PENDAHULUAN. Abstract

Ukuran: px
Mulai penontonan dengan halaman:

Download "PENDAHULUAN. Abstract"

Transkripsi

1 Nur Lathifah Dwi Fitrianti,et al.perbandingan Efisiensi Kerja Alat Diesel dengan Hydraulic pada Pekerjaan Pondasi Dari Segi Waktu Dan Biaya (Studi Kasus : Proyek Pebangunan Jeber Sport Center) PERBANDINGAN EFISIENSI KERJA ALAT DIESEL HAMMER DENGAN HYDRAULIC HAMMER PADA PEKERJAAN PONDASI TIANG PANCANG DARI SEGI WAKTU DAN BIAYA (Studi Kasus : Proyek Pebangunan Jeber Sport Center) a long tie. But not only Hydraulic which can be used for coparison with Diesel, that ethod was chosen because Hydraulic has siilar charateristic with Diesel Hae. More fastest pile drive used for piling will be affected on tiing finishing project. Fro the calculation of productivity, cost, and tie required for each tool. Diesel required 0.75 eters / inute whereas Hydraulic is 0,906 eters / inute. It takes total hours at a cost of Rp. 38,444, with Diesel while the piling process by using Hydraulic takes a total of hours at a cost of Rp. 41,134, (COMPARISON OF WORK EFFICIENCY OF DIESEL HAMMER WITH HYDRAULIC HAMMER IN TERMS OF THE PILE FOUNDATION TIME AND COST (Case Study: Jeber Sport Center Construction Project)) Nur Lathifah D. Fitrianti, Anik Ratnaningsih, Jojok W. Soetjipto Teknik Sipil, Fakultas Teknik, Universitas Jeber Jln. Kaliantan 37, Jeber E-ail: ndwifitrianti@yahoo.co Abstrak Pebangunan Stadion Jeber Sport Center erupakan proyek diana pondasi yang dipakai adalah jenis tiang. Dala proses peancangannya dipakai Diesel, Diesel dipilih karena berdasarkan keadaan lapangan serta biaya yang bisa ditekan karena peancangan yang ebutuhkan waktu cukup laa. Naun tidak berarti tidak ada alternatif alat lain yang bisa dipakai. Hydraulic dipilih sebagai pebanding dari Diesel, alat tersebut dipilih karena epunyai karakter yang hapir irip dengan Diesel. Peilihan alat yang lebih cepat akan epengaruhi durasi pengerjaan dala enyelesaikan proyek. Dari hasil perhitungan produktivitas, biaya dan waktu yang dibutuhkan asing-asing alat untuk Diesel 0,75 eter/enit sedangkan Hydraulic yaitu 0,906 eter/enit dibutuhkan waktu total 197,014 ja dengan biaya Rp ,00 sedangkan peancangan dengan enggunakan Hydraulic ebutuhkan waktu total 169,255 ja dengan biaya Rp ,00 Kata Kunci: Diesel, Hydraulic, produktivitas Abstract The Construction of Jeber Sport Stadiu Center is a project which is used a piles type foundation. In the piling process used Diesel, Diesel have been chosen by based on field conditions, so the costs can be reduced because of piling process will take Artikel Iliah Hasil Penelitian Mahasiswa Yahun 2014 Keywords: Diesel, Hydraulic, productivity dipilih karena sesuai dengan kondisi PENDAHULUAN lingkungan disekitar proyek yang jauh dari peukian penduduk, selain itu Diesel dipilih karena biaya peakaiannya yang bisa ditekan karena peancangan yang dilakukan ebutuhkan waktu yang cukup laa. Peancangan pondasi dengan Diesel adalah peancangan dengan Ra yang bergerak sendiri dengan esin diesel tanpa diperlukan suber daya dari luar seperti kopresor dan boiler (Nursin, 1995) [2]. ini sederhana dan udah bergerak dari satu lokasi kelokasi lain. Sebuah unit Diesel terdiri atas vertical silinder, sebuah Ra, sebuah anvil, tangki inyak dan peluas, popa solar, Injector, dan peluas ekanik. Penelitian sebelunya tentang Produktivitas Kerja Alat Dala engerjakan pekerjaan pondasi pada proyek yang enggunakan tiang sebagai pondasinya tentunya diperlukan suatu alat yang disebut alat. Ada beberapa jenis alat yang digunakan dala peancangan pondasi tiang yaitu: Drop, Single Acting Stea, Double Acting Stea, Differential Acting Stea, Diesel, Vibratory, Hydraulic, dan Hydraulic Pile Driving (Rocanhadi, 1992) [1]. Beberapa alat tersebut epunyai kelebihan dan kekurangan asing-asing. Alat yang dipakai di suatu pekerjaan proyek dipilih karena berdasarkan faktor-faktor tertentu seperti keadaaan lingkungan di sekitar proyek, kondisi tanah, biaya alat dan lainlain. Pada pebangunan Stadion Jeber Sport Centre pondasi yang digunakan adalah pondasi tiang, sedangkan etode yang dipakai ialah etode peancangan dengan enggunakan Diesel. Peancangan dengan enggunakan Diesel Pada Pondasi enyipulkan bahwa pada kegiatan proyek khususnya pada pekerjaan pondasi tiang penentuan julah alat berat bukan diperhitungakan dari berapa laa waktu penyelesaian proyek tetapi berapa julah target produksi yang ingin dicapai dala pelaksanaan, diana volue pekerjaan dihitung pertitiknya, jenis

2 Nur Lathifah Dwi Fitrianti,et al.perbandingan Efisiensi Kerja Alat Diesel dengan Hydraulic pada Pekerjaan Pondasi Dari Segi Waktu Dan Biaya (Studi Kasus : Proyek Pebangunan Jeber Sport Center) aterial yang akan dikan dan waktu siklus dari alat yang dipakai. Dala enentukan jenis dan julah alat berat yang akan digunakan diperlukan suatu perencanaan yang teliti, diana disesuaikan dengan apa yang akan digunakan, seberapa besar pekerjaannya dan kondisi edan kerja (Agus Saeful, 2009) [3]. Produktivitas alat yang dipakai sangat berpengaruh terhadap waktu dan biaya pada saat pelaksanaan, oleh karena itu perlunya dilakukan penelitian terhadap produktivitas alat Diesel ini. Penelitian juga dilakukan dengan ebandingkan Diesel tersebut dengan alat jenis lain yaitu Hydraulic. Dengan ebandingkan dua alat yang berbeda aka suatu proyek dapat engetahui alat ana yang lebih efisien untuk digunakan, bahkan jika dipakai keduanya eungkinkan suatu proyek dapat lebih epercepat pekerjaan peancangan. METODOLOGI PENELITIAN Metodologi penelitian ialah suatu pebahasan yang berisi tentang penjelasan engenai langkahlangkah sisteatika penelitian yang diulai dari pengolahan data hingga penyelesaian. Tinjauan Proyek Pondasi tiang erupakan jenis pondasi dala yang digunakan sebagai sub struktur pada bangunan Stadion Jeber Sport Center ini. Jenis tiang yang dipakai yaitu tiang beton pracetak berpenapang persegi, dengan ukuran sisi 30 c x 30 c. Alat yang digunakan adalah Diesel. Pengabilan Data Data Prier Sebelu elakukan survei lapangan aka dilakukan persiapanpersiapan untuk enunjang terlaksananya survei tersebut. Tahapan-tahapan yang dilakukan adalah sebagai berikut : a. Perijinan Untuk data prier sebelu elakukan observasi di lapangan aka terlebih dahulu engajukan perohonan ijin secara tertulis kepada pipinan proyek, setelah perijinan tersebut disetujui aka bisa elakukan observasi untuk pengabilan sapel yang akan dipakai. Untuk data sekunder didapatkan dengan langsung eneui pihak tertentu yang berwenang untuk enjelaskan spesifikasi dan jenis alat. b. Survey lapangan Survey lapangan dilakukan pada saat pelaksanaan Kerja Praktek. Survey yang dilakukan diantaranya elakukan perhitungan waktu siklus yaitu dengan encatat berapa laa gerakan Diesel untuk eancang sapai kedalaan tertentu atau waktu siklus produksi untuk satu jenis pekerjaan. Didala waktu siklus ini sudah terasuk sapel operator dan laanya pukulan haer. Data Sekunder Pengupulan data (Dikantor) 1. Layout Site (Project) 2. Bearing Capacity tiang 3. Spesifikasi alat Menentukan Metode Pelaksanaan Artikel Iliah Hasil Penelitian Mahasiswa Yahun 2014 Menentukan etode pelaksanaan pekerjaan antara penggunaan alat Diesel dan Hydraulic yang juga berpengaruh terhadap waktu dan biaya pelaksanaan dilapangan. Menganalisa dan Mengolah Data a. Menghitung produktivitas asingasing alat yang dapat dianalisa dengan data spesifikasi alat serta data Bearing Capacity. b. Melakukan perhitungan waktu Perhitungan waktu yang diaksud adalah perhitungan waktu yang dibutuhkan alat untuk elakukan peancangan pada setiap tiang yang keudian dikalikan dengan julah yang ada dari asing-asing kedalaan. c. Perhitungan biaya 1. Biaya sewa alat. 2. Biaya operasional, upah operator dan yang terdiri dari peakaian bahan bakar, inyak peluas, upah operator dan crew pendukung peralatan. Perhitungan Waktu dan Biaya Pelaksanaan analisa serta pengolahan data, aka waktu dan biaya pelaksanaan pekerjaan untuk penggunaan Diesel dan Hydraulic dapat diperoleh. Mebandingkan Hasil Dari Perhitungan Setelah waktu dan biaya pelaksanaan pekerjaan dari kedua alat berat diperoleh, aka dapat dibandingkan antara kedua alat berat tersebut anakah yang paling efisien dari segi biaya dan waktu. HASIL DAN PEMBAHASAN Tabel Perbedaan Hydraulic dengan Diesel No. Hydraulic 1 Tingkat kebisingan/getaran yang relatif lebih rendah 2 Bebas dari polusi Meni 3 Dapat dikontrol tinggi Kesulita jatuhnya pada tanah lunak 4 Relatif ahal Eko 5 Kesulitan dala obilisasi alat Suber : Alat Berat Untuk Proyek Konstruksi, Rostiyanti [4] 2 Perhitungan Produktivitas Diesel dan Hydraulic Sesuai dengan etode pelaksanaan peancangan yang telah dijelaskan, waktu yang dibutuhkan proses peancangan yang diulai dari pengikatan sapai penepatan pada titik tiang dapat diketahui dengan elakukan pengaatan secara langsung dilapangan. Proses pengikatan sapai penepatan tiang pada titik dilakukan dengan enggunakan Crane Service. Pengaatan dilakukan dengan encatat waktu dengan enggunakan stopwatch yang keudian dicatat diselebar kertas. Berikut hasil dari pencatatan waktu yang disajikan pada tabel 4.2 Mudah Tabel Sapel Rata-rata Waktu Aktivitas Sebelu Peancangan Pada Diesel No Aktivitas Pengikatan 1 1,3 2 Pengangkatan 0,5 0, Peindahan 0,53 0,67 0

3 Nur Lathifah Dwi Fitrianti,et al.perbandingan Efisiensi Kerja Alat Diesel dengan Hydraulic pada Pekerjaan Pondasi Dari Segi Waktu Dan Biaya (Studi Kasus : Proyek Pebangunan Jeber Sport Center) 4 Penepatan 0,4 Σ Mean (enit) Suber : Hasil Pengaatan dilapangan Dari rata-rata waktu pengikatan sapai penepatan tiang yang dilakukan oleh Crane Service pada titik yang telah diketahui aka total waktu yang dibutuhkan untuk seluruh julah tiang adalah 3,07 x 2996,32 enit Menghitung produktivitas alat dengan engacu pada spesifikasi alat yang dipakai serta, data yang ada pada Bearing Capacity. Spesifikasi Diesel yang dipakai, Dongfang DD25 : Cylinder coples ass 2500 kg Max. Cylinder stroke 2300 Frequency per/inutes Max. Energy 56 kgf Oil consuption 10 ltr/hour Cylinder bore 370 Reduction ratio 22 ass 4,2 ton Guide type channel Guide distance 3/330 Perhitungan produktifitas Diesel : Untuk enghitung julah pukulan setiap eternya yaitu dengan ebagi rata-rata julah pukulan dari seua tiang yang ada dilapangan dengan rata-rata tiang yang asuk dari seluruh julah tiang yang ada dilapangan. Julah tiang tiang Julah pukulan seluruh tiang pukulan Julah tiang yang asuk 6634,9 eter Rata-rata julah pukulan J u l a h p u k u l a n se l u r u J u l a h t i a n g pu k ul a n 378 Rata-rata tiang yang asuk J u l a h t i n g g i t i a n g p a J u l a h t i a n g 6634,9 6,8 et e r Sehingga rata-rata pukulan/eter : R a t a r at a j u l a R at a r a t a t i an g p a nc a Berdasarkan spesifikasi alat : 42 pukulan 1 enit 56 pukulan 1 eter 42 P u k u l a n 1 e ni t 56 pukulan x enit x 1,33 enit Dari perhitungan diatas aka produktivitas alat adalah : 1,33 enit/eter 0,75 eter/enit Tabel Rata-rata Waktu Aktivitas Sebelu Peancangan Pada Hydraulic Aktivitas Pengikatan Pengangkatan Peindahan Penepatan Mean (enit) Suber : Penelitian Sebelunya, Agus Saeful Dari rata-rata waktu pengikatan sapai penepatan tiang yang dilakukan oleh Crane Service pada titik Artikel Iliah Hasil Penelitian Mahasiswa Yahun 2014 yang telah diketahui aka total waktu yang dibutuhkan untuk seluruh julah tiang adalah : 2,9 x 2830,4 enit aksial haer Tabel Faktor Kondisi Input : julah alat Kerja dan Manajeen / Tata h : tinggi jatuh Laksana in. haer Tie : satu satuan Kondisi Tata Laksana Kondisi unit waktu Baik Pekerjaan Baik (hari, ja, Sekali enit atau Baik Sekali detik) Baik fk : faktor koreksi Sedang Jelek P r o d u k t i vi t y Suber : Rochanhadi, (1984) [5] Spesifikasi Hydraulic yang dipakai, Bruce 0312 : Max. Cylinder stroke 1200 Min. Cylinder stoke 200 Blow Rate at Max. Storke 40 blow/inutes Max. Energy 3,6 ton.eter Operating Pressure 230 bar Required Flow Rate 100 lp ass 3 ton Waktu kerja /hari 8 ja Kondisi pekerja 0,75 (baik) Perhitungan produktifitas Hydraulic : Julah tiang tiang Julah tiang yang asuk 6634,9 eter Rata-rata tiang yang asuk J u l a h t i n g g i t i a n g p a J u l a h t i a n g 6634,9 6,8 et er Berdasarkan spesifikasi alat, aka produktivitas alat (Pilcher, 1992) [6]: o u t p ut x a x. st P r od u k t i vi t y input x h x tie x fk Diana : Output : Kedalaan tiang Max. Stroke : tinggi jatuh Maka waktu yang dibutuhkan untuk peancangan sedala 1 eter adalah : 0,906 1 eni t 1 x enit 6,8 x1,2 1 x 0,2 x x 0,75 0,906 /enit x 1,104 enit 3 Perhitungan Volue Pekerjaan dan Kebutuhan Waktu Peancangan Diesel dan Hydraulic perhitungan produktivitas alat selanjutnya yaitu enghitung volue pekerjaan dari aktivitas peancangan, sehingga dari volue pekerjaan yang sudah diketahui dapat dihitung waktu yang dibutuhkan alat untuk elakukan peancangan sapai pada kedalaan tertentu. Diesel Volue pekerjaan peancangan kedalaan 2 2 x 1 titik 2 2 x 1,33 2,66 enit

4 Nur Lathifah Dwi Fitrianti,et al.perbandingan Efisiensi Kerja Alat Diesel dengan Hydraulic pada Pekerjaan Pondasi Dari Segi Waktu Dan Biaya (Studi Kasus : Proyek Pebangunan Jeber Sport Center) Volue pekerjaan peancangan kedalaan 4,5 4,5 x 1 titik 4,5 4,5 x 1,33 5,985 enit Volue pekerjaan peancangan kedalaan 5 5 x x 1,33 73,15 enit Untuk volue pekerjaan serta kebutuhan waktu dari asing-asing kedalaan tiang selengkapnya dapat dilihat pada tabel berikut : Tabel Volue Pekerjaan dan Kebutuhan Waktu Dala Peancangan pada Diesel Kedalaan Julah Volue () ,5 1 4, ,2 1 5,2 5,3 1 5,3 Suber : Hasil Perhitungan Tabel Volue Pekerjaan dan Kebutuhan Waktu Dala Peancangan pada Diesel (Lanjutan) Kedalaan Julah Volue () 5, ,7 1 5,7 5,8 2 11,6 5,9 1 5, ,2 1 6,2 6,3 4 6,3 6,4 1 6,4 6, ,6 2 13,2 6,7 3 20,1 6, , ,1 2 14,2 7,2 2 14,4 7, ,3 3 21,9 7,4 1 7,4 7, ,6 1 7,6 7,7 2 15,4 7,8 1 7, ,3 1 8,3 8, ,9 Suber : Hasil Perhitungan Kedalaan () Dari hasil perhitungan waktu yang telah diperoleh aka kebutuhan waktu per ja untuk asing-asing alat adalah : Crane Service : T ot a l w a k t u C r an e S e Waktu (enit) 2996,32 49,94 j a Diesel haer : T ot a l w a k t u P e a n ca Waktu (enit) 8824, ,074 j Volue pekerjaan Kedalaan peancangan kedalaan 2 () 2 x 1 titik 2 2 x 1,104 2,208 enit Volue pekerjaan peancangan kedalaan 4,5 4,5 x 1 titik 4,5 4,5 x 1,104 4,968 enit Volue pekerjaan peancangan kedalaan 5 5 x x 1,104,72 enit Untuk volue pekerjaan serta kebutuhan waktu dari asing-asing kedalaan tiang selengkapnya dapat dilihat pada tabel berikut : Tabel Volue Pekerjaan dan Kebutuhan Waktu Dala Peancangan Pada Hydraulic Julah Volue Artikel Iliah Hasil Penelitian Mahasiswa Yahun ,5 1 4, ,2 1 5,2 5,3 1 5,3 5,5 40 5,5 5,7 1 5,7 5,8 2 11,6 5,9 1 5, ,2 1 6,2 6,3 4 6,3 6,4 1 6,4 6, ,6 2 13,2 6,7 3 20,1 6, , ,1 2 14,2 7,2 2 14,4 7, Suber : Hasil Perhitungan Tabel Volue Pekerjaan dan Kebutuhan Waktu Dala Peancangan Pada Hydraulic (Lanjutan) Julah Volue 7,3 3 21,9 7,4 1 7,4 7, ,6 1 7,6 7,7 2 15,4 7,8 1 7, ,3 1 8,3 8, ,9 Suber : Hasil Perhitungan Dari hasil perhitungan waktu yang telah diperoleh aka kebutuhan waktu per ja untuk asingasing alat adalah : Crane Service : T ot a l W a k t u C r a n e S e r Waktu (enit) 2830,4 47,173 j a Hydraulic haer : T ot a l w a k t u P e a n ca Waktu (enit) 7324, ,082 Perhitungan Biaya Sewa Alat Tabel Total Harga Sewa Alat Pada Peancangan Diesel Alat Harga Sewa/ja (Rp) Crane Service Diesel Kebutuhan Waktu (ja) ,00 49, ,00 147,074 Σ 197,014 Suber : Hasil Perhitungan Tabel Total Harga Sewa Alat Pada Peancangan Hydraulic Alat Harga Sewa/ja (Rp) Kebutuha Waktu (ja) Crane ,00 47,173 Service Hydrauli ,00 122,082 c Σ 169,255 Suber : Hasil Perhitungan Perbandingan waktu siklus antara Diesel dengan Hydraulic dari proses pengikatan hingga peancangan tiang dapat disajikan pada diagra dibawah. Dari diagra dapat dilihat bahwa waktu siklus pada Hydraulic lebih cepat dibandingkan dengan Diesel. perhitungan terhadap produktivitas, kebutuhan waktu, serta biaya yang dibutuhkan dala peancangan, aka dapat 4

5 Nur Lathifah Dwi Fitrianti,et al.perbandingan Efisiensi Kerja Alat Diesel dengan Hydraulic pada Pekerjaan Pondasi Dari Segi Waktu Dan Biaya (Studi Kasus : Proyek Pebangunan Jeber Sport Center) 5 disajikan grafik perbandingan dari kedua alat Kesipulan PENUTUP 1. Produktivitas yang dihasilkan dari peancangan dengan Diesel 0,75 eter/enit sedangkan Hydraulic yaitu 0,906 eter/enit. Sehingga waktu peancangan lebih cepat dilakukan dengan enggunakan Hydraulic. 2. Dari perhitungan produktivitas kedua alat dapat diketahui waktu yang dibutuhkan untuk proses peancangan. Untuk Diesel dibutuhkan waktu total 197,014 ja dengan biaya Rp ,00 sedangkan peancangan dengan enggunakan Hydraulic ebutuhkan waktu total 169,255 ja dengan biaya Rp ,00 3. Dari segi waktu peancangan, dapat dilihat Hydraulic lebih efisien naun dari segi biaya Diesel asih lebih efisien. Saran 1. Untuk penelitian selanjutnya sebaiknya kondisi tanah juga dijadikan faktor yang berpengaruh dala perhitungan produktivitas dengan tujuan hasil yang lebih valid 2. Alat yang dibandingkan sebaiknya saa-saa digunakan dilapangan tepat dilakukan penelitian 3. Efisiensi dan efektifitas tidak hanya dilihat dari segi teknis tetapi juga non teknis DAFTAR PUSTAKA [1] Rochanhadi Alat-alat Berat dan Peggunaannya. Departeen Pekerjaan Uu. Jakarta. [2] Nursin Alat Berat. Pusat Pengebangan Pendidikan Politeknik Bandung. Jakarta. [3] Saeful Agus Produktivitas Kerja Alat Pada Pondasi (Jurnal). Universitas Pakuan, Bogo [4] Rostiyanti Alat Berat Untuk Proyek Konstruksi. Rineka Cipta. Jakarta [5] Rochanhadi Perhitungan Biaya Pelaksanaan Pekerjaan Dengan Alat-alat Berat. Departeen Pekerjaan Uu. Jakarta [6] Pilcher, Roy Principles of Construction Manageent 3rd. McGraw- Hill Book Copany Europe. England. Artikel Iliah Hasil Penelitian Mahasiswa Yahun 2014

PERBANDINGAN EFISIENSI KERJA ALAT DIESEL HAMMER

PERBANDINGAN EFISIENSI KERJA ALAT DIESEL HAMMER PERBANDINGAN EFISIENSI KERJA ALAT DIESEL HAMMER DENGAN HYDRAULIC HAMMER PADA PEKERJAAN PONDASI TIANG PANCANG DARI SEGI WAKTU DAN BIAYA (Studi Kasus : Proyek Pembangunan Jember Sport Center) SKRIPSI Oleh

Lebih terperinci

Dampak Pembangunan SMPN 3 Blitar Terhadap Kinerja Lalu Lintas Sekitarnya

Dampak Pembangunan SMPN 3 Blitar Terhadap Kinerja Lalu Lintas Sekitarnya Dapak Pebangunan SMPN 3 Blitar Terhadap Kinerja Lalu Lintas Sekitarnya Miftachul Huda 1), Dwi Muryanto 2) 1) Teknik Sipil, Teknik, Universitas Muhaadiyah Surabaya Jl. Sutorejo No. 59 Surabaya, 60113 Eail:

Lebih terperinci

PERBANDINGAN PRODUKTIVITAS ALAT HYDRAULIC HAMMER DAN JACK IN PILE DI SURABAYA

PERBANDINGAN PRODUKTIVITAS ALAT HYDRAULIC HAMMER DAN JACK IN PILE DI SURABAYA PERBANDINGAN PRODUKTIVITAS ALAT HYDRAULIC HAMMER DAN JACK IN PILE DI SURABAYA Risanto Tedjokusumo 1, Verryanto Goenawan 2, Paravita S. Wulandari 3, dan Jonathan Hendra Kusuma 4 ABSTRAK : Pelaksanaan pemancangan

Lebih terperinci

JURNAL TUGAS AKHIR PRODUKTIVITAS KERJA ALAT HAMMER PADA PONDASI TIANG PANCANG

JURNAL TUGAS AKHIR PRODUKTIVITAS KERJA ALAT HAMMER PADA PONDASI TIANG PANCANG JURNAL TUGAS AKHIR PRODUKTIVITAS KERJA ALAT HAMMER PADA PONDASI TIANG PANCANG (Studi Kasus : Proyek Pembangunan Gedung Rumah Sakit Central Medika Cibinong Bogor) Disusun oleh : AGUS SAEPUL 0531 03 026

Lebih terperinci

BAB I PENDAHULUAN. segi kuantitas dan kualitasnya. Penambahan jumlah konsumen yang tidak di ikuti

BAB I PENDAHULUAN. segi kuantitas dan kualitasnya. Penambahan jumlah konsumen yang tidak di ikuti BAB I PENDAHULUAN 1.1 Latar Belakang Air erupakan kebutuhan yang penting bagi kehidupan anusia. Manusia tidak dapat elanjutkan kehidupannya tanpa penyediaan air yang cukup dala segi kuantitas dan kualitasnya.

Lebih terperinci

Jurnal Ilmiah Teknik Sipil No. 1, Vol. 1, Maret 2014

Jurnal Ilmiah Teknik Sipil No. 1, Vol. 1, Maret 2014 EFISIENSI PENGGUNAAN ALAT BERAT PADA PEMBANGUNAN GEDUNG TRAINING CENTRE UNIVERSITAS NEGERI GORONTALO 1) LIONY DWI PUTRI TAKAREDAS, 2) ARFAN UTIARAHMAN 1) Mahasiswa S1 Teknik Sipil Fakultas Teknik Universitas

Lebih terperinci

SEMINAR NASIONAL PENDIDIKAN FISIKA 2017

SEMINAR NASIONAL PENDIDIKAN FISIKA 2017 Peran Pendidikan, Sains, dan Teknologi untuk Mengebangkan Budaya Iliah dan Inovasi terbarukan dala endukung Sustainable Developent Goals (SDGs) 2030 ANALISIS INTENSITAS MEDAN MAGNET EXTREMELY LOW FREQUENCY

Lebih terperinci

BAB I PENDAHULUAN. dalam skala prioritas pembangunan nasional dan daerah di Indonesia

BAB I PENDAHULUAN. dalam skala prioritas pembangunan nasional dan daerah di Indonesia BAB I PENDAHULUAN A. Latar Belakang Masalah Pebangunan ekonoi erupakan asalah penting bagi suatu negara, untuk itu sejak awal pebangunan ekonoi endapat tepat penting dala skala prioritas pebangunan nasional

Lebih terperinci

JURNAL LOGIKA, Volume XII, No 3 Tahun 2014 ISSN : KESTABILAN KOLOM DENGAN METODE SNI DAN PPBBI 1984

JURNAL LOGIKA, Volume XII, No 3 Tahun 2014 ISSN : KESTABILAN KOLOM DENGAN METODE SNI DAN PPBBI 1984 JURNAL LOGIKA, Volue XII, No 3 Tahun 2014 ISSN : 1978-2560 www.jurnallogika.co KESTABILAN KOLOM DENGAN METODE SNI DAN PPBBI 1984 Fathur Rohan (Universitas Swadaya Gunung Jati) Abstrak Kolo adalah batang

Lebih terperinci

Sistem Informasi Manajemen Penjualan Pada Koperasi Pegawai Negeri Kantor

Sistem Informasi Manajemen Penjualan Pada Koperasi Pegawai Negeri Kantor Siste Inforasi Manajeen Penjualan Pada Koperasi Pegawai Negeri Kantor Gubernur Berbasis Web Deasy AnnisaSari, Helfi Nasution 2, Anggi Sriurdianti Sukato 3. Progra Studi Inforatika Universitas Tanjungpura,2,3

Lebih terperinci

RUMUS DAYA DUKUNG TIANG PANCANG : P = M 2. H. fs. ht (M + m). Z

RUMUS DAYA DUKUNG TIANG PANCANG : P = M 2. H. fs. ht (M + m). Z RUMUS DAYA DUKUNG TIANG PANCANG : P = M 2. H. fs. ht (M + m). Z Dimana : M = Berat balok pancang m = Berat sendiri tiang H = Tinggi jatuh balok pancang fs = Faktor keamanan 5 P = Beban tiang Z = untuk

Lebih terperinci

PENGARUH VARIASI TABUNG UDARA TERHHADAP DEBIT PEMOMPAAN POMPA HIDRAM

PENGARUH VARIASI TABUNG UDARA TERHHADAP DEBIT PEMOMPAAN POMPA HIDRAM 25 PENGARUH VARIASI TABUNG UDARA TERHHADAP DEBIT PEMOMPAAN POMPA HIDRAM Budi Hartono Fakultas Teknik, Universitas Ibnu Chaldun, Jl. Raya Serang Cilegon K.5, Serang Banten. Telp. 254-82357 / Fax. 254-82358

Lebih terperinci

BAB I PENDAHULUAN. daya nasional yang memberikan kesempatan bagi peningkatan demokrasi, dan

BAB I PENDAHULUAN. daya nasional yang memberikan kesempatan bagi peningkatan demokrasi, dan BAB I PENDAHULUAN A. Latar Belakang Masalah Pebangunan daerah sebagai bagian yang integral dari pebangunan nasional dilaksanakan berdasakan prinsip otonoi daerah dan pengaturan suber daya nasional yang

Lebih terperinci

PENGARUH LAY-OUT OPERASI PERALATAN PANCANG TERHADAP PRODUKTIFITAS PEMANCANGAN PONDASI GEDUNG X

PENGARUH LAY-OUT OPERASI PERALATAN PANCANG TERHADAP PRODUKTIFITAS PEMANCANGAN PONDASI GEDUNG X PENGARUH LAY-OUT OPERASI PERALATAN PANCANG TERHADAP PRODUKTIFITAS PEMANCANGAN PONDASI GEDUNG X Darman Katni S Dosen D3 Teknik Sipil FTSP-ITS Email : darman@ce.its.ac.id ABSTRAK Pada pelaksanaan pondasi

Lebih terperinci

UNIVERSITAS BINA NUSANTARA. Jurusan Teknik Sipil Skripsi Sarjana Semester Ganjil Tahun 2011/2012

UNIVERSITAS BINA NUSANTARA. Jurusan Teknik Sipil Skripsi Sarjana Semester Ganjil Tahun 2011/2012 UNIVERSITAS BINA NUSANTARA Jurusan Teknik Sipil Skripsi Sarjana Semester Ganjil Tahun 2011/2012 EFISIENSI HARGA BANGUNAN BERTINGKAT RUSUNAWA PROTOTIPE DENGAN MENGGUNAKAN METODE PRACETAK PADA WILAYAH JAKARTA

Lebih terperinci

TEKNIK PELAKSANAAN DAN PERHITUNGAN DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK CITRALAND BAGYA CITY

TEKNIK PELAKSANAAN DAN PERHITUNGAN DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK CITRALAND BAGYA CITY TEKNIK PELAKSANAAN DAN PERHITUNGAN DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK CITRALAND BAGYA CITY LAPORAN Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma

Lebih terperinci

I. PENDAHULUAN. Bangunan sipil terbagi atas dua bagian yaitu bangunan di atas tanah (upper

I. PENDAHULUAN. Bangunan sipil terbagi atas dua bagian yaitu bangunan di atas tanah (upper I. PENDAHULUAN A. Latar Belakang Bangunan sipil terbagi atas dua bagian yaitu bangunan di atas tanah (upper structure) dan bangunan di bawah tanah (sub structure) yang membedakan diantara keduanya adalah

Lebih terperinci

STUDI PERBANDINGAN KAPASITAS DUKUNG VERTIKAL MINI PILE UKURAN 20X20 CM MENGGUNAKAN BERBAGAI FORMULA DINAMIK BERDASARKAN DATA PEMANCANGAN TIANG

STUDI PERBANDINGAN KAPASITAS DUKUNG VERTIKAL MINI PILE UKURAN 20X20 CM MENGGUNAKAN BERBAGAI FORMULA DINAMIK BERDASARKAN DATA PEMANCANGAN TIANG STUDI PERBANDINGAN KAPASITAS DUKUNG VERTIKAL MINI PILE UKURAN 20X20 CM MENGGUNAKAN BERBAGAI FORMULA DINAMIK BERDASARKAN DATA PEMANCANGAN TIANG YUSRI RURAN NRP : 0621053 Pembimbing : Ir. Herianto Wibowo,

Lebih terperinci

ANALISA PEMILIHAN ALTERNATIF ALAT PANCANG (STUDI KASUS PROYEK APARTEMEN GUNAWANGSA) I Putu Artama Wiguna, Ir.MT.PhD. Farida Rachmawati, ST.

ANALISA PEMILIHAN ALTERNATIF ALAT PANCANG (STUDI KASUS PROYEK APARTEMEN GUNAWANGSA) I Putu Artama Wiguna, Ir.MT.PhD. Farida Rachmawati, ST. ANALISA PEMILIHAN ALTERNATIF ALAT PANCANG (STUDI KASUS PROYEK APARTEMEN GUNAWANGSA) DISUSUN OLEH: AGUS PRIADI M 3109 106 048 DOSEN PEMBIMBING: I Putu Artama Wiguna, Ir.MT.PhD. Farida Rachmawati, ST.MT

Lebih terperinci

STUDI ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG

STUDI ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG Jurnal Rancang Sipil Volume 1 Nomor 1, Desember 2012 21 STUDI ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG Jhonson Tambunan Staf Pengajar Program Studi Teknik Sipil Fakultas Teknik Universitas Simalungun

Lebih terperinci

Analisis Pondasi Konvensional dan Pondasi Elevated Tangki Refrigerated LPG PT Pertamina Tanjung Sekong dari Segi Biaya dan Waktu

Analisis Pondasi Konvensional dan Pondasi Elevated Tangki Refrigerated LPG PT Pertamina Tanjung Sekong dari Segi Biaya dan Waktu D165 Analisis Pondasi Konvensional dan Pondasi Elevated Tangki Refrigerated LPG PT Pertamina Tanjung Sekong dari Segi Biaya dan Waktu Sry Rashida Sofyan dan Cahyono Bintang Nurcahyo Departemen Teknik Sipil,

Lebih terperinci

PRODUKTIVITAS DAN KETERLAMBATAN PRODUKSI TIANG PANCANG DAN TIANG LISTRIK PADA PERUSAHAAN X DENGAN MPDM

PRODUKTIVITAS DAN KETERLAMBATAN PRODUKSI TIANG PANCANG DAN TIANG LISTRIK PADA PERUSAHAAN X DENGAN MPDM PRODUKTIVITAS DAN KETERLAMBATAN PRODUKSI TIANG PANCANG DAN TIANG LISTRIK PADA PERUSAHAAN X DENGAN MPDM Alvin J.L. 1, Leonard F.A. 2, Sentosa Limanto 3 & Jonathan H.K. 4 ABSTRAK : Perkembangan teknologi

Lebih terperinci

PEMBENTUKAN SEL-SEL MESIN UNTUK MENDAPATKAN PENGURANGAN JARAK DAN BIAYA MATERIAL HANDLING DENGAN METODE HEURISTIK DI PT. BENGKEL COKRO BERSAUDARA

PEMBENTUKAN SEL-SEL MESIN UNTUK MENDAPATKAN PENGURANGAN JARAK DAN BIAYA MATERIAL HANDLING DENGAN METODE HEURISTIK DI PT. BENGKEL COKRO BERSAUDARA PEMBENTUKAN SEL-SEL MESIN UNTUK MENDAPATKAN PENGURANGAN JARAK DAN BIAYA MATERIAL HANDLING DENGAN METODE HEURISTIK DI PT. BENGKEL COKRO BERSAUDARA Babang Purwanggono, Andre Sugiyono Progra Studi Teknik

Lebih terperinci

PETUNJUK UMUM Pengerjaan Soal Tahap Final Diponegoro Physics Competititon Tingkat SMA

PETUNJUK UMUM Pengerjaan Soal Tahap Final Diponegoro Physics Competititon Tingkat SMA PETUNJUK UMUM Pengerjaan Soal Tahap Final Diponegoro Physics Copetititon Tingkat SMA 1. Ujian Eksperien berupa Naskah soal beserta lebar jawaban dan kertas grafik. 2. Waktu keseluruhan dala eksperien dan

Lebih terperinci

Disusun sebagai salah satu syarat menyelesaikan Program Studi Strata I pada Jurusan Teknik Sipil Fakultas Teknik. Oleh :

Disusun sebagai salah satu syarat menyelesaikan Program Studi Strata I pada Jurusan Teknik Sipil Fakultas Teknik. Oleh : ANALISA PERBANDINGAN DETAIL KEKUATAN, JUMLAH TULANGAN DAN BIAYA ANTARA BORED PILE DENGAN TIANG PANCANG PADA PEMBANGUNAN HOTEL BEST WESTREN ADISUCIPTO YOGYAKARTA Disusun sebagai salah satu syarat menyelesaikan

Lebih terperinci

Analisis Pengaruh Pipa Kapiler yang Dililitkan pada Line Suction Terhadap Performansi Mesin Pendingin 1)

Analisis Pengaruh Pipa Kapiler yang Dililitkan pada Line Suction Terhadap Performansi Mesin Pendingin 1) JURNAL TEKNIK MESIN Vol 4, No 2, Oktober 2002: 94 98 Analisis Pengaruh Pipa Kapiler yang Dililitkan pada Line Suction Terhadap Perforansi Mesin Pendingin ) Ekadewi Anggraini Handoyo Dosen Fakultas Teknologi

Lebih terperinci

BAB I PENDAHULUAN. pembangunan di bidang-bidang lain, seperti sosial, politik, dan budaya. perbedaan antara yang kaya dengan yang miskin.

BAB I PENDAHULUAN. pembangunan di bidang-bidang lain, seperti sosial, politik, dan budaya. perbedaan antara yang kaya dengan yang miskin. BAB I PENDAHULUAN A. Latar Belakang Masalah Pebangunan ekonoi erupakan asalah penting bagi suatu negara, untuk itu sejak awal pebangunan ekonoi endapat tepat penting dala skala prioritas pebangunan nasional

Lebih terperinci

PERHITUNGAN INTEGRAL FUNGSI REAL MENGGUNAKAN TEKNIK RESIDU

PERHITUNGAN INTEGRAL FUNGSI REAL MENGGUNAKAN TEKNIK RESIDU PERHITUNGAN INTEGRAL FUNGSI REAL MENGGUNAKAN TEKNIK RESIDU Warsito (warsito@ail.ut.ac.id) Universitas Terbuka ABSTRAT A function f ( x) ( is bounded and continuous in (, ), so the iproper integral of rational

Lebih terperinci

ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT

ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT ANALISA PERHITUNGAN DAYA DUKUNG TIANG PANCANG TUNGGAL BERDASARKAN DATA SPT PADA PROYEK PEMBANGUNAN GEDUNG PERKANTORAN MEGA PRIMA DEVELOPMENT LAPORAN Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir

Lebih terperinci

PERENCANAAN ALTERNATIF STRUKTUR BAJA GEDUNG MIPA CENTER (TAHAP I) FAKULTAS MATEMATIKA DAN ILMU PENGETAHUAN ALAM UNIVERSITAS BRAWIJAYA MALANG JURNAL

PERENCANAAN ALTERNATIF STRUKTUR BAJA GEDUNG MIPA CENTER (TAHAP I) FAKULTAS MATEMATIKA DAN ILMU PENGETAHUAN ALAM UNIVERSITAS BRAWIJAYA MALANG JURNAL PERENCANAAN ALTERNATIF STRUKTUR BAJA GEDUNG MIPA CENTER (TAHAP I) FAKULTAS MATEMATIKA DAN ILMU PENGETAHUAN ALAM UNIVERSITAS BRAWIJAYA MALANG JURNAL Diajukan untuk eenuhi persyaratan eperoleh gelar Sarjana

Lebih terperinci

ANALISIS KECEPATAN LARI 400 METER PUTRI FINAL PADA KEJUARAAN NASIONAL ATLETIK JAWA TIMUR TERBUKA DI SURABAYA TAHUN 2016

ANALISIS KECEPATAN LARI 400 METER PUTRI FINAL PADA KEJUARAAN NASIONAL ATLETIK JAWA TIMUR TERBUKA DI SURABAYA TAHUN 2016 Analisis Kecepatan Lari..(Dian Saputri) ANALISIS KECEPATAN LARI METER PUTRI FINAL PADA KEJUARAAN NASIONAL ATLETIK JAWA TIMUR TERBUKA DI SURABAYA TAHUN THE ANALYSIS OF METERS RUN SPEED WOMEN ATHLETES IN

Lebih terperinci

PENGARUH BENTUK COVER TERHADAP PRODUKTIFITAS DAN EFISIENSI SOLAR STILL

PENGARUH BENTUK COVER TERHADAP PRODUKTIFITAS DAN EFISIENSI SOLAR STILL PENGARUH BENTUK COVER TERHADAP PRODUKTIFITAS DAN EFISIENSI SOLAR STILL Nova R. Isail Jurusan Teknik Mesin Fakultas Teknik Universitas Widyagaa Malang novarislapung@yahoo.co.id ABSTRACT Various distillation

Lebih terperinci

Volume 17, Nomor 2, Hal Juli Desember 2015

Volume 17, Nomor 2, Hal Juli Desember 2015 Volue 17, Noor 2, Hal. 111-120 Juli Deseber 2015 ISSN:0852-8349 EFEKTIVITAS PENGGUNAAN MEDIA MIND MAP TERHADAP PRESTASI BELAJAR BIOLOGI SISWA KELAS VII SMP NEGERI 2 KERINCI TAHUN PELAJARAN 2014/2015 Efriana

Lebih terperinci

Definisi 3.3: RUANG SAMPEL KONTINU Ruang sampel kontinu adalah ruang sampel yang anggotanya merupakan interval pada garis bilangan real.

Definisi 3.3: RUANG SAMPEL KONTINU Ruang sampel kontinu adalah ruang sampel yang anggotanya merupakan interval pada garis bilangan real. 0 RUANG SAMPEL Kita akan eperoleh ruang sapel, jika kita elakukan suatu eksperien atau percobaan. Eksperien disini erupakan eksperien acak. Misalnya kita elakukan suatu eksperien yang diulang beberapa

Lebih terperinci

ABSTRAK. Keywords: Economic Quantity Production, Nasution, A.H, Perencanaan dan Pengendalian Persediaan. ABSTRACT

ABSTRAK. Keywords: Economic Quantity Production, Nasution, A.H, Perencanaan dan Pengendalian Persediaan. ABSTRACT PERECANAAN DAN PENGENDALIAN PRODUKSI UNTUK MEMINIMALKAN BIAYA PRODUKSI DENGAN METODE ECONOMIC PRODUCTION QUANTITY MULTI ITEM DI CV. FAJAR TEKNIK SEJAHTERA Dio Kharisa Putra, Rusindiyanto dan Budi Santoso

Lebih terperinci

Keywords: Railway, Jenggala, Operational Performance, Cross Capacity, IPA

Keywords: Railway, Jenggala, Operational Performance, Cross Capacity, IPA KAJIAN KINERJA OPERASIONAL KERETA API JENGGALA JURUSAN MOJOKERTO SIDOARJO (A Study On Operational Perforance of Jenggala Train, Mojokerto Sidoarjo Route) Irfan Nurdiansyah, Achad Wicaksono, Hendi Bowoputro

Lebih terperinci

BAB III METODE BEDA HINGGA CRANK-NICOLSON

BAB III METODE BEDA HINGGA CRANK-NICOLSON BAB III METODE BEDA HINGGA CRANK-NICOLSON 3. Metode Beda Hingga Crank-Nicolson (C-N) Metode Crank-Nicolson dikebangkan oleh Crank John dan Phyllips Nicholson pada pertengahan abad ke-, etode ini erupakan

Lebih terperinci

SKRIPSI ANALISIS RISIKO KONSTRUKSI STRUKTUR BORE PILE PADA PROYEK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP)

SKRIPSI ANALISIS RISIKO KONSTRUKSI STRUKTUR BORE PILE PADA PROYEK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) SKRIPSI ANALISIS RISIKO KONSTRUKSI STRUKTUR BORE PILE PADA PROYEK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) (Studi Kasus : Proyek Perkuatan Lereng Kiri Kaki Bendungan Jatigede Sumedang Jawa Barat)

Lebih terperinci

DISTRIBUSI DUA PEUBAH ACAK

DISTRIBUSI DUA PEUBAH ACAK 0 DISTRIBUSI DUA PEUBAH ACAK Dala hal ini akan dibahas aca-aca fungsi peluang atau fungsi densitas ang berkaitan dengan dua peubah acak, aitu distribusi gabungan, distribusi arginal, distribusi bersarat,

Lebih terperinci

ANALISIS PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE (STUDI KASUS PADA BANGUNAN PERKANTORAN 31 LANTAI)

ANALISIS PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE (STUDI KASUS PADA BANGUNAN PERKANTORAN 31 LANTAI) ANALISIS PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE (STUDI KASUS PADA BANGUNAN PERKANTORAN 31 LANTAI) Abraham Putra Lesmana 1, Ratna S. Alifen 2 ABSTRAK : Pondasi dalam banyak digunakan pada bangunan-bangunan

Lebih terperinci

BAB I PENDAHULUAN. sumber untuk membiayai dirinya dan keluarganya, dan bagi tenaga kerja yang

BAB I PENDAHULUAN. sumber untuk membiayai dirinya dan keluarganya, dan bagi tenaga kerja yang BAB I PENDAHULUAN A. Latar Belakang Upah bagi para pekerja erupakan faktor penting karena erupakan suber untuk ebiayai dirinya dan keluarganya, dan bagi tenaga kerja yang berpendidikan upah erupakan hasil

Lebih terperinci

RANCANGAN ALAT SISTEM PEMIPAAN DENGAN CARA TEORITIS UNTUK UJI POMPA SKALA LABORATORIUM. Oleh : Aprizal (1)

RANCANGAN ALAT SISTEM PEMIPAAN DENGAN CARA TEORITIS UNTUK UJI POMPA SKALA LABORATORIUM. Oleh : Aprizal (1) RANCANGAN ALAT SISTEM PEMIPAAN DENGAN CARA TEORITIS UNTUK UJI POMPA SKALA LABORATORIUM Oleh : Aprizal (1) 1) Dosen Progra Studi Teknik Mesin. Fakultas Teknik Universitas Pasir Pengaraian Eail. ijalupp@gail.co

Lebih terperinci

BAB I PENDAHULUAN. History Analysis), metode respon spektrum (Response Spectrum Method), dangaya

BAB I PENDAHULUAN. History Analysis), metode respon spektrum (Response Spectrum Method), dangaya BAB I PENDAHULUAN 1.1 Latar Belakang Masalah Gepa dapat terjadi sewaktu waktu akibat gelobang yang terjadi pada sekitar kita dan erabat ke segala arah.gepa bui dala hubungannya dengan suatu wilayah berkaitan

Lebih terperinci

BAB II LANDASAN TEORI

BAB II LANDASAN TEORI BAB II LANDASAN TEORI 2.1 Data dan Variabel 2.1.1 Data Pengertian data enurut Webster New World Dictionary adalah things known or assued, yang berarti bahwa data itu sesuatu yang diketahui atau dianggap.

Lebih terperinci

Implementasi Histogram Thresholding Fuzzy C-Means untuk Segmentasi Citra Berwarna

Implementasi Histogram Thresholding Fuzzy C-Means untuk Segmentasi Citra Berwarna JURNAL TEKNIK POMITS Vol., No., (03) ISSN: 337-3539 (30-97 Print) Ipleentasi Histogra Thresholding Fuzzy C-Means untuk Segentasi Citra Berwarna Risky Agnesta Kusua Wati, Diana Purwitasari, Rully Soelaian

Lebih terperinci

PENGARUH POSISI BEBAN DAN MOMEN INERSIA TERHADAP PUTARAN KRITIS PADA MODEL POROS MESIN KAPAL

PENGARUH POSISI BEBAN DAN MOMEN INERSIA TERHADAP PUTARAN KRITIS PADA MODEL POROS MESIN KAPAL PENGARUH POSISI BEBAN DAN MOMEN INERSIA TERHADAP PUTARAN KRITIS PADA MODEL POROS MESIN KAPAL Waris Wibowo Staf Pengajar Akadei Mariti Yogyakarta (AMY) ABSTRAK Penelitian ini bertujuan untuk endapatkan

Lebih terperinci

BAHASAN ALGORITME ARITMETIK GF(3 ) Telah dijelaskan sebelumnya bahwa dalam mengonstruksi field GF(3 )

BAHASAN ALGORITME ARITMETIK GF(3 ) Telah dijelaskan sebelumnya bahwa dalam mengonstruksi field GF(3 ) BAB IV BAHASAN ALGORITME ARITMETIK GF(3 ) Telah dijelaskan sebelunya bahwa dala engonstruksi field GF(3 ) diperoleh dari perluasan field 3 dengan eilih polinoial priitif berderajat atas 3 yang dala hal

Lebih terperinci

Penggunaan Media Manik-Manik Untuk Meningkatkan Kemampuan Belajar Matematika Anak Tunagrahita. Maman Abdurahman SR dan Hayatin Nufus

Penggunaan Media Manik-Manik Untuk Meningkatkan Kemampuan Belajar Matematika Anak Tunagrahita. Maman Abdurahman SR dan Hayatin Nufus Riset PenggunaanMedia Manik-Manik* Maan Abdurahan SR HayatinNufus Penggunaan Media Manik-Manik Untuk Meningkatkan Keapuan Belajar Mateatika Anak Tunagrahita Maan Abdurahan SR Hayatin Nufus Universitas

Lebih terperinci

ANALISIS BIAYA PELAKSANAAN PEMANCANGAN TIANG PANCANG BAJA DI LAUT PADA JEMBATAN SURAMADU SISI SURABAYA

ANALISIS BIAYA PELAKSANAAN PEMANCANGAN TIANG PANCANG BAJA DI LAUT PADA JEMBATAN SURAMADU SISI SURABAYA ANALISIS BIAYA PELAKSANAAN PEMANCANGAN TIANG PANCANG BAJA DI LAUT PADA JEMBATAN SURAMADU SISI SURABAYA LAPORAN PROYEK AKHIR Oleh : Kukuk Dwi Prasetyo NIM 021903103035 PROGRAM STUDI TEKNIK DIPLOMA III JURUSAN

Lebih terperinci

PERANCANGAN SISTEM KOMPUTERISASI PROSES PINJAMAN DAN ANGSURAN PINJAMAN ANGGOTA KOPERASI ( STUDI KASUS PADA KOPERASI AMANAH SEJAHTERA SEMARANG )

PERANCANGAN SISTEM KOMPUTERISASI PROSES PINJAMAN DAN ANGSURAN PINJAMAN ANGGOTA KOPERASI ( STUDI KASUS PADA KOPERASI AMANAH SEJAHTERA SEMARANG ) PERANCANGAN SISTEM KOMPUTERISASI PROSES PINJAMAN DAN ANGSURAN PINJAMAN ANGGOTA KOPERASI ( STUDI KASUS PADA KOPERASI AMANAH SEJAHTERA SEMARANG ) Siti Munawaroh, S.Ko Abstrak: Koperasi Aanah Sejahtera erupakan

Lebih terperinci

PERANCANGAN MESIN PENEKUK PLAT MINI. Dalmasius Ganjar Subagio*)

PERANCANGAN MESIN PENEKUK PLAT MINI. Dalmasius Ganjar Subagio*) PERANCANGAN ESIN PENEKUK PLAT INI Dalmasius Ganjar Subagio*) INTISARI PERANCANGAN ESIN PENEKUK PLAT INI. Telah dibuat rancang bangun mesin penekuk mini, dimensi dari mesin ini panjang 565 mm lebar 180

Lebih terperinci

KAJIAN METODE ZILLMER, FULL PRELIMINARY TERM, DAN PREMIUM SUFFICIENCY DALAM MENENTUKAN CADANGAN PREMI PADA ASURANSI JIWA DWIGUNA

KAJIAN METODE ZILLMER, FULL PRELIMINARY TERM, DAN PREMIUM SUFFICIENCY DALAM MENENTUKAN CADANGAN PREMI PADA ASURANSI JIWA DWIGUNA Jurnal Mateatika UNAND Vol. 3 No. 4 Hal. 160 167 ISSN : 2303 2910 c Jurusan Mateatika FMIPA UNAND KAJIAN METODE ZILLMER, FULL PRELIMINARY TERM, DAN PREMIUM SUFFICIENCY DALAM MENENTUKAN CADANGAN PREMI PADA

Lebih terperinci

MENGUKUR MOMEN INERSIA BEBERAPA MODEL VELG SEPEDA MINI

MENGUKUR MOMEN INERSIA BEBERAPA MODEL VELG SEPEDA MINI KONSTAN: Jurnal Fisika dan Pendidikan Fisika (ISSN.460-919) Volue 1, No., Maret 016 MENGUKUR MOMEN INERSIA BEBERAPA MODEL VELG SEPEDA MINI 1 Suraidin, Islahudin, 3 M. Firan Raadhan 1 Mahasiswa Sarjana

Lebih terperinci

MAKALAH SEMINAR TUGAS AKHIR ANALISIS TEKSTUR MENGGUNAKAN METODE TRANSFORMASI PAKET WAVELET Rosanita Listyaningrum*, Imam Santoso**, R.

MAKALAH SEMINAR TUGAS AKHIR ANALISIS TEKSTUR MENGGUNAKAN METODE TRANSFORMASI PAKET WAVELET Rosanita Listyaningrum*, Imam Santoso**, R. 1 MAKALAH SEMINAR TUGAS AKHIR ANALISIS TEKSTUR MENGGUNAKAN METODE TRANSFORMASI PAKET WAVELET Rosanita Listyaningru*, Ia Santoso**, R.Rizal Isnanto** Abstrak - Tekstur adalah karakteristik yang penting

Lebih terperinci

BAB III m BAHASAN KONSTRUKSI GF(3 ) dalam penelitian ini dapat dilakukan dengan mengacu pada konsep perluasan filed pada Bab II bagian 2.8.

BAB III m BAHASAN KONSTRUKSI GF(3 ) dalam penelitian ini dapat dilakukan dengan mengacu pada konsep perluasan filed pada Bab II bagian 2.8. BAB III BAHASAN KONSTRUKSI GF( ) Untuk engonstruksi GF( ) dala penelitian ini dapat dilakukan dengan engacu pada konsep perluasan filed pada Bab II bagian 28 Karena adalah bilangan pria, aka berdasarkan

Lebih terperinci

PENENTUAN BESAR CADANGAN PADA ASURANSI JIWA BERSAMA DWIGUNA DENGAN MENGGUNAKAN METODE ILLINOIS

PENENTUAN BESAR CADANGAN PADA ASURANSI JIWA BERSAMA DWIGUNA DENGAN MENGGUNAKAN METODE ILLINOIS Jurnal Mateatika UNAND Vol. 5 No. 3 Hal. 85 91 ISSN : 2303 2910 c Jurusan Mateatika FMIPA UNAND PENENTUAN BESAR CADANGAN PADA ASURANSI JIWA BERSAMA DWIGUNA DENGAN MENGGUNAKAN METODE ILLINOIS FERDY NOVRI

Lebih terperinci

BAB II METODOLOGI PENELITIAN

BAB II METODOLOGI PENELITIAN 6 BAB II METODOLOGI PENELITIAN.1 Waktu dan Tepat Penelitian Gabar Peta kawasan hutan KPH Madiun Peru perhutani Unit II Jati. Pengabilan data penelitian ini dilakukan pada bulan Oktober sapai dengan bulan

Lebih terperinci

PONDASI AN PDA PATIMURA- LAPORAN. oleh: SONIA HOTMA MEDAN

PONDASI AN PDA PATIMURA- LAPORAN. oleh: SONIA HOTMA MEDAN PERHITUNGAN DAYA DUKUNG PONDASI TIANG TUNGGAL PADAA TITIK BH-01 DAN TITIK BH-02 BERDASARKAN DATAA SPT DIBANDINGKAN DENGAN HASIL PENGUJI AN PDA PADA PROYEK PEMBANGUNANN GEDUNG PERKANTORAN PATIMURA- MEDAN

Lebih terperinci

LAPORAN SKRIPSI OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN DESAIN TIANG PANCANG. Oleh : JALIL MULYANTO

LAPORAN SKRIPSI OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN DESAIN TIANG PANCANG. Oleh : JALIL MULYANTO LAPORAN SKRIPSI OTOMATISASI METODE MEYERHOF UNTUK MENENTUKAN DESAIN TIANG PANCANG Oleh : JALIL MULYANTO 2009-51-028 SKRIPSI DIAJUKAN SEBAGAI SALAH SATU SYARAT UNTUK MEMPEROLEH GELAR SARJANA KOMPUTER PROGRAM

Lebih terperinci

Keyword: duration efficiency, diesel hammer, hydraulic

Keyword: duration efficiency, diesel hammer, hydraulic Identifikasi Efisiensi Waktu Pemancangan Tiang Pancang Tipe Hidrolik Dan Diesel Hammer (Studi Kasus Pembangunan World Class University dan Perluasan Balairung UI) Benny Artha In the planning stages of

Lebih terperinci

Penerapan Metode Simpleks Untuk Optimalisasi Produksi Pada UKM Gerabah

Penerapan Metode Simpleks Untuk Optimalisasi Produksi Pada UKM Gerabah Konferensi Nasional Siste & Inforatika 2017 STMIK STIKOM Bali, 10 Agustus 2017 Penerapan Metode Sipleks Untuk Optialisasi Produksi Pada UKM Gerabah Ni Luh Gede Pivin Suwirayanti STMIK STIKOM Bali Jl. Raya

Lebih terperinci

Maria Ulfa Putri dkk., Efisiensi Pelaksanaan Pekerjaan Struktur Balok Kolom Metode Konvensional Dan

Maria Ulfa Putri dkk., Efisiensi Pelaksanaan Pekerjaan Struktur Balok Kolom Metode Konvensional Dan Maria Ulfa Putri dkk., Efisiensi Pelaksanaan Pekerjaan Struktur Balok Kolom Metode Konvensional Dan 1 EFISIENSI PELAKSANAAN PEKERJAAN STRUKTUR BALOK KOLOM METODE KONVENSIONAL DAN PRACETAK DITINJAU DARI

Lebih terperinci

KAJIAN PERBANDINGAN KINERJA GRAFIK PENGENDALI CUMULATIVE SUM

KAJIAN PERBANDINGAN KINERJA GRAFIK PENGENDALI CUMULATIVE SUM KAJIAN PERBANDINGAN KINERJA GRAFIK PENGENDALI CUMULATIVE SUM (CUSUM) DAN EXPONENTIALLY WEIGHTED MOVING AVERAGE () DALAM MENDETEKSI PERGESERAN RATARATA PROSES Oleh: Nurul Hidayah 06 0 05 Desen pebibing:

Lebih terperinci

Jurnal Ilmiah Universitas Batanghari Jambi Vol.15 No.3 Tahun 2015

Jurnal Ilmiah Universitas Batanghari Jambi Vol.15 No.3 Tahun 2015 Jurnal Ilmiah Universitas Batanghari Jambi Vol.5 No.3 Tahun 205 EFISIENSI PENGGUNAAN ALAT BERAT PADA PEKERJAAN PEMBANGUNAN TPA (TEMPAT PEMPROSESAN AKHIR ) DESA AMD KEC. MUARA BULIAN KAB. BATANGHARI Elvira

Lebih terperinci

LAPORAN PRAKTIKUM PH METER, PERSIAPAN LARUTAN PENYANGGAN, DAN PENGENCERAN

LAPORAN PRAKTIKUM PH METER, PERSIAPAN LARUTAN PENYANGGAN, DAN PENGENCERAN LAPORAN PRAKTIKUM PH METER, PERSIAPAN LARUTAN PENYANGGAN, DAN PENGENCERAN NAMA PRAKTIKAN : Raadhan Bestari T. Barlian GRUP PRAKTIKAN : Grup Pagi (08.00-11.00) KELOMPOK : 2 HARI/TGL. PRAKTIKUM : Kais, 17

Lebih terperinci

PERENCANAAN PELAKSANAAN KONSTRUKSI GEDUNG RUSUNAWA ITB JATINANGOR

PERENCANAAN PELAKSANAAN KONSTRUKSI GEDUNG RUSUNAWA ITB JATINANGOR PERENCANAAN PELAKSANAAN KONSTRUKSI GEDUNG RUSUNAWA ITB JATINANGOR 1 Dana Lutfi Ilmansyah dan 2 Krishna S Pribadi Program Studi Teknik Sipil, Fakultas Teknik Sipil dan Lingkungan Institut Teknologi Bandung

Lebih terperinci

JURNAL KARYA TEKNIK SIPIL, Volume 6, Nomor 1, Tahun 2017, Halaman Online di:

JURNAL KARYA TEKNIK SIPIL, Volume 6, Nomor 1, Tahun 2017, Halaman Online di: JURNAL KARYA TEKNIK SIPIL, Volue 6, Noor 1, Tahun 2017, Halaan 246-262 JURNAL KARYA TEKNIK SIPIL, Volue 6, Noor 1, Tahun 2017, Halaan 246-262 Online di: http://ejournal-s1.undip.ac.id/index.php/jkts PERBANDINGAN

Lebih terperinci

III. METODOLOGI PENELITIAN. Percobaan, fabrikasi dan pengambilan data pada penelitian ini dilakukan di

III. METODOLOGI PENELITIAN. Percobaan, fabrikasi dan pengambilan data pada penelitian ini dilakukan di III. METODOLOGI PENELITIAN 3.1. Tepat dan Waktu Penelitian Percobaan, fabrikasi dan pengabilan data pada penelitian ini dilakukan di Laboratoriu Terodinaika serta Bengkel Mekanik untuk elakukan beberapa

Lebih terperinci

BAB 4. HASIL DAN PEMBAHASAN

BAB 4. HASIL DAN PEMBAHASAN BAB 4. HASIL DAN PEMBAHASAN Analisa pelat lantai gedung rawat inap RSUD Surodinawan Kota Mojokerto dengan enggunakan teori garis leleh ebutuhkan beberapa tahap perhitungan dan analsis aitu perhitungan

Lebih terperinci

PERHITUNGAN TIANG PANCANG PADA PELAKSANAAN PEMBANGUNAN JEMBATAN MARGOMULYO DI KOTA BALIKPAPAN PADA DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN TIMUR

PERHITUNGAN TIANG PANCANG PADA PELAKSANAAN PEMBANGUNAN JEMBATAN MARGOMULYO DI KOTA BALIKPAPAN PADA DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN TIMUR PERHITUNGAN TIANG PANCANG PADA PELAKSANAAN PEMBANGUNAN JEMBATAN MARGOMULYO DI KOTA BALIKPAPAN PADA DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN TIMUR Disusun Oleh : FAJAR RIYANTO NPM : 08.11.1001.7311.091

Lebih terperinci

BAB 2 LANDASAN TEORI

BAB 2 LANDASAN TEORI BAB LANDASAN TEORI. Beberapa Defenisi Pada analisa keputusan, si pebuat keputusan selalu doinan terhadap penjabaran seluruh alternatif yang terbuka, eperkirakan konsequensi yang perlu dihadapi pada setiap

Lebih terperinci

EFISIENSI PELAKSANAAN PEKERJAAN STRUKTUR BALOK KOLOM METODE KONVENSIONAL DAN PRACETAK DITINJAU DARI SEGI WAKTU DAN BIAYA

EFISIENSI PELAKSANAAN PEKERJAAN STRUKTUR BALOK KOLOM METODE KONVENSIONAL DAN PRACETAK DITINJAU DARI SEGI WAKTU DAN BIAYA EFISIENSI PELAKSANAAN PEKERJAAN STRUKTUR BALOK KOLOM METODE KONVENSIONAL DAN PRACETAK DITINJAU DARI SEGI WAKTU DAN BIAYA (Studi Kasus Proyek Jember Sport Center, Jember) PROPOSAL SKRIPSI Oleh Maria Ulfa

Lebih terperinci

Jurnal Rekayasa Tenik Sipil Universitas Madura Vol. 1 No.2 Desember 2016 ISSN

Jurnal Rekayasa Tenik Sipil Universitas Madura Vol. 1 No.2 Desember 2016 ISSN Analisis Kapasitas Daya Dukung Tiang Pancang Berdasarkan Metode Statis Metode Dinamis Dan Kekuatan Bahan Berdasarkan Data NSPT (Studi Kasus Pembangunan Hotel Ayola Surabaya) Mila Kusuma Wardani 1 dan Ainur

Lebih terperinci

PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP

PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PENJADUALAN PRODUKSI JENIS FLOW SHOP PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN UNTUK PERJADUALAN PRODUKSI JENIS FLOW SHOP (Didik Wahyudi) PERBANDINGAN KINERJA ALGORITMA GENETIKA DAN ALGORITMA HEURISTIK RAJENDRAN

Lebih terperinci

KARAKTERISTIK WATER CHILLER

KARAKTERISTIK WATER CHILLER Karakteristik Water Chiller (PK Purwadi dan Wibowo Kusbandono KARAKTERISTIK WATER CHILLER PK Purwadi dan Wibowo Kusbandono ABSTRACT The quantities of cooling load and the condition of air in air conditioning

Lebih terperinci

PENGARUH PERTUMBUHAN KENDARAAN YANG BEROPERASI PADA RUAS JALAN TERHADAP KARAKTERISTIK LALULINTAS (STUDI KASUS PADA JALAN JEND. SUDIRMAN PALEMBANG)

PENGARUH PERTUMBUHAN KENDARAAN YANG BEROPERASI PADA RUAS JALAN TERHADAP KARAKTERISTIK LALULINTAS (STUDI KASUS PADA JALAN JEND. SUDIRMAN PALEMBANG) PENGARUH PERTUMBUHAN KENDARAAN YANG BEROPERASI PADA RUAS JALAN TERHADAP KARAKTERISTIK LALULINTAS (STUDI KASUS PADA JALAN JEND. SUDIRMAN PALEMBANG) Yusri ABSTRAK Penelitian ini bertujuan untuk engetahui

Lebih terperinci

BAB V PERENCANAAN STRUKTUR

BAB V PERENCANAAN STRUKTUR BAB V PERENCANAAN STRUKTUR 5.1. TINJAUAN UMUM Dala perencanaan suatu bangunan pantai harus ditetapkan terlebih dahulu paraeter-paraeter yang berperan dalan perhitungan struktur. Paraeterparaeter tersebut

Lebih terperinci

Perencanaan Konstruksi Dinding Penahan Tanah pada Underpass PTC, Surabaya ABSTRAK PENDAHULUAN

Perencanaan Konstruksi Dinding Penahan Tanah pada Underpass PTC, Surabaya ABSTRAK PENDAHULUAN 1 Perencanaan Konstruksi Dinding Penahan Tanah pada Underpass PTC, Surabaya Ronald Adi Saputro, Suwarno, Musta in Arief Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan,Institut Teknologi Sepuluh

Lebih terperinci

ANALISIS WASTE PENGGUNAAN BETON READY MIX PADA PEKERJAAN PONDASI RUMAH SAKIT X ABSTRAK

ANALISIS WASTE PENGGUNAAN BETON READY MIX PADA PEKERJAAN PONDASI RUMAH SAKIT X ABSTRAK ANALISIS WASTE PENGGUNAAN BETON READY MIX PADA PEKERJAAN PONDASI RUMAH SAKIT X Johan Wijaya NRP: 1121007 Pembimbing: Deni Setiawan, S.T., M.T. ABSTRAK Keadaan lingkungan di dunia saat ini sudah mulai memprihatinkan

Lebih terperinci

Pelabelan Total Super (a,d) - Sisi Antimagic Pada Graf Crown String (Super (a,d)-edge Antimagic Total Labeling of Crown String Graph )

Pelabelan Total Super (a,d) - Sisi Antimagic Pada Graf Crown String (Super (a,d)-edge Antimagic Total Labeling of Crown String Graph ) 1 Pelabelan Total Super (a,d) - Sisi Antiagic Pada Graf Crown String (Super (a,d)-edge Antiagic Total Labeling of Crown String Graph ) Enin Lutfi Sundari, Dafik, Slain Pendidikan Mateatika, Fakultas Keguruan

Lebih terperinci

PEMETAAN MEDAN ELEKTROMAGNETIK PADA PEMUKIMAN PENDUDUK DI BAWAH JARINGAN SUTT 150 KV PLN WILAYAH KALIMANTAN BARAT

PEMETAAN MEDAN ELEKTROMAGNETIK PADA PEMUKIMAN PENDUDUK DI BAWAH JARINGAN SUTT 150 KV PLN WILAYAH KALIMANTAN BARAT PEMETAAN MEDAN ELEKTROMAGNETIK PADA PEMUKIMAN PENDUDUK DI BAWAH JARINGAN SUTT 5 KV PLN WILAYAH KALIMANTAN BARAT Baharuddin Progra Studi Teknik Elektro, Universitas Tanjungpura, Pontianak Eail : cithara89@gail.co

Lebih terperinci

Sistem Linear Max-Plus Interval Waktu Invariant

Sistem Linear Max-Plus Interval Waktu Invariant Siste Linear Max-Plus Interval Waktu Invariant A 11 M. Andy udhito Progra Studi Pendidikan Mateatika FKIP Universitas Sanata Dhara Paingan Maguwoharjo Yogyakarta eail: arudhito@yahoo.co.id Abstrak elah

Lebih terperinci

APLIKASI INTEGER LINEAR PROGRAMMING UNTUK MEMINIMALKAN BIAYA PEMINDAHAN BARANG DI PT RST

APLIKASI INTEGER LINEAR PROGRAMMING UNTUK MEMINIMALKAN BIAYA PEMINDAHAN BARANG DI PT RST APLIKASI INTEGER LINEAR PROGRAMMING UNTUK MEMINIMALKAN BIAYA PEMINDAHAN BARANG DI PT RST Andry Budian Sutanto dan Abdullah Shahab Progra Studi Magter Manajeen Teknologi, Institut Teknologi Sepuluh Nopeber

Lebih terperinci

1 1. POLA RADIASI. P r Dengan : = ½ (1) E = (resultan dari magnitude medan listrik) : komponen medan listrik. : komponen medan listrik

1 1. POLA RADIASI. P r Dengan : = ½ (1) E = (resultan dari magnitude medan listrik) : komponen medan listrik. : komponen medan listrik 1 1. POLA RADIASI Pola radiasi (radiation pattern) suatu antena : pernyataan grafis yang enggabarkan sifat radiasi suatu antena pada edan jauh sebagai fungsi arah. pola edan (field pattern) apabila yang

Lebih terperinci

SISTEM PENDUKUNG KEPUTUSAN ACCOUNT OFFICER BRIGUNA PRODUKTIF DENGAN METODE SIMPLE ADDITIVE WEIGHTING PADA PT BANK RAKYAT INDONESIA (PESERO),

SISTEM PENDUKUNG KEPUTUSAN ACCOUNT OFFICER BRIGUNA PRODUKTIF DENGAN METODE SIMPLE ADDITIVE WEIGHTING PADA PT BANK RAKYAT INDONESIA (PESERO), SISTEM PENDUKUNG KEPUTUSAN ACCOUNT OFFICER BRIGUNA PRODUKTIF DENGAN METODE SIMPLE ADDITIVE WEIGHTING PADA PT BANK RAKYAT INDONESIA (PESERO), Tbk KANTOR CABANG SEMARANG PATIMURA Dhia Prathaa Adikusua Siste

Lebih terperinci

PENGEMBANGAN FASILITAS SISI UDARA BANDARA BLIMBINGSARI, KABUPATEN BANYUWANGI

PENGEMBANGAN FASILITAS SISI UDARA BANDARA BLIMBINGSARI, KABUPATEN BANYUWANGI PENGEMBANGAN FASILITAS SISI UDARA BANDARA BLIMBINGSARI, KABUPATEN BANYUWANGI Bayu Surya Dara T, Ir. Hera Widyastuti, MT. PhD., Istiar, ST. MT. Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan,

Lebih terperinci

PENGARUH VARIASI PENAMBAHAN ALKOHOL 96% PADA BENSIN TERHADAP UNJUK KERJA MOTOR OTTO

PENGARUH VARIASI PENAMBAHAN ALKOHOL 96% PADA BENSIN TERHADAP UNJUK KERJA MOTOR OTTO PENGARUH VARIASI PENAMBAHAN ALKOHOL 96% PADA BENSIN TERHADAP UNJUK KERJA MOTOR OTTO Monang Butar Butar 1, Muli Hazwi 2 1,2 Departeen Teknik Mesin, Fakultas Teknik, Universitas Suatera Utara Jl. Alaater

Lebih terperinci

ISSN WAHANA Volume 67, Nomer 2, 1 Desember 2016

ISSN WAHANA Volume 67, Nomer 2, 1 Desember 2016 ISSN 0853 4403 WAHANA Volue 67, Noer 2, Deseber 206 PERBANDINGAN LATIHAN BOLA DIGANTUNG DAN BOLA DILAMBUNGKAN TERHADAP HASIL BELAJAR SEPAK MULA DALAM PERMAINAN SEPAK TAKRAW PADA SISWA PUTRA KELAS X-IS

Lebih terperinci

ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG DENGAN SISTEM HIDROLIS PADA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS NEGERI MEDAN

ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG DENGAN SISTEM HIDROLIS PADA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS NEGERI MEDAN ANALISIS DAYA DUKUNG PONDASI TIANG PANCANG DENGAN SISTEM HIDROLIS PADA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS NEGERI MEDAN Andri Sapora Ginting 1 dan Rudi Iskandar 2 1 Departemen Teknik Sipil,

Lebih terperinci

METODE ITERASI TIGA LANGKAH DENGAN ORDE KONVERGENSI LIMA UNTUK MENYELESAIKAN PERSAMAAN NONLINEAR BERAKAR GANDA ABSTRACT

METODE ITERASI TIGA LANGKAH DENGAN ORDE KONVERGENSI LIMA UNTUK MENYELESAIKAN PERSAMAAN NONLINEAR BERAKAR GANDA ABSTRACT METODE ITERASI TIGA LANGKAH DENGAN ORDE KONVERGENSI LIMA UNTUK MENYELESAIKAN PERSAMAAN NONLINEAR BERAKAR GANDA Zuhnia Lega 1, Agusni, Supriadi Putra 1 Mahasiswa Progra Studi S1 Mateatika Laboratoriu Mateatika

Lebih terperinci

DIPLOMA III TEKNIK SIPIL - FTSP STEFANUS HENDY L DIANA WAHYU HAYATI DISUSUN OLEH : DOSEN PEMBIMBING :

DIPLOMA III TEKNIK SIPIL - FTSP STEFANUS HENDY L DIANA WAHYU HAYATI DISUSUN OLEH : DOSEN PEMBIMBING : PERENCANAAN PROGRAM PENGENDALIAN WAKTU, BIAYA, MUTU DAN CONSTRUCTION SAFETY PADA PEMBANGUNAN PROYEK THE MILLENIUM BUILDING SD MUHAMMADIYAH 4 PUCANG SURABAYA DISUSUN OLEH : STEFANUS HENDY L. 3108.030.031

Lebih terperinci

Dian Rahayu Rose Marini

Dian Rahayu Rose Marini PERHITUNGAN DAN PERENCANAAN PENGENDALIAN WAKTU DAN BIAYA PADA PEMBANGUNAN GEDUNG ASRAMA TRAINING CENTER IAIN SUNAN AMPEL SURABAYA Oleh: Dian Rahayu Rose Marini 3109.030.015 Dosen Pembimbing: Ir. Sukobar,

Lebih terperinci

DiajukanKepadaUniversitas Islam Indonesia YogyakartaUntukMemenuhi PersyaratanMemperolehDerajatSarjana Strata SatuTeknikSipil

DiajukanKepadaUniversitas Islam Indonesia YogyakartaUntukMemenuhi PersyaratanMemperolehDerajatSarjana Strata SatuTeknikSipil TUGAS AKHIR ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PENGECATAN DENGAN METODE MPDM (Studi Kasus: Perumahan Residence Palagan 2 Hyarta, Yogyakarta) DiajukanKepadaUniversitas Islam Indonesia YogyakartaUntukMemenuhi

Lebih terperinci

KAJI NUMERIK PORTABLE PORTABLE COLD STORAGE TERMOELEKTRIK TEC

KAJI NUMERIK PORTABLE PORTABLE COLD STORAGE TERMOELEKTRIK TEC KAJI NUMERIK PORTABLE PORTABLE COLD STORAGE TERMOELEKTRIK TEC1-12706 Denny M. E Soedjono (1), Joko Sarsetiyanto (2), Dedy Zulhidayat Noor (3), Davit Priabodo 4) 1),2),3),4) Progra Studi D3 Teknik Mesin

Lebih terperinci

BAB IV GENERATOR BILANGAN RANDOM

BAB IV GENERATOR BILANGAN RANDOM BAB IV GENERATOR BILANGAN RANDOM 4.1. Generator Bilangan Rando dan Fungsi Distribusi Pada siulasi seringkali dibutuhkan bilangan-bilangan yang ewakili keadaan siste yang disiulasikan. Biasanya, kegiatan

Lebih terperinci

ANALISA PERBEDAAN HARGA RAB DENGAN RAP UNTUK PEKERJAAN BETON BERTULANG PADA PROYEK ITC POLONIA MEDAN

ANALISA PERBEDAAN HARGA RAB DENGAN RAP UNTUK PEKERJAAN BETON BERTULANG PADA PROYEK ITC POLONIA MEDAN ANALISA PERBEDAAN HARGA RAB DENGAN RAP UNTUK PEKERJAAN BETON BERTULANG PADA PROYEK ITC POLONIA MEDAN LAPORAN Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III

Lebih terperinci

BAB V METODE PELAKSANAAN PEKERJAAN. digunakan untuk menerima dan mentransfer (menyalurkan) beban dari struktur

BAB V METODE PELAKSANAAN PEKERJAAN. digunakan untuk menerima dan mentransfer (menyalurkan) beban dari struktur BAB V METODE PELAKSANAAN PEKERJAAN 5.1 Uraian Umum Pondasi tiang pancang (pile foundation) adalah bagian dari struktur yang digunakan untuk menerima dan mentransfer (menyalurkan) beban dari struktur atas

Lebih terperinci

Kinerja Fasad Selubung Ganda dalam Menurunkan Konsumsi Energi untuk Pendinginan pada Bangunan Gedung

Kinerja Fasad Selubung Ganda dalam Menurunkan Konsumsi Energi untuk Pendinginan pada Bangunan Gedung TEMU ILMIAH IPLBI 2016 Kinerja Fasad Selubung Ganda dala Menurunkan Konsusi Energi untuk Pendinginan pada Bangunan Gedung Rosady Mulyadi Lab. Sains dan Teknologi Bangunan, Departeen Arsitektur, Fakultas

Lebih terperinci

EVALUASI PENYIMPANGAN PONDASI TIANG DARI RENCANA AWAL

EVALUASI PENYIMPANGAN PONDASI TIANG DARI RENCANA AWAL EVALUASI PENYIMPANGAN PONDASI TIANG DARI RENCANA AWAL Charles 1, Hendry 2 and Gogot 3 ABSTRAK : Penelitian ini bertujuan untuk mencari ketepatan dalam pemancangan pondasi tiang dan membandingkan penyimpangan

Lebih terperinci

BAB III. METODE PENELITIAN. Tabel 1. Indikator/ Indikasi Penelitian

BAB III. METODE PENELITIAN. Tabel 1. Indikator/ Indikasi Penelitian 39 BAB III. METODE PENELITIAN 3.1. Tipe Penelitian Penelitian ini terasuk tipe penelitian dengan pendekatan analisis deskriptif kualitatif dan kuantitatif. Analisis ini dipergunakan untuk enggabarkan tentang

Lebih terperinci