-data yang diperlukan yang akan digunakan untuk melakukan perancangan sistem pemipaan dengan menggunakan program Caesar

Lebih terperinci

PENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa?

PENDAHULUAN PERUMUSAN MASALAH. Bagaimana pengaruh interaksi antar korosi terhadap tegangan pada pipa? PENDAHULUAN Korosi yang menyerang sebuah pipa akan berbeda kedalaman dan ukurannya Jarak antara korosi satu dengan yang lain juga akan mempengaruhi kondisi pipa. Dibutuhkan analisa lebih lanjut mengenai

Lebih terperinci

DECANTER (D) Sifat Fisis Komponen Beberapa sifat fisis dari komponen-komponen dalam decanter ditampilkan dalam tabel berikut.

DECANTER (D) Sifat Fisis Komponen Beberapa sifat fisis dari komponen-komponen dalam decanter ditampilkan dalam tabel berikut. DECANTER (D) Deskripsi Tugas : Memisahkan benzaldehyde dari campuran keluar reaktor yang mengandung benzaldehyde, cinnamaldehyde, serta NaOH dan katalis 2 HPb-CD terlarut dalam air Suhu : 50 o C (323 K)

Lebih terperinci

PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N PADA ENGINEERING FLIGHT SIMULATOR

PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N PADA ENGINEERING FLIGHT SIMULATOR PENGEMBANGAN PERANGKAT LUNAK WAKTU-NYATA SIMULASI SISTEM PEMBANGKIT KENDALI ELEVATOR N250-100 PADA ENGINEERING FLIGHT SIMULATOR ABSTRAK Pesawat udara merupakan suatu sistem yang terdiri dari beberapa

Lebih terperinci

Rahasia Cermat & Mahir Menguasai Akuntansi Keuangan Menengah (Indonesian Edition)

Rahasia Cermat & Mahir Menguasai Akuntansi Keuangan Menengah (Indonesian Edition) Rahasia Cermat & Mahir Menguasai Akuntansi Keuangan Menengah (Indonesian Edition) Hery Hery Click here if your download doesn"t start automatically Rahasia Cermat & Mahir Menguasai Akuntansi Keuangan Menengah

Lebih terperinci

BAB III PERENCANAAN SISTEM HYDRANT

BAB III PERENCANAAN SISTEM HYDRANT BAB III PERENCANAAN SISTEM HYDRANT 3.1. Metode Pengambilan Data Penganbilan data ini dilakukan di gedung VLC (Vehicle Logistic Center) PT. X berdasarlan data dan kegiatan yang ada di gedung tersebut. Dengan

Lebih terperinci

TUGAS BROWSING. Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1. Di susun oleh : INDRI SARI UTAMI PEND. FISIKA / B EFD-1 / C

TUGAS BROWSING. Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1. Di susun oleh : INDRI SARI UTAMI PEND. FISIKA / B EFD-1 / C TUGAS BROWSING Diajukan untuk memenuhi salah satu tugas Eksperimen Fisika Dasar 1 Di susun oleh : INDRI SARI UTAMI 060888 PEND. FISIKA / B EFD-1 / C JURUSAN PENDIDIKAN FISIKA FAKULTAS PENDIDIKAN MATEMATIKA

Lebih terperinci

BAB VI PEMBAHASAN DAN HASIL

BAB VI PEMBAHASAN DAN HASIL BAB VI PEMBAHASAN DAN HASIL 6.1. Persiapan Permodelan Sebelum melakukan pemodelan dan analisis, perlu dilakukan olah data terlebih dahulu dari data-data yang diperoleh untuk mempermudah dalam melakukan

Lebih terperinci

Metode Seleksi Material pada Pengilangan Minyak dan Gas Menggunakan Neraca Massa dan Energi dan Diagram Alir Proses

Metode Seleksi Material pada Pengilangan Minyak dan Gas Menggunakan Neraca Massa dan Energi dan Diagram Alir Proses Metode Seleksi Material pada Pengilangan Minyak dan Gas Menggunakan Neraca Massa dan Energi dan Diagram Alir Proses Material Selection Methodology in Oil and gas Refinery using Heat Material Balances and

Lebih terperinci

BAB III ANALISA DAN PEMBAHASAN

BAB III ANALISA DAN PEMBAHASAN BAB III ANALISA DAN PEMBAHASAN 3.1. Perhitungan Ketebalan Pipa (Thickness) Penentuan ketebalan pipa (thickness) adalah suatu proses dimana akan ditentukan schedule pipa yang akan digunakan. Diameter pipa

Lebih terperinci

PERANCANGAN DAN ANALISA SISTEM PERPIPAAN PROCESS PLANT DENGAN METODE ELEMEN HINGGA

PERANCANGAN DAN ANALISA SISTEM PERPIPAAN PROCESS PLANT DENGAN METODE ELEMEN HINGGA PERANCANGAN DAN ANALISA SISTEM PERPIPAAN PROCESS PLANT DENGAN METODE ELEMEN HINGGA *Hendri Hafid Firdaus 1, Djoeli Satrijo 2 1 Mahasiswa Jurusan Teknik Mesin, Fakultas Teknik, Universitas Diponegoro 2

Lebih terperinci

10/2/2012 TANK SYSTEM AQUACULTURE ENGINEERING

10/2/2012 TANK SYSTEM AQUACULTURE ENGINEERING TANK SYSTEM 1 2 1 Menciptakan Volume yang dibatasi dimana ikan atau organisme akuatik lainnya dapat di beri makan pada lingkungan air yang baik. Tujuan Utama 3 1. Asupan air, termasuk oksigen terlarut

Lebih terperinci

ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE

ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE ANALISA KONFIGURASI PIPA BAWAH LAUT PADA ANOA EKSPANSION TEE Oleh: WIRA YUDHA NATA 4305 100 014 JURUSAN TEKNIK KELAUTAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA 2010 ANALISA

Lebih terperinci

ANALISIS TEBAL LAPIS TAMBAHAN (OVERLAY) PADA PERKERASAN KAKU (RIGID PA VEMENT) DENGAN PROGRAM ELCON DAN METODE ASPHALT INSTITUTE TESIS

ANALISIS TEBAL LAPIS TAMBAHAN (OVERLAY) PADA PERKERASAN KAKU (RIGID PA VEMENT) DENGAN PROGRAM ELCON DAN METODE ASPHALT INSTITUTE TESIS ANALISIS TEBAL LAPIS TAMBAHAN (OVERLAY) PADA PERKERASAN KAKU (RIGID PA VEMENT) DENGAN PROGRAM ELCON DAN METODE ASPHALT INSTITUTE (STUDI KASUS : JALAN TOL PADALARANG - CILEUNYI) TESIS Karya tulis sebagai

Lebih terperinci

PERHITUNGAN KESTABILAN LUBANG BUKAAN PADA TEROWONGAN HEADRACE PLTA SINGKARAK MENGGUNAKAN ANALISIS BALIK TESIS MAGISTER

PERHITUNGAN KESTABILAN LUBANG BUKAAN PADA TEROWONGAN HEADRACE PLTA SINGKARAK MENGGUNAKAN ANALISIS BALIK TESIS MAGISTER PERHITUNGAN KESTABILAN LUBANG BUKAAN PADA TEROWONGAN HEADRACE PLTA SINGKARAK MENGGUNAKAN ANALISIS BALIK TESIS MAGISTER OLEH : RUDY SETYAWAN NIM. 25094040 BIDANG PENGUTAMAAN GEOTEKNIK PROGRAM STUDI TEKNIK

Lebih terperinci

ANALISA PELETAKAN BOOSTER PUMP PADA ONSHORE PIPELINE JOB PPEJ (JOINT OPERATING BODY PERTAMINA PETROCHINA EAST JAVA)

ANALISA PELETAKAN BOOSTER PUMP PADA ONSHORE PIPELINE JOB PPEJ (JOINT OPERATING BODY PERTAMINA PETROCHINA EAST JAVA) ANALISA PELETAKAN BOOSTER PUMP PADA ONSHORE PIPELINE JOB PPEJ (JOINT OPERATING BODY PERTAMINA PETROCHINA EAST JAVA) O l e h : D eb r i n a A l f i t r i Ke n t a n i a 4 3 1 0 1 0 0 0 7 9 D o s e n Pe

Lebih terperinci

Oleh : Luthfan Riandy*

Oleh : Luthfan Riandy* STUDI PENGARUH KOMPOSISI, KONDISI OPERASI, DAN KARAKTERISTIK GEOMETRI PIPA TERHADAP PEMBENTUKAN KONDENSAT DI PIPA TRANSMISI GAS BASAH The Study of Composition, Operation Condition, and Pipe Characteristic

Lebih terperinci

FULL DEVELOPMENT OF PIPELINE NETWORKING AT X FIELD

FULL DEVELOPMENT OF PIPELINE NETWORKING AT X FIELD Seminar Nasional Cendekiawan ke 3 Tahun 2017 ISSN (P) : 2460-8696 Buku 1 ISSN (E) : 2540-7589 FULL DEVELOPMENT OF PIPELINE NETWORKING AT X FIELD Fazri Apip Jurusan Teknik Perminyakan Fakultas Teknik Kebumian

Lebih terperinci

Lampiran A: Gambar Bagian- bagian dari Alat Penukar Kalor Berdasarkan Standar TEMA

Lampiran A: Gambar Bagian- bagian dari Alat Penukar Kalor Berdasarkan Standar TEMA Lampiran A: Gambar Bagian- bagian dari Alat Penukar Kalor Berdasarkan Standar TEMA (Sumber: Lit. 1 hal. 2) Lampiran B: Tabel Tebal Shell Minimum (Sumber: Lit. 1 hal. 30) Lampiran C: Tabel Diameter Ruang

Lebih terperinci

MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA

MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN BANKIR INDONESIA DOWNLOAD EBOOK : MANAJEMEN RISIKO 1 (INDONESIAN EDITION) BY IKATAN Click link bellow and free register to download ebook: MANAJEMEN RISIKO

Lebih terperinci

6 KERANJANG 7 LANGKAH API (INDONESIAN EDITION) BY LIM TUNG NING

6 KERANJANG 7 LANGKAH API (INDONESIAN EDITION) BY LIM TUNG NING 6 KERANJANG 7 LANGKAH API (INDONESIAN EDITION) BY LIM TUNG NING READ ONLINE AND DOWNLOAD EBOOK : 6 KERANJANG 7 LANGKAH API (INDONESIAN EDITION) BY LIM TUNG NING PDF Click button to download this ebook

Lebih terperinci

PANDUAN PERHITUNGAN TEBAL PIPA

PANDUAN PERHITUNGAN TEBAL PIPA PANDUAN PERHITUNGAN TEBAL PIPA 1.1 Alur Analisa Untuk mendesain sebuah pipa yang akan digunakan untuk moda distribusi, hal pertama yang perlu dilakukan adalah menghitung tebal pipa minimum yang paling

Lebih terperinci

JURNAL TEKNIK POMITS Vol. 2, No. 1, (2013) ISSN: ( Print) 1

JURNAL TEKNIK POMITS Vol. 2, No. 1, (2013) ISSN: ( Print) 1 JURNAL TEKNIK POMITS Vol. 2, No. 1, (213) ISSN: 2337-3539 (231-9271 Print) 1 Analisa Peletakan Booster Pump pada Onshore Pipeline JOB PPEJ (Joint Operating Body Pertamina Petrochina East Java) Debrina

Lebih terperinci

BAB II LANDASAN TEORI

BAB II LANDASAN TEORI BAB II LANDASAN TEORI 2.1 Pendahuluan Sejak dahulu manusia sudah mengenal sistem perpipaan, namun penggunaan sistem dan bahannya masih sangat sederhana, untuk memenuhi kebutuhan mereka secara pribadi ataupun

Lebih terperinci

BAB IV DATA SISTEM PERPIPAAN HANGTUAH

BAB IV DATA SISTEM PERPIPAAN HANGTUAH BAB IV DATA SISTEM PERPIPAAN HANGTUAH 4.1. Sistem Perpipaan 4.1.1. Lokasi Sistem Perpipaan Sistem perpipaan yang dianalisis sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan milik Conoco

Lebih terperinci

Analisa Aliran Control Valve HCB BAB IV ANALISA FLOW CONTROL VALVE HCB UNTUK STEAM PADA PT POLICHEM INDONESIA TBK

Analisa Aliran Control Valve HCB BAB IV ANALISA FLOW CONTROL VALVE HCB UNTUK STEAM PADA PT POLICHEM INDONESIA TBK 38 BAB IV ANALISA FLOW CONTROL VALVE HCB UNTUK STEAM PADA PT POLICHEM INDONESIA TBK 4.1 Aplikasi Control Valve Pada PT Polichem Indonesia Tbk. PT Polichem Indonesia Tbk. adalah sebuah perusahaan yang memproduksi

Lebih terperinci

SEPARATOR. Nama Anggota: PITRI YANTI ( } KARINDAH ADE SYAPUTRI ( ) LISA ARIYANTI ( )

SEPARATOR. Nama Anggota: PITRI YANTI ( } KARINDAH ADE SYAPUTRI ( ) LISA ARIYANTI ( ) SEPARATOR Nama Anggota: PITRI YANTI (03121403032} KARINDAH ADE SYAPUTRI (03121403042) LISA ARIYANTI (03121403058) 1.Separator Separator merupakan peralatan awal dalam industri minyak yang digunakan untuk

Lebih terperinci

KESASTRAAN MELAYU TIONGHOA DAN KEBANGSAAN INDONESIA: JILID 2 FROM KPG (KEPUSTAKAAN POPULER GRAMEDIA)

KESASTRAAN MELAYU TIONGHOA DAN KEBANGSAAN INDONESIA: JILID 2 FROM KPG (KEPUSTAKAAN POPULER GRAMEDIA) Read Online and Download Ebook KESASTRAAN MELAYU TIONGHOA DAN KEBANGSAAN INDONESIA: JILID 2 FROM KPG (KEPUSTAKAAN POPULER GRAMEDIA) DOWNLOAD EBOOK : KESASTRAAN MELAYU TIONGHOA DAN KEBANGSAAN Click link

Lebih terperinci

PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA ABSTRAK

PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA ABSTRAK PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA Dedy Haryanto, Sagino, Riswan Djambiar Pusat Teknologi Reaktor dan Keselamatan Nuklir ABSTRAK PERANCANGAN KONDENSOR KOMPAK PADA UNTAI UJI BETA. Telah dilakukan

Lebih terperinci

DESAIN DAN ANALISIS TEGANGAN SISTEM PERPIPAAN MAIN STEAM (HIGH PRESSURE) PADA COMBINED CYCLE POWER PLANT

DESAIN DAN ANALISIS TEGANGAN SISTEM PERPIPAAN MAIN STEAM (HIGH PRESSURE) PADA COMBINED CYCLE POWER PLANT DESAIN DAN ANALISIS TEGANGAN SISTEM PERPIPAAN MAIN STEAM (HIGH PRESSURE) PADA COMBINED CYCLE POWER PLANT *Muhammad Zainal Mahfud 1, Djoeli Satrijo 2, Toni Prahasto 2 1 Mahasiswa Jurusan Teknik Mesin, Fakultas

Lebih terperinci

Sumber : Brownell & Young Process Equipment design. USA : Jon Wiley &Sons, Inc. Chapter 3, hal : Abdul Wahid Surhim

Sumber : Brownell & Young Process Equipment design. USA : Jon Wiley &Sons, Inc. Chapter 3, hal : Abdul Wahid Surhim Sumber : Brownell & Young. 1959. Process Equipment design. USA : Jon Wiley &Sons, Inc. Chapter 3, hal : 36-57 3 Abdul Wahid Surhim *Vessel merupakan perlengkapan paling dasar dari industri kimia dan petrokimia

Lebih terperinci

ABSTRAK ABSTRACT KATA PENGANTAR

ABSTRAK ABSTRACT KATA PENGANTAR DAFTAR ISI Halaman LEMBAR PENGESAHAN... i LEMBAR PERSETUJUAN.... ii ABSTRAK... iii ABSTRACT... iv KATA PENGANTAR... v DAFTAR ISI... vi DAFTAR GAMBAR... viii DAFTAR TABEL... ix DAFTAR RUMUS... x BAB I PENDAHULUAN...

Lebih terperinci

JUTAAN UMKM PAHLAWAN PAJAK: URUS PAJAK ITU SANGAT MUDAH (INDONESIAN EDITION) BY CHANDRA BUDI

JUTAAN UMKM PAHLAWAN PAJAK: URUS PAJAK ITU SANGAT MUDAH (INDONESIAN EDITION) BY CHANDRA BUDI Read Online and Download Ebook JUTAAN UMKM PAHLAWAN PAJAK: URUS PAJAK ITU SANGAT MUDAH (INDONESIAN EDITION) BY CHANDRA BUDI DOWNLOAD EBOOK : JUTAAN UMKM PAHLAWAN PAJAK: URUS PAJAK ITU Click link bellow

Lebih terperinci

ANALISIS KASUS UPHEAVAL BUCKLING PADA ONSHORE PIPELINE

ANALISIS KASUS UPHEAVAL BUCKLING PADA ONSHORE PIPELINE ANALISIS KASUS UPHEAVAL BUCKLING PADA ONSHORE PIPELINE Diajukan untuk meraih gelar sarjana Teknik Metalurgi pada Program Studi Teknik Metalurgi Institut Teknologi Bandung TUGAS AKHIR Oleh: Depita Harahap

Lebih terperinci

DAFTAR SNI PRODUK/PERALATAN SUB BIDANG MINYAK DAN GAS BUMI

DAFTAR SNI PRODUK/PERALATAN SUB BIDANG MINYAK DAN GAS BUMI DAFTAR SNI PRODUK/PERALATAN SUB BIDANG MINYAK DAN GAS BUMI 1. 2. 3. / / / Pipa-pipa baja pengujian tinggi untuk saluran pada industry minyak dan gas bumi 07-0728- 1989 High tested steel pipes for petroleum

Lebih terperinci

Dosen Pembimbing: 1. Ir. Imam Rochani, M.Sc. 2. Ir. Handayanu, M.Sc., Ph.D.

Dosen Pembimbing: 1. Ir. Imam Rochani, M.Sc. 2. Ir. Handayanu, M.Sc., Ph.D. Sidang Tugas Akhir (P3) Surabaya, 7 Agustus 2014 PERANCANGAN RISER DAN EXPANSION SPOOL PIPA BAWAH LAUT: STUDI KASUS KILO FIELD PT. PERTAMINA HULU ENERGI OFFSHORE NORTHWEST JAVA Oleh: Hidayat Wusta Lesmana

Lebih terperinci

Analisa Rancangan Pipe Support Sistem Perpipaan dari Pressure Vessel ke Air Condenser Berdasarkan Stress Analysis dengan Pendekatan CAESAR II

Analisa Rancangan Pipe Support Sistem Perpipaan dari Pressure Vessel ke Air Condenser Berdasarkan Stress Analysis dengan Pendekatan CAESAR II 1 Analisa Rancangan Pipe Support Sistem Perpipaan dari Pressure Vessel ke Air Condenser Berdasarkan Stress Analysis dengan Pendekatan CAESAR II Andis Dian Saputro dan Budi Agung Kurniawan Jurusan Teknik

Lebih terperinci

MISTERI PEMBUNUHAN DI KAKEK BODO (INDONESIAN EDITION) BY S. MARA GD.

MISTERI PEMBUNUHAN DI KAKEK BODO (INDONESIAN EDITION) BY S. MARA GD. Read Online and Download Ebook MISTERI PEMBUNUHAN DI KAKEK BODO (INDONESIAN EDITION) BY S. MARA GD. DOWNLOAD EBOOK : MISTERI PEMBUNUHAN DI KAKEK BODO (INDONESIAN Click link bellow and free register to

Lebih terperinci

MODULE 1 GRADE XI VARIATION OF EXPRESSIONS

MODULE 1 GRADE XI VARIATION OF EXPRESSIONS MODULE 1 GRADE XI VARIATION OF EXPRESSIONS Compiled by: Theresia Riya Vernalita H., S.Pd. Kompetensi Dasar 3.1 Menganalisis fungsi sosial, struktur teks, dan unsur kebahasaan pada ungkapan memberi saran

Lebih terperinci

BAB III 1 METODE PENELITIAN

BAB III 1 METODE PENELITIAN 17 BAB III 1 METODE PENELITIAN 1.1 Prosedur Penelitian Prosedur yang dilakukan dalam penelitian ini terdiri dari beberapa langkah. Langkah pertama, yaitu melakukan studi literatur dari berbagi sumber terkait.

Lebih terperinci

Existing : 790 psig Future : 1720 psig. Gambar 1 : Layout sistem perpipaan yang akan dinaikkan tekanannya

Existing : 790 psig Future : 1720 psig. Gambar 1 : Layout sistem perpipaan yang akan dinaikkan tekanannya 1. PENDAHULUAN Jika ditemukan sumber gas yang baru, maka perlu dipertimbangkan pula untuk mengalirkannya melalui sistem perpipaan yang telah ada. Hal ini dilakukan untuk menghemat biaya pengadaan sistem

Lebih terperinci

Studi Pemanfaatan Condensate Outlet Steam Trap Sebagai Air Umpan Boiler di Pabrik Amoniak Pusri-IB

Studi Pemanfaatan Condensate Outlet Steam Trap Sebagai Air Umpan Boiler di Pabrik Amoniak Pusri-IB 20 Jurnal Rekayasa Proses, Vol. 7, No. 1, 2013 Studi Pemanfaatan Condensate Outlet Steam Trap Sebagai Air Umpan Boiler di Pabrik Amoniak Pusri-IB Alfa Widyawan* dan Ferlyn Fachlevie PT. Pupuk Sriwidjaja

Lebih terperinci

BAB III. PERENCANAAN BAGIAN BAGIAN UTAMA CHEMICAL INJECTION PACKAGE DAN PERHITUNGAN PERENCANAAN

BAB III. PERENCANAAN BAGIAN BAGIAN UTAMA CHEMICAL INJECTION PACKAGE DAN PERHITUNGAN PERENCANAAN BAB III. PERENCANAAN BAGIAN BAGIAN UTAMA CHEMICAL INJECTION PACKAGE DAN PERHITUNGAN PERENCANAAN III.1 Bagian Bagian Utama Chemical Injection Package Pada bab ini dilakukan perencanaan untuk mendesign bagian

Lebih terperinci

Bab III Data Perancangan GRP Pipeline

Bab III Data Perancangan GRP Pipeline Bab III Data Perancangan GRP Pipeline 3.2 Sistem Perpipaan Sistem perpipaan yang dirancang sebagai studi kasus pada tugas akhir ini adalah sistem perpipaan penyalur fluida cair yaitu crude dan well fluid

Lebih terperinci

Abstrak. Kata kunci: Hydrotest, Faktor Keamanan, Pipa, FEM ( Finite Element Method )

Abstrak. Kata kunci: Hydrotest, Faktor Keamanan, Pipa, FEM ( Finite Element Method ) PERBANDINGAN PRESSURE AKTUAL HYDROTEST WELDING PIPE API 5L B PSL 1 ERW SCH 10 Ø30 TERHADAP TEGANGAN LULUH DENGAN SIMULASI NUMERIK METODE FEM ( FINITE ELEMENT METHOD ) Muhammad Irawan *, Nurul Laili Arifin

Lebih terperinci

BASIC THERMODYNAMIC CONCEPTS

BASIC THERMODYNAMIC CONCEPTS BASIC THERMODYNAMIC CONCEPTS SYSTEM Definition: Region of space which is under study Surrounding: the whole universe excluding the system Example: Cash In Ci Cash Out Co BANK Cc Ci : all deposits Co :

Lebih terperinci

Pengecoran logam. Pengecoran (casting)

Pengecoran logam. Pengecoran (casting) Pengecoran logam (casting) Pengecoran (casting) Adalah proses dimana logam cair mengalir dengan gaya gravitasi atau gaya lain, kedalam cetakan, yang kemudian akan memadat mengikuti bentuk dari ruang cetakan.

Lebih terperinci

Abstrak Kata Kunci :

Abstrak Kata Kunci : Abstrak Mekanika fluida adalah disiplin ilmu bagian dari bidang mekanika terapan yang mengkaji perilaku dari zat zat cair dan gas dalam keadaan diam ataupun bergerak. Pipa biasanya memiliki penampang melintang

Lebih terperinci

APA SAJA PEKERJAAN PROCESS DESIGN ENGINEER? Oleh: Fadhli Halim Anggota Milis Migas Indonesia

APA SAJA PEKERJAAN PROCESS DESIGN ENGINEER? Oleh: Fadhli Halim Anggota Milis Migas Indonesia APA SAJA PEKERJAAN PROCESS DESIGN ENGINEER? Oleh: Fadhli Halim Anggota Milis Migas Indonesia PENDAHULUAN Menurut saya, seorang Process Design Engineer haruslah dan dituntut untuk mengetahui scope pekerjaan

Lebih terperinci

JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN UNIVERSITAS DARMA PERSADA JAKARTA

JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN UNIVERSITAS DARMA PERSADA JAKARTA TUGAS AKHIR PENGARUH PERUBAHAN PENGATURAN KATUP PADA SISTEM PEMIPAAN POMPA AIR SENTRIFUGAL 300 WATT TERHADAP TEKANAN, KECEPATAN DAN KERUGIAN ALIRAN DI KAPAL Diajukan untuk melengkapi tugas tugas guna untuk

Lebih terperinci

BAB I PENDAHULUAN. Plant, Nuclear Plant, Geothermal Plant, Gas Plant, baik di On-Shore maupun di. Offshore, semuanya mempunyai dan membutuhkan Piping.

BAB I PENDAHULUAN. Plant, Nuclear Plant, Geothermal Plant, Gas Plant, baik di On-Shore maupun di. Offshore, semuanya mempunyai dan membutuhkan Piping. BAB I PENDAHULUAN 1.1. Latar Belakang Masalah. Didalam sebuah Plant, entah itu LNG Plant, Petrochemical Plant, Fertilizer Plant, Nuclear Plant, Geothermal Plant, Gas Plant, baik di On-Shore maupun di Offshore,

Lebih terperinci

TERM OF REFERENCE ( T O R ) KONTRAK PAYUNG HOT INSULATION SERVICES

TERM OF REFERENCE ( T O R ) KONTRAK PAYUNG HOT INSULATION SERVICES SISTEM MANAJEMEN ISO 900 08-09 Tgl Terbit : September 0 Halaman : dari. LATAR BELAKANG Dalam kegiatan pemeliharaan pembangkit, dimungkinkan terjadi kerusakan dimana dalam proses perbaikannya mengharuskan

Lebih terperinci

Gambar 1.1 Sistem perpipaan steam 17 bar

Gambar 1.1 Sistem perpipaan steam 17 bar BAB I PENDAHULUAN 1.1 Latar Belakang Pada dasarnya bahan bakar minyak dan gas, menjadi kebutuhan utama untuk dunia transportasi, dunia industri, dan rumah tangga. Setiap tahun kebutuhan akan pasokan bahan

Lebih terperinci

Addition of beneficiary for other currency than INR

Addition of beneficiary for other currency than INR Addition of beneficiary for other currency than INR Penambahan penerima untuk pengiriman uang INR akan di proses secara offline dan nasabah perlu menggunggah permintaanya melalui Internet Banking kemudian

Lebih terperinci

KESESUAIAN PENGGUNAAN CAMPURAN ASPAL MINYAK DAN ASBUTON MIKRO DENGAN PEN. 40 SEBAGAI BAHAN PENGIKAT DALAM HOT ROLLED SHEET

KESESUAIAN PENGGUNAAN CAMPURAN ASPAL MINYAK DAN ASBUTON MIKRO DENGAN PEN. 40 SEBAGAI BAHAN PENGIKAT DALAM HOT ROLLED SHEET KESESUAIAN PENGGUNAAN CAMPURAN ASPAL MINYAK DAN ASBUTON MIKRO DENGAN PEN. 40 SEBAGAI BAHAN PENGIKAT DALAM HOT ROLLED SHEET RINGKASAN THE SUITABILITY OF A 40 PEN. BLEND OF REFINERY AND MICROASBUTON BITUMEN

Lebih terperinci

Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan Caesar II

Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan Caesar II JURNAL TEKNIK POMITS Vol. 3, No. 2, (2014) ISSN: 2337-3539 (2301-9271 Print) F-168 Analisa Rancangan Pipe Support pada Sistem Perpipaan High Pressure Vent Berdasarkan Stress Analysis dengan Pendekatan

Lebih terperinci

4 BAB IV PERHITUNGAN DAN ANALISA

4 BAB IV PERHITUNGAN DAN ANALISA 4 BAB IV PERHITUNGAN DAN ANALISA 4.1 Data Penelitian Data material pipa API-5L Gr B ditunjukkan pada Tabel 4.1, sedangkan kondisi kerja pada sistem perpipaan unloading line dari jetty menuju plan ditunjukan

Lebih terperinci

ANALISIS MID-POINT TIE-IN PADA PIPA BAWAH LAUT

ANALISIS MID-POINT TIE-IN PADA PIPA BAWAH LAUT ANALISIS MID-POINT TIE-IN PADA PIPA BAWAH LAUT Mulyadi Maslan Hamzah (mmhamzah@gmail.com) Program Studi Magister Teknik Kelautan Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung, Jl Ganesha

Lebih terperinci

DESAIN BASIS DAN ANALISIS STABILITAS PIPA GAS BAWAH LAUT

DESAIN BASIS DAN ANALISIS STABILITAS PIPA GAS BAWAH LAUT LABORATORIUM KEANDALAN DAN KESELAMATAN JURUSAN TEKNIK SISTEM PERKAPALAN FAKULTAS TEKNOLOGI KELAUTAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER SIDANG HASIL P3 DESAIN BASIS DAN ANALISIS STABILITAS PIPA GAS BAWAH

Lebih terperinci

32-bit and 64-bit Windows: Frequently asked questions

32-bit and 64-bit Windows: Frequently asked questions 32-bit and 64-bit Windows: Frequently asked questions // // Here are answers to some common questions about the 32-bit and 64-bit versions of Windows. Frequently asked questions Collapse all What is the

Lebih terperinci

Saher System. English. indonesia. Road Safety 996

Saher System. English. indonesia. Road Safety 996 Saher System English 2 1 4 3 indonesia 6 5 Road Safety 996 What is the Saher System? Saher is a automated traffic control and management system that uses a network of digital cameras connected to the

Lebih terperinci

THESIS. OPTIMASI PEMILIHAN KOMBINASI ALAT BERAT DENGAN APLIKASI REKURSIF DYNAMIC PROGRAMMING Studi Kasus : PT. VICO INDONESIA

THESIS. OPTIMASI PEMILIHAN KOMBINASI ALAT BERAT DENGAN APLIKASI REKURSIF DYNAMIC PROGRAMMING Studi Kasus : PT. VICO INDONESIA THESIS OPTIMASI PEMILIHAN KOMBINASI ALAT BERAT DENGAN APLIKASI REKURSIF DYNAMIC PROGRAMMING Studi Kasus : PT. VICO INDONESIA Disusun Oleh: NUGRAHA INDRA PERMADI 25099081 PROGRAM MAGISTER TEKNIK SIPIL BIDANG

Lebih terperinci

POLITEKNOLOGI VOL. 15 No. 3 SEPTEMBER 2016 ABSTRACT ABSTRAK

POLITEKNOLOGI VOL. 15 No. 3 SEPTEMBER 2016 ABSTRACT ABSTRAK POLITEKNOLOGI VOL. 15 No. 3 SEPTEMBER 2016 ANALISIS FAKTOR HEAD LOSSES PENSTOCK TERHADAP DAYA YANG DIHASILKAN DI PLTA SAGULING Irfan Muhamad Ramadon dan Adi Syuriadi Program Studi Teknik Konversi Energi,

Lebih terperinci

Bab 4 Pemodelan Sistem Perpipaan dan Analisis Tegangan

Bab 4 Pemodelan Sistem Perpipaan dan Analisis Tegangan Bab 4 Pemodelan Sistem Perpipaan dan Analisis Tegangan Pada bab ini akan dilakukan pemodelan dan analisis tegangan sistem perpipaan pada topside platform. Pemodelan dilakukan berdasarkan gambar isometrik

Lebih terperinci